CN217151468U - Cover plate mounting connection node for tower crown construction - Google Patents

Cover plate mounting connection node for tower crown construction Download PDF

Info

Publication number
CN217151468U
CN217151468U CN202220449918.4U CN202220449918U CN217151468U CN 217151468 U CN217151468 U CN 217151468U CN 202220449918 U CN202220449918 U CN 202220449918U CN 217151468 U CN217151468 U CN 217151468U
Authority
CN
China
Prior art keywords
cover plate
fixedly connected
tower crown
connection node
sliding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220449918.4U
Other languages
Chinese (zh)
Inventor
杨义涛
李玉昊
卢宏伟
陈刚
尤佳
白永宁
潘航
祝岗
申洋洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
China Construction Second Bureau Decoration Engineering Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
China Construction Second Bureau Decoration Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd, China Construction Second Bureau Decoration Engineering Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202220449918.4U priority Critical patent/CN217151468U/en
Application granted granted Critical
Publication of CN217151468U publication Critical patent/CN217151468U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The application relates to a apron installation connected node of tower crown construction usefulness, including the mounting. The inner cavity of the fixing part is fixedly connected with a sliding rod, the inner cavity of the fixing part is fixedly connected with a threaded rod located below the sliding rod, two sliding parts are slidably mounted on the surfaces of the sliding rod and the threaded rod, the bottom of one sliding part is fixedly connected with a first clamping part, and the bottom of one sliding part is fixedly connected with a second clamping part. The utility model discloses in the in-service use for the internal diameter mounting dimension of apron can be adjusted, and then when the installation apron, the interval of flower fork aluminium veneer and inside stand need not be adjusting, because flower fork aluminium veneer and inside stand set up on the building body, are difficult to demolish the adjustment, so reduced the construction volume, make that the apron can be better carry out the adaptation with flower fork aluminium veneer and inside stand for the installation rate, thereby improved the efficiency of construction.

Description

Cover plate mounting connection node for tower crown construction
Technical Field
The application relates to the field of steel structure buildings, in particular to a cover plate mounting and connecting node for tower crown construction.
Background
The steel structure building is a novel building system, breaks through the industrial boundary lines between the house and land industry, the building industry and the metallurgical industry, and is integrated into a new industrial system, which is the steel structure building system generally seen by people in the industry, compared with the traditional concrete building, the steel structure building replaces reinforced concrete with steel plates or profile steel, has higher strength and better shock resistance, and because components can be manufactured in a factory and installed on site, the construction period is greatly reduced, because the steel can be reused, the construction waste can be greatly reduced, and the steel structure building is more environment-friendly, so the steel structure building is widely adopted by countries all over the world, is applied to industrial buildings and civil buildings, in the structure of the steel structure building, the tower crown is one of the steel structure building, the traditional tower crown is in the construction process, the installation of the tower crown cover plate is fixed in a welding mode, so the connection node can not be adjusted, and different buildings, the construction size that adopts is different, and then the width of its apron also is difficult to with the size adaptation of building, even need carry out interim cutting adjustment at the in-process of construction, and is very troublesome, the efficiency of construction is low.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem that the size of the existing tower crown installation node is difficult to adjust, the application provides a cover plate installation connection node for tower crown construction.
The application provides a apron erection joint node that tower crown construction was used adopts following technical scheme: apron installation connected node of tower crown construction usefulness includes the mounting: the inner cavity fixedly connected with slide bar of mounting, the inner cavity fixedly connected with threaded rod that is located the slide bar below of mounting, the surface sliding who slides slide bar and threaded rod installs two sliders, the bottom fixedly connected with fastener one of them slider, the bottom fixedly connected with fastener two of them slider, threaded rod surface thread installs two adjusting nut one that are located between two sliders, the surface thread of threaded rod installs two adjusting nut two that are located two slider outsides.
Through adopting above-mentioned technical scheme, in the in-service use of reality, make the internal diameter mounting dimension of apron adjust, and then when the installation apron, the interval of flower fork aluminium veneer and inside stand need not be adjusting, because flower fork aluminium veneer and inside stand set up on the building body, are difficult to demolish the adjustment, so reduced the construction volume, make that the apron can be better carry out the adaptation with flower fork aluminium veneer and inside stand, accelerate installation rate, thereby improved the efficiency of construction.
Preferably, the two first adjusting nuts and the two second adjusting nuts are matched with the two sliding pieces.
Preferably, the both sides of mounting inner chamber are the equal fixedly connected with spacing slide, and the spacing spout with spacing slide looks adaptation is all seted up to the both sides of slider.
Preferably, one side of the sliding part is provided with a through hole matched with the sliding rod, and one side of the sliding part is provided with a through hole matched with the threaded rod.
Preferably, the bottom of the first clamping piece is provided with four first clamping grooves, and the bottom of the second clamping piece is provided with a second clamping groove.
Preferably, the outer side of the fixing part is provided with a cover plate, and the bottom of the cover plate is provided with a buckling cavity.
Preferably, a flower fork aluminum single plate and an inner upright post are respectively arranged on two sides of the inner cavity of the buckling cavity, the flower fork aluminum single plate is matched with the four first clamping grooves, and the inner upright post is matched with the second clamping groove.
Preferably, all fixed mounting is on the building body to flower fork aluminium veneer and inside stand.
In summary, the present application includes the following beneficial technical effects:
the utility model can adjust the inner diameter installation size of the cover plate in actual use, and further when the cover plate is installed, the distance between the flower fork aluminum single plate and the inner upright post is not needed to be adjusted, because the flower fork aluminum single plate and the inner upright post are arranged on the building body and are difficult to be disassembled and adjusted, the construction amount is reduced, the cover plate can be better matched with the flower fork aluminum single plate and the inner upright post, the installation speed is accelerated, and the construction efficiency is improved, the cover plate installation connecting node for the tower crown construction solves the problem that the traditional tower crown is fixed in the construction process, the installation of the tower crown cover plate is fixed in a welding mode, so the connecting node can not be adjusted, and different buildings adopt different construction sizes, and further the width of the cover plate is difficult to be matched with the size of the building, even temporary cutting adjustment is needed in the construction process, very troublesome and low construction efficiency.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this application, serve to provide a further understanding of the application and to enable other features, objects, and advantages of the application to be more apparent. The drawings and their description illustrate the embodiments of the invention and do not limit it. In the drawings:
FIG. 1 is a schematic structural diagram of the embodiment.
Fig. 2 is a bottom perspective view of a partial structure of the embodiment.
FIG. 3 is a bottom perspective view of an embodiment fastener construction.
FIG. 4 is an exploded perspective view of a fastener construction according to an embodiment.
Description of reference numerals: 1. a flower fork aluminum veneer; 2. an internal post; 3. a cover plate; 4. a snap cavity; 5. a fixing member; 6. a slide bar; 7. a threaded rod; 8. a slider; 9. adjusting a first nut; 10. adjusting a second nut; 11. a first clamping piece; 12. a second clamping piece; 13. a limiting sliding plate; 14. a limiting chute; 15. perforating; 16. a through hole; 17. a first clamping groove; 18. and a second clamping groove.
Detailed Description
In order to make the technical solutions better understood by those skilled in the art, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are only partial embodiments of the present application, but not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
It should be noted that the terms "first," "second," and the like in the description and claims of this application and in the drawings described above are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order. It should be understood that the data so used may be interchanged under appropriate circumstances such that embodiments of the application described herein may be used. Furthermore, the terms "comprises," "comprising," and "having," and any variations thereof, are intended to cover a non-exclusive inclusion, such that a process, method, system, article, or apparatus that comprises a list of steps or elements is not necessarily limited to those steps or elements expressly listed, but may include other steps or elements not expressly listed or inherent to such process, method, article, or apparatus.
In this application, the terms "upper", "lower", "left", "right", "front", "rear", "top", "bottom", "inner", "outer", "middle", "vertical", "horizontal", "lateral", "longitudinal", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings. These terms are used primarily to better describe the present application and its embodiments, and are not used to limit the indicated devices, elements or components to a particular orientation or to be constructed and operated in a particular orientation.
Moreover, some of the above terms may be used to indicate other meanings besides the orientation or positional relationship, for example, the term "on" may also be used to indicate some kind of attachment or connection relationship in some cases. The specific meaning of these terms in this application will be understood by those of ordinary skill in the art as appropriate.
In addition, the term "plurality" shall mean two as well as more than two.
It should be noted that, in the present application, the embodiments and features of the embodiments may be combined with each other without conflict. The present application will be described in detail below with reference to the embodiments with reference to the attached drawings.
The present application is described in further detail below with reference to figures 1-4.
The first embodiment is as follows:
with reference to fig. 1 to 4, the embodiment of the present application discloses a cover plate installation connection node for tower crown construction, including a fixing member 5: the inner cavity of the fixing part 5 is fixedly connected with a sliding rod 6, the inner cavity of the fixing part 5 is fixedly connected with a threaded rod 7 located below the sliding rod 6, two sliding parts 8 are arranged on the surfaces of the sliding rod 6 and the threaded rod 7 in a sliding mode, a first clamping part 11 is fixedly connected to the bottom of one sliding part 8, a second clamping part 12 is fixedly connected to the bottom of one sliding part 8, two first adjusting nuts 9 located between the two sliding parts 8 are arranged on the surface of the threaded rod 7 in a threaded mode, and two second adjusting nuts 10 located on the outer sides of the two sliding parts 8 are arranged on the surface of the threaded rod 7 in a threaded mode.
Example two:
two adjusting nut 9 and two adjusting nut 10 all with two 8 looks adaptations of slider, the equal fixedly connected with spacing slide 13 in both sides of the 5 inner chambers of mounting, spacing spout 14 with spacing slide 13 looks adaptations is all seted up to slider 8's both sides, perforation 15 with the 6 adaptations of slide bar is seted up to one side of slider 8, through-hole 16 with the 7 adaptations of threaded rod is seted up to one side of slider 8, four draw-in grooves 17 have been seted up to the bottom of fastener 11, draw-in groove two 18 have been seted up to the bottom of fastener two 12, the outside of mounting 5 is provided with apron 3, buckle chamber 4 has been seted up to the bottom of apron 3, the both sides of the 4 inner chambers in buckle chamber are provided with flower fork aluminium veneer 1 and inside stand 2 respectively, flower fork aluminium veneer 1 and four draw-in groove 17 adaptations, inside stand 2 and the two 18 adaptations of draw-in groove, flower fork aluminium veneer 1 and the equal fixed mounting of inside stand 2 are on the building body.
The working principle is as follows: the utility model discloses in the in-service use, because flower fork aluminium veneer 1 and inside stand 2 just installed earlier on the building body, consequently when installing apron 3, need realize the assembly at buckle chamber 4 with connected node, the installation distribution condition, arrange the overall arrangement according to the actual structure of the building body, improve connected node and adjusted buckle chamber 4's internal diameter size after, directly with apron 3 lid receive flower fork aluminium veneer 1 and inside stand 2 on can, it is light convenient, high speed, thereby can improve the installation effectiveness, accommodation process is as follows: firstly, the two second adjusting nuts 10 are rotated to enable the two second adjusting nuts 10 to slide outwards, then the two sliding parts 8 are slid towards two sides, so that the first clamping piece 11 and the second clamping piece 12 move along, so that the adjusting nut I9 can be adjusted to a proper position, and then the adjusting nut I9 is screwed to slide towards two sides and be screwed tightly, under the cooperation of the first adjusting nut 9 and the second adjusting nut 10, the sliding part 8 can be positioned at the position, then the clamping groove I17 and the clamping groove II 18 are used for aligning the flower fork aluminum single plate 1 and the inner upright post 2, the cover plate 3 is directly covered on the flower fork aluminum single plate 1 and the inner upright post 2, then the adjusting nut I9 and the adjusting nut II 10 are screwed to further adjust the position of the sliding part 8, so that the first clamping piece 11 and the second clamping piece 12 are firmly clamped on the flower fork aluminum single plate 1 and the inner upright post 2, and the cover plate 3 can be installed.
In summary, the following steps: the cover plate installation connecting node for the tower crown construction has the advantages that in actual use, the installation size of the inner diameter of the cover plate can be adjusted, further, when the cover plate is installed, the distance between the flower fork aluminum single plate 1 and the inner upright post 2 does not need to be adjusted, because the flower fork aluminum single plate 1 and the inner upright post 2 are arranged on a building body and are difficult to remove and adjust, the construction amount is reduced, the cover plate can be better matched with the flower fork aluminum single plate 1 and the inner upright post 2, the installation speed is increased, the construction efficiency is improved, the cover plate installation connecting node for the tower crown construction solves the problems that in the construction process of the traditional tower crown, the installation of the cover plate of the tower crown is fixed in a welding mode, so the connecting node cannot be adjusted, different buildings adopt different construction sizes, and further the width of the cover plate is difficult to be matched with the size of the building, even temporary cutting adjustment is needed in the construction process, which is very troublesome and has low construction efficiency.
The above description is only a preferred embodiment of the present application and is not intended to limit the present application, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, improvement and the like made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims (8)

1. Apron installation connected node of tower crown construction usefulness, its characterized in that includes mounting (5): the inner chamber fixedly connected with slide bar (6) of mounting (5), the inner chamber fixedly connected with of mounting (5) is located threaded rod (7) of slide bar (6) below, the surface sliding who slides bar (6) and threaded rod (7) installs two slider (8), the bottom fixedly connected with fastener (11) of one of them slider (8), the bottom fixedly connected with fastener two (12) of one of them slider (8), threaded rod (7) surface thread installs two adjusting nut (9) that are located between two slider (8), the surface thread of threaded rod (7) installs two adjusting nut two (10) that are located two slider (8) outsides.
2. The cover plate installation connection node for the tower crown construction according to claim 1, characterized in that: the two first adjusting nuts (9) and the two second adjusting nuts (10) are matched with the two sliding parts (8).
3. The cover plate installation connection node for the tower crown construction according to claim 2, wherein: the equal fixedly connected with spacing slide (13) in both sides of mounting (5) inner chamber, spacing spout (14) with spacing slide (13) looks adaptation are all seted up to the both sides of slider (8).
4. The cover plate installation connection node for the tower crown construction according to claim 3, wherein: a through hole (15) matched with the sliding rod (6) is formed in one side of the sliding piece (8), and a through hole (16) matched with the threaded rod (7) is formed in one side of the sliding piece (8).
5. The cover plate installation connection node for tower crown construction according to claim 4, wherein: the bottom of the first clamping piece (11) is provided with four first clamping grooves (17), and the bottom of the second clamping piece (12) is provided with a second clamping groove (18).
6. The cover plate installation connection node for the tower crown construction according to claim 5, wherein: the outer side of the fixing piece (5) is provided with a cover plate (3), and the bottom of the cover plate (3) is provided with a buckling cavity (4).
7. The cover plate installation connection node for the tower crown construction according to claim 6, wherein: the clamping device is characterized in that a flower fork aluminum single plate (1) and an inner upright post (2) are respectively arranged on two sides of an inner cavity of the clamping cavity (4), the flower fork aluminum single plate (1) is matched with the four first clamping grooves (17), and the inner upright post (2) is matched with the second clamping groove (18).
8. The cover plate installation connection node for the tower crown construction according to claim 7, wherein: the flower fork aluminum veneer (1) and the internal upright post (2) are both fixedly installed on a building body.
CN202220449918.4U 2022-03-03 2022-03-03 Cover plate mounting connection node for tower crown construction Active CN217151468U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220449918.4U CN217151468U (en) 2022-03-03 2022-03-03 Cover plate mounting connection node for tower crown construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220449918.4U CN217151468U (en) 2022-03-03 2022-03-03 Cover plate mounting connection node for tower crown construction

Publications (1)

Publication Number Publication Date
CN217151468U true CN217151468U (en) 2022-08-09

Family

ID=82692675

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220449918.4U Active CN217151468U (en) 2022-03-03 2022-03-03 Cover plate mounting connection node for tower crown construction

Country Status (1)

Country Link
CN (1) CN217151468U (en)

Similar Documents

Publication Publication Date Title
CN209384469U (en) A kind of Curtain wall frame fixation kit
CN201567787U (en) Form-traveler steel formwork
CN217151468U (en) Cover plate mounting connection node for tower crown construction
CN212802174U (en) Curtain wall keel convenient to stably install
CN215106971U (en) Stone material column bottom movable design receipts limit structure convenient to maintain
CN217480534U (en) Unit type curtain wall hanging seat for hanging on side edge of structure
CN210049580U (en) Novel template for house building engineering
CN212001774U (en) High-strength glass curtain wall in building
CN212583021U (en) Adjustable fixing device for installing ceiling keel
CN211221304U (en) Insert borer roof beam
CN210194906U (en) Concrete formwork for fabricated building
CN203961436U (en) A kind of novel wood-plastic fence
CN211647310U (en) Building formwork reinforced structure
CN211448490U (en) A remove and hang ladder for steel construction
CN210622285U (en) Scaffold frame that facade was reformed transform and is used even wall device
CN202359708U (en) Decorative moulding system of back-bolt curtain wall
CN211037832U (en) Left-hand thread device that reinforced concrete die block was easily demolishd
CN206581398U (en) A kind of attachment structure of 3D building modules Z-type keel wall and beam
CN221346554U (en) Steel construction building envelope
CN203129385U (en) Keel hanging part for decorative curtain walls
CN205466682U (en) Mould of pre -buried strong and weak electronic box
CN205917958U (en) Cable suspension device and fossil fragments articulate subassembly
CN216007587U (en) Steel protective structure for balcony
CN210685440U (en) Multifunctional traction device for constructional engineering
CN210291227U (en) LED signboard convenient to dismouting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant