CN217151526U - Fence for constructional engineering - Google Patents

Fence for constructional engineering Download PDF

Info

Publication number
CN217151526U
CN217151526U CN202122400931.9U CN202122400931U CN217151526U CN 217151526 U CN217151526 U CN 217151526U CN 202122400931 U CN202122400931 U CN 202122400931U CN 217151526 U CN217151526 U CN 217151526U
Authority
CN
China
Prior art keywords
rail
fixedly connected
base
pull rod
sliding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122400931.9U
Other languages
Chinese (zh)
Inventor
刘婷芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202122400931.9U priority Critical patent/CN217151526U/en
Application granted granted Critical
Publication of CN217151526U publication Critical patent/CN217151526U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fencing (AREA)

Abstract

The utility model discloses a rail for building engineering relates to building apparatus technical field. This rail for building engineering, including support and rail guard, the support is provided with two, and the rail guard is located between two supports, the equal fixedly connected with mounting panel in both ends of rail guard, and the bottom of two supports all is provided with the base. This rail for building engineering, can receive the transverse pressure that earth gave after the stake is squeezed into the underground, make fill with earth in the flourishing soil sleeve, thereby make the base more firm, insert the support in the standing groove on the base, install the rail guard between two supports again, the mounting panel of rail guard both sides can extrude the installation spring and make its compression take place deformation, it can be more firm to make the rail guard installation under the reaction force promotion of installation spring, avoid resulting in the rail guard to drop by bad weather influence, the device has realized that the protection rail does not receive the topography restriction, can install fast, strengthen the practicality and practice thrift installation time.

Description

Fence for constructional engineering
Technical Field
The utility model relates to a building apparatus technical field specifically is a rail for building engineering.
Background
Fence wide application in the building field, all there is the installation fence at the construction site in city, the fence mainly plays the effect of isolation protection, at the construction site, in order to prevent effectively that non-constructor from getting into the potential safety hazard that the construction site brought, avoid unnecessary accident dispute, the construction unit can set up the fence around the construction site usually, but in prior art, present fence structure generally adopts a large amount of metalwork to build and forms, when the transport, the volume is very huge, the dismouting is all very inconvenient, in addition, because the land unevenness on the building site, if lay concrete after flattening and install the enclosure again, not only time consuming, still increase cost, in the face of some subsection temporary works, construction cost is great.
SUMMERY OF THE UTILITY MODEL
The utility model provides a fence for construction engineering, according to the area size that the place needs to be enclosed, the pile nail is driven into the ground, the distance between every two pile nails is controlled within a certain value, when the base is at the same level, the pile nail stops being driven, the pile nail receives the lateral pressure given by the soil, so that the soil is filled in the soil containing sleeve, thereby the base is more stable, the bracket is inserted into the placing groove on the base, then the fence is arranged between the two brackets, the mounting plates at the two sides of the fence can extrude the mounting spring to compress and deform, after the mounting plates are conveniently arranged in the mounting groove, the fixture block is continuously arranged, the installation of the fence can be firmer under the pushing of the reaction force of the mounting spring, the falling off of the fence caused by the influence of severe weather is avoided, the device realizes that the fence is not limited by the terrain, and can be rapidly installed, strengthen the practicality and practice thrift the installation time, if need dismantle the rail, pull down the locking board earlier, make the fixture block take out from the mounting groove, upwards move and to take off the rail guard, pull the pull rod again, make it drive flourishing soil sleeve in the stake upset downwards, when extracting the stake, earth in the flourishing soil sleeve also can receive the gravity to influence and drop by oneself, when the pull rod pulling, can drive the both sides fixed plate and shift up, thereby extrusion reset spring takes place deformation, when the empty back of earth in the flourishing soil sleeve, stop to the pull rod atress, it resets to drive the pull rod under reset spring's reaction force, make flourishing soil sleeve resume opening angle up, be convenient for reuse, the device has realized the repeatedly usable to the base, avoid extravagant.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a rail for building engineering, includes support and rail guard, the support is provided with two, the rail guard is located between two supports, the equal fixedly connected with mounting panel in both ends of rail guard, two the bottom of support all is provided with the base, two a set of mounting groove has all been seted up to the one end that the support is close, two the mounting panel slides respectively and inlays the inside of locating two sets of mounting grooves, the standing groove has all been seted up to two portions about the top of base, and the inside and support sliding connection of standing groove, the bottom fixedly connected with peg of base, the inside sliding connection of peg has the pull rod, and the top of pull rod runs through the base, all rotate on the both ends inner wall of peg and be connected with a set of flourishing soil sleeve, and the one end that two sets of flourishing soil sleeves are close all rotates with the pull rod and is connected.
Further, the equal fixedly connected with fixed plate in both ends about the pull rod, two the equal fixedly connected with reset spring in top of fixed plate, two reset spring's top all with base fixed connection.
Further, it is two sets of the equal fixedly connected with installation spring of last inner wall of mounting groove, and the equal sliding connection in inside of every group mounting groove has a set of fixture block.
Furthermore, the inner walls of the two ends of the pile nail are provided with sliding grooves, the sliding blocks are connected to the inner parts of the two sliding grooves in a sliding mode, and the two sliding blocks are fixedly connected with the two fixing plates at the close ends respectively.
Furthermore, every group the equal fixedly connected with locking plate in front end of fixture block, and the equal fixedly connected with handle in front end of two locking plates.
Furthermore, the bottom end of the dowel pin is of a conical structure.
The utility model provides a rail for building engineering. The method has the following beneficial effects:
the fence for the construction engineering is characterized in that the piles are driven into the ground according to the area of a field to be enclosed, the distance between every two piles is controlled within a certain value, when the bases are at the same horizontal height, the pile nails are stopped to be beaten, and the pile nails are subjected to the transverse pressure given by the soil, so that the soil is filled in the soil containing sleeve, thereby the base is more stable, the brackets are inserted into the placing groove on the base, the protective guard is arranged between the two brackets, the mounting plates at the two sides of the protective guard can extrude the mounting springs to compress the mounting springs to deform, the mounting plates are convenient to continue to mount the clamping blocks after being arranged in the mounting grooves, the guard rail can be more firmly installed under the pushing of the counterforce of the installation spring, the falling off of the guard rail caused by the influence of severe weather is avoided, the device has realized that the protection rail does not receive the topography restriction, can install fast, strengthens the practicality and practices thrift installation time.
(II), this rail for building engineering, if need dismantle the rail, pull down the locking plate earlier, make the fixture block take out from the mounting groove, upwards move and to take off the rail guard, pull the pull rod again, make it drive the flourishing soil sleeve of peg upset downwards, when extracting the peg, earth in the flourishing soil sleeve also can receive the gravity to influence and drop by oneself, when the pull rod pulling, can drive both sides fixed plate and shift up, thereby extrusion reset spring takes place deformation, when the empty back of earth in the flourishing soil sleeve, stop to the pull rod atress, it resets to drive the pull rod under reset spring's reaction force, make flourishing soil sleeve resume opening angle up, be convenient for reuse, the device has realized the repeatedly usable to the base, avoid extravagant.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is an enlarged view of a point a in fig. 1 according to the present invention;
fig. 3 is a schematic structural view of the stake of the present invention;
fig. 4 is an enlarged view of the position B in fig. 3 according to the present invention;
fig. 5 is a front view of the present invention.
In the figure: 1. a support; 2. installing a spring; 3. mounting a plate; 4. mounting grooves; 5. protecting the fence; 6. a base; 7. a pull rod; 8. pile nails; 9. a placement groove; 10. a soil containing sleeve; 11. a slider; 12. a chute; 13. a return spring; 14. a fixing plate; 15. a clamping block; 16. and (5) locking the plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary and intended to be used for explaining the present invention, and should not be construed as limiting the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: the utility model provides a rail for building engineering, including support 1 and rail guard 5, support 1 is provided with two, rail guard 5 is located between two supports 1, the equal fixedly connected with mounting panel 3 in both ends of rail guard 5, the bottom of two supports 1 all is provided with base 6, a set of mounting groove 4 has all been seted up to 1 similar one end of two supports, two mounting panels 3 slide respectively and inlay the inside of locating two sets of mounting grooves 4, standing groove 9 has all been seted up to two about the top of base 6, and the inside and the 1 sliding connection of support of standing groove 9, the bottom fixedly connected with peg 8 of base 6, the inside sliding connection of peg 8 has pull rod 7, and base 6 is run through on the top of pull rod 7, all rotate on the both ends inner wall of peg 8 and be connected with a set of flourishing soil sleeve 10, and the one end that two sets of flourishing soil sleeve 10 are close all rotates with pull rod 7 to be connected.
In this embodiment: the protective guard 5 is arranged between two supports 1, the two ends of the protective guard 5 are both provided with mounting plates 3, the bottom ends of the supports 1 are provided with bases 6, one end of each of the two supports 1 close to each other is provided with a set of mounting grooves 4, the mounting grooves 4 are convenient for mounting the protective guard 5, the left and right parts of the top end of each base 6 are both provided with placing grooves 9, the supports 1 are mounted in the placing grooves 9 for vertical fixation, the length of each placing groove 9 is longer than the transverse length of the support 1, a certain deviation is allowed to occur in the mounting distance between every two bases 6, each base 6 can be provided with two supports 1 for keeping the continuity of the protective guard 5, the bottom ends of the bases 6 are provided with studs 8, the studs 8 can be firmly fixed beside the engineering such as civil engineering or water conservancy and the like through the studs 8, so that the bases 6 can serve as fixing piles, when the studs 8 are mounted in the ground, after the bases 6 are in the same horizontal plane with the ground, stake 8 receives the transverse force that earth given for in the flourishing soil sleeve 10 of earth can be packed into for 8 installations of stake are more stable, if need extract stake 8, upwards stimulate pull rod 7, make it drive flourishing soil sleeve 10 and rotate, thereby make the open position of flourishing soil sleeve 10 down, conveniently pour out the earth in the flourishing soil sleeve 10 of 8 in-process of extracting the stake, reduce the degree of difficulty of extracting.
Specifically, the equal fixedly connected with fixed plate 14 in both ends about pull rod 7, the equal fixedly connected with reset spring 13 in top of two fixed plates 14, the top of two reset spring 13 all with base 6 fixed connection.
In this embodiment: when the pull rod 7 is pulled upwards, the fixing plates 14 on the two sides are driven to move upwards, so that the reset spring 13 is extruded to deform, after the pile nails 8 are pulled out of soil, the pile nails stop to bear the force on the pull rod 7, the pull rod 7 is driven to reset under the counter-acting force of the reset spring 13, and the soil containing sleeve 10 is enabled to recover the upward opening angle and is convenient to reuse.
Specifically, the equal fixedly connected with installation spring 2 of the last inner wall of two sets of mounting grooves 4, and the equal sliding connection in inside of every set of mounting groove 4 has a set of fixture block 15.
In this embodiment: when the protective guard 5 is installed, the installation springs 2 are extruded by the installation plates 3 on the two sides to be compressed and deformed, the fixture blocks 15 are continuously installed after the installation plates 3 are conveniently installed in the installation grooves 4, the protective guard 5 can be installed more firmly under the reaction force of the installation springs 2, and the protective guard 5 is prevented from falling off due to the influence of severe weather.
Specifically, all seted up spout 12 on the both ends inner wall of peg 8, and the equal sliding connection in inside of two spouts 12 has slider 11, and the one end that two sliders 11 are close respectively with two fixed plates 14 fixed connection.
In this embodiment: the pull rod 7 can move smoothly under the matching of the sliding block 11 and the sliding groove 12, and meanwhile, dislocation of the pull rod 7 during movement is avoided.
Specifically, the front end of each group of the clamping blocks 15 is fixedly connected with a locking plate 16, and the front ends of the two locking plates 16 are fixedly connected with handles.
In this embodiment: the front end of each group of clamping blocks 15 is provided with a locking plate 16, and the guard rail 5 is convenient for workers to mount and dismount through a handle.
Specifically, the bottom end of the peg 8 adopts a tapered structure.
In this embodiment: the bottom end of the peg 8 adopts a conical structure, so that the peg 8 is convenient to install.
When the device is used, firstly, the pile nails 8 are driven into the ground according to the area size of the enclosure required by the site, the distance between every two pile nails 8 is controlled within a certain value, when the base 6 is positioned at the same horizontal height, the pile nails 8 can be subjected to the transverse pressure given by the soil, so that the soil is filled in the soil containing sleeve 10, the base 6 is more stable, the support 1 is inserted into the placing groove 9 on the base 6, the protective guard 5 is installed between the two supports 1, the mounting plates 3 at the two sides of the protective guard 5 can extrude the mounting springs 2 to compress and deform the mounting springs 2, the clamping blocks 15 are continuously installed after the mounting plates 3 are conveniently installed in the mounting grooves 4, the protective guard 5 can be more firmly installed under the pushing action force of the mounting springs 2, the protective guard 5 is prevented from falling off due to the influence of severe weather, the device realizes that the protective fence is not limited by the terrain and can be quickly installed, strengthen the practicality and practice thrift installation time, if need dismantle the rail, pull rod 7 again, make it drive flourishing native sleeve 10 upset downwards in the peg 8, when extracting peg 8, earth in the flourishing native sleeve 10 also can receive the gravity to influence and drop by oneself, when pull rod 7 stimulates, can drive both sides fixed plate 14 and shift up, thereby extrusion reset spring 13 takes place to deform, when the empty back of earth in the flourishing native sleeve 10, stop to pull rod 7 atress, it resets to drive pull rod 7 under reset spring 13's reaction force, make flourishing native sleeve 10 resume the angle of opening up, be convenient for reuse, the device has realized the repeatedly usable to base 6, avoid extravagant.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a rail for building engineering, includes support (1) and rail guard (5), support (1) is provided with two, rail guard (5) are located between two supports (1), its characterized in that: the two ends of the guard rail (5) are fixedly connected with mounting plates (3), the bottom ends of the two brackets (1) are respectively provided with a base (6), one end of each bracket (1) close to the other bracket is respectively provided with a group of mounting grooves (4), the two mounting plates (3) are respectively embedded in the two groups of mounting grooves (4) in a sliding manner, the left part and the right part of the top end of the base (6) are both provided with a placing groove (9), the inside of the placing groove (9) is connected with the bracket (1) in a sliding way, the bottom end of the base (6) is fixedly connected with a dowel pin (8), the inside of the dowel pin (8) is connected with a pull rod (7) in a sliding way, the top end of the pull rod (7) penetrates through the base (6), the inner walls of the two ends of the dowel pin (8) are respectively and rotatably connected with a group of soil containing sleeves (10), and one ends of the two groups of soil containing sleeves (10) close to each other are rotatably connected with the pull rod (7).
2. The fence for construction engineering of claim 1, wherein: the equal fixedly connected with fixed plate (14) in both ends about pull rod (7), two the equal fixedly connected with reset spring (13) in top of fixed plate (14), two the top of reset spring (13) all with base (6) fixed connection.
3. A fence for construction work as claimed in claim 2, wherein: two sets of the equal fixedly connected with installation spring (2) of last inner wall of mounting groove (4), and the equal sliding connection in inside of every group mounting groove (4) has a set of fixture block (15).
4. A fence for construction work as claimed in claim 3, wherein: the inner walls of the two ends of the stud (8) are provided with sliding grooves (12), the inner parts of the two sliding grooves (12) are connected with sliding blocks (11) in a sliding mode, and the two ends, close to the sliding blocks (11), are fixedly connected with the two fixing plates (14) respectively.
5. A fencing for construction engineering as claimed in claim 4, wherein: the front end of each clamping block (15) is fixedly connected with a locking plate (16), and the front ends of the two locking plates (16) are fixedly connected with handles.
6. A fencing for construction engineering as claimed in claim 5, wherein: the bottom end of the dowel pin (8) adopts a conical structure.
CN202122400931.9U 2021-10-02 2021-10-02 Fence for constructional engineering Expired - Fee Related CN217151526U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122400931.9U CN217151526U (en) 2021-10-02 2021-10-02 Fence for constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122400931.9U CN217151526U (en) 2021-10-02 2021-10-02 Fence for constructional engineering

Publications (1)

Publication Number Publication Date
CN217151526U true CN217151526U (en) 2022-08-09

Family

ID=82659153

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122400931.9U Expired - Fee Related CN217151526U (en) 2021-10-02 2021-10-02 Fence for constructional engineering

Country Status (1)

Country Link
CN (1) CN217151526U (en)

Similar Documents

Publication Publication Date Title
CN209066912U (en) A kind of foundation pit edge protection fence
CN105672323A (en) Compound soil nail wall supporting structure system with steel pipe piles and construction method of compound soil nail wall supporting structure system
CN111101524B (en) Temporary supporting structure for foundation pit construction and temporary supporting construction method
CN217151526U (en) Fence for constructional engineering
CN113668344A (en) Construction auxiliary device is backfilled in maintenance of highway section
CN106499420B (en) A kind of mechanically high constant-resistance individual prop installation method and erection method
CN206635779U (en) Soil nailed wall retaining structure
CN210684727U (en) Construction safety supporting construction
CN208815540U (en) Deep foundation pit support structure
CN206635780U (en) A kind of soil nailed wall retaining structure
CN211395652U (en) Steel-pipe pile foundation reinforced structure
CN213204130U (en) High steep slope uncovered heavy consolidation grouting construction platform
CN215518790U (en) Underground works side slope supporting construction
CN110821279B (en) Terrain self-adaptive railing and using method
CN211006686U (en) Deep foundation pit supporting structure
CN212375872U (en) A supporting construction for morals and manners rock area foundation ditch
CN109138397B (en) Overhanging type scaffold and building method thereof
CN205591216U (en) Foundation ditch erect column pile for housing construction
CN202899599U (en) Building site stair swift formula installation and removal protection device
CN219711148U (en) Temporary initiating explosive device storehouse
CN213742656U (en) Safety device is used in railway engineering construction
CN219604363U (en) Grouting device suitable for geotechnical engineering
CN220100906U (en) Foundation pit guardrail
CN216999841U (en) Stone cage curtain convenient to adjust
CN210421990U (en) Independent hoop kiln reinforcing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220809