CN217126583U - Climbing type operation platform for well way in building - Google Patents

Climbing type operation platform for well way in building Download PDF

Info

Publication number
CN217126583U
CN217126583U CN202220684149.6U CN202220684149U CN217126583U CN 217126583 U CN217126583 U CN 217126583U CN 202220684149 U CN202220684149 U CN 202220684149U CN 217126583 U CN217126583 U CN 217126583U
Authority
CN
China
Prior art keywords
speed reducer
screw rod
wall
frame
axis speed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220684149.6U
Other languages
Chinese (zh)
Inventor
隆元刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Longsheng International Construction Group Co ltd
Original Assignee
Longsheng International Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Longsheng International Construction Group Co ltd filed Critical Longsheng International Construction Group Co ltd
Priority to CN202220684149.6U priority Critical patent/CN217126583U/en
Application granted granted Critical
Publication of CN217126583U publication Critical patent/CN217126583U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a climbing type operation platform for a well way in a building, which comprises a fixed bottom plate, wherein the top outer wall of the fixed bottom plate is respectively provided with a support frame and a power assembly, the power assembly is positioned below the support frame, the top outer wall of the support frame is respectively provided with a screw rod mechanism and a support guide rod, the support guide rods are positioned at two sides of the screw rod mechanism, the screw rod mechanism is fixedly connected with a sliding plate through a screw rod nut, the sliding plate is positioned on the side wall of the support guide rod, the output end of the power assembly is respectively connected with the screw rod mechanism, one end of the support guide rod far away from the support frame is fixedly provided with a support plate, the support plate is connected with the support frame through the screw rod mechanism, and the operation platform can also carry out certain height adjustment after being installed in a well way through the screw rod mechanism, the support plate and the power assembly, thereby leading a worker to carry out position adjustment in the construction process, thereby being beneficial to improving the construction efficiency of workers.

Description

Climbing type operation platform for well way in building
Technical Field
The utility model relates to a building operation platform technical field, in particular to formula operation platform climbs in building well way.
Background
When the closed well of the high-rise building is constructed nowadays, because the well is large, constructors do not have standing points, the vertical transportation and construction of materials are inconvenient, the efficiency is low, the installation work on the inner side of the well cannot be carried out, and because of the high-rise building, the safety problem during construction is particularly important.
The existing building well operation platform cannot be subjected to height adjustment after installation is completed, and needs to be repeatedly disassembled and assembled when needed to be adjusted, so that the construction efficiency is low, and the existing well operation platform has no high-altitude falling object protection device and has certain potential safety hazards.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a well formula operation platform that climbs in building to solve the current building well operation platform that proposes in the above-mentioned background art and can't carry out the altitude mixture control after the installation is accomplished, just will relapse the dismouting when needs adjustment, thereby lead to the inefficiency of construction, current well operation platform does not have high altitude weight protector moreover, has the problem of certain potential safety hazard.
In order to achieve the above object, the utility model provides a following technical scheme: a climbing type operation platform for a well way in a building comprises a fixed bottom plate, wherein a support frame and a power assembly are respectively arranged on the outer wall of the top of the fixed bottom plate, the power assembly is positioned below the support frame, a screw rod mechanism and a support guide rod are respectively arranged on the outer wall of the top of the support frame, the support guide rods are respectively positioned at two sides of the screw rod mechanism, the screw rod mechanism is fixedly connected with a sliding plate through a screw rod nut, the sliding plate is positioned on the side wall of the support guide rod, the output end of the power assembly is respectively connected with the screw rod mechanism, a support plate is fixedly arranged at one end of the support guide rod, which is far away from the support frame, the support plate is connected with the support frame through the screw rod mechanism, a protective assembly and a connecting column are respectively arranged on the outer wall of the top of the sliding plate, and the connecting columns are positioned at two sides of the protective assembly, the connecting column is far away from the one end of sliding plate and is installed the buffering subassembly, be provided with the shielding plate on the lateral wall of buffering subassembly.
Preferably, a supporting frame is fixedly mounted on the outer wall of the bottom of the fixed bottom plate, oblique supporting rods are respectively mounted on one side wall of the supporting frame, and one ends, far away from the supporting frame, of the oblique supporting rods are connected with the fixed bottom plate.
Preferably, a control button box is arranged on the outer wall of the bottom of the shielding plate through a connecting rope.
Preferably, the power component includes driving motor, triaxial speed reducer and biax speed reducer, the biax speed reducer with driving motor is located respectively the both sides of triaxial speed reducer, driving motor the triaxial speed reducer with the biax speed reducer is located respectively on PMKD's the top outer wall, driving motor's output with the triaxial speed reducer is connected, the output of triaxial speed reducer is connected with the power shaft, just the triaxial speed reducer passes through the power shaft with the biax speed reducer is connected, the triaxial speed reducer with the output of biax speed reducer respectively with screw mechanism is connected.
Preferably, the protection assembly comprises a fixing frame, the fixing frame is located on the outer wall of the top of the sliding plate, a left protection frame and a right protection frame are connected to one side wall of the fixing frame through hinges respectively, a bolt is installed on one side wall of the left protection frame, and the left protection frame is connected with the right protection frame through the bolt.
Preferably, the buffering subassembly includes the fixed block, the fixed block is located the spliced pole is kept away from the one end of sliding plate, install the buffering post on the top outer wall of fixed block, be provided with buffer spring on the lateral wall of buffering post, the buffering post is kept away from the dog is installed to the one end of fixed block.
The utility model discloses a technological effect and advantage:
1. through the screw rod mechanism, the support frame, the support plate and the power assembly, the operation platform can be installed inside a well and then can be subjected to certain height adjustment, so that a worker can adjust the position in the construction process, and the construction efficiency of the worker is improved.
2. Through the buffer spring, the stop block, the connecting column and the baffle plate, the mechanism can help workers to shield sundries falling from high altitude, so that the personal health of the workers is protected, and accidents are avoided.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic diagram of the structure of the power assembly of the present invention.
Fig. 3 is a schematic view of the structure of the protection assembly of the present invention.
Fig. 4 is a schematic view of the structure of the buffer assembly of the present invention.
In the figure: 1. fixing the bottom plate; 2. a support frame; 3. a shielding plate; 4. a guard assembly; 41. a fixing frame; 42. a left protective frame; 43. a right protection frame; 44. a bolt; 5. a screw mechanism; 6. supporting the guide bar; 7. a sliding plate; 8. a support plate; 9. connecting columns; 10. a buffer assembly; 101. a fixed block; 102. a buffer column; 103. a buffer spring; 104. a stopper; 11. a control button box; 12. a support frame; 13. an inclined support rod; 14. a power assembly; 141. a three-axis speed reducer; 142. a double-shaft speed reducer; 143. a power shaft; 144. the motor is driven.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model provides a climbing type operation platform of a well track in a building as shown in figures 1-4, which comprises a fixed bottom plate 1, wherein a support frame 2 and a power assembly 14 are respectively arranged on the outer wall of the top part of the fixed bottom plate 1, the power assembly 14 is positioned below the support frame 2, a screw rod mechanism 5 and a support guide rod 6 are respectively arranged on the outer wall of the top part of the support frame 2, the support guide rods 6 are respectively positioned at two sides of the screw rod mechanism 5, the screw rod mechanism 5 is fixedly connected with a sliding plate 7 through a screw rod nut, the sliding plate 7 is positioned on the side wall of the support guide rod 6, the sliding plate 7 can stably move up and down through the support guide rod 6, the output end of the power assembly 14 is respectively connected with the screw rod mechanism 5, the screw rod mechanism 5 is driven through the power assembly 14, thereby the sliding plate 7 is driven to move up and down, so that the mechanism can change the height of the operation platform without being disassembled and assembled again, thereby being beneficial to improving the construction efficiency of workers, a supporting plate 8 is fixedly arranged at one end of a supporting guide rod 6 far away from a supporting frame 2, the supporting plate 8 is connected with the supporting frame 2 through a screw rod mechanism 5, a protective component 4 and a connecting column 9 are respectively arranged on the outer wall of the top part of a sliding plate 7, the workers are prevented from falling from a working platform through the protective component 4, safety accidents are avoided, the connecting column 9 is positioned at two sides of the protective component 4, a buffer component 10 is arranged at one end of the connecting column 9 far away from the sliding plate 7, secondary damage of falling objects is avoided through the buffer component 10, a baffle plate 3 is arranged on the side wall of the buffer component 10, the workers are prevented from being injured by the falling objects through the baffle plate 3, a supporting frame 12 is fixedly arranged on the outer wall of the bottom part of a fixed bottom plate 1, and an inclined supporting rod 13 is respectively arranged on one side wall of the supporting frame 12, the one end that braced frame 12 was kept away from to bearing diagonal pole 13 is connected with PMKD 1, through braced frame 12 and bearing diagonal pole 13, is favorable to this work platform to fix on one side inner wall of building well, is provided with control button box 11 through connecting the rope on the bottom outer wall of shielding plate 3, through control button box 11, is favorable to the workman to control the lift of this platform.
In this embodiment, the power assembly 14 includes a driving motor 144, a three-axis speed reducer 141 and a two-axis speed reducer 142, the two-axis speed reducer 142 and the driving motor 144 are respectively located on two sides of the three-axis speed reducer 141, the driving motor 144, the three-axis speed reducer 141 and the two-axis speed reducer 142 are respectively located on the outer wall of the top of the fixed base plate 1, the output end of the driving motor 144 is connected to the three-axis speed reducer 141, the output end of the three-axis speed reducer 141 is connected to a power shaft 143, the three-axis speed reducer 141 is connected to the two-axis speed reducer 142 through the power shaft 143, the output ends of the three-axis speed reducer 141 and the two-axis speed reducer 142 are respectively connected to the screw rod mechanism 5, the three-axis speed reducer 141 and the two-axis speed reducer 141 are driven by the driving motor 144 to rotate with the screw rod mechanism 5, so that the sliding plate 7 can move up and down, and the improvement of the construction efficiency of workers is facilitated.
In this embodiment, the protection component 4 includes a fixed frame 41, the fixed frame 41 is located the top outer wall of sliding plate 7, there are left protection frame 42 and right protection frame 43 through hinge connection respectively on a lateral wall of fixed frame 41, a lateral wall of left protection frame 42 is installed with bolt 44, and left protection frame 42 is connected with right protection frame 43 through bolt 44, open bolt 44 through the manual work, make left protection frame 42 and right protection frame 43 open, after the workman enters, rethread bolt 44 locks left protection frame 42 and right protection frame 43, thereby be favorable to protecting workman's personal safety, prevent that the workman from falling from the high altitude.
In this embodiment, buffering subassembly 10 includes fixed block 101, fixed block 101 is located the one end that the sliding plate 7 was kept away from to spliced pole 9, install buffering post 102 on the top outer wall of fixed block 101, through buffering post 102, be favorable to shielding plate 3 to remain steady all the time, be provided with buffer spring 103 on the lateral wall of buffering post 102, through buffer spring 103, be favorable to buffering high altitude weight thing, prevent that the secondary from destroying, buffering post 102 keeps away from the one end of fixed block 101 and installs dog 104, through dog 104, be favorable to shielding plate 3's dismouting.
This practical theory of operation: the utility model relates to a climbing formula operation platform of well way in building, the manual work is installed this operation platform in the well, when needs height-adjusting, presses on control button box 11 through the manual work and goes up on-off control driving motor 144 and start, drives triaxial speed reducer 141 through driving motor 144 to drive biaxial speed reducer 142 and screw rod mechanism 5 and rotate, make sliding plate 7 rise under screw rod mechanism 5's effect, finally reach altitude mixture control's purpose.
When falling object appears in the high altitude, shelter from falling object through shielding plate 3, then cushion falling object through buffer spring 103, prevent that falling object from leading to the secondary to destroy.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (6)

1. The utility model provides a climbing formula operation platform of well way in building, includes PMKD (1), its characterized in that: the top outer wall of the fixed bottom plate (1) is respectively provided with a support frame (2) and a power assembly (14), the power assembly (14) is positioned below the support frame (2), the top outer wall of the support frame (2) is respectively provided with a screw rod mechanism (5) and a support guide rod (6), the support guide rods (6) are respectively positioned at two sides of the screw rod mechanism (5), the screw rod mechanism (5) is fixedly connected with a sliding plate (7) through a screw rod nut, the sliding plate (7) is positioned on the side wall of the support guide rod (6), the output end of the power assembly (14) is respectively connected with the screw rod mechanism (5), one end of the support guide rod (6) far away from the support frame (2) is fixedly provided with a support plate (8), and the support plate (8) is connected with the support frame (2) through the screw rod mechanism (5), the protective component (4) and the connecting column (9) are respectively installed on the outer wall of the top of the sliding plate (7), the connecting column (9) is located on two sides of the protective component (4), the buffer component (10) is installed at one end, far away from the sliding plate (7), of the connecting column (9), and the shielding plate (3) is arranged on the side wall of the buffer component (10).
2. The climbing operation platform for the well inside the building according to claim 1, wherein: the supporting frame is characterized in that a supporting frame (12) is fixedly mounted on the outer wall of the bottom of the fixed bottom plate (1), an inclined supporting rod (13) is mounted on one side wall of the supporting frame (12) respectively, and one end of the supporting frame (12) is far away from the inclined supporting rod (13) and is connected with the fixed bottom plate (1).
3. The climbing operation platform for the well inside the building according to claim 1, wherein: and a control button box (11) is arranged on the outer wall of the bottom of the shielding plate (3) through a connecting rope.
4. The climbing operation platform for the well inside the building according to claim 1, wherein: the power assembly (14) comprises a driving motor (144), a three-axis speed reducer (141) and a two-axis speed reducer (142), the two-axis speed reducer (142) and the driving motor (144) are respectively located on two sides of the three-axis speed reducer (141), the driving motor (144), the three-axis speed reducer (141) and the two-axis speed reducer (142) are respectively located on the outer wall of the top of the fixed base plate (1), the output end of the driving motor (144) is connected with the three-axis speed reducer (141), the output end of the three-axis speed reducer (141) is connected with a power shaft (143), the three-axis speed reducer (141) passes through the power shaft (143) and the two-axis speed reducer (142) is connected, and the output end of the three-axis speed reducer (141) and the two-axis speed reducer (142) are respectively connected with the screw rod mechanism (5).
5. The climbing operation platform for the well inside the building according to claim 1, wherein: the protection assembly (4) comprises a fixing frame (41), the fixing frame (41) is located on the outer wall of the top of the sliding plate (7), a left protection frame (42) and a right protection frame (43) are connected to one side wall of the fixing frame (41) through hinges respectively, a bolt (44) is installed on one side wall of the left protection frame (42), and the left protection frame (42) is connected with the right protection frame (43) through the bolt (44).
6. The climbing operation platform for the well inside the building according to claim 1, wherein: buffer unit (10) include fixed block (101), fixed block (101) are located spliced pole (9) are kept away from the one end of sliding plate (7), install buffering post (102) on the top outer wall of fixed block (101), be provided with buffer spring (103) on the lateral wall of buffering post (102), buffering post (102) are kept away from the one end detachable of fixed block (101) installs dog (104).
CN202220684149.6U 2022-03-25 2022-03-25 Climbing type operation platform for well way in building Active CN217126583U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220684149.6U CN217126583U (en) 2022-03-25 2022-03-25 Climbing type operation platform for well way in building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220684149.6U CN217126583U (en) 2022-03-25 2022-03-25 Climbing type operation platform for well way in building

Publications (1)

Publication Number Publication Date
CN217126583U true CN217126583U (en) 2022-08-05

Family

ID=82644992

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220684149.6U Active CN217126583U (en) 2022-03-25 2022-03-25 Climbing type operation platform for well way in building

Country Status (1)

Country Link
CN (1) CN217126583U (en)

Similar Documents

Publication Publication Date Title
CN214498342U (en) Climbing type building construction operation platform outside building
CN217126583U (en) Climbing type operation platform for well way in building
CN214656426U (en) Bridge construction platform
CN112780057A (en) Climbing type building construction operation platform outside building
CN215711605U (en) Support for protecting maintenance platform of desulfurization and denitrification tower
CN215167778U (en) But height-adjusting's stable form engineering construction scaffold
CN214570537U (en) Safety protection lift for aerial work platform
CN213738478U (en) Auxiliary device for state maintenance of power equipment
CN213060110U (en) Elevating platform protective structure for electric power construction
CN110629997A (en) Integrated form climbs frame
CN218205593U (en) Safe anti-falling device for building construction
CN220598200U (en) Bridge below operation device
CN217557575U (en) Lifting type building scaffold
CN219690314U (en) High-altitude operation installation protection device and equipment
CN217106072U (en) Construction platform convenient to remove
CN212105031U (en) Building external climbing type building construction device
CN218375063U (en) Scaffold frame of high security
CN220666854U (en) Adjustable construction frame
CN217782783U (en) Safety lifting platform for constructional engineering
CN220401823U (en) Wisdom campus security protection equipment
CN214220525U (en) Scaffold for building engineering
CN212984581U (en) Safety platform that building engineering construction was used
CN217027979U (en) Protection device for house construction
CN220645086U (en) Construction safety work frame with adjustable building engineering is used
CN217128920U (en) Protective structure and scaffold for building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant