CN217104918U - Construction equipment is laid to river course slope protection brick for hydraulic engineering - Google Patents
Construction equipment is laid to river course slope protection brick for hydraulic engineering Download PDFInfo
- Publication number
- CN217104918U CN217104918U CN202220218471.XU CN202220218471U CN217104918U CN 217104918 U CN217104918 U CN 217104918U CN 202220218471 U CN202220218471 U CN 202220218471U CN 217104918 U CN217104918 U CN 217104918U
- Authority
- CN
- China
- Prior art keywords
- protection brick
- adjusting
- hydraulic engineering
- plate
- river course
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a construction equipment is laid to river course bank protection brick for hydraulic engineering belongs to the bank protection brick and lays technical field. The utility model provides a construction equipment is laid to river course slope protection brick for hydraulic engineering, includes moving frame, and the moving frame right part articulates there are two bracing pieces, rotates between two bracing pieces to be connected with a plurality of skew rollers, is located rear side vaulting pole outer wall and has set firmly the locating plate, and is located rear side vaulting pole top surface and is equipped with the roll adjustment arc board, is located front side vaulting pole bottom surface and has set firmly spacing L board, is located front side vaulting pole top surface and is equipped with the regulation arc board, and regulation arc board left part cover is equipped with the interception arc board. The utility model discloses but the portable regulation of roll adjustment arc board for the device is applicable to not unidimensional bank protection brick transportation, has improved the suitability of device greatly.
Description
Technical Field
The utility model relates to a technical field is laid to the bank protection brick, more specifically says, relates to a construction equipment is laid to river course bank protection brick for hydraulic engineering.
Background
Slope protection refers to the general term of various paving and planting on a slope surface in order to prevent the slope from being washed. In the river section where the bridge site is located, the concave bank of the river bank is washed by water flow year by year, and the river bank can be continuously collapsed. In order to protect the safety of bridges and embankments, protective buildings need to be built on the concave bank. Patent document of publication No. CN112554136A provides a construction equipment is laid to river course slope protection brick for hydraulic engineering among the prior art, the device passes through conveying mechanism and carries the commentaries on classics piece, synchronous drive positioning mechanism when every carries a commentaries on classics piece, positioning mechanism is with a fragment of brick length in guide rail below, thereby make the fragment of brick slide to guide rail on along guide rail landing to the side slope, realize that the fragment of brick closely lays, avoid artifical side slope and bank that come and go, improve laying efficiency, though the device beneficial effect is more, nevertheless still there is the following problem: the bank protection brick removes in the track, has great frictional resistance, is unfavorable for the bank protection brick to lay, in view of this, we provide a construction equipment is laid to river course bank protection brick for hydraulic engineering.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
An object of the utility model is to provide a construction equipment is laid to river course slope protection brick for hydraulic engineering to solve the problem that provides in the above-mentioned background art.
2. Technical scheme
A riverway slope protection brick laying construction device for hydraulic engineering comprises a movable frame, wherein a cross rod is inserted into the left wall of the movable frame, an adjusting screw A is in threaded fit with the middle of the cross rod, a limiting plate is fixedly arranged on the right wall of the cross rod, two supporting rods are hinged to the right part of the movable frame in a front-back symmetrical structure, penetrating grooves are formed in the outer walls of the supporting rods, a plurality of inclined rolling shafts are rotatably connected between the two supporting rods in a linear equidistant structure, a positioning plate is fixedly arranged on the outer wall of the supporting rod at the rear side, an adjusting screw B is rotatably connected to the middle of the positioning plate, a distance adjusting arc plate is arranged on the top surface of the supporting rod at the rear side, an adjusting frame is fixedly arranged on the rear wall of the distance adjusting arc plate, a limiting L plate is fixedly arranged on the bottom surface of the supporting rod at the front side, a fastening bolt is arranged on the right part of the limiting L plate, an adjusting arc plate is arranged on the top surface of the supporting rod at the front side, the adjustable arc plate is characterized in that a spring groove is formed in the right part of the adjustable arc plate, an intercepting arc plate is sleeved on the left part of the adjustable arc plate, and a tension spring is fixedly arranged on the left wall of the intercepting arc plate.
Preferably, the adjusting screw a is rotatably connected with the moving frame.
Preferably, the limiting plate is in sliding fit with the through groove.
Preferably, the inner walls of the distance-adjusting arc plate, the adjusting arc plate and the intercepting arc plate are all rotatably connected with rollers.
Preferably, the adjusting frame is in threaded fit with the adjusting screw rod B, and the adjusting frame is in sliding fit with the positioning plate.
Preferably, the adjusting arc plate is in sliding fit with the limiting L plate.
Preferably, the intercepting arc plate is in sliding fit with the adjusting arc plate.
Preferably, the tension spring is fixedly connected with the spring groove.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages of:
1. the utility model discloses an adjusting screw A can carry out angle modulation to the bracing piece for the slope protection brick of oblique roller bearing top surface transportation removes more swiftly, through roll adjustment arc board, a plurality of rollers of regulation arc board and interception arc inboard wall rotation connection, it is spacing to carry out the water conservancy diversion to the slope protection brick of removing through the roller, makes the slope protection brick be difficult for dropping, has improved the result of use of device greatly, has solved the slope protection brick and has removed in the track, has great frictional resistance, is unfavorable for the problem that the slope protection brick was laid.
2. The utility model discloses portable regulation of roll adjustment arc board for the device is applicable to not unidimensional bank protection brick transportation, has improved the suitability of device greatly, and this device simple structure is compact, and the simple operation has fine transport effect.
Drawings
Fig. 1 is a left side schematic view of the overall structure of the present invention;
FIG. 2 is a right side schematic view of the overall structure of the present invention;
FIG. 3 is a schematic view of the whole structure of the present invention;
fig. 4 is a rear side schematic view of the overall structure of the present invention;
the reference numbers in the figures illustrate: 1. a moving frame; 2. a cross bar; 3. a support bar; 4. an oblique roller; 5. positioning a plate; 6. adjusting the distance of the arc plate; 7. a limiting L plate; 8. adjusting the arc plate; 9. intercepting an arc plate; 201. adjusting a screw A; 202. a limiting plate; 301. a through slot; 501. adjusting a screw B; 601. an adjusting frame; 801. a spring slot; 901. a tension spring.
Detailed Description
Referring to fig. 1-4, the present invention provides a technical solution:
a riverway slope protection brick laying construction device for hydraulic engineering comprises a movable frame 1, a cross rod 2 is inserted into the left wall of the movable frame 1, an adjusting screw A201 is in threaded fit with the middle of the cross rod 2, the adjusting screw A201 is convenient to drive a limiting plate 202 to be adjusted in height, so that the angle of the supporting rod 3 is inclined, the brick is convenient to move, a limiting plate 202 is fixedly arranged on the right wall of the cross rod 2, the right part of the movable frame 1 is hinged with two supporting rods 3 in a front-back symmetrical structure, a through groove 301 is formed in the outer wall of each supporting rod 3, a plurality of inclined rolling shafts 4 are rotatably connected between the two supporting rods 3 in a linear equal-interval structure, the inclined rolling shafts 4 are convenient to reduce the moving friction resistance of the slope protection brick, a positioning plate 5 is fixedly arranged on the outer wall of a rear supporting rod 3, an adjusting screw B501 is rotatably connected to the middle of the positioning plate 5, the adjusting screw B501 is convenient to drive the distance adjustment of an arc plate 6, and an arc plate 6 is arranged on the top surface of the rear supporting rod 3, the back wall of the distance-adjusting arc plate 6 is fixedly provided with an adjusting frame 601, the bottom surface of the front side supporting rod 3 is fixedly provided with a limiting L plate 7, the right part of the limiting L plate 7 is screwed with a fastening bolt, the top surface of the front side supporting rod 3 is provided with an adjusting arc plate 8, the right part of the adjusting arc plate 8 is provided with a spring groove 801, the left part of the adjusting arc plate 8 is sleeved with an intercepting arc plate 9, and the left wall of the intercepting arc plate 9 is fixedly provided with a tension spring 901.
Specifically, adjusting screw A201 rotates with moving frame 1 to be connected, is convenient for drive limiting plate 202 height adjustment for 3 angular inclinations of bracing piece make things convenient for the fragment of brick to remove.
Further, the limiting plate 202 is slidably fitted in the through groove 301, so as to limit the angular inclination of the supporting rod 3.
Still further, the equal rotation of roll adjustment arc 6, regulation arc 8 and the 9 inner walls of interception arc is connected with the roller, is convenient for reduce the frictional resistance that slope protection brick transportation produced.
Furthermore, the adjusting frame 601 is in threaded fit with the adjusting screw B501, and the adjusting frame 601 is in sliding fit with the positioning plate 5, so as to facilitate driving the distance adjustment of the distance adjusting arc plates 6.
It is worth to say that, adjusting arc board 8 and spacing L board 7 sliding fit, be convenient for adjust the spacing removal of arc board 8.
It is worth noting that the intercepting arc plate 9 is in sliding fit with the adjusting arc plate 8, so as to define the moving track of the intercepting arc plate 9.
In addition, the tension spring 901 is fixedly connected with the spring groove 801, so that the intercepting arc plate 9 is conveniently limited and pulled.
The working principle is as follows: when the device is used, the movable frame 1 of the device is moved to the slope edge, then the supporting rod 3 is adjusted in an inclined way according to the use requirement, the adjusting screw A201 is manually rotated clockwise, the adjusting screw A201 is in threaded fit with the cross rod 2, further driving the cross bar 2 to move downwards for limiting, so that the limiting plate 202 drives the left ends of the two support bars 3 to incline for limiting, after adjusting to a proper angle, stopping rotating the adjusting screw A201, then according to the size of the slope protection brick, the distance of the distance adjusting arc plate 6 is adjusted by manually rotating the adjusting screw B501 clockwise, the adjusting screw B501 is in threaded fit with the adjusting frame 601, the adjusting frame 601 is limited and pushed forwards, when the distance between the distance-adjusting arc plate 6 and the distance-adjusting arc plate 8 is in accordance with the size of the slope protection brick, the rotation of the adjusting screw B501 is stopped, then place the slope protection brick and carry at 4 top surfaces of oblique roller bearing, place the department through removal regulation arc board position to the slope protection brick at last and adjust can.
Claims (8)
1. The utility model provides a construction equipment is laid to river course bank protection brick for hydraulic engineering, includes moving frame (1), its characterized in that: the movable frame is characterized in that a left wall of the movable frame (1) is inserted with a cross rod (2), the middle of the cross rod (2) is in threaded fit with an adjusting screw A (201), a limiting plate (202) is fixedly arranged on a right wall of the cross rod (2), a front symmetrical structure and a rear symmetrical structure of the right part of the movable frame (1) are hinged with two support rods (3), a through groove (301) is formed in the outer wall of each support rod (3), a plurality of inclined rolling shafts (4) are rotatably connected between the two support rods (3) in a linear equidistant structure, a positioning plate (5) is fixedly arranged on the outer wall of each support rod (3) on the rear side, an adjusting screw B (501) is rotatably connected in the middle of each positioning plate (5), a distance adjusting arc plate (6) is arranged on the top surface of each support rod (3) on the rear side, an adjusting frame (601) is fixedly arranged on the rear wall of each distance adjusting arc plate (6), a limiting L plate (7) is fixedly arranged on the bottom surface of each support rod (3) on the front side, spacing L board (7) right part spiro union has fastening bolt, is located the front side bracing piece (3) top surface is equipped with adjusts arc board (8), adjust arc board (8) right part and seted up spring groove (801), it is equipped with interception arc board (9) to adjust arc board (8) left part cover, interception arc board (9) left wall has set firmly extension spring (901).
2. The river course bank protection brick laying construction device for hydraulic engineering of claim 1, characterized in that: the adjusting screw A (201) is rotatably connected with the movable frame (1).
3. The river course bank protection brick laying construction device for hydraulic engineering of claim 1, characterized in that: the limiting plate (202) is in sliding fit with the through groove (301).
4. The river course bank protection brick laying construction device for hydraulic engineering of claim 1, characterized in that: the inner walls of the distance-adjusting arc plate (6), the adjusting arc plate (8) and the intercepting arc plate (9) are all rotatably connected with rollers.
5. The river course bank protection brick laying construction device for hydraulic engineering of claim 1, characterized in that: the adjusting frame (601) is in threaded fit with the adjusting screw B (501), and the adjusting frame (601) is in sliding fit with the positioning plate (5).
6. The river course bank protection brick laying construction device for hydraulic engineering of claim 1, characterized in that: the adjusting arc plate (8) is in sliding fit with the limiting L plate (7).
7. The river course bank protection brick laying construction device for hydraulic engineering of claim 1, characterized in that: the intercepting arc plate (9) is in sliding fit with the adjusting arc plate (8).
8. The river course bank protection brick laying construction device for hydraulic engineering of claim 1, characterized in that: the tension spring (901) is fixedly connected with the spring groove (801).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220218471.XU CN217104918U (en) | 2022-01-26 | 2022-01-26 | Construction equipment is laid to river course slope protection brick for hydraulic engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220218471.XU CN217104918U (en) | 2022-01-26 | 2022-01-26 | Construction equipment is laid to river course slope protection brick for hydraulic engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217104918U true CN217104918U (en) | 2022-08-02 |
Family
ID=82596073
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220218471.XU Active CN217104918U (en) | 2022-01-26 | 2022-01-26 | Construction equipment is laid to river course slope protection brick for hydraulic engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217104918U (en) |
-
2022
- 2022-01-26 CN CN202220218471.XU patent/CN217104918U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111648306A (en) | Concrete paving device for canal lining | |
CN212612285U (en) | Concrete paving device for canal lining | |
CN114439264B (en) | Foundation pit guardrail shielding device during foundation pit soil sampling | |
CN110656664B (en) | Waterproof coiled material device is laid to piping lane side wall | |
CN217104918U (en) | Construction equipment is laid to river course slope protection brick for hydraulic engineering | |
CN110409368B (en) | Angle-adjustable permeable T-dam | |
CN209139677U (en) | Auxiliary feeding frame on plate shearing machine | |
CN113089673B (en) | Guiding device for concrete pipe pile construction | |
CN214699537U (en) | Be used for horizontal damping device of reinforcing bar template floor concrete pump line | |
CN210917205U (en) | Angle-adjustable permeable spur dike | |
CN112554187A (en) | Steel-pipe pile construction guiding mechanism based on pile foundation engineering | |
CN210662030U (en) | Adjustable fixing frame for visual identification of angle steel camera | |
CN210418291U (en) | Feeding structure | |
CN208167741U (en) | A kind of large size template mobile device | |
CN113550332A (en) | Emergency collapse-preventing supporting rack applied to urban pipeline ditch construction | |
CN111335117A (en) | Concrete paving device for road construction | |
CN215289942U (en) | Automatic side slope rolling device | |
CN219100049U (en) | Steel sheet pile draws hole guider | |
CN214943138U (en) | Foundation ditch rail guard | |
CN220284707U (en) | River bed guiding device | |
CN212098164U (en) | Convenient to use's drawing device for mechanical design | |
CN210681745U (en) | Concrete member storage structure | |
CN215055493U (en) | Large-span steel structure sliding device | |
CN221094773U (en) | Asphalt concrete pavement paving control template | |
CN219491020U (en) | Movable steel structure for guaranteeing safe and rapid construction of groove |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |