CN217104752U - Auxiliary tool for mounting bridge precast beam - Google Patents

Auxiliary tool for mounting bridge precast beam Download PDF

Info

Publication number
CN217104752U
CN217104752U CN202220761079.XU CN202220761079U CN217104752U CN 217104752 U CN217104752 U CN 217104752U CN 202220761079 U CN202220761079 U CN 202220761079U CN 217104752 U CN217104752 U CN 217104752U
Authority
CN
China
Prior art keywords
precast beam
bridge
mounting
auxiliary tool
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220761079.XU
Other languages
Chinese (zh)
Inventor
袁松涛
栾加友
栾楷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Progressive Concrete Prefabricated Component Co ltd
Original Assignee
Jiangsu Progressive Concrete Prefabricated Component Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Progressive Concrete Prefabricated Component Co ltd filed Critical Jiangsu Progressive Concrete Prefabricated Component Co ltd
Priority to CN202220761079.XU priority Critical patent/CN217104752U/en
Application granted granted Critical
Publication of CN217104752U publication Critical patent/CN217104752U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to the technical field of bridge laying, in particular to an auxiliary tool for mounting a bridge precast beam, which solves the defects that when a bridge precast beam body is hoisted and riveted, end connecting holes are difficult to finely adjust the bridge precast beam body, and comprises a base, wherein a jack is arranged on the upper surface of the base, a supporting plate is fixed on the telescopic end of the jack, a supporting rod is welded on the upper surface of the base, a supporting ball is clamped at the top end of the supporting rod, a vertical plate is welded at one end of the base, a pedal is fixed on the adjusting end of the jack, a clamping plate is welded on the inner side of the top of the vertical plate, an adjusting ball is clamped on the inner side of the clamping plate, an adjusting ball is clamped in the adjusting ball and provided with a pry bar, a precast beam is arranged on the upper surface of the supporting plate, and the auxiliary tool for mounting the bridge precast beam can effectively adjust the position of the precast beam after one end of the precast beam is tilted, thereby ensuring that riveting holes at the end parts of the two precast beams are aligned, the installation of convenient precast beam is fixed.

Description

Auxiliary tool for mounting bridge precast beam
Technical Field
The utility model relates to a technical field is laid to the bridge, especially relates to an appurtenance is used in installation of bridge precast beam.
Background
The bridge is generally a structure erected on rivers, lakes and seas to enable vehicles, pedestrians and the like to smoothly pass through, and is also extended to be a building which is erected to span mountain stream, unfavorable geology or meet other traffic needs to enable the vehicles, pedestrians and the like to pass through more conveniently in order to adapt to the modern high-speed developed traffic industry. The bridge generally comprises an upper structure, a lower structure, a support and an auxiliary structure, wherein the upper structure is also called a bridge span structure and is a main structure for spanning obstacles; the lower structure comprises a bridge abutment, a bridge pier and a foundation; the support is a force transmission device arranged at the supporting positions of the bridge span structure and the bridge pier or the bridge abutment; the auxiliary structures refer to bridge end butt straps, tapered revetments, diversion works and the like.
At present, for standardized production, the bridge precast beam is mostly made into standard parts according to laying requirements, mounting holes for riveting are formed in the end part of the bridge precast beam, the weight of the precast beam is heavy, riveting holes in the end part are required to be aligned when the precast beams at the front end and the rear end are riveted, when the precast beams are hung, the amplitude swing of a beam body is difficult to control, and the beam body is placed and then adjusted, so that the adjustment is difficult due to the heavy weight of the beam body.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving among the prior art when the hoist and mount of bridge precast beam body rivet, the end connection hole is difficult to it, is difficult to carry out the shortcoming of fine setting to the precast beam, and the installation of a bridge precast beam appurtenance who provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides an appurtenance is used in installation of bridge precast beam, the on-line screen storage device comprises a base, surface mounting has the jack on the base, the flexible end of jack is fixed with the fagging, and the skin weld has the bracing piece on the base, bracing piece top card is equipped with the support ball, and the welding of base one end has the riser, and jack adjusting end is fixed with the step, the inboard welding in riser top has splint, the inboard card of splint is equipped with the regulation ball, it is equipped with the pinch bar to adjust the ball inside callipers, the fagging upper surface is provided with precast beam.
Preferably, one end of the pedal penetrates through and extends to the outside of one side of the vertical plate, and a clamping hole matched with the pedal is formed in the outer side of the vertical plate.
Preferably, the surface of the supporting plate is provided with a mounting hole matched with the supporting rod.
Preferably, a guide block is arranged on one side of the supporting plate, and a guide groove matched with the vertical plate is formed in the inner side of the vertical plate.
Preferably, the clamping plate is of a circular arc structure.
Preferably, the bottom end of the pry bar is of a conical structure.
The utility model has the advantages that:
this bridge precast beam installation appurtenance can effectively adjust precast beam position with precast beam one end perk back to guarantee that the riveting hole of two sections precast beam tip aligns, make things convenient for the installation of precast beam to fix.
Drawings
Fig. 1 is a schematic structural view of an auxiliary tool for mounting a bridge precast beam provided by the present invention;
fig. 2 is a schematic top view of the auxiliary tool for mounting the bridge precast beam provided by the present invention;
fig. 3 is the utility model provides a bridge is appurtenance's precast beam laying structure schematic diagram for precast beam installation.
In the figure: 1. a base; 2. a jack; 3. a support bar; 4. a support ball; 5. a supporting plate; 6. stepping; 7. a vertical plate; 8. a splint; 9. adjusting the ball; 10. a pry bar; 11. and (5) prefabricating the beam.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-3, an appurtenance is used in installation of bridge precast beam, including base 1, 1 upper surface mounting of base has jack 2, 2 telescopic end of jack is fixed with fagging 5, 1 upper surface welding of base has bracing piece 3, 3 top cards of bracing piece are equipped with support ball 4, 1 one end welding of base has riser 7, 2 adjusting end of jack is fixed with step 6, 7 inboard welding in top of riser have splint 8, 8 inboard cards of splint are equipped with adjusting ball 9, the card is equipped with pinch bar 10 in the adjusting ball 9, 5 upper surfaces of fagging are provided with precast beam 11.
Step 6 one end run through and extend to one side of riser 7 outside, the riser 7 outside seted up with step 6 complex card hole, 5 surfaces of fagging seted up with bracing piece 3 complex mounting holes, fagging 5 one side is provided with the guide block, 7 inboard setups of riser rather than complex guide way, splint 8 are circular-arc structure, and pinch bar 10 bottom is the toper structure.
In this embodiment, the supporting plate 5 is first controlled to be lifted by stepping on the foot 6, so that the supporting plate 5 is higher than the supporting balls 4 at the top of the supporting rod 3, and then the precast beam 11 is lifted and slowly lowered, so that the end of the precast beam is located on the upper surface of the supporting plate 5, and the jack 2 is adjusted to lower the supporting plate 5, at this time, the precast beam 11 will be separated from the supporting plate 5, and the lower surface of the precast beam will be in contact with the supporting balls 4.
Furthermore, after the pry bar 10 is inserted into the adjusting ball 9, one end of the pry bar is pushed into the riveting hole of the precast beam 11, the pry bar 10 is pulled off, the adjusting ball 9 rotates in the clamping plate 8, so that the position of the precast beam 11 is finely adjusted, the bottom of the precast beam 11 is in contact with the supporting ball 4, the contact area is small, and the supporting ball 4 can rotate, so that the fine adjustment of the precast beam 11 does not need to consume more physical force, the riveting hole without the bayonet lock is firstly positioned after adjustment, the rivet is inserted, the base 1 is pulled outwards, the whole auxiliary device can be separated from the precast beam 11, the positioning of the precast beam 11 is completed, and the installation work is convenient.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides an appurtenance is used in installation of bridge precast beam, includes base (1), its characterized in that, surface mounting has jack (2) on base (1), jack (2) flexible end is fixed with fagging (5), and surface welding has bracing piece (3) on base (1), bracing piece (3) top card is equipped with support ball (4), and base (1) one end welding has riser (7), and jack (2) regulating end is fixed with step foot (6), the inboard welding in riser (7) top has splint (8), splint (8) inboard card is equipped with adjusting ball (9), adjusting ball (9) inside callipers is equipped with pinch bar (10), fagging (5) upper surface is provided with precast beam (11).
2. The auxiliary tool for mounting the bridge precast beam is characterized in that one end of the pedal (6) penetrates through and extends to the outside of one side of the vertical plate (7), and a clamping hole matched with the pedal (6) is formed in the outside of the vertical plate (7).
3. The auxiliary tool for mounting the bridge precast beam is characterized in that the surface of the supporting plate (5) is provided with a mounting hole matched with the supporting rod (3).
4. The auxiliary tool for mounting the bridge precast beam is characterized in that a guide block is arranged on one side of the supporting plate (5), and a guide groove matched with the vertical plate (7) is formed on the inner side of the vertical plate.
5. The auxiliary tool for mounting the bridge precast beam is characterized in that the clamping plate (8) is of a circular arc structure.
6. The auxiliary tool for the installation of the bridge precast beam is characterized in that the bottom end of the pry bar (10) is in a conical structure.
CN202220761079.XU 2022-04-02 2022-04-02 Auxiliary tool for mounting bridge precast beam Active CN217104752U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220761079.XU CN217104752U (en) 2022-04-02 2022-04-02 Auxiliary tool for mounting bridge precast beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220761079.XU CN217104752U (en) 2022-04-02 2022-04-02 Auxiliary tool for mounting bridge precast beam

Publications (1)

Publication Number Publication Date
CN217104752U true CN217104752U (en) 2022-08-02

Family

ID=82577697

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220761079.XU Active CN217104752U (en) 2022-04-02 2022-04-02 Auxiliary tool for mounting bridge precast beam

Country Status (1)

Country Link
CN (1) CN217104752U (en)

Similar Documents

Publication Publication Date Title
CN208815525U (en) A kind of positioning guiding rack for the construction of pile foundation steel pile casting
CN103410335B (en) Front support post-tensioning large cantilever beam integral embedded type construction method for hanging
CN217104752U (en) Auxiliary tool for mounting bridge precast beam
CN116332061A (en) High-strength steel welded pipe for crane boom
CN217539856U (en) Pipeline connecting device for hydraulic engineering
CN218526061U (en) Mounting structure of cable stringing pole
CN206987345U (en) A kind of scaffold connecting structure for aluminum alloy mould plate construction
CN110076468A (en) A kind of jack truss installation method and its temporary fastening device
CN211621558U (en) Bored concrete pile steel reinforcement cage elevation control mounting structure
CN214530590U (en) Single-pile stabilizing platform of large-diameter pile body
CN112267486B (en) Steel pipe concrete anti-seismic bridge pile foundation and pile foundation construction method
CN211420889U (en) Temporary limiting device for linear adjustment of PC track beam
CN114753259A (en) Alignment leveling method for precast beam erection construction
CN211113201U (en) Self-stabilizing lattice type supporting system
CN215828158U (en) Culvert pipe overhead hoist for hydraulic engineering
CN220598126U (en) Bridge base structure
CN212475838U (en) Marine crane tower second platform limiting assembly
CN218745226U (en) Bridge pipe fitting cutting assembly
CN220848024U (en) H-shaped steel beam butt joint device
CN212129884U (en) Security protection device for engineering construction
CN211056457U (en) Building structure reinforcing apparatus
CN216959122U (en) A spud pile device for cable laying
JPS627120B2 (en)
CN217580280U (en) Structure is assembled to component of assembled station
CN221253588U (en) Auxiliary lifting device for curtain wall aluminum alloy cross beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant