CN217174316U - Crack repairing device for traffic highway engineering - Google Patents

Crack repairing device for traffic highway engineering Download PDF

Info

Publication number
CN217174316U
CN217174316U CN202123437683.1U CN202123437683U CN217174316U CN 217174316 U CN217174316 U CN 217174316U CN 202123437683 U CN202123437683 U CN 202123437683U CN 217174316 U CN217174316 U CN 217174316U
Authority
CN
China
Prior art keywords
fixedly connected
box
pump machine
crack
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202123437683.1U
Other languages
Chinese (zh)
Inventor
王义武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202123437683.1U priority Critical patent/CN217174316U/en
Application granted granted Critical
Publication of CN217174316U publication Critical patent/CN217174316U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Landscapes

  • Road Repair (AREA)

Abstract

The utility model discloses a crack patching device for traffic highway engineering, including box, retaining chamber, water delivery pump machine, storage cavity and clean cover, the first electro-magnet of top fixedly connected with of clean cover inner chamber, the lower extreme fixedly connected with baffle of clean cover inner chamber, both ends all are provided with the guide bar about the baffle, the top fixedly connected with second electro-magnet of guide bar, the spring has been cup jointed to the upper end of guide bar surface, the cotton board of bottom fixedly connected with moisture absorption of guide bar. The utility model discloses a threaded rod, movable block, direction spout, fixed pin axle, connecting rod, regulation seat, nozzle, water delivery pump machine, the effect of leading to water board, first electro-magnet, second electro-magnet, the cotton board of moisture absorption and spring, solved the unable thorough clearance of foreign matter such as dust of current crack repair device in to the crack, influenced the repair quality in later stage, used the problem of bringing inconvenience for the staff.

Description

Crack repairing device for traffic highway engineering
Technical Field
The utility model relates to a highway engineering technical field specifically is a crack repair device for traffic highway engineering.
Background
Highway engineering refers to works such as reconnaissance, measurement, design, construction, maintenance, management of highway structure, and highway engineering structure includes: roadbed, road surface, bridge, culvert, tunnel, drainage system, safety protection facility, afforestation and traffic monitoring facility, and the house, workshop and other service facilities that construction, maintenance and control used, and in highway engineering, highway construction is accomplished and is put into use, through the wearing and tearing of a period of time, the phenomenon of road surface fracture can appear, need repair the gap that highway fracture formed to slow down the further fracture of highway, but current crack patching device can't thoroughly clear up the foreign matter such as dust in the crack, influenced the repair quality in later stage, bring inconvenience for staff's use, for this reason, we propose a crack patching device for traffic highway engineering.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a crack patching device for traffic highway engineering possesses thoroughly to clear up and repair effectual advantage, has solved current crack patching device and can't thoroughly clear up to foreign matters such as dust in the crack, has influenced the repair quality in later stage, uses the problem of bringing inconvenience for the staff.
In order to achieve the above object, the utility model provides a following technical scheme: a crack repairing device for traffic highway engineering comprises a box body, a water storage cavity, a water delivery pump machine, a material storage cavity and a cleaning cover, wherein a first electromagnet is fixedly connected to the top of the inner cavity of the cleaning cover, a partition plate is fixedly connected to the lower end of the inner cavity of the cleaning cover, guide rods are arranged at the left end and the right end of the partition plate respectively, a second electromagnet is fixedly connected to the top of each guide rod, a spring is sleeved on the upper end of the outer surface of each guide rod, a moisture absorption cotton plate is fixedly connected to the bottom of each guide rod, a U-shaped frame and an adjusting seat are fixedly connected to the lower end of the left side of the box body, a connecting rod is movably connected to the left end of each adjusting seat through a rotating shaft, a water passing plate is fixedly connected to the bottom of each connecting rod, a nozzle is fixedly installed at the bottom of the water passing plate, a guide chute is formed in the upper end of each connecting rod, and a threaded rod is movably connected to the inner side of the U-shaped frame through a bearing, the outer surface threaded connection of threaded rod has the movable block, the lower extreme fixedly connected with fixed pin axle of movable block, and fixed pin axle slides in the inboard of direction spout, the left end fixed mounting of storage cavity bottom has defeated material pump machine.
Preferably, the upper end fixed mounting on box right side has control switch, the lower extreme fixedly connected with battery box on box right side, the left end of box is provided with the retaining chamber, the right-hand member of box is provided with the storage cavity, the lower extreme of storage cavity is provided with the guide block, one side of guide block and the lower extreme on storage cavity right side all inlay and are equipped with the electrical heating piece.
Preferably, the right-hand member fixedly connected with row stub bar and electric putter of bottom half, electric putter's the end fixedly connected with that stretches out rolls the roller, the left end fixedly connected with of bottom half cleans the cover.
Preferably, the left side fixedly connected with turning block of threaded rod, and the surface of turning block is provided with anti-skidding line.
Preferably, the first electromagnet and the second electromagnet correspond to each other up and down and are arranged in a mutual exclusion manner.
Preferably, a water delivery pump is fixedly installed at the left end of the bottom of the water storage cavity, and a liquid outlet end of the water delivery pump is communicated with the water passing plate through a pipeline.
Preferably, the feeding end of the material conveying pump machine is communicated with the lower end of the guide block through a pipeline, and the discharging end of the material conveying pump machine is communicated with the discharging head through a pipeline.
Compared with the prior art, the beneficial effects of the utility model are as follows:
the utility model drives the threaded rod to rotate through the rotating block, and then drives the connecting rod to realize the adjustment of the inclination angle in the adjusting seat through the cooperation of the movable block, the guide chute and the fixed pin shaft, thereby adjusting the injection angle of the nozzle, then, after the device is driven to move to the repairing position through the push handle, the water delivery pump machine is opened by the control switch, and then the water delivery pump machine can convey the water in the water storage cavity into the water passing plate, and the water is discharged from the nozzle, thereby realizing the flushing of the repaired pavement crack, thereby clearing the foreign matters such as dust in the crack, then, when the first electromagnet and the second electromagnet are electrified by the control switch, the water is influenced by the mutual exclusion setting, the second electromagnet can drive the guide rod and the moisture absorption cotton plate to move downwards, and the spring is compressed, so that the moisture absorption cotton plate can contact with the pavement after flushing, thereby the water in the crack can be cleared quickly, then, cut off the power supply to first electro-magnet and second electro-magnet by control switch, the spring can drive the cotton board of moisture absorption and reset, then, open electric putter and defeated material pump machine by control switch, and then defeated material pump machine can carry discharge in the row of discharge head to the pitch material of electric heating piece heating, repair the crack, electric putter has driven when stretching out and has rolled roller and road surface contact, thereby roll the material repaired, make this device reach thorough clearance and repair effectual purpose, the unable thorough clearance of foreign matter such as dust in current crack patching device to the crack has been solved, the repair quality in later stage has been influenced, the problem of inconvenience is brought for the staff use.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic sectional view of the present invention in a front view;
fig. 3 is a schematic sectional view of the cleaning cover of the present invention.
In the figure: 1. a box body; 2. a control switch; 3. a battery case; 4. an electric push rod; 5. rolling a roller; 6. a discharge head; 7. a cleaning hood; 8. a nozzle; 9. a water passing plate; 10. a connecting rod; 11. an adjusting seat; 12. a guide chute; 13. a U-shaped frame; 14. a threaded rod; 15. rotating the block; 16. a movable block; 17. fixing a pin shaft; 18. a water delivery pump machine; 19. a water storage cavity; 20. a material storage cavity; 21. an electrical heating block; 22. a material conveying pump machine; 23. a guide block; 24. a first electromagnet; 25. a second electromagnet; 26. a guide bar; 27. a spring; 28. a partition plate; 29. a moisture absorption cotton board.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, a crack repairing device for traffic highway engineering comprises a box body 1, a water storage cavity 19, a water delivery pump 18, a material storage cavity 20 and a cleaning cover 7, wherein the top of the inner cavity of the cleaning cover 7 is fixedly connected with a first electromagnet 24, the lower end of the inner cavity of the cleaning cover 7 is fixedly connected with a partition plate 28, the left end and the right end of the partition plate 28 are respectively provided with a guide rod 26, the top of the guide rod 26 is fixedly connected with a second electromagnet 25, the upper end of the outer surface of the guide rod 26 is sleeved with a spring 27, the bottom of the guide rod 26 is fixedly connected with a moisture absorption cotton plate 29, the lower end of the left side of the box body 1 is fixedly connected with a U-shaped frame 13 and an adjusting seat 11, the left end of the adjusting seat 11 is movably connected with a connecting rod 10 through a rotating shaft, the bottom of the connecting rod 10 is fixedly connected with a water passing plate 9, the bottom of the water passing plate 9 is fixedly provided with a nozzle 8, the upper end of the connecting rod 10 is provided with a guide chute 12, the inner side of the U-shaped frame 13 is movably connected with a threaded rod 14 through a bearing, the outer surface of the threaded rod 14 is in threaded connection with a movable block 16, the lower end of the movable block 16 is fixedly connected with a fixed pin shaft 17, the fixed pin shaft 17 slides to the inner side of the guide chute 12, the left end of the bottom of the material storage cavity 20 is fixedly provided with a material conveying pump 22, the threaded rod 14 is driven to rotate through the rotating block 15, the connecting rod 10 is driven to realize the adjustment of the inclination angle in the adjusting seat 11 through the matching of the movable block 16, the guide chute 12 and the fixed pin shaft 17, so that the spraying angle of the nozzle 8 is adjusted, then, after the device is driven to move to the repairing position through the push handle, the water conveying pump 18 is opened through the control switch 2, and then the water conveying pump 18 can convey the water in the water storage cavity 19 into the water passing plate 9 and is discharged from the nozzle 8, the repaired pavement crack is washed, so that foreign matters such as dust and the like are removed, then, when the control switch 2 is used for electrifying the first electromagnet 24 and the second electromagnet 25, under the influence of mutual exclusion setting, the second electromagnet 25 can drive the guide rod 26 and the moisture absorption cotton plate 29 to move downwards, and the spring 27 is compressed, so that the moisture absorption cotton plate 29 can be contacted with the washed road surface, thereby rapidly removing the water body in the crack, then, the control switch 2 is used for powering off the first electromagnet 24 and the second electromagnet 25, the spring 27 can drive the moisture absorption cotton plate 29 to reset, then, the control switch 2 turns on the electric push rod 4 and the material conveying pump 22, and the material conveying pump 22 can convey the asphalt material heated by the electric heating block 21 into the material discharge head 6 for discharge, repair the crack, driven when electric putter 4 stretches out and rolled roller 5 and road surface contact to roll the material of repairing, makeed this device reach thoroughly clear up and repair effectual purpose.
The upper end fixed mounting on box 1 right side has control switch 2, and the lower extreme fixedly connected with battery box 3 on box 1 right side, the left end of box 1 are provided with retaining chamber 19, and the right-hand member of box 1 is provided with storage chamber 20, and the lower extreme of storage chamber 20 is provided with guide block 23, and one side of guide block 23 and the lower extreme on storage chamber 20 right side all inlay and are equipped with electric heating block 21.
The right-hand member fixedly connected with of box 1 bottom arranges stub bar 6 and electric putter 4, and the end fixedly connected with that stretches out of electric putter 4 rolls roller 5, and the left end fixedly connected with of box 1 bottom covers 7 cleanly.
The left side of threaded rod 14 is fixedly connected with turning block 15, and the surface of turning block 15 is provided with anti-skidding line.
The first electromagnet 24 and the second electromagnet 25 are vertically corresponding and are mutually exclusive.
The left end of the bottom of the water storage cavity 19 is fixedly provided with a water delivery pump machine 18, and the liquid outlet end of the water delivery pump machine 18 is communicated with the water passing plate 9 through a pipeline.
The feed end of the material conveying pump 22 is communicated with the lower end of the guide block 23 through a pipeline, and the discharge end of the material conveying pump 22 is communicated with the discharge head 6 through a pipeline.
When the device is used, the rotating block 15 drives the threaded rod 14 to rotate, the connecting rod 10 is driven to realize the adjustment of the inclination angle in the adjusting seat 11 through the matching of the movable block 16, the guide chute 12 and the fixed pin shaft 17, so that the spraying angle of the nozzle 8 is adjusted, then, the device is driven to move to a repairing position through the pushing handle, the water delivery pump machine 18 is started through the control switch 2, the water delivery pump machine 18 can convey water in the water storage cavity 19 into the water passing plate 9 and is discharged from the nozzle 8, the repaired pavement cracks are washed, so that foreign matters such as dust and the like in the cracks are removed, then, when the first electromagnet 24 and the second electromagnet 25 are electrified through the control switch 2, the foreign matters are influenced by mutual exclusion setting, the second electromagnet 25 can drive the guide rod 26 and the moisture absorption cotton plate 29 to move downwards and compress the spring 27, so that the moisture absorption cotton plate 29 can be contacted with the washed pavement, thereby can clear away the water in the crack fast, then, by control switch 2 to first electro-magnet 24 and the 25 outage of second electro-magnet, spring 27 can drive moisture absorption cotton board 29 and reset, then, open electric putter 4 and defeated material pump machine 22 by control switch 2, and then defeated material pump machine 22 can carry the discharge in the discharge head 6 to the pitch material of electric heating piece 21 heating, repair the crack, electric putter 4 has driven when stretching out and has rolled roller 5 and road surface contact, thereby roll the material of repairing, make this device reach thoroughly clear up and repair effectual purpose.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a crack patching device for traffic highway engineering, includes box (1), water storage cavity (19), water delivery pump machine (18), storage cavity (20) and clean cover (7), its characterized in that: the top of the inner cavity of the cleaning cover (7) is fixedly connected with a first electromagnet (24), the lower end of the inner cavity of the cleaning cover (7) is fixedly connected with a partition plate (28), guide rods (26) are arranged at the left end and the right end of the partition plate (28), a second electromagnet (25) is fixedly connected with the top of each guide rod (26), a spring (27) is sleeved at the upper end of the outer surface of each guide rod (26), a moisture absorption cotton plate (29) is fixedly connected with the bottom of each guide rod (26), a U-shaped frame (13) and an adjusting seat (11) are fixedly connected with the left lower end of the box body (1), a connecting rod (10) is movably connected with the left end of the adjusting seat (11) through a rotating shaft, a water passing plate (9) is fixedly connected with the bottom of the connecting rod (10), a nozzle (8) is fixedly installed at the bottom of the water passing plate (9), and a guide chute (12) is formed in the upper end of the connecting rod (10), the inboard of U-shaped frame (13) has threaded rod (14) through bearing swing joint, the surface threaded connection of threaded rod (14) has movable block (16), the lower extreme fixedly connected with fixed pin axle (17) of movable block (16), and fixed pin axle (17) slide in the inboard of direction spout (12), the left end fixed mounting of storage cavity (20) bottom has defeated material pump machine (22).
2. The crack repairing device for traffic road engineering according to claim 1, wherein: the utility model discloses a storage battery box, including box (1), lower extreme fixedly connected with battery box (3) on box (1) right side, the upper end fixed mounting on box (1) right side has control switch (2), the lower extreme fixedly connected with battery box (3) on box (1) right side, the left end of box (1) is provided with water storage chamber (19), the right-hand member of box (1) is provided with storage chamber (20), the lower extreme of storage chamber (20) is provided with guide block (23), one side of guide block (23) and the lower extreme on storage chamber (20) right side all inlay and are equipped with electrical heating piece (21).
3. The crack repairing device for traffic road engineering according to claim 1, wherein: the material discharging device is characterized in that a material discharging head (6) and an electric push rod (4) are fixedly connected to the right end of the bottom of the box body (1), a rolling roller (5) is fixedly connected to the extending end of the electric push rod (4), and a cleaning cover (7) is fixedly connected to the left end of the bottom of the box body (1).
4. The crack repairing device for traffic road engineering according to claim 1, wherein: the left side fixedly connected with turning block (15) of threaded rod (14), and the surface of turning block (15) is provided with anti-skidding line.
5. The crack repairing device for traffic road engineering according to claim 1, wherein: the first electromagnet (24) and the second electromagnet (25) are vertically corresponding and are mutually exclusive.
6. The crack repairing device for traffic road engineering according to claim 1, wherein: the left end of the bottom of the water storage cavity (19) is fixedly provided with a water delivery pump machine (18), and the liquid outlet end of the water delivery pump machine (18) is communicated with the water passing plate (9) through a pipeline.
7. The crack repairing device for traffic road engineering according to claim 1, wherein: the feeding end of the material conveying pump machine (22) is communicated with the lower end of the guide block (23) through a pipeline, and the discharging end of the material conveying pump machine (22) is communicated with the discharging head (6) through a pipeline.
CN202123437683.1U 2021-12-31 2021-12-31 Crack repairing device for traffic highway engineering Expired - Fee Related CN217174316U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123437683.1U CN217174316U (en) 2021-12-31 2021-12-31 Crack repairing device for traffic highway engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123437683.1U CN217174316U (en) 2021-12-31 2021-12-31 Crack repairing device for traffic highway engineering

Publications (1)

Publication Number Publication Date
CN217174316U true CN217174316U (en) 2022-08-12

Family

ID=82732561

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123437683.1U Expired - Fee Related CN217174316U (en) 2021-12-31 2021-12-31 Crack repairing device for traffic highway engineering

Country Status (1)

Country Link
CN (1) CN217174316U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115418923A (en) * 2022-09-23 2022-12-02 阜阳市科信交通工程试验检测有限公司 Highway crack patching device for traffic engineering

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115418923A (en) * 2022-09-23 2022-12-02 阜阳市科信交通工程试验检测有限公司 Highway crack patching device for traffic engineering
CN115418923B (en) * 2022-09-23 2023-11-17 阜阳市科信交通工程试验检测有限公司 Road crack repairing device for traffic engineering

Similar Documents

Publication Publication Date Title
CN217174316U (en) Crack repairing device for traffic highway engineering
CN107482531B (en) A kind of full-automatic electric line foreign matter processing unit
CN210766319U (en) Highway bridge maintains prosthetic devices
CN107470197A (en) A kind of power distribution cabinet shell cleaning plant
CN205711947U (en) A kind of efficient snow-removing device of highway
CN211228309U (en) Asphalt pavement maintenance device
CN212103569U (en) Highway construction paver
CN209891027U (en) Highway subgrade maintenance road surface cementation of fissures device
CN104826836B (en) Cleaning dolly, compression band using cleaning dolly and filament cutter
CN204825747U (en) Four seasons road sweeper
CN211849216U (en) Electric multifunctional ice-making machine
CN108677863A (en) A kind of icebreaking device of municipal works
CN211472366U (en) Device for melting ice and snow on road
CN108199679A (en) A kind of solar-energy photo-voltaic cell surface automated programming system
CN113756164A (en) Highway is curing means for bituminous paving
KR101706937B1 (en) auto cleaning pad mounted transformer
CN217174411U (en) Repairing device for bridge ground
CN218203785U (en) Road pavement patching device
CN111926666A (en) High-efficient patching device of bituminous paving for municipal works
CN213290996U (en) Waste rubber recovery device
CN220644041U (en) Road and bridge safety deicing device
CN219508333U (en) Pavement maintenance milling equipment
CN214497017U (en) High-speed railway base pulverization renovation device with good repairing effect
CN107905168A (en) A kind of town and country silicate concrete highway road road surface cleaning equipment
CN209551410U (en) A kind of crack repairing gap cleaning plant

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220812