CN217106247U CN202220163072.8U CN202220163072U CN217106247U CN 217106247 U CN217106247 U CN 217106247U CN 202220163072 U CN202220163072 U CN 202220163072U CN 217106247 U CN217106247 U CN 217106247U
Authority
CN
China
Prior art keywords
water supply
water
shear force
force wall
responsible
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220163072.8U
Other languages
Chinese (zh)
Inventor
袁志豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Yuxinguo Construction Engineering Co ltd
Original Assignee
Guangdong Yuxinguo Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Yuxinguo Construction Engineering Co ltd filed Critical Guangdong Yuxinguo Construction Engineering Co ltd
Priority to CN202220163072.8U priority Critical patent/CN217106247U/en
Application granted granted Critical
Publication of CN217106247U publication Critical patent/CN217106247U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a building technical field, concretely relates to shear force wall area mould curing means, including the outlet pipe, set gradually solenoid valve and booster pump on the outlet pipe, set up in the first water supply person in charge at shear force wall top and set up respectively in two second water supply person in charge of shear force wall both sides, one row of first hole for water spraying has been seted up at the top that the first water supply was responsible for, and the side that the second water supply was responsible for is connected with a plurality of water supply branch pipes, and the shower nozzle is all installed to the delivery port of every water supply branch pipe, and the shower nozzle is just to the side of shear force wall. The utility model discloses a shear force wall area mould curing means is responsible for and sets up the second in the both sides of shear force wall and supplies water through setting up first water supply at the top of shear force wall and be responsible for, effectively cools down the moisturizing to the shear force wall through first hole for water spraying and shower nozzle, makes the temperature of shear force wall unanimous with outdoor temperature, can effectively reduce the vertical crack of shear force wall.

Description

Shear wall area mould curing means
Technical Field
The utility model relates to a building technical field, concretely relates to shear force wall area mould curing means.
Background
At present, maintenance of shear walls is generally performed manually, but when manual maintenance is performed, the problems of high cost, time and labor waste, low efficiency and poor safety always exist, water resource waste is serious, and meanwhile, the condition that maintenance is not in place due to human factors often occurs, so that the quality of concrete is unqualified and the quality after construction is seriously influenced.
Disclosure of Invention
In order to overcome the shortcoming and the deficiency that exist among the prior art, the utility model aims to provide a shear force wall area mould curing means.
The purpose of the utility model is realized through the following technical scheme: the utility model provides a shear force wall area mould curing means, including the outlet pipe, set gradually solenoid valve and booster pump on the outlet pipe, set up in the first water supply person in charge at shear force wall top and set up respectively in two second water supply person in charge of shear force wall both sides, one row of first hole for water spraying has evenly been seted up along its length direction in the top that first water supply person in charge, first hole for water spraying is the inside-out big loudspeaker form, the side that second water supply person in charge evenly is connected with a plurality of water supply branch pipes along its length direction, the shower nozzle is all installed to the delivery port of every water supply branch pipe, the shower nozzle is just to the side of shear force wall, the delivery port of booster pump is connected with four-way joint, four-way joint's three delivery port is responsible for the water inlet through hose and first water supply respectively, two second water supply person in charge's water inlet intercommunication.
Further, the interval between two adjacent first water spray holes is 10-20 cm.
Further, the interval between two adjacent water supply branch pipes is 100-200 cm.
Further, the distance between the spray head and the side face of the shear wall is 50-100 cm.
Further, the spraying angle of the spray head is 80-120 degrees, and the spraying range of the spray head is 80-180 cm.
Furthermore, the spray head comprises a pull cap sleeved on the water outlet of the water supply branch pipe, a spray nozzle screwed on the inner side of the pull cap, and a second water spray hole axially formed in the middle of the spray nozzle.
Furthermore, a first sealing ring is sleeved between the pull cap and the water supply branch pipe, and a second sealing ring is sleeved between the pull cap and the nozzle.
Furthermore, the first sealing ring and the second sealing ring are both polyurethane rubber sealing rings.
The beneficial effects of the utility model reside in that: the utility model discloses a shear force wall area mould curing means is responsible for and sets up the second in the both sides of shear force wall and supplies water through setting up first water supply at the top of shear force wall and be responsible for, effectively cools down the moisturizing to the shear force wall through first hole for water spraying and shower nozzle, makes the temperature of shear force wall unanimous with outdoor temperature, can effectively reduce the vertical crack of shear force wall.
The shear wall belt mold maintenance device of the utility model does not need to manually hold the water pipe for sprinkling operation, thereby avoiding the high-altitude operation of workers and ensuring the operation safety; the first water spraying holes and the spray heads which are uniformly distributed are adopted for spraying water, so that the water consumption is greatly reduced, and a good water saving effect is achieved; by adopting the electromagnetic valve, the sprinkling time can be controlled, the automatic control degree of sprinkling operation is greatly improved, the concrete is in the environment and humidity required by the cement curing process within a certain time, the labor intensity of workers is reduced, and the labor cost is saved.
Drawings
Fig. 1 is a plan view of the present invention.
Fig. 2 is a cross-sectional view of the sprinkler head of the present invention.
The reference signs are: the water supply device comprises a water outlet pipe 1, an electromagnetic valve 2, a booster pump 3, a first water supply main pipe 4, a first water spraying hole 41, a second water supply main pipe 5, a water supply branch pipe 51, a spray head 52, a pull cap 521, a spray nozzle 522, a second water spraying hole 523, a first sealing ring 524, a second sealing ring 525 and a four-way joint 6.
Detailed Description
In order to facilitate the understanding of those skilled in the art, the present invention will be further described with reference to the following examples and accompanying fig. 1-2, which are not intended to limit the present invention.
Referring to fig. 1-2, a shear wall belt mold maintenance device comprises a water outlet pipe 1, an electromagnetic valve 2 and a booster pump 3 which are sequentially arranged on the water outlet pipe 1, set up in the first water supply of shear force wall top and be responsible for 4 and set up respectively in two second water supplies of shear force wall both sides and be responsible for 5, first water supply is responsible for the top of 4 and has evenly seted up one row of first hole for water spraying 41 along its length direction, first hole for water spraying 41 is the loudspeaker form of big-end-up, the side of the second water supply is responsible for 5 evenly is connected with a plurality of water supply branch pipes 51 along its length direction, shower nozzle 52 is all installed to every water supply branch pipe 51's delivery port, shower nozzle 52 is just to the side of shear force wall, booster pump 3's delivery port is connected with four way connection 6, four way connection 6's three delivery port is respectively through hose and the water inlet of the first water supply is responsible for 4, two second water supplies to be responsible for the water inlet intercommunication of 5.
The utility model discloses a shear force wall area mould curing means is responsible for 4 and sets up the second and supply water in the both sides of shear force wall and be responsible for 5 through setting up first water supply at the top of shear force wall, effectively cools down the moisturizing to the shear force wall through first hole for water spraying 41 and shower nozzle 52, makes the temperature and the outdoor temperature of shear force wall unanimous, can effectively reduce the vertical crack of shear force wall.
In this embodiment, the interval between two adjacent first water spraying holes 41 is 10-20 cm. The arrangement of the intervals can ensure that the water consumption is reduced under the condition of the spraying range.
In this embodiment, the interval between two adjacent water supply branch pipes 51 is 100-200 cm. The arrangement of the intervals can ensure that the water consumption is reduced under the condition of the spraying range.
In this embodiment, the distance between the spray head 52 and the side surface of the shear wall is 50-100 cm. The arrangement of the distance can ensure that the water consumption is reduced under the condition of the spraying range.
In this embodiment, the spraying angle of the spraying nozzle 52 is 80 to 120 °, and the spraying range of the spraying nozzle 52 is 80 to 180 cm. The arrangement of the spraying angle and the spraying range can reduce the water consumption.
In this embodiment, the nozzle 52 includes a pull cap 521 sleeved on the water outlet of the water supply branch pipe 51, a nozzle 522 screwed on the inner side of the pull cap 521, and a second water spraying hole 523 axially opened in the middle of the nozzle 522. The arrangement structure of the spray head 52 is simple, and the spraying range can be adjusted.
In this embodiment, a first sealing ring 524 is sleeved between the pulling cap 521 and the water supply branch pipe 51, and a second sealing ring 525 is sleeved between the pulling cap 521 and the nozzle 522. The first seal ring 524 and the second seal ring 525 are provided to seal against leakage of water.
In this embodiment, the first seal ring 524 and the second seal ring 525 are both urethane rubber seal rings. The polyurethane rubber sealing ring has excellent wear resistance, high strength and good elasticity.
The above-mentioned embodiment is the utility model discloses the implementation of preferred, in addition, the utility model discloses can also realize by other modes, not deviating from the utility model discloses any obvious replacement is all within the protection scope under the prerequisite of design.

Claims (8)

1. The utility model provides a shear force wall area mould curing means which characterized in that: including the outlet pipe, set gradually solenoid valve and booster pump on the outlet pipe, set up in the first water supply of shear force wall top and be responsible for and set up respectively in two second water supplies of shear force wall both sides and be responsible for, one row of first hole for water spraying has evenly been seted up along its length direction in the top that first water supply was responsible for, first hole for water spraying is the loudspeaker form of big-end-up in the interior, the side that second water supply was responsible for evenly is connected with a plurality of water supply branch pipes along its length direction, the shower nozzle is all installed to the delivery port of every water supply branch pipe, the shower nozzle is just to the side of shear force wall, the delivery port of booster pump is connected with four way connection, four way connection's three delivery port is respectively through the water inlet that hose and first water supply were responsible for, the water inlet intercommunication of two second water supplies to be responsible for.
2. The shear wall strip mold maintenance device of claim 1, wherein: the interval between two adjacent first water spray holes is 10-20 cm.
3. The shear wall strip mold maintenance device of claim 1, wherein: the interval between two adjacent water supply branch pipes is 100-200 cm.
4. The shear wall strip mold maintenance device of claim 1, wherein: the distance between the spray head and the side face of the shear wall is 50-100 cm.
5. The shear wall strip mold maintenance device of claim 1, wherein: the spraying angle of the spray head is 80-120 degrees, and the spraying range of the spray head is 80-180 cm.
6. The shear wall strip mold maintenance device of claim 1, wherein: the spray head comprises a pull cap sleeved on the water outlet of the water supply branch pipe, a spray nozzle screwed on the inner side of the pull cap, and a second water spray hole axially arranged in the middle of the spray nozzle.
7. A shear wall belt mold maintenance device according to claim 6, characterized in that: a first sealing ring is sleeved between the pull cap and the water supply branch pipe, and a second sealing ring is sleeved between the pull cap and the nozzle.
8. The shear wall strip mold maintenance device of claim 7, wherein: the first sealing ring and the second sealing ring are both polyurethane rubber sealing rings.
CN202220163072.8U 2022-01-21 2022-01-21 Shear wall area mould curing means Active CN217106247U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220163072.8U CN217106247U (en) 2022-01-21 2022-01-21 Shear wall area mould curing means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220163072.8U CN217106247U (en) 2022-01-21 2022-01-21 Shear wall area mould curing means

Publications (1)

Publication Number Publication Date
CN217106247U true CN217106247U (en) 2022-08-02

Family

ID=82597717

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220163072.8U Active CN217106247U (en) 2022-01-21 2022-01-21 Shear wall area mould curing means

Country Status (1)

Country Link
CN (1) CN217106247U (en)

Similar Documents

Publication Publication Date Title
CN104972554B (en) The automatic spray curing system of prefabricated T-shaped beam
CN106431494A (en) Automatic spraying system and method for shear wall curing
CN104264995A (en) Automatic spraying conservation system for high-rise building shear wall structure
CN217106247U (en) Shear wall area mould curing means
CN105003691A (en) Remote control type multi-way energy saving irrigation valve
WO2017128937A1 (en) Panel-type microporous aerator
CN106702631B (en) Multicolor long spray-width atomizing spray-dyeing equipment and control system thereof
CN104389429A (en) Intelligent garden type concrete spray maintenance device and concrete maintenance method thereof
CN207480869U (en) A kind of buried automatic spray curing means of pedestal
CN206220549U (en) A kind of spray equipment for shear wall maintenance
CN208340976U (en) A kind of adjustable spray watering device of hand-held for water receiving pipe
CN211517913U (en) Be used for outdoor concrete curing means
CN210977568U (en) Wind-water linkage adjusting spraying device for dust fall in tunneling work
CN219081084U (en) Outer wall bolt eye shutoff waterproof ring spraying mould
CN208052230U (en) A kind of Intelligent fixed time movable type beam field curing means
CN208557886U (en) The area high-speed rail plate Cun Ban automatic spray curing system
CN216766844U (en) Concrete wall moisturizing and curing device
CN209971070U (en) Concrete member sprays curing means
CN212309914U (en) Can dismantle building outer wall trickle testing arrangement of recovery
CN205954550U (en) A spraying dedusting device for improving underground cavern air quality
CN218190375U (en) Paint spray gun
CN220175934U (en) Concealed sprinkler head
CN215803098U (en) Outer wall water intercepting structure depending on climbing frame
CN213946893U (en) Precast beam curing means
CN216492561U (en) Energy-saving irrigation device for arid area lawn

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant