CN217174858U - Side slope protection structure of side slope top - Google Patents

Side slope protection structure of side slope top Download PDF

Info

Publication number
CN217174858U
CN217174858U CN202220671967.2U CN202220671967U CN217174858U CN 217174858 U CN217174858 U CN 217174858U CN 202220671967 U CN202220671967 U CN 202220671967U CN 217174858 U CN217174858 U CN 217174858U
Authority
CN
China
Prior art keywords
platform
side slope
hillside
barricade
bearing platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220671967.2U
Other languages
Chinese (zh)
Inventor
钟士国
秦哲
李庆率
杨德伟
刘源
赵岩
尹子祎
张德智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Jianyuan Survey And Design Co ltd
Original Assignee
Henan Jianyuan Survey And Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Jianyuan Survey And Design Co ltd filed Critical Henan Jianyuan Survey And Design Co ltd
Priority to CN202220671967.2U priority Critical patent/CN217174858U/en
Application granted granted Critical
Publication of CN217174858U publication Critical patent/CN217174858U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/23Dune restoration or creation; Cliff stabilisation

Abstract

The embodiment of the utility model discloses side slope protection architecture on side slope top belongs to slope top protection technical field, including the hillside, the bearing platform has been pour to hillside top one side, the bearing platform top is connected with the barricade, the platform has been pour to barricade one side, platform bottom sky department is supported by the hillside, the bearing platform bottom is connected with the slip casting pipeline, the bearing platform opposite side is supported by the pillar, evenly arranged the steel bar support in the pillar, the bearing platform is provided with the embedded bar with the barricade junction and carries out fixed connection, weave the tiling reinforcing bar in the platform. The problem of because the fence carries out wind-blowing rain for a long time under natural condition for life is low, and whole in a jumble leads to the guard action to disappear, needs in time to pile again, not only can consume a large amount of labours and time, and the protection cost also increases is solved. The protective device has the advantages of high protective performance, long service life, neat appearance and improvement of use safety.

Description

Side slope protection structure of side slope top
Technical Field
The embodiment of the utility model provides a slope top protection technical field, concretely relates to side slope protection structure of side slope top.
Background
Dangerous rockfall, as one of three natural disasters in mountainous areas, has become a limiting factor for the development of mountainous traffic construction. Its disaster is a lot, wide, sudden and random. Since rockfall disasters are often difficult to predict and their occurrence always causes significant damage, necessary preventive measures are taken against rockfall to minimize the disasters.
However, the existing protection structure for the top of the side slope is extremely simple, only the fence is used for installation and interception, the fence can only properly block the rock rolling, and the fence is blown with wind and rain for a long time in a natural state, so that the service life is short, the protection integrity is messy, the protection effect disappears, the pile needs to be driven again in time, a large amount of labor and time can be consumed, the protection cost is increased, and therefore, the side slope protection structure for the top of the side slope is provided.
SUMMERY OF THE UTILITY MODEL
Therefore, the embodiment of the utility model provides a side slope protection structure of side slope top to solve among the prior art because the fence carries out wind for a long time under natural state and drenches with rain, make life low, the protection wholeness is also more mixed and disorderly, leads to the guard action to disappear, need in time carry out pile again, not only can consume a large amount of labours and time, and the problem that the protection cost also increased.
In order to achieve the above object, the embodiment of the present invention provides the following technical solutions:
according to the utility model discloses an in the first aspect, including the hillside, the supporting station has been pour to hillside top one side, the supporting station top is connected with the barricade, the platform has been pour to barricade one side, platform bottom suspension department is supported by the hillside, the supporting station bottom is connected with the slip casting pipeline, the supporting station opposite side is supported by the pillar, the steel bar support of evenly having arranged in the pillar, the supporting station is provided with the embedded steel bar with the barricade junction and carries out fixed connection, the tiling reinforcing bar has been woven in the platform.
Furthermore, the grouting pipelines are arranged at more than four positions, concrete is poured inside the grouting pipelines, and the grouting pipelines and the bottom end of the receiving platform are poured into a whole.
Further, the embedded steel bars connected between the bearing platform and the retaining wall are obliquely arranged, and the inclination angle of the embedded steel bars and the inclination angle of the retaining wall are the same and are between 70 degrees and 75 degrees.
Further, the tiling reinforcing bar is netted to more than three rows of tiling, pour the formation platform with the concrete, and form wholly with the barricade, and the barricade has 40 ~ 60cm slightly above the platform.
According to the utility model discloses in the second aspect, including the hillside, the supporting station has been pour to hillside top one side, the supporting station top is connected with the barricade, the platform has been pour to barricade one side, platform bottom suspension department is supported by the hillside, the supporting station bottom is connected with the slip casting pipeline, the supporting station opposite side is supported by the pillar, the steel bar support of evenly having arranged in the pillar, the supporting station is provided with the embedded bar with the barricade junction and carries out fixed connection, the tiling reinforcing bar has been woven in the platform, the pillar has six, and the embedded bar has two rows, and the slip casting pipeline has six groups.
Furthermore, the steel bar supports arranged inside the support columns are vertically supported, concrete is poured to form a whole with the bearing table, and the number of the support columns is more than four.
Furthermore, the grouting pipeline and the support are embedded in the hillside, and when concrete is poured and solidified, the concrete is adhered to the interior of the hillside.
Furthermore, the retaining wall and the platform are scraped evenly by cement on the exposed surface of the hillside and are neat.
The embodiment of the utility model provides a have following advantage:
1. through the structure designed by the utility model, the slope top is protected according to the concrete and the steel bar structure, and the traditional fence is replaced for protection, so that the structure is more durable, the maintenance is reduced, the cost use is reduced under the long-term use, and the labor force and the time required by the maintenance are reduced;
2. by adopting the structure designed by the utility model, the cement is scraped on the exposed bearing table and the exposed platform, so that the surface is cleaner, pedestrians can conveniently pass through the structure, the earth is prevented from slipping in rainy days, the safety of the pedestrians is improved, and rainwater is conveniently discharged;
3. through the utility model discloses a structure according to barricade and platform formation whole, the barricade height is higher than the platform height simultaneously, improves the security of pedestrian's walking, simultaneously, prevents that the mountain top from rolling the stone that falls down, causes to injure by a crashing object the personnel of bottom.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below. It should be apparent that the drawings in the following description are merely exemplary, and that other embodiments can be derived from the drawings provided by those of ordinary skill in the art without inventive effort.
The structure, ratio, size and the like shown in the present specification are only used for matching with the content disclosed in the specification, so as to be known and read by people familiar with the technology, and are not used for limiting the limit conditions which can be implemented by the present invention, so that the present invention has no technical essential significance, and any structure modification, ratio relationship change or size adjustment should still fall within the scope which can be covered by the technical content disclosed by the present invention without affecting the efficacy and the achievable purpose of the present invention.
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the front plan structure of the present invention;
FIG. 3 is a schematic side view of the present invention;
FIG. 4 is a schematic view of the internal structure of the present invention;
in the figure: 1. a hillside; 2. a receiving table; 3. retaining walls; 4. a platform; 5. a pillar; 6. grouting a pipeline; 7. embedding reinforcing steel bars in advance; 8. paving steel bars; 9. and (5) a steel bar support.
Detailed Description
The present invention is described in terms of specific embodiments, and other advantages and benefits of the present invention will become apparent to those skilled in the art from the following disclosure. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to that the description is shown in the attached drawings 1-4, a side slope protection structure on side slope top, including hillside 1, accepting platform 2 has been pour to 1 top one side of hillside, 2 tops of accepting platform are connected with barricade 3, 3 one sides of barricade have been pour platform 4, 4 bottom suspended places of platform are supported by hillside 1, 2 bottoms of accepting platform are connected with slip casting pipeline 6, 2 opposite sides of accepting platform are supported by pillar 5, evenly arranged reinforcing bar support 9 in the pillar 5, accepting platform 2 is provided with embedded steel bar 7 with 3 junctions of barricade and carries out fixed connection, weave tiling reinforcing bar 8 in the platform 4.
The grouting pipelines 6 are arranged at more than four positions, concrete is poured into the grouting pipelines 6, and the grouting pipelines and the bottom end of the bearing platform 2 are poured into a whole.
The embedded steel bars 7 connected between the bearing platform 2 and the retaining wall 3 are obliquely arranged, and the inclination angle of the embedded steel bars 7 is 70-75 degrees as the inclination angle of the retaining wall 3.
Tiling reinforcing bar 8 is netted to more than three rows of tiling, pour with the concrete and form platform 4, and form wholly with barricade 3, and barricade 3 has 40 ~ 60cm slightly above platform 4.
The steel bar supports 9 arranged inside the pillars 5 are vertically supported and poured by concrete to form a whole with the bearing platform 2, and the number of the pillars 5 is more than four.
The grouting pipeline 6 and the support 5 are embedded in the hillside 1, and when concrete is poured and solidified, the concrete is adhered to the interior of the hillside 1.
And the retaining wall 3 and the platform 4 are scraped off by cement on the exposed surface of the hillside 1 and are neat.
The real-time scene is specifically as follows: during construction, firstly, cylinder holes needed by a grouting pipeline 6 and a support post 5 are arranged on a hillside 1, then a baffle is fixed to form a grinding tool for casting concrete, reinforcing steel bars are placed in the grouting pipeline 6, reinforcing steel bar supports 9 are uniformly tied in the support post 5, after the concrete is completely prepared, the concrete casting is started, in the process of solidification, embedded reinforcing steel bars 8 are embedded in advance, then the concrete casting is carried out again, after solidification for a certain time, a bearing platform 2 and the support post 5 are formed, then the embedded reinforcing steel bars 8 are subjected to angle adjustment, then the grinding tool of a retaining wall 3 is manufactured, after the concrete is manufactured and fixed, the concrete is poured in, after solidification, a retaining wall 3 is formed, finally, a slope top is subjected to leveling treatment, the tiled reinforcing steel bars 8 are tiled on the flat slope top, the concrete casting is carried out, a platform 4 connected with the retaining wall 3 is formed, finally, the retaining wall 3 and the platform 4 exposed outside the hillside 1 are subjected to cement brushing, and then the material is scraped and solidified for use to form a protective structure for the hillside 1.
Referring to the description attached figure 1-4 and showing, including hillside 1, accept platform 2 has been pour to 1 top one side of hillside, 2 tops of accept platform are connected with barricade 3, 3 one sides of barricade have been pour platform 4, 4 bottom suspension departments of platform are supported by hillside 1, 2 bottom of accept platform are connected with slip casting pipeline 6, 2 opposite sides of accept platform are supported by pillar 5, evenly arranged reinforcing bar support 9 in pillar 5, accept platform 2 and 3 junctions of barricade are provided with embedded steel bar 7 and carry out fixed connection, tile reinforcing bar 8 has been woven in the platform 4, pillar 5 has six, and embedded steel bar 7 has two rows, and slip casting pipeline 6 has six groups.
The real-time scene is specifically as follows: offer six section of thick bamboo holes and six groups of slip casting pipelines 6 and carry out concrete placement on hillside 1, pour and solidify the back, set up two rows of pre-buried reinforcing bars 7 and make things convenient for subsequent barricade 3 on accepting platform 2, barricade 3 pours and finishes solidifying the back, at the flat within range of mountain top shovel, prevents and treats one row of tiling reinforcing bar 7 earlier, carries out concrete placement, concreties the back, places one row of tiling reinforcing bar 7 again, pours once more, forms the platform after solidifying.
The utility model discloses use as follows: platform 4 set up make things convenient for the pedestrian to walk and improve the clean and tidy nature on 1 top of hillside, increase the security to form wholly by barricade 3 and platform 4, make the soil stone on 1 top of hillside blockked in one side, prevent to produce and flow, and be higher than platform 4 at barricade 3, block down the stone that forms on 1 hillside, prevent to drop and cause the injury to the personnel of massif bottom.
Although the invention has been described in detail with respect to the general description and the specific embodiments, it will be apparent to those skilled in the art that modifications and improvements can be made based on the invention. Therefore, such modifications and improvements are intended to be within the scope of the invention as claimed.
In the present specification, the terms "upper", "lower", "left", "right", "middle", and the like are used for the sake of clarity only, and are not intended to limit the scope of the present invention, and changes or adjustments of the relative relationship thereof are also considered to be the scope of the present invention without substantial changes in the technical content.

Claims (7)

1. The utility model provides a side slope protection structure at side slope top, includes hillside (1), its characterized in that: bearing platform (2) have been pour to hillside (1) top one side, bearing platform (2) top is connected with barricade (3), platform (4) have been pour to barricade (3) one side, platform (4) bottom suspension department is supported by hillside (1), bearing platform (2) bottom is connected with slip casting pipeline (6), bearing platform (2) opposite side is supported by pillar (5), evenly arranged reinforcing bar support (9) in pillar (5), bearing platform (2) are provided with embedded steel bar (7) with barricade (3) junction and carry out fixed connection, woven reinforcing bar tiling (8) in platform (4).
2. The side slope protection structure of the side slope top of claim 1, characterized in that: the grouting pipelines (6) are arranged at more than four positions, concrete is poured inside the grouting pipelines (6), and the grouting pipelines and the bottom end of the bearing platform (2) are poured into a whole.
3. The side slope protection structure of the side slope top of claim 1, characterized in that: the embedded steel bars (7) connected between the bearing platform (2) and the retaining wall (3) are obliquely arranged, and the inclination angle of the embedded steel bars (7) and the inclination angle of the retaining wall (3) are the same between 70 degrees and 75 degrees.
4. The side slope protection structure of the side slope top of claim 1, characterized in that: tiling reinforcing bar (8) are netted to more than three rows of tiling, pour with the concrete and form platform (4), and form wholly with barricade (3), and barricade (3) have 40 ~ 60cm a little more than platform (4).
5. The side slope protection structure of the side slope top of claim 1, characterized in that: the steel bar supports (9) arranged in the pillars (5) are vertically supported and poured by concrete to form a whole with the bearing platform (2), and the number of the pillars (5) is more than four.
6. The side slope protection structure of the side slope top of claim 1, characterized in that: the grouting pipeline (6) and the support (5) are embedded in the hillside (1), and when concrete is poured and solidified, the concrete is adhered to the interior of the hillside (1).
7. The side slope protection structure of the side slope top of claim 1, characterized in that: and the retaining wall (3) and the platform (4) are leveled by cement on the exposed surface of the hillside (1) and are tidy.
CN202220671967.2U 2022-03-25 2022-03-25 Side slope protection structure of side slope top Active CN217174858U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220671967.2U CN217174858U (en) 2022-03-25 2022-03-25 Side slope protection structure of side slope top

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220671967.2U CN217174858U (en) 2022-03-25 2022-03-25 Side slope protection structure of side slope top

Publications (1)

Publication Number Publication Date
CN217174858U true CN217174858U (en) 2022-08-12

Family

ID=82745754

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220671967.2U Active CN217174858U (en) 2022-03-25 2022-03-25 Side slope protection structure of side slope top

Country Status (1)

Country Link
CN (1) CN217174858U (en)

Similar Documents

Publication Publication Date Title
CN108951441A (en) A kind of ecological shed hole structure for protecting high gradient slope to get down the highway
CN210216254U (en) Concrete guardrail structure
CN209669895U (en) Intercept water side slope of embankment ecological protection
CN217174858U (en) Side slope protection structure of side slope top
CN207714344U (en) A kind of passive protection net for complex mountainous cut slope
CN212742403U (en) Landscape footpath structure for side slope
CN106012971A (en) Vegetation concrete protection slope and construction method thereof
CN206070542U (en) A kind of new stone blocking net Cable Structure for avalanche preventing and treating
CN206000550U (en) A kind of anti-mud-rock flow and the shed tunnel top structure of rock-fall impact
CN113931093B (en) Defeated formula of leading is empty reed bundle formula sand barrier down
CN105241320B (en) A kind of both sides, Gao Dou valley, scenic spot bridge abutment controlled blasting and means of defence
CN214460120U (en) A slope protection structure for hydraulic engineering
CN211547611U (en) City narrow river course shore protection structure
CN209652882U (en) Temporarily use access gallery structure
CN209816862U (en) Construction supporting device of town road drainage structures
RU119353U1 (en) FLEXIBLE PROTECTIVE CONCRETE MAT FOR Rough SURFACES
CN210856824U (en) Highway subgrade protective structure
CN210737592U (en) Temporary soil retaining protective facility
RU104195U1 (en) DRAINAGE STRUCTURE ON PERMANENT WATERWATERS
CN214383875U (en) Landscape footpath
CN218027489U (en) Turf slope protection structure
CN215832597U (en) Protection device that steel gentle combines
CN218970043U (en) High and steep dangerous rock slope greening structure
CN219547831U (en) Red sandstone side slope flexible protection system
CN209194376U (en) A kind of ecological shed hole structure for protecting high gradient slope to get down the highway

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant