CN217166289U - Square pier stud steel reinforcement cage processing location bed-jig - Google Patents
Square pier stud steel reinforcement cage processing location bed-jig Download PDFInfo
- Publication number
- CN217166289U CN217166289U CN202220154883.1U CN202220154883U CN217166289U CN 217166289 U CN217166289 U CN 217166289U CN 202220154883 U CN202220154883 U CN 202220154883U CN 217166289 U CN217166289 U CN 217166289U
- Authority
- CN
- China
- Prior art keywords
- steel
- jig frame
- positioning
- reinforcement cage
- jig
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/30—Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model provides a square pier stud reinforcement cage processing and positioning jig frame, which relates to the technical field of bridge construction, and comprises a jig frame base, channel steel, stirrup positioning steel bars, supporting steel bars, steel pipes and round steel; the jig frame base is formed by welding two parallel guide rails and the channel steel; the fixture set is installed to the left and right sides of two parallel guide rails, fixture set with the bed-jig base can be dismantled and be connected, fixture set upper end and lower extreme all with stirrup positioning bar pothook is connected, evenly weld the support bar on the stirrup positioning bar, the fixture set is equipped with the support bar every 10cm on the outside, the steel pipe with the support bar suit. The utility model provides a processing location bed-jig simple structure, the operation is convenient, and the quality is controllable, practices thrift mechanical equipment cost, and safety ring protects, has solved the problem of reinforcing bar location, has guaranteed the preparation quality of square pier stud steel reinforcement cage, has also practiced thrift the preparation time of steel reinforcement cage simultaneously.
Description
Technical Field
The utility model belongs to the technical field of square pier stud steel reinforcement cage processing and specifically relates to a square pier stud steel reinforcement cage processing location bed-jig.
Background
The construction process of uniformly processing and manufacturing the square pier stud reinforcement cage in a reinforcement factory and then transporting the square pier stud reinforcement cage to a construction operation surface for installation is particularly suitable for projects such as municipal engineering, highway engineering and the like with high standardization degree requirements and heavy construction period and tasks. According to the respective characteristics of each unit, the tire clamp is also designed into a five-flower eight-door structure, and the problems of large steel bar spacing deviation, low manufacturing efficiency, poor overall quality of the steel bar cage and the like exist in the processing of the square pier stud steel bar cage.
Based on the problems, the square pier stud reinforcement cage processing and positioning jig frame is simple in structure, convenient to operate, controllable in quality, safe, environment-friendly, capable of saving a large amount of manpower and material resources and convenient to work, and saves mechanical equipment cost.
Disclosure of Invention
In view of this, the utility model aims at providing a square pier stud steel reinforcement cage processing location bed-jig to solve the big, not high, the relatively poor technical problem of steel reinforcement cage overall quality of the steel reinforcement interval deviation that exists among the prior art of preparation efficiency.
In order to realize the purposes, the utility model is realized by the following technical proposal that the square pier stud reinforcement cage processing and positioning jig comprises a jig base, channel steel, stirrup positioning steel, supporting steel, steel pipes and round steel;
the jig frame base is formed by welding two parallel guide rails and the channel steel;
the left side and the right side of the two parallel guide rails are provided with fixture groups, the fixture groups are formed by welding 3 channel steels, and the fixture groups are detachably connected with the jig frame base;
the round steel is arranged between the adjacent channel steels and fixedly connected with the channel steels;
the upper end and the lower end of the fixture group are both connected with the stirrup positioning steel bar clamping hooks, and the stirrup positioning steel bars are uniformly welded with supporting steel bars and used for positioning fixtures of stirrup spacing;
supporting steel bars are arranged on the outer side of the fixture group every 10cm, and the fixture group is welded with the supporting steel bars and used as a main bar spacing clamping groove;
the steel pipe is sleeved with the supporting steel bars and used for enabling the main bars to pass through smoothly.
Preferably, the baffle is square and formed by welding 4 channel steels, the plane of the baffle is perpendicular to the plane of one ends of the two parallel guide rails, and the intersecting line of the plane of the baffle is perpendicular to the two parallel guide rails.
Preferably, the thickness of the channel steel is 100mm, and the length of the channel steel is 2.0 m.
Preferably, the diameter range of the stirrup positioning steel bar is phi 25-30 mm, the length of the support steel bar is 5cm, and the diameter range is phi 12-15 mm.
Preferably, the diameter range of the steel pipe is phi 32-35 mm.
Compared with the prior art, the utility model possess following beneficial effect:
the utility model provides a processing location bed-jig simple structure, the operation is convenient, and the quality is controllable, practices thrift the mechanical equipment cost, and safety ring protects, has solved the problem of bar location, has guaranteed the preparation quality of square pier stud steel reinforcement cage, has also practiced thrift the preparation time of steel reinforcement cage simultaneously.
Drawings
Fig. 1 is a plan view of a square pier stud reinforcement cage processing positioning jig frame provided by the utility model;
fig. 2 is a vertical view of a positioning jig frame for processing a square pier stud reinforcement cage provided by the utility model;
fig. 3 is a cross-sectional view of the square pier stud reinforcement cage processing and positioning jig frame provided by the utility model;
fig. 4 is the utility model provides a three views of baffle of square pier stud steel reinforcement cage processing location bed-jig.
Icon: 1: channel steel, 2: stirrup positioning bar, 3: supporting steel bar, 4: and (5) steel pipes.
Detailed Description
To make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions of the present invention will be described clearly and completely with reference to the accompanying drawings. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in fig. 1-4, the utility model provides a square pier stud reinforcement cage processing and positioning jig frame, which comprises a jig frame base, channel steel, stirrup positioning steel, supporting steel, steel pipes and round steel;
the jig frame base is formed by welding two parallel guide rails and the channel steel;
the left side and the right side of the two parallel guide rails are provided with fixture groups, the fixture groups are formed by welding 3 channel steels, and the fixture groups are detachably connected with the jig frame base;
the round steel is arranged between the adjacent channel steels and fixedly connected with the channel steels;
the upper end and the lower end of the fixture group are both connected with the stirrup positioning steel bar clamping hooks, and the stirrup positioning steel bars are uniformly welded with supporting steel bars and used for positioning fixtures of stirrup spacing;
supporting steel bars are arranged on the outer side of the fixture group every 10cm, and the fixture group is welded with the supporting steel bars and used as a main bar spacing clamping groove;
the steel pipe is sleeved with the supporting steel bars and used for enabling the main bars to pass through smoothly.
Preferably, the steel bar reinforced concrete structure further comprises a baffle which is square and formed by welding 4 channel steels, wherein the plane where the baffle is located is perpendicular to the plane where one ends of the two parallel guide rails are located, and the intersecting line of the plane where the baffle is located is perpendicular to the two parallel guide rails and used for controlling the vertical position of the main rib.
Preferably, the thickness of the channel steel is 100mm, and the length of the channel steel is 2.0 m.
Preferably, the diameter range of the stirrup positioning steel bar is phi 25-30 mm, the length of the support steel bar is 5cm, and the diameter range is phi 12-15 mm.
Preferably, the diameter range of the steel pipe is phi 32-35 mm, and the steel pipe is used as a main rib supporting platform and a sliding platform.
Preferably, the main reinforcement is a steel bar bearing gravity load in the concrete member, and the stirrup is used for binding and fixing the main reinforcement.
In this embodiment, during the steel reinforcement cage preparation, can dismantle with the fixture group that stirrup positioning reinforcement and channel-section steel welding formed earlier and be connected, fix on the bed-jig base, place phi 32mm steel pipe through the draw-in groove, push away main muscle from one end to the other end, at the fixed vertical position of baffle department, make main muscle end flush, then suitably adjust main muscle interval and carry out the ligature fixed, readjust main muscle interval ligature fixed, form square pier stud steel reinforcement cage processing location bed-jig.
It should be noted that, in this document, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. A positioning jig frame for processing a square pier stud reinforcement cage is characterized by comprising a jig frame base, channel steel, stirrup positioning reinforcements, supporting reinforcements, steel pipes and round steels;
the jig frame base is formed by welding two parallel guide rails and the channel steel;
the left side and the right side of the two parallel guide rails are provided with fixture groups, the fixture groups are formed by welding 3 channel steels, and the fixture groups are detachably connected with the jig frame base;
the round steel is arranged between the adjacent channel steels and fixedly connected with the channel steels;
the upper end and the lower end of the fixture group are both connected with the stirrup positioning steel bar clamping hooks, and the stirrup positioning steel bars are uniformly welded with supporting steel bars and used for positioning fixtures of stirrup spacing;
supporting steel bars are arranged on the outer side of the fixture group every 10cm, and the fixture group is welded with the supporting steel bars and used as a main bar spacing clamping groove;
the steel pipe is sleeved with the supporting steel bars and used for enabling the main bars to pass through smoothly.
2. The positioning jig frame as claimed in claim 1, further comprising a baffle plate, wherein the baffle plate is square and is formed by welding 4 channel steels, the plane of the baffle plate is perpendicular to the plane of one end of the two parallel guide rails, and the intersection line of the plane of the baffle plate is perpendicular to the two parallel guide rails.
3. The positioning jig frame as claimed in claim 1, wherein the channel steel has a thickness of 100mm and a length of 2.0 m.
4. The positioning jig frame as claimed in claim 1, wherein the stirrup positioning bar has a diameter in the range of phi 25-30 mm, and the support bar has a length of 5cm and a diameter in the range of phi 12-15 mm.
5. The positioning jig frame as claimed in claim 1, wherein the diameter of the steel tube is in the range of Φ 32-35 mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220154883.1U CN217166289U (en) | 2022-01-20 | 2022-01-20 | Square pier stud steel reinforcement cage processing location bed-jig |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220154883.1U CN217166289U (en) | 2022-01-20 | 2022-01-20 | Square pier stud steel reinforcement cage processing location bed-jig |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217166289U true CN217166289U (en) | 2022-08-12 |
Family
ID=82735795
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220154883.1U Active CN217166289U (en) | 2022-01-20 | 2022-01-20 | Square pier stud steel reinforcement cage processing location bed-jig |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217166289U (en) |
-
2022
- 2022-01-20 CN CN202220154883.1U patent/CN217166289U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204435638U (en) | A kind of hollow laminated floor slab | |
CN104612300A (en) | Hollow composite floor slab and construction method thereof | |
CN102518300A (en) | Embedded conical bearing joint type steel structural support and construction method thereof | |
CN217166289U (en) | Square pier stud steel reinforcement cage processing location bed-jig | |
JP2009108611A (en) | Reinforcement erecting tool and reinforcement erecting method | |
CN212420249U (en) | Quick positioning mould tool suitable for machining reinforcement cages with different diameters | |
CN205012533U (en) | Steel bar truss building carrier plate | |
CN110630035A (en) | Steel column supporting structure for bottom of reinforced concrete floor beam | |
CN215060111U (en) | Large-diameter vertical pipe mounting and fixing structure | |
CN113202310B (en) | Light-support attached formwork construction process | |
CN107916790B (en) | System and method for dismantling guide pipe of assembled construction steel bar of building block | |
CN210236845U (en) | Adjustable hanger for component steel reinforcement cage | |
CN220036183U (en) | Clamp type code plate for steel beam installation | |
CN215055311U (en) | Self-locking type steel-wood column formwork supporting system | |
CN110919825A (en) | Large die table die for plate type prefabricated part assembly line construction | |
CN205436732U (en) | A operation platform for steel ladder flier hem | |
CN214498482U (en) | Roofing concrete placement's below net rack reinforcement instrument | |
CN217897271U (en) | A concrete placement template for two wall positions | |
CN219034024U (en) | Hanging die reinforcing device | |
CN215212312U (en) | Fixing clamp for concrete guide wall or beam mould | |
CN218438222U (en) | Reinforcing tool for post-pouring strip template of top plate of garage | |
CN109278171B (en) | Energy-saving roughening machine for producing prefabricated parts and use method thereof | |
CN215208069U (en) | Hanging hook convenient for hanging articles along with steel structure hoisting | |
CN213410185U (en) | Prefabricated ligature mould of single-box multi-chamber large-section suspension casting box girder inclined web reinforcing steel bar | |
CN219730287U (en) | Can improve prefabricated plate type component hoist and mount frame of stability |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |