- CN217142931U CN217142931U CN202220794241.8U CN202220794241U CN217142931U CN 217142931 U CN217142931 U CN 217142931U CN 202220794241 U CN202220794241 U CN 202220794241U CN 217142931 U CN217142931 U CN 217142931U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- pipe
- steel
- moving
- moving mechanism
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Turning (AREA)
Abstract
The utility model discloses a steel pipe end trimming machine, which comprises a conveying device, a first pipe trimming device, a first moving mechanism, a second pipe trimming device, a second moving mechanism and a discharging device; the conveying device comprises a steel pipe moving mechanism and a positioning mechanism comprising a plurality of steel pipe placing supports arranged in parallel, the steel pipe placing supports are sequentially provided with a plurality of steel pipe placing grooves along the axial direction at the upper ends, and the steel pipe moving mechanism drives the steel pipes to transversely move among the steel pipe placing grooves; the first pipe repairing device is arranged on one side of the positioning mechanism; the first moving mechanism is used for driving the steel pipe to enable one end of the steel pipe to reach the first pipe repairing device, so that the first pipe repairing device can process one end of the steel pipe; the second pipe repairing device is arranged on the other side of the positioning mechanism; the second moving mechanism is used for driving the steel pipe so that the second pipe repairing device can process the other end of the steel pipe; the discharging device is arranged at the output end of the conveying device and used for receiving the steel pipe sent out by the steel pipe moving mechanism. The problem of how high-efficient stable to steel pipe tip carry out the repairment is solved.
Description
Technical Field
The utility model relates to a steel pipe baling equipment's technical field, in particular to steel pipe tip finisher.
Background
The steel pipe is as common building materials, and market demand is huge, and the market all has great demand to the steel pipe of various specifications, in the steel pipe production process, needs cut, forms the steel pipe of setting for length, and the tip of steel pipe need be maintained after the cutting, if through artifical the maintenance, the inefficiency is relatively low, and the effect of just repairing is unstable, and how high-efficient stable to the steel pipe tip maintain the problem that needs the solution.
SUMMERY OF THE UTILITY MODEL
The utility model provides a steel pipe tip finisher for solve how high-efficient stable carry out the problem of repairing to the steel pipe tip.
The utility model discloses a steel pipe tip finisher, include:
the conveying device comprises a steel pipe moving mechanism and a positioning mechanism comprising a plurality of steel pipe placing supports arranged in parallel, wherein the steel pipe placing supports are sequentially provided with a plurality of steel pipe placing grooves along the axial direction at the upper ends of the steel pipe placing supports, and the steel pipe moving mechanism drives the steel pipes to transversely move among the steel pipe placing grooves;
the first pipe repairing device is arranged on one side of the positioning mechanism, corresponds to one end of the steel pipe and is used for machining one end of the steel pipe;
the first moving mechanism is used for driving the steel pipe to enable one end of the steel pipe to reach the first pipe repairing device, so that the first pipe repairing device can process one end of the steel pipe;
the second pipe repairing device is arranged on the other side of the positioning mechanism, corresponds to the other end of the steel pipe and is used for machining the other end of the steel pipe;
the second moving mechanism is used for driving the steel pipe to enable the other end of the steel pipe to reach the second pipe repairing device, so that the second pipe repairing device can process the other end of the steel pipe;
and the discharging device is arranged at the output end of the conveying device and used for receiving the steel pipe sent out by the steel pipe moving mechanism.
Further, the device also comprises a feeding device; the feeding device sends the steel pipes to the steel pipe placing groove on one side of the steel pipe placing support close to the feeding device.
Further, the steel pipe moving mechanism comprises an eccentric wheel and a moving bracket; the two eccentric wheels are respectively and rotatably connected with the movable bracket, and the eccentric wheels drive the movable bracket to ascend and descend; the moving bracket is provided with a moving groove, and the moving groove is used for arranging the steel pipe when the moving bracket rises so that the moving bracket drives the steel pipe to transversely move between the steel pipe arranging grooves.
Further, the first moving mechanism comprises a first rotating column and a first rotating wheel driving motor; the first rotating wheel drives the motor to be in transmission connection with the first rotating column, and the first rotating wheel drives the motor to drive the first rotating column to rotate; the circumference of the first rotary column is provided with a first bracket, and the first bracket is provided with one or more brackets.
Further, the second moving mechanism comprises a second rotating column and a second rotating wheel driving motor; the second rotating wheel drives the motor to be in transmission connection with the second rotating column, and the second rotating wheel drives the motor to drive the second rotating column to rotate; and a second bracket is arranged on the second rotary column in the circumferential direction, and one or more second brackets are arranged on the second bracket.
Further, the first pipe trimming device comprises a first aligning plate, a first fixing mechanism and a first pipe trimming mechanism; the first fixing mechanism and the first pipe correcting mechanism are sequentially distributed in the axial direction of the steel pipe to be processed; the first aligning plate is arranged beside the first fixing mechanism and the first pipe correcting mechanism.
Further, the second pipe trimming device comprises a second aligning plate, a second fixing mechanism and a second pipe trimming mechanism; the second fixing mechanism and the second pipe correcting mechanism are sequentially distributed in the axial direction of the steel pipe to be processed; the second aligning plate is arranged beside the second fixing mechanism and the second pipe correcting mechanism.
Further, the surface of steel pipe arrangement groove covers has elastic buffer layer.
Further, the discharging device comprises a guide inclined rod and a containing groove; the uppermost end of the containing groove is lower than the output end of the conveying device; the guide inclined rod inclines from the output end of the conveying device to the containing groove.
Further, the first pipe trimming device and the second pipe trimming device can move towards or away from the conveying device.
The utility model discloses a steel pipe tip finisher, the steel pipe after the cutting is put into positioning mechanism's steel pipe arrangement groove, drive through steel pipe moving mechanism and make the steel pipe move between steel pipe arrangement groove, so that the steel pipe reaches the settlement position, when will finishing the one end of steel pipe, drive through steel pipe moving mechanism and make the steel pipe reach the steel pipe arrangement groove that corresponds with first moving mechanism, later drive the steel pipe through first moving mechanism and remove and make the one end of steel pipe reach the first one end of repairing the pipe device and repair the one end of steel pipe, and the same reason can be repaired the other end of steel pipe; after the both ends of steel pipe all maintained, drive through steel pipe moving mechanism and make the steel pipe reach discharging device, maintained the in-process, can not need artifical the participation, work efficiency is stable high-efficient, solves the problem how high-efficient stable to steel pipe tip maintain.
Drawings
Fig. 1 is a schematic structural view of an embodiment of the steel pipe end finisher of the present invention.
Reference numbers in the drawings illustrate: the device comprises a conveying device 1, a steel pipe placing support 11, a steel pipe placing groove 111, a steel pipe moving mechanism 12, an eccentric wheel 121, a moving support 122, a moving groove 1221, a first pipe repairing device 2, a first aligning plate 21, a first fixing mechanism 22, a first pipe correcting mechanism 23, a first moving mechanism 3, a first rotary column 31, a first bracket 311, a second pipe repairing device 4, a second aligning plate 41, a second fixing mechanism 42, a second pipe correcting mechanism 43, a second moving mechanism 5, a second rotary column 51, a second bracket 511, a discharging device 6, a guide inclined rod 61, a containing groove 62 and a feeding device 7.
Detailed Description
To facilitate understanding of the present invention by those skilled in the art, the present invention will be further described with reference to the accompanying drawings. It should be understood that the detailed description and specific examples, while indicating the invention, are given by way of illustration only.
Fig. 1 schematically shows a steel pipe end finisher of the present invention.
As shown in fig. 1, the utility model discloses a steel pipe end trimming machine, which comprises a conveying device 1, a first pipe trimming device 2, a first moving mechanism 3, a second pipe trimming device 4, a second moving mechanism 5 and a discharging device 6; the conveying device 1 comprises a steel pipe moving mechanism 12 and a positioning mechanism comprising a plurality of steel pipe placing supports 11 which are arranged in parallel, a plurality of steel pipe placing grooves 111 are sequentially arranged at the upper ends of the steel pipe placing supports 11 along the axial direction, and the steel pipe moving mechanism 12 drives steel pipes to transversely move among the steel pipe placing grooves 111; the first pipe repairing device 2 is arranged on one side of the positioning mechanism, corresponds to one end of the steel pipe and is used for machining one end of the steel pipe; the first moving mechanism 3 is used for driving the steel pipe to enable one end of the steel pipe to reach the first pipe repairing device 2, so that the first pipe repairing device 2 can process one end of the steel pipe; the second pipe repairing device 4 is arranged on the other side of the positioning mechanism, corresponds to the other end of the steel pipe and is used for machining the other end of the steel pipe; the second moving mechanism 5 is used for driving the steel pipe to enable the other end of the steel pipe to reach the second pipe repairing device 4, so that the second pipe repairing device 4 can process the other end of the steel pipe; the discharging device 6 is arranged at the output end of the conveying device 1 and is used for receiving the steel pipe sent by the steel pipe moving mechanism 12.
Specifically, the cut steel pipe is placed in a steel pipe placing groove 111 of the positioning mechanism, the steel pipe is driven by a steel pipe moving mechanism 12 to move between the steel pipe placing grooves 111, so that the steel pipe reaches a set position, when one end of the steel pipe is to be repaired, the steel pipe is driven by the steel pipe moving mechanism 12 to reach the steel pipe placing groove 111 corresponding to the first moving mechanism 3, then the steel pipe is driven by the first moving mechanism 3 to move, so that one end of the steel pipe reaches the first pipe repairing device 2, and one end of the steel pipe is repaired, similarly, when the other end of the steel pipe is to be repaired, the steel pipe is driven by the steel pipe moving mechanism 12 to reach the steel pipe placing groove 111 corresponding to the second moving mechanism 5, and then the other end of the steel pipe is driven by the second moving mechanism 5 to move, so that the other end of the steel pipe reaches the second pipe repairing device 4, and the other end of the steel pipe is repaired; after the both ends of steel pipe all were maintained, drive through steel pipe moving mechanism 12 and make the steel pipe reach discharging device 6, maintained the in-process, can not need artifical the participation, work efficiency is stable high-efficient, solves the problem how high-efficient stable to steel pipe tip maintain.
It should be noted that in some embodiments, the treatment is performed in the following order for a set number of steel pipes: receiving the steel pipe, moving the steel pipe, aligning one end of the steel pipe, moving the steel pipe, trimming one end of the steel pipe, moving the steel pipe, aligning the other end of the steel pipe, moving the steel pipe, trimming the other end of the steel pipe, and then sending the steel pipe to a discharging device 6; the moving steel pipe here means that the steel pipe moves transversely between the steel pipe seating grooves 111; in some embodiments, each traverse is a movement of all the steel tubes in the conveyor 1, trimming the ends of two steel tubes at a time.
It should be mentioned that, the steel pipe placing grooves 111 on the steel pipe placing brackets 11 are in one-to-one correspondence, that is, each steel pipe is supported by one steel pipe placing groove 111 of the steel pipe placing brackets 11, and the steel pipe can be stably parked after being transversely moved, wherein the transverse movement refers to the movement of the steel pipe between the steel pipe placing grooves 111 of the same steel pipe placing bracket 11.
Further, in some embodiments, the steel pipe end finisher further includes a feeding device 7; the feeding device 7 sends the steel pipes to the steel pipe placing groove 111 on one side of the steel pipe placing support 11 close to the feeding device 7.
Specifically, can cooperate the steel pipe condition of repairing, put into steel pipe mounting groove 111 through loading attachment 7 with the steel pipe after the cutting, for example two steel pipes are put into once to loading attachment 7, and loading attachment 7 can save the steel pipe after many cuttings, and loading attachment 7 can last for conveyor 1 continuously inputs the steel pipe, makes steel pipe tip finisher continuously high-efficient work.
Further, in some embodiments, the steel pipe moving mechanism 12 includes an eccentric 121 and a moving bracket 122; two eccentric wheels 121 are arranged, the two eccentric wheels 121 are respectively connected with the movable bracket 122 in a rotating manner, and the eccentric wheels 121 drive the movable bracket 122 to ascend and descend; the moving bracket 122 is provided with a moving groove 1221, and the moving groove 1221 is used for placing the steel pipe when the moving bracket 122 ascends, so that the moving bracket 122 drives the steel pipe to move transversely between the steel pipe placing grooves 111.
Specifically, the two eccentric wheels 121 rotate to drive the moving support 122, so that the moving support 122 swings backwards, then the moving support 122 swings upwards to jack up and move forwards the steel pipe, the steel pipe in the steel pipe accommodating groove 111 is moved forwards, and the steel pipe is replenished from the feeding device 7, then the moving support 122 swings downwards in an arc shape, the steel pipe is placed in the steel pipe accommodating groove 111, the moving support 122 returns to the initial position, the steel pipe transverse moving effect is realized, and the steel pipe is replenished and the processed steel pipe is removed.
It should be noted that, in order to ensure the stability of the steel pipe movement, in some embodiments, two steel pipe moving mechanisms 12 are provided, corresponding to two ends of the steel pipe.
In some embodiments, the eccentric 121 can be directly rotated by a motor, and in some embodiments, the eccentric 121 can be rotated by a transmission mechanism.
Further, in some embodiments, the first moving mechanism 3 includes a first rotary column 31 and a first rotary wheel driving motor (not shown in the drawings); the first rotating wheel drives the motor to be in transmission connection with the first rotating column 31, and the first rotating wheel drives the motor to drive the first rotating column 31 to rotate; the first rotary column 31 is provided with a first bracket 311 in the circumferential direction, and the first bracket 311 is provided with one or more brackets.
Specifically, the number of the first brackets 311 can be correspondingly set according to the number of the steel pipes to be moved at a time, and each first bracket 311 correspondingly moves one steel pipe; in some embodiments, the first pulley drive motor is a servo motor.
It should be noted that, in some embodiments, the surface of the first bracket 311 is covered with an elastic friction layer, and the friction layer is made of an elastic wear-resistant material, such as plastic, to increase friction against the steel tube, so as to better ensure that the steel tube moves in the axial direction.
Further, the second moving mechanism 5 includes a second rotating column 51 and a second rotating wheel driving motor (not shown); the second rotating wheel drives the motor to be in transmission connection with the second rotating column 51, and the second rotating wheel drives the motor to drive the second rotating column 51 to rotate; the second rotary column 51 is provided with a second bracket 511 in the circumferential direction, and the second bracket 511 is provided with one or more brackets.
Specifically, the number of the second brackets 511 can be correspondingly set according to the number of steel tubes to be moved at a time, and each second bracket 511 correspondingly moves one steel tube; in some embodiments, the second wheel drive motor is a servo motor.
It should be noted that in some embodiments, the surface of the second bracket 511 is covered with an elastic friction layer, and the friction layer is made of an elastic wear-resistant material, such as plastic, to increase friction against the steel tube, so as to better ensure that the steel tube moves in the axial direction.
In some embodiments, the first moving mechanism 3 and the second moving mechanism 5 are both arranged in the space between the steel pipe placing supports 11 and are close to the middle position of the steel pipe, so that the steel pipe can be contacted when the steel pipe does not generate too large deviation, the contact with the steel pipe can be better ensured, and the working effect is ensured.
Further, in some embodiments, the first pipe trimming device 2 includes a first aligning plate 21, a first fixing mechanism 22, and a first pipe trimming mechanism 23; the first fixing mechanism 22 and the first pipe correcting mechanism 23 are sequentially distributed in the axial direction of the steel pipe to be processed; the first aligning plate 21 is provided beside the first fixing mechanism 22 and the first pipe correcting mechanism 23.
Specifically, taking the example of finishing two steel pipes at a time, the steel pipes are firstly abutted against the first aligning plate 21 under the driving of the first moving mechanism 3, so that one ends of the two steel pipes are aligned, then the two steel pipes are moved to the corresponding position of the first pipe correcting mechanism 23 under the driving of the steel pipe moving mechanism 12 and are fixed under the action of the first fixing mechanism 22, and the first fixing mechanism 22 prevents the steel pipes from moving in the finishing process, so that the finishing effect is more stable.
Further, the second pipe trimming device 4 includes a second aligning plate 41, a second fixing mechanism 42, and a second pipe trimming mechanism 43; the second fixing mechanism 42 and the second pipe correcting mechanism 43 are sequentially distributed in the axial direction of the steel pipe to be processed; the second aligning plate 41 is provided beside the second fixing mechanism 42 and the second tube correcting mechanism 43.
Specifically, for example, two steel pipes are trimmed at a time, the steel pipes are firstly abutted against the second aligning plate 41 under the driving of the second moving mechanism 5, so that the other ends of the two steel pipes are aligned, then the two steel pipes are moved to the corresponding position of the second pipe correcting mechanism 43 under the driving of the steel pipe moving mechanism 12 and are fixed under the action of the second fixing mechanism 42, and the second fixing mechanism 42 prevents the steel pipes from moving in the trimming process, so that the trimming effect is more stable.
It should be noted that in some embodiments, the first securing mechanism 22 and the second securing mechanism 42 are mechanisms that can clamp the ends of the steel tube, such as tube clamping mechanisms that can be clamped up and down; the first pipe correcting mechanism 23 and the second pipe correcting mechanism 43 are mechanisms for finishing the end of the steel pipe, for example, a mechanism for grinding the pipe end, a mechanism for grooving the pipe end, and the like, and specific functions are set according to actual requirements, which are not described in detail.
Further, in some embodiments, the surface of the steel pipe seating groove 111 is covered with a buffer layer having elasticity.
Specifically, in some embodiments, the elastic member is installed in the steel pipe installation groove 111 to cover the surface of the steel pipe installation groove 111, and the elastic member is detachable and can be replaced quickly when the elastic member is worn.
Further, in some embodiments, the outfeed device 6 comprises a guide diagonal 61 and a tank 62; the uppermost end of the containing groove 62 is lower than the output end of the conveying device 1; the guide slope 61 slopes from the output end of the conveyor 1 toward the trough 62.
Specifically, the moving bracket 122 drives the processed steel pipe to move to the guiding diagonal rod 61, and then the steel pipe enters the containing groove 62 under the guidance of the guiding diagonal rod 61; after the set steel pipes are placed in the placing groove 62, the steel pipes can be packaged and transported.
Further, in some embodiments, the first and second pipe repair devices 2, 4 are movable towards or away from the delivery device 1.
Specifically, the first pipe trimming device 2 and the second pipe trimming device 4 can adapt to steel pipes with different lengths through adjustment, so that the application range of the steel pipe end trimming machine is wider.
The utility model discloses a steel pipe tip finisher, the steel pipe after the cutting is put into positioning mechanism's steel pipe arrangement groove 111, it makes the steel pipe remove between steel pipe arrangement groove 111 to drive through steel pipe moving mechanism 12, so that the steel pipe reaches the settlement position, when will finishing the one end of steel pipe, drive through steel pipe moving mechanism 12 and make the steel pipe reach the steel pipe arrangement groove 111 that corresponds with first moving mechanism 3, later drive the steel pipe through first moving mechanism 3 and remove and make the one end of steel pipe reach first maintenance device 2 and repair the one end of steel pipe, and the same is true, can repair the other end of steel pipe; after the both ends of steel pipe all were maintained, drive through steel pipe moving mechanism 12 and make the steel pipe reach discharging device 6, maintained the in-process, can not need artifical the participation, work efficiency is stable high-efficient, solves the problem how high-efficient stable to steel pipe tip maintain.
The above are only some embodiments of the present invention. For those skilled in the art, without departing from the inventive concept, several modifications and improvements can be made, which are within the scope of the invention.
Claims (10)
1. The utility model provides a steel pipe end finisher which characterized in that includes:
the conveying device comprises a steel pipe moving mechanism and a positioning mechanism comprising a plurality of steel pipe placing supports arranged in parallel, wherein the steel pipe placing supports are sequentially provided with a plurality of steel pipe placing grooves along the axial direction at the upper ends of the steel pipe placing supports, and the steel pipe moving mechanism drives steel pipes to transversely move among the steel pipe placing grooves;
the first pipe repairing device is arranged on one side of the positioning mechanism, corresponds to one end of the steel pipe and is used for machining one end of the steel pipe;
the first moving mechanism is used for driving the steel pipe to enable one end of the steel pipe to reach the first pipe repairing device, so that the first pipe repairing device can process one end of the steel pipe;
the second pipe repairing device is arranged on the other side of the positioning mechanism, corresponds to the other end of the steel pipe and is used for machining the other end of the steel pipe;
the second moving mechanism is used for driving the steel pipe to enable the other end of the steel pipe to reach the second pipe repairing device, so that the second pipe repairing device can process the other end of the steel pipe;
and the discharging device is arranged at the output end of the conveying device and used for receiving the steel pipe sent out by the steel pipe moving mechanism.
2. The steel pipe end finisher of claim 1, further comprising a feeding device;
the feeding device sends the steel pipes to the steel pipe placing groove on one side, close to the feeding device, of the steel pipe placing support.
3. The steel pipe end finisher of claim 1, wherein the steel pipe moving mechanism comprises an eccentric and a moving bracket;
the two eccentric wheels are respectively and rotatably connected with the movable bracket, and the eccentric wheels drive the movable bracket to ascend and descend;
the steel pipe lifting device is characterized in that a moving groove is formed in the moving support and used for placing a steel pipe when the moving support rises, so that the moving support drives the steel pipe to transversely move between the steel pipe placing grooves.
4. The steel pipe end finisher of claim 1, wherein the first moving mechanism comprises a first rotating column and a first rotating wheel driving motor;
the first rotating wheel drives a motor to be in transmission connection with the first rotating column, and the first rotating wheel drives the motor to drive the first rotating column to rotate;
the circumference of the first rotary column is provided with a first bracket, and the first bracket is provided with one or more brackets.
5. The steel pipe end finisher of claim 1, wherein the second moving mechanism comprises a second rotating column and a second rotating wheel driving motor;
the second rotating wheel drives the motor to be in transmission connection with the second rotating column, and the second rotating wheel drives the motor to drive the second rotating column to rotate;
and a second bracket is arranged on the second rotary column in the circumferential direction and is provided with one or more brackets.
6. The steel pipe end finisher of claim 1, wherein the first pipe finishing device includes a first aligning plate, a first fixing mechanism, and a first pipe finishing mechanism;
the first fixing mechanism and the first pipe correcting mechanism are sequentially distributed in the axial direction of the steel pipe to be processed;
the first aligning plate is arranged beside the first fixing mechanism and the first pipe correcting mechanism.
7. The steel pipe end finisher of claim 1, wherein the second pipe finishing device includes a second aligning plate, a second fixing mechanism, and a second pipe finishing mechanism;
the second fixing mechanism and the second pipe correcting mechanism are sequentially distributed in the axial direction of the steel pipe to be processed;
the second aligning plate is arranged beside the second fixing mechanism and the second pipe correcting mechanism.
8. The steel pipe end finisher of claim 1, wherein the surface of the steel pipe seating groove is covered with a buffer layer having elasticity.
9. The steel pipe end finisher of claim 1, wherein the discharging means comprises a guide diagonal and a holding tank;
the uppermost end of the containing groove is lower than the output end of the conveying device;
the guide inclined rod inclines towards the containing groove from the output end of the conveying device.
10. The steel pipe end finisher of claim 1, wherein the first pipe finisher and the second pipe finisher are movable toward or away from the conveyor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220794241.8U CN217142931U (en) | 2022-04-06 | 2022-04-06 | Steel pipe end trimming machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220794241.8U CN217142931U (en) | 2022-04-06 | 2022-04-06 | Steel pipe end trimming machine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217142931U true CN217142931U (en) | 2022-08-09 |
Family
ID=82698869
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220794241.8U Active CN217142931U (en) | 2022-04-06 | 2022-04-06 | Steel pipe end trimming machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217142931U (en) |
-
2022
- 2022-04-06 CN CN202220794241.8U patent/CN217142931U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100840216B1 (en) | Apparatus for cutting heat shrink tube and inserting pipe into the tube automatically | |
CN100519068C (en) | Double face abrading machine | |
CN202367813U (en) | After-loading high-speed computer cut-to-size saw | |
CN102390063A (en) | Back loading high-speed computer panel saw | |
KR102082493B1 (en) | Cutting device | |
CN103991001A (en) | Automatic pipe cutting machine | |
CN210099081U (en) | Pipe machining equipment | |
CN217142931U (en) | Steel pipe end trimming machine | |
CN112475700B (en) | Automatic circular seam welding equipment and welding method | |
CN213672432U (en) | Full-automatic laser pipe cutting machine | |
CN116713753B (en) | Bar grooving device for building material processing and use method thereof | |
CN212264359U (en) | Feeding device of bending machine | |
CN211034084U (en) | Automatic feeding equipment | |
CN218638672U (en) | Automatic feeding machine for automobile air pipe cutting | |
CN109877467B (en) | Automatic processing device for elastic hair band | |
CN209850142U (en) | Metal tubular product laser cutting auxiliary device | |
CN109513999A (en) | Full-automatic pipe cutting machine | |
CN115817890A (en) | Automatic packaging machine for saw blade protection strip | |
CN113231929B (en) | Piston ring mouth repairing machine | |
CN114603365A (en) | Part machining device of carrier and technological method thereof | |
CN210387964U (en) | Metal pipe laser cutting auxiliary assembly | |
CN211894816U (en) | Rubber circulation loading attachment | |
CN210816371U (en) | Automatic loading and unloading device for pipe shrinking machine | |
CN114800080A (en) | Novel polish device | |
CN221389777U (en) | Conjoined crank bending machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |