CN217108521U - Pipeline hanging device - Google Patents

Pipeline hanging device Download PDF

Info

Publication number
CN217108521U
CN217108521U CN202220523527.2U CN202220523527U CN217108521U CN 217108521 U CN217108521 U CN 217108521U CN 202220523527 U CN202220523527 U CN 202220523527U CN 217108521 U CN217108521 U CN 217108521U
Authority
CN
China
Prior art keywords
pipeline
band iron
link
iron
screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220523527.2U
Other languages
Chinese (zh)
Inventor
孙晓东
吕飞
贾文龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHAANXI HUABIN COAL INDUSTRY CO LTD
Original Assignee
SHAANXI HUABIN COAL INDUSTRY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHAANXI HUABIN COAL INDUSTRY CO LTD filed Critical SHAANXI HUABIN COAL INDUSTRY CO LTD
Priority to CN202220523527.2U priority Critical patent/CN217108521U/en
Application granted granted Critical
Publication of CN217108521U publication Critical patent/CN217108521U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a pipeline cable suspension device belongs to the piping erection field, pipeline cable suspension device, including the link, the link is the arc setting, the first band iron of fixedly connected with on the link lateral wall, first band iron upside is provided with the second band iron, be provided with locking mechanism between first band iron and the second band iron, bilateral symmetry has seted up two mounting holes on the link lateral wall, and this technical scheme passes through mutually supporting between link, first band iron, second band iron and locking mechanism etc. this device is applicable to the colliery and hangs in the pipeline erection of going down many times, can further improve pipeline erection quality in the pit, makes things convenient for the later stage to adjust pipeline erection height after tunnel bottom heave or roof sink.

Description

Pipeline hanging device
Technical Field
The utility model relates to a pipeline installation field, more specifically say, relate to pipeline cable suspension device.
Background
A conduit refers to a pipe in a hydraulic system that carries a working fluid. A pipe is a properly arranged pipe system as opposed to a pipe. Especially, when the operation in the pit, the installation of pipeline plays crucial effect, and the pipeline need utilize the subassembly of hanging to support fixedly when the installation, ensures the stability of pipeline in the use.
When installing the pipeline in the pit among the prior art, generally utilize the wire drawing hook to carry out distance adjustment or use according to field size processing, if the pipeline is more, the intensity of wire drawing hook is relatively poor, easily appears the fracture and causes the pipeline to drop the scheduling problem, and its security performance is relatively poor.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
To the problem that exists among the prior art, the utility model aims to provide a pipeline cable suspension device solves the not enough scheduling problem of wire drawing hook intensity when many times pipeline is hung.
2. Technical scheme
In order to solve the above problems, the utility model adopts the following technical proposal.
Pipeline cable suspension device, including the link, the link is the arc setting, the first band iron of fixedly connected with on the link lateral wall, first band iron upside is provided with the second band iron, be provided with locking mechanism between first band iron and the second band iron, bilateral symmetry has seted up two mounting holes on the link lateral wall.
Furthermore, locking mechanism includes the screw, the screw is located first band iron and second band iron top surface respectively, the screw is provided with two respectively, and the left side is two swing joint has same lead screw in the screw, swing joint has a plurality of lock nut on the lead screw lateral wall.
Furthermore, a bolt matched with the mounting hole is movably connected in the mounting hole.
Furthermore, the inner wall of the hanging ring is fixedly connected with a protective pad, and the protective pad is arranged in an arc shape.
Furthermore, a plurality of gaskets are movably connected to the side wall of the screw rod, and the gaskets are matched with the locking nuts.
Further, the first flat iron and the second flat iron can be arranged in an L shape.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages of:
(1) this technical scheme passes through mutually supporting between link, first band iron, second band iron and the locking mechanism etc. and this device is applicable to the colliery and hangs in the pipeline installation of going down many times, can further improve pipeline installation quality in the pit, makes things convenient for the later stage to adjust pipeline mounting height because of tunnel pucking or roof sink back.
(2) This technical scheme can select the band iron of different specifications according to the place demand during installation through mutually supporting between first band iron and the second band iron etc for pipeline after the installation is more firm stable, prevents that not hard up the scheduling problem that causes to drop from appearing in the pipeline.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged view of the point A of FIG. 1 according to the present invention;
fig. 3 is a schematic structural view of the L-shape of the second flat iron of the present invention.
The reference numbers in the figures illustrate:
1. hanging a ring; 2. a first flat iron; 3. a second flat iron; 4. mounting holes; 5. a screw hole; 6. a screw rod; 7. locking the nut; 8. a bolt; 9. a protective pad; 10. and (7) a gasket.
Detailed Description
The technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiment of the present invention; obviously, the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by those skilled in the art without any inventive work are within the scope of the present invention based on the embodiments of the present invention.
Example 1:
referring to fig. 1-3, the pipeline hanging device includes a hanging ring 1, the hanging ring 1 is arranged in an arc shape, a first flat iron 2 is fixedly connected to the side wall of the hanging ring 1, a second flat iron 3 is arranged on the upper side of the first flat iron 2, a locking mechanism is arranged between the first flat iron 2 and the second flat iron 3, and two mounting holes 4 are symmetrically arranged on the side wall of the hanging ring 1.
Referring to fig. 1, fig. 2, locking mechanism includes screw 5, screw 5 is located first band iron 2 and the 3 top surfaces of second band iron respectively, screw 5 is provided with two respectively, swing joint has same lead screw 6 in two screws 5 on the left side, swing joint has a plurality of lock nut 7 on the 6 lateral walls of lead screw, through link 1, first band iron 2, mutually support between second band iron 3 and the locking mechanism etc., this device is applicable to the colliery and hangs in the pipeline installation of many times in the pit, can further improve pipeline installation quality in the pit, make things convenient for the later stage to adjust pipeline mounting height after tunnel pucking or roof sink.
Referring to fig. 1, the mounting hole 4 is movably connected with a bolt 8 matched with the mounting hole, and the bolt 8 is used for fixing the pipeline more conveniently, so that the pipeline can be conveniently disassembled and maintained in the later period.
Referring to fig. 1, the inner wall of the hanging ring 1 is fixedly connected with a protection pad 9, and the protection pad 9 is arranged in an arc shape, so that a pipeline can be protected, and the hanging ring 1 is prevented from extruding the pipeline to cause pipeline deformation.
Referring to fig. 1 and 2, the side wall of the screw rod 6 is movably connected with a plurality of gaskets 10, the gaskets 10 and the locking nuts 7 are arranged in a matched manner, and the gaskets 10 can enhance the stability between the screw rod 6 and the locking nuts 7, so that the problems of looseness and the like of the locking nuts 7 due to vibration can be avoided.
Referring to fig. 3, first band iron 2 and second band iron 3 can be the setting of L shape, through mutually supporting between first band iron 2 and the second band iron 3 etc. can select the band iron of different specifications according to the place demand during the installation for the pipeline after the installation is more firm stable, prevents that not hard up the scheduling problem that causes to drop from appearing in the pipeline.
The first flat iron 2 and the second flat iron 3 can be manufactured into an L shape, a U shape and the like, and the first flat iron 2 and the second flat iron 3 with different specifications are selected according to different installation components, so that the purpose of combined use is achieved.
When in use: at first according to installation environment selection first band iron 2 and the second band iron 3 of appointed specification, and fix first band iron 2 on link 1, later pass link 1 with the pipeline, screw up bolt 8 again, make link 1 tighten up, fix the pipeline, then fix first band iron 2 and the second band iron 3 on suitable position, play the fixed purpose of support to the pipeline, after long-term the use, tunnel bottom drum or roof sink, the height of usable lead screw 6 regulation pipeline, prevent that the pipeline from taking place to sink the bending, cause potential safety hazard scheduling problem, repeat above-mentioned step, can effectually improve its practicality.
The above description is only the preferred embodiment of the present invention; the scope of the present invention is not limited thereto. Any person skilled in the art should also be able to cover the technical scope of the present invention by replacing or changing the technical solution and the improvement concept of the present invention with equivalents and modifications within the technical scope of the present invention.

Claims (6)

1. Pipeline cable suspension device, including link (1), its characterized in that: the hanging ring is characterized in that the hanging ring (1) is arc-shaped, a first flat iron (2) is fixedly connected to the side wall of the hanging ring (1), a second flat iron (3) is arranged on the upper side of the first flat iron (2), a locking mechanism is arranged between the first flat iron (2) and the second flat iron (3), and two mounting holes (4) are formed in the side wall of the hanging ring (1) in a bilateral symmetry mode.
2. The pipeline hanger of claim 1, wherein: locking mechanism includes screw (5), screw (5) are located first band iron (2) and second band iron (3) top surface respectively, screw (5) are provided with two respectively, and the left side is two swing joint has same lead screw (6) in screw (5), swing joint has a plurality of lock nut (7) on lead screw (6) lateral wall.
3. The pipeline hanger of claim 1, wherein: and a bolt (8) matched with the mounting hole (4) is movably connected in the mounting hole.
4. The pipeline hanger of claim 1, wherein: the inner wall of the hanging ring (1) is fixedly connected with a protective pad (9), and the protective pad (9) is arranged in an arc shape.
5. The pipeline hanger device of claim 2, wherein: the screw rod (6) is movably connected with a plurality of gaskets (10) on the side wall, and the gaskets (10) are matched with the locking nuts (7) mutually.
6. The pipeline hanger of claim 1, wherein: the first flat iron (2) and the second flat iron (3) can be arranged in an L shape.
CN202220523527.2U 2022-03-10 2022-03-10 Pipeline hanging device Expired - Fee Related CN217108521U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220523527.2U CN217108521U (en) 2022-03-10 2022-03-10 Pipeline hanging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220523527.2U CN217108521U (en) 2022-03-10 2022-03-10 Pipeline hanging device

Publications (1)

Publication Number Publication Date
CN217108521U true CN217108521U (en) 2022-08-02

Family

ID=82603009

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220523527.2U Expired - Fee Related CN217108521U (en) 2022-03-10 2022-03-10 Pipeline hanging device

Country Status (1)

Country Link
CN (1) CN217108521U (en)

Similar Documents

Publication Publication Date Title
CN217108521U (en) Pipeline hanging device
CN204385984U (en) Back of the body bolt suspension member group formula shaped steel keel stone curtain wall
CN212338414U (en) Corridor gallows convenient to installation
CN204293716U (en) Transformer safety rope suspension arrangement
CN105977870A (en) Power leading-down cable fixing device
CN204940706U (en) Anti-floating assembly fixed by a kind of reinforcing bar
CN211012628U (en) Graphite heat exchanger fixing device
CN214739166U (en) Composite aluminum buckle plate convenient to install
CN212205027U (en) Hanging type vibration reduction mounting structure of total heat exchanger
CN211521362U (en) Aluminum profile lifting device
CN213233712U (en) Municipal administration sewage pipe network reforms transform engineering device
CN209115905U (en) A kind of foundation bolt for vibratory equipment
CN219860271U (en) Cantilever crane on section bar frame
CN213871438U (en) Energy-saving pipeline suspension bracket for construction engineering with adjustable exquisite construction
CN216759597U (en) Fixing device is used in production of excavator front support assembly
CN202160356U (en) Vertical rod hanging box fixing pedestal
CN214248509U (en) Pipeline side direction antidetonation gallows for construction
CN212359088U (en) Building construction steel pipe fixing device
CN218983250U (en) Multi-specification titanium ingot centering drilling device
CN209876146U (en) Flat spring support hanger
CN216975346U (en) Installation structure of suspension pump for mineral separation
CN210716838U (en) Telescopic peg of dust sensor
CN213328902U (en) Hydraulic engineering slope net
CN216112529U (en) Assembled antidetonation support of multilayer water pipe for interior decoration
CN212475772U (en) Hoisting tool welded on surface of steel pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220802