CN217151950U - TBM advanced drilling machine installation mechanism - Google Patents

TBM advanced drilling machine installation mechanism Download PDF

Info

Publication number
CN217151950U
CN217151950U CN202221254167.7U CN202221254167U CN217151950U CN 217151950 U CN217151950 U CN 217151950U CN 202221254167 U CN202221254167 U CN 202221254167U CN 217151950 U CN217151950 U CN 217151950U
Authority
CN
China
Prior art keywords
tbm
gear ring
ear seat
arc
main beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221254167.7U
Other languages
Chinese (zh)
Inventor
曾绍毅
齐梦学
苑进才
张帅华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Tunnel Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Tunnel Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd, Tunnel Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN202221254167.7U priority Critical patent/CN217151950U/en
Application granted granted Critical
Publication of CN217151950U publication Critical patent/CN217151950U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a TBM forepoling machine installation mechanism, including TBM main beam (1), TBM main beam (1) up end is provided with ring gear track mechanism and coupling mechanism, one end of the coupling mechanism is connected with ring gear track mechanism, and the other end is connected with TBM main beam (1) rotation; and jacking mechanisms connected with the gear ring track mechanism are arranged on two sides of the connecting mechanism. The utility model has the advantages of simple structure, be convenient for equipment, convenient operation, low cost adopt it can realize the quick installation of leading rig, improved the efficiency of the reinforcement or the geophysical prospecting construction of the unfavorable geology in front of the TBM face, reduced construction cost.

Description

TBM advanced drilling machine installation mechanism
Technical Field
The utility model relates to a TBM advanced drilling machine, especially a TBM advanced drilling machine installation mechanism.
Background
Along with the popularization of domestic open-type TBM construction, the engineering geological adaptability of TBM equipment is required in tunnel excavation, the requirement on the capability of solving unfavorable geological construction is higher and higher, and particularly, a lead drilling machine is carried and used for strengthening the unfavorable geology in front of a tunnel face or for geophysical prospecting. At present, when an advanced drilling machine needs to be constructed, a drilling machine supporting mechanism and a drilling machine are installed on the upper portion of a TBM main beam and behind a shield, wherein the supporting mechanism is heavy and inconvenient to move, the space on the upper portion of the TBM main beam is limited, the installation is inconvenient, and the construction efficiency of the advanced drilling machine is limited.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a simple to operate, weight are lighter, can effectively improve the construction efficiency's TBM rig installation mechanism in advance.
The utility model aims at realizing through the technical scheme, a TBM forepoling machine installation mechanism, including the TBM girder, be provided with ring gear track mechanism and coupling mechanism on the TBM girder up end, one end and the ring gear track mechanism of coupling mechanism are connected, and the other end rotates with the TBM girder and is connected; and jacking mechanisms connected with the gear ring track mechanism are arranged on two sides of the connecting mechanism.
The gear ring track mechanism comprises a gear ring, circular arc tracks with two ends flush with the two ends of the gear ring are arranged on the front end surface and the rear end surface of the gear ring, a flange A is arranged in the middle of the inner side of the gear ring, and the gear ring is connected with a connecting mechanism through the flange A; the ring gear inboard is provided with ear seat A and ear seat B, flange A is located between ear seat A and the ear seat B, ear seat A and ear seat B are connected with climbing mechanism.
The connecting mechanism comprises a connecting rod and a rotating base, wherein one end of the connecting rod is provided with a flange B, the other end of the connecting rod is hinged to one end of the rotating base, the rotating base is vertically inserted into a through hole formed in a TBM main beam, and the connecting rod is movably sleeved with a sleeve.
The utility model discloses in, rotating base includes cylindrical base body the vertical ear seat C that is provided with in base body upper end, ear seat C is articulated with connecting rod one end.
Further described, the jacking mechanism comprises an arc-shaped jacking rod A and an arc-shaped jacking rod B, and the lower end of the arc-shaped jacking rod A and the lower end of the arc-shaped jacking rod B are respectively connected with the ear base A and the ear base B.
In order to prevent the separation, a clamp spring is arranged at the lower end of the cylindrical base body.
Since the technical scheme is used, the utility model has the advantages of simple structure, be convenient for equipment, convenient operation, low cost, adopt it to realize the quick installation of leading rig, improved the efficiency of the reinforcement or the geophysical prospecting construction of the unfavorable geology in front of the TBM face, reduced construction cost.
Drawings
The drawings of the utility model are explained as follows:
fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a cross-sectional view taken along line A-A of FIG. 1;
fig. 3 is a side view of the present invention;
fig. 4 is a top view of the present invention.
Detailed Description
The following detailed description of the embodiments of the present invention will be provided with reference to the accompanying drawings, but the present invention is not limited to these embodiments, and any modifications or substitutions in the basic spirit of the embodiments will still fall within the scope of the present invention as claimed in the appended claims.
Example 1: as shown in fig. 1, 2, 3 and 4, the mounting mechanism of the TBM advanced drilling machine comprises a TBM main beam 1, wherein a gear ring track mechanism and a connecting mechanism are arranged on the upper end surface of the TBM main beam 1, one end of the connecting mechanism is connected with the gear ring track mechanism, and the other end of the connecting mechanism is rotatably connected with the TBM main beam 1; and jacking mechanisms connected with the gear ring track mechanism are arranged on two sides of the connecting mechanism.
The gear ring track mechanism comprises a gear ring 2, circular arc tracks 3 with two ends flush with two ends of the gear ring 2 are arranged on the front end face and the rear end face of the gear ring 2, a flange A4 is arranged in the middle of the inner side of the gear ring 2, and the gear ring 2 is connected with a connecting mechanism through a flange A4; the inner side of the gear ring 2 is provided with an ear seat A5 and an ear seat B6, the flange A4 is positioned between the ear seat A5 and the ear seat B6, and the ear seat A5 and the ear seat B6 are connected with a jacking mechanism.
Wherein, coupling mechanism includes connecting rod 7 and rotating base, the one end of connecting rod 7 is provided with flange B8, and the other end is articulated with rotating base's one end, rotating base vertically inserts the through-hole that sets up on TBM girder 1 the cover is equipped with sleeve 9 movably on connecting rod 7.
Further describing, the rotating base comprises a cylindrical base body 10, an ear seat C11 is vertically arranged at the upper end of the base body 10, and the ear seat C11 is hinged with one end of the connecting rod 7.
The utility model discloses in, climbing mechanism includes arc jacking rod A12 and arc jacking rod B13, arc jacking rod A12's lower extreme and arc jacking rod B13's lower extreme are connected with ear seat A5 and ear seat B6 respectively.
In order to prevent the falling off, a snap spring 14 is arranged at the lower end of the cylindrical base body 10.
The utility model discloses a work like this: when the arc lifting rod A12 and the arc lifting rod B13 are pressed down, the gear ring 2 and the arc track 3 are lifted together with the connecting rod 7, and when the connecting rod 7 is vertical, the sleeve 9 moves downwards to the ear seat C11, so that the connecting rod 7 is fixedly hinged with the ear seat C11. Then, the cylindrical base body 10 drives the gear ring 2 and the arc track 3 to rotate 90 degrees, and the gear ring can be connected with a track of a jumbolter to be installed. After the installation is finished, the connecting mechanism can be disassembled, and the advanced drilling machine is installed.
In order to ensure the smooth installation of the gear ring track mechanism, the end surface of the gear ring track mechanism lifted after the connecting rod 7 is vertical is consistent with the section of the anchor rod drilling machine track. The jacking capacity of the jacking mechanism is larger than the installation required height of the gear ring track mechanism. In order to ensure the rigidity of the arc-shaped lifting rod A12 and the arc-shaped lifting rod B13, the arc-shaped lifting rod A12 and the arc-shaped lifting rod B13 can be connected into a whole.

Claims (6)

1. The utility model provides a TBM advance rig installation mechanism, includes TBM main beam (1), characterized by: a gear ring track mechanism and a connecting mechanism are arranged on the upper end face of the TBM main beam (1), one end of the connecting mechanism is connected with the gear ring track mechanism, and the other end of the connecting mechanism is rotatably connected with the TBM main beam (1); and jacking mechanisms connected with the gear ring track mechanism are arranged on two sides of the connecting mechanism.
2. The TBM lead drill mounting mechanism as claimed in claim 1 wherein: the gear ring track mechanism comprises a gear ring (2), arc tracks (3) with two ends flush with the two ends of the gear ring (2) are arranged on the front end face and the rear end face of the gear ring (2), a flange A (4) is arranged in the middle of the inner side of the gear ring (2), and the gear ring (2) is connected with a connecting mechanism through the flange A (4); ring gear (2) inboard is provided with ear seat A (5) and ear seat B (6), flange A (4) are located between ear seat A (5) and ear seat B (6), ear seat A (5) and ear seat B (6) are connected with climbing mechanism.
3. The TBM lead drill mounting mechanism as claimed in claim 2 wherein: coupling mechanism includes connecting rod (7) and rotating base, the one end of connecting rod (7) is provided with flange B (8), and the other end is articulated with rotating base's one end, rotating base vertically inserts the through-hole that sets up on TBM girder (1) the cover is equipped with sleeve pipe (9) movably on connecting rod (7).
4. The TBM lead drill mounting mechanism as claimed in claim 3 wherein: the rotary base comprises a cylindrical base body (10), an ear seat C (11) is vertically arranged at the upper end of the base body (10), and the ear seat C (11) is hinged to one end of a connecting rod (7).
5. The TBM lead drill mounting mechanism as claimed in claim 4 wherein: the jacking mechanism comprises an arc jacking rod A (12) and an arc jacking rod B (13), and the lower end of the arc jacking rod A (12) and the lower end of the arc jacking rod B (13) are respectively connected with the lug seat A (5) and the lug seat B (6).
6. The TBM lead drill mounting mechanism as claimed in claim 5 wherein: the lower end of the cylindrical base body (10) is provided with a clamp spring (14).
CN202221254167.7U 2022-05-24 2022-05-24 TBM advanced drilling machine installation mechanism Active CN217151950U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221254167.7U CN217151950U (en) 2022-05-24 2022-05-24 TBM advanced drilling machine installation mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221254167.7U CN217151950U (en) 2022-05-24 2022-05-24 TBM advanced drilling machine installation mechanism

Publications (1)

Publication Number Publication Date
CN217151950U true CN217151950U (en) 2022-08-09

Family

ID=82671880

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221254167.7U Active CN217151950U (en) 2022-05-24 2022-05-24 TBM advanced drilling machine installation mechanism

Country Status (1)

Country Link
CN (1) CN217151950U (en)

Similar Documents

Publication Publication Date Title
CN210343233U (en) Drilling rig for coal mine operation
CN208502762U (en) A kind of minor diameter hard rock shaft excavation machine
CN109724836A (en) A kind of underground water surveying device for coal mining
CN217151950U (en) TBM advanced drilling machine installation mechanism
CN210858762U (en) Roofbolter that tunnel or culvert construction was used
CN211386698U (en) Fully-mechanized excavating roadway inner anchor cable wire cutting device
CN211008448U (en) Rotary drilling rig for engineering construction
CN213710986U (en) Geological prospecting drill bit
CN115450571A (en) Drilling stabilizing device of hydraulic drilling machine for coal mine excavation and using method thereof
CN216518078U (en) Electromechanical installation protection device of colliery
CN210289775U (en) Adjusting device for digging head of coal mine heading machine
CN210440040U (en) Rotary excavating device for tunnel construction
CN209908406U (en) Seven-arm intelligent drill carriage for underground coal mine tunneling roadway
CN209767087U (en) colliery supply cable fixing device
CN113323585A (en) Rock-soil drilling and digging equipment with function of preventing drilling collapse
CN218716568U (en) Computer drill arm for coal mine
CN208619046U (en) A kind of drilling machine support base
CN112211630A (en) Loader-digger with detecting device
CN215830443U (en) Movable connection frame assembly suitable for preventing and treating water in coal mine geology
CN213116349U (en) Mining tunneling shield support for coal mine
CN111395958A (en) Crawler-type core drilling machine with small-inclination drilling function
CN216240408U (en) Portable drilling equipment for geological exploration
CN218444538U (en) Coal mine geology deep sampler
CN218030059U (en) Drilling machine base supporting device for coal mine geological survey
CN216617500U (en) Tunneling device for coal mining

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant