CN208815525U - A kind of positioning guiding rack for the construction of pile foundation steel pile casting - Google Patents

A kind of positioning guiding rack for the construction of pile foundation steel pile casting Download PDF

Info

Publication number
CN208815525U
CN208815525U CN201821268856.7U CN201821268856U CN208815525U CN 208815525 U CN208815525 U CN 208815525U CN 201821268856 U CN201821268856 U CN 201821268856U CN 208815525 U CN208815525 U CN 208815525U
Authority
CN
China
Prior art keywords
frame
steel pile
pile casting
door frame
pile foundation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821268856.7U
Other languages
Chinese (zh)
Inventor
李敏
李汉愿
刘磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
Fifth Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical Fifth Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority to CN201821268856.7U priority Critical patent/CN208815525U/en
Application granted granted Critical
Publication of CN208815525U publication Critical patent/CN208815525U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a kind of positioning guiding racks for the construction of pile foundation steel pile casting, including door frame and open frame, open frame is that successively in addition fixation is on one side the frame on doorway on three sides, and the vertical beam of door frame two sides is hinged with the doorway of open frame respectively;Quadrangular frame top, the first locating rod is welded between every two adjacent side stand, the second locating rod is welded between door frame and the side stand of two sides;It is the octagon connecting rod surrounded by the upper beam of the top beam of three side stands, two the first locating rods, two the second locating rods and door frame in quadrangular frame roof, the inscribed diameter of a circle of the octagon connecting rod is 2cm bigger than the outer diameter for the pile foundation steel pile casting transferred in advance;Guide roller is equipped on the upper beam of two the first locating rods and door frame, the inscribe diameter of a circle of three guide rollers is 1cm bigger than with the outer diameter for the pile foundation steel pile casting transferred in advance.The efficient and convenient accurate positioning of steel pile casting may be implemented in the utility model.

Description

A kind of positioning guiding rack for the construction of pile foundation steel pile casting
Technical field
The utility model relates to a kind of positioning devices for the construction of pile foundation steel pile casting, more particularly to one kind to be used for pile foundation steel The positioning guiding rack of casing construction.
Background technique
Currently, in cross a river construction field over strait, it is often necessary to pile foundation is set up in water, it is usual when constructing pile foundation It needs first to sink to pile foundation steel pile casting.To ensure that plan-position when sinking steel protecting canister and verticality meet construction requirement, need big The crane barge of type and underwater operation personnel cooperation, there are costly and personnel safeties to guarantee.If the river at construction Water flow velocity is larger, is more difficult to be accurately positioned (stake steel pile casting is squeezed into using vibration hammer in water) when beating steel pile casting.Therefore, urgently A kind of simple device is needed to complete the accurate positioning of pile foundation steel pile casting.
Summary of the invention
In order to overcome prior art problem, the utility model provides a kind of positioning and guiding for the construction of pile foundation steel pile casting It is efficient and convenient accurate that steel pile casting may be implemented by installing the positioning and guiding of pile foundation steel pile casting construction on drilling platform in frame Positioning.
In order to solve the above-mentioned technical problem, the utility model proposes it is a kind of for pile foundation steel pile casting construction positioning and guiding Frame, including a quadrangular frame, the quadrangular frame include a door frame and an open frame, the open frame Frame is that successively in addition fixation is on one side the frame on doorway on three sides, and the open frame is made of three side stands, three Side stand is made of three adjacent columns and the top beam, bottom beam and the diagonal brace that are arranged between two successively adjacent columns, institute State the vertical beam and upper beam and lower beam that door frame includes two sides, the vertical beam of the door frame two sides respectively with the doorway of open frame Hingedly;Quadrangular frame top, be welded with the first locating rod between every two adjacent side stand, the door frame with The second locating rod is welded between the side stand of two sides;It is a top by three side stands in the quadrangular frame roof The octagon connecting rod that the upper beam of beam, two the first locating rods, two the second locating rods and door frame surrounds, the octagon connecting rod Inscribed diameter of a circle is 2cm bigger than the outer diameter for the pile foundation steel pile casting transferred in advance;In the upper cross of two the first locating rods and the door frame Guide roller is equipped on beam, the inscribe diameter of a circle of three guide rollers is bigger than with the outer diameter for the pile foundation steel pile casting transferred in advance 1cm。
Further, in the utility model, the top of the quadrangular frame be equipped with multiple guide pads, guide pad it is interior Side is inclined-plane, and the medial surface of multiple guide pads forms a horn mouth.
It is welding between the positioning guiding rack and drilling platform, limit is connected between positioning guiding rack and drilling platform and is added Strength plate.
Support rod is respectively connected between two the first locating rods and two columns being connected.
Compared with prior art, the beneficial effects of the present invention are:
Since the utility model positioning guiding rack is designed as open frame structure, compared to closed frame convenient for artificial pre- Adjustment, and safety;This practical positioning guiding rack is by being arranged multiple guide rollers in frame internal orifice, smoothly convenient for steel pile casting Decentralization;In addition, be equipped with the guide pad of generally bell mouth shape at the top of frame, convenient for steel pile casting thread into.
Detailed description of the invention
Fig. 1 is the main view of the utility model positioning guiding rack;
Fig. 2 is the top view of positioning guiding rack shown in Fig. 1;
Fig. 3 is the operational flowchart that sinking steel protecting canister construction is carried out using the utility model positioning guiding rack.
In figure: 1- door frame, 11- vertical beam, 12- upper beam, 13- lower beam, 2- side stand, 3- column, 31- top beam, 32- Bottom beam, 33- diagonal brace, the first locating rod of 4-, the second locating rod of 5-, 6- guide roller, 7- guide pad, 8- drilling platform, strength plate.
Specific embodiment
Technical solution of the present invention is described in further detail in the following with reference to the drawings and specific embodiments, it is described specific Embodiment is only explained the present invention, is not intended to limit the invention.
The utility model proposes it is a kind of for pile foundation steel pile casting construction positioning guiding rack, as depicted in figs. 1 and 2, should Positioning guiding rack includes a quadrangular frame, and the quadrangular frame includes a door frame 1 and an open frame, described Open frame is that successively in addition fixation is on one side the frame on doorway on three sides, and the open frame is by three side stands 2 It constitutes, three side stands weld together, and the appended drawing reference 30 in Fig. 2 shows weld seam, and three side stands 2 are by adjacent three Column 3 and the top beam 31 being arranged between two successively adjacent columns 3, bottom beam 32 and diagonal brace 33 are constituted, and the door frame 1 includes The vertical beam 11 and upper beam 12 and lower beam 13 of two sides, the vertical beam 11 of 1 two sides of door frame respectively with the doorway of open frame Hinged 20;Quadrangular frame top, the first locating rod 4 is welded between every two adjacent side stand 2, in order to even The stability connect, two the first locating rods 4 and is respectively connected with support rod between two columns 3 being connected.The door frame 1 with The second locating rod 5 is welded between the side stand 2 of two sides;It is one by three side stands in the quadrangular frame roof The octagon connecting rod that the upper beam 12 of the second locating rod 5 of the first locating rod 4 two of top beam 31, two and door frame surrounds, eight side The inscribed diameter of a circle of shape connecting rod is 2cm bigger than the outer diameter for the pile foundation steel pile casting 40 transferred in advance;In two the first locating rods 4 and described Be equipped with guide roller 6 on the upper beam 12 of door frame 1, the inscribe diameter of a circles of three guide rollers 6 than with the pile foundation transferred in advance The big 1cm of the outer diameter of steel pile casting 40.Multiple guide pads 7 are equipped at the top of the quadrangular frame, the medial surface of guide pad 7 is oblique The medial surface in face, multiple guide pads 7 forms a horn mouth.
The positioning guiding rack is welded on drilling platform 8 with channel steel using when the positioning guiding rack, and in positioning and guiding Strength plate 9 is welded on frame by positioning guiding rack in 8 upper limit of drilling platform.
The embodiment of sinking steel protecting canister is carried out using the utility model positioning guiding rack:
As depicted in figs. 1 and 2, total a height of 4m of positioning guiding rack is directly stood on above drilling platform, center and pile foundation Center is overlapped.In view of steel pile casting handling enters the convenience in hole, the side of positioning guiding rack according to activity can evolution formula design, remaining Three sides use stationary frame structure.Positioning guiding rack uses 4 symmetrical cloth of triangle bracket after being adjusted in place between drilling platform Single-sided welding limit, floating-crane lifting steel pile casting are set, and is entered slowly.Positioning guiding rack is first by artificial coarse positioning, plan-position Positioning accuracy deviation must not exceed 3cm, and after movable door frame is shut, the gap between steel pile casting and guide roller 6 is controlled by 1cm System, the second locating rod of then burn-oning.
As shown in figure 3, the step of sinking steel protecting canister, is as follows:
(1) positioning guiding rack is in place: the plan-position of survey crew's setting-out positioning guiding rack 10, lifts positioning and guiding Frame 10 is in place, adjusts verticality and the plan-position of positioning guiding rack 10.It by channel steel and is bored in the lower part of positioning guiding rack 10 Hole platform 8 welds, while using strength plate 9 by positioning guiding rack 10 in 8 upper limit of drilling platform.
(2) steel pile casting merogenesis lifts: steel pile casting uses 150t floating-crane lifting and installation, and longer steel pile casting is divided to two sections to rise It hangs.
(3) steel pile casting lifts by crane, is in place, being fixed temporarily: slinging coxopodite steel pile casting using 150t crane barge, and is slowly sent into positioning In leading truck 10, before steel pile casting will enter water, stop decentralization, and adjust steel pile casting to normotopia, by being mounted on positioning and guiding Two the first locating rods 4 at angle are positioned in frame 10.
Designated barge is arranged at the about 100m of drilling platform upstream, on wirerope cable clamp under water steel pile casting, position exists At the lower above 3m in section casing bottom, to prevent steel cable from sliding to the bottom, wirerope can be hung with 2 ropes made of hemp and be tied up on drilling platform To control the elevation of wirerope;The wirerope other end refutes strand tank with positioning and connects, and passes through and twists the adjustable steel pile casting verticality of tank.In the water surface Above, steel pile casting downstream side direction setting limit channel steel, the channel steel scene temporary weld, channel steel rear portion, which is set, shores and drilling platform Structure is connected.Water is put under steel pile casting is slow to be drilled and consolidated with platform when top opening absolute altitude is higher than positioning guiding rack top 50cm It is fixed.Fixed form can be used and weld bracket in steel pile casting (platform section below), is fastened by wirerope and buckles bracket and vertically fix.
Steel pile casting is saved in lifting, is connected with lower section steel pile casting.4 guide pads 7 are symmetrical arranged at the top of lower section steel pile casting, to After upper section steel pile casting substantially enters in guide pad 7 in place, the slight off the hook of crane barge makes lower section casing bear to save casing in a part Weight, under the effect of gravity and the guiding role of leading truck, upper section steel pile casting will with lower section steel pile casting is straight connects, at this time in Seam crossing welds four horse legs, fixes its interface, and abutment joint is welded, and 45 ° broken should be arranged by section steel pile casting at seam Mouthful.
The place connecting with positioning guiding rack is cut open after welding, and cancels steel pile casting vertical spacing, sinking steel pile casting, When steel pile casting bottom end is buried, adjusts the verticality and the setting of port plane of steel pile casting again by tightening wirerope, meet the requirements After start sinking steel pile casting.
(4) vibration hammer installation and vibration-sunk: when crawler crane places vibration hammer, after hydraulic tongs are aligned, casing is clamped, is delayed Slow pine hook, measurement verticality carry out a vibration, measurement observation casing verticality and plan-position, vibration are applied after meeting the requirements and is extremely oriented to Frame top opening;Remove upper layer leading truck, then Shi Zhenzhi designed elevation.After single casing sinking, immediately by its with sunk casing It is linked to be entirety, prevents single casing from deviation occurs in flow action.
Although above in conjunction with attached drawing, invention has been described, and the invention is not limited to above-mentioned specific implementations Mode, the above mentioned embodiment is only schematical, rather than restrictive, and those skilled in the art are at this Under the enlightenment of invention, without deviating from the spirit of the invention, many variations can also be made, these belong to of the invention Within protection.

Claims (4)

1. a kind of positioning guiding rack for the construction of pile foundation steel pile casting, including a quadrangular frame, the quadrangular frame packet A door frame (1) and an open frame are included, the open frame is that successively in addition fixation is on one side doorway on three sides Frame, the open frame is made of three side stands (2), and three side stands (2) are by three adjacent columns (3) and set Top beam (31), bottom beam (32) and the diagonal brace (33) set between two successively adjacent columns (3) are constituted, door frame (1) packet Include the vertical beam (11) and upper beam (12) and lower beam (13) of two sides, the vertical beam (11) of door frame (1) two sides respectively with opening The doorway of formula frame is hinged;
Quadrangular frame top, the first locating rod (4) are welded between every two adjacent side stand (2), it is described The second locating rod (5) are welded between door frame (1) and the side stand (2) of two sides;
It is a top beam (31) by three side stands, two the first locating rods (4) two in the quadrangular frame roof The octagon connecting rod that the upper beam (12) of two locating rods (5) and door frame surrounds, the inscribed diameter of a circle of the octagon connecting rod is than pre- The big 2cm of outer diameter of the pile foundation steel pile casting of decentralization;
It is equipped with guide roller (6) on the upper beam (12) of two the first locating rods (4) and the door frame (1), three guiding The inscribe diameter of a circle of idler wheel (6) is 1cm bigger than with the outer diameter for the pile foundation steel pile casting transferred in advance.
2. the positioning guiding rack for the construction of pile foundation steel pile casting according to claim 1, which is characterized in that in the quadrangular The top of frame is equipped with multiple guide pads (7), and the medial surface of guide pad (7) is inclined-plane, and the medial surface of multiple guide pads (7) is formed One horn mouth.
3. the positioning guiding rack for the construction of pile foundation steel pile casting according to claim 1, which is characterized in that the positioning guiding rack It is welding between drilling platform (8), limit stiffener (9) is connected between positioning guiding rack and drilling platform (8).
4. the positioning guiding rack for the construction of pile foundation steel pile casting according to claim 1, which is characterized in that two first positioning Support rod is respectively connected between bar (4) and two columns (3) being connected.
CN201821268856.7U 2018-08-08 2018-08-08 A kind of positioning guiding rack for the construction of pile foundation steel pile casting Active CN208815525U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821268856.7U CN208815525U (en) 2018-08-08 2018-08-08 A kind of positioning guiding rack for the construction of pile foundation steel pile casting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821268856.7U CN208815525U (en) 2018-08-08 2018-08-08 A kind of positioning guiding rack for the construction of pile foundation steel pile casting

Publications (1)

Publication Number Publication Date
CN208815525U true CN208815525U (en) 2019-05-03

Family

ID=66272656

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821268856.7U Active CN208815525U (en) 2018-08-08 2018-08-08 A kind of positioning guiding rack for the construction of pile foundation steel pile casting

Country Status (1)

Country Link
CN (1) CN208815525U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110195435A (en) * 2019-05-27 2019-09-03 中交第四航务工程局有限公司 A kind of positioning device for pile foundation construction
CN110424380A (en) * 2019-08-09 2019-11-08 倡创(上海)咨询管理事务所 The accurate guide construction method of cast-in-situ bored pile
CN110438994A (en) * 2019-07-16 2019-11-12 中交一公局第二工程有限公司 Guide frame for steel casing
CN110670587A (en) * 2019-10-23 2020-01-10 中建七局安装工程有限公司 Pile foundation construction positioning method
WO2022121554A1 (en) * 2021-07-05 2022-06-16 中铁上海工程局集团有限公司 Protective casing guide frame structure
CN115094897A (en) * 2022-07-21 2022-09-23 中国十七冶集团有限公司 River-crossing steel pipe pile positioning support and using method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110195435A (en) * 2019-05-27 2019-09-03 中交第四航务工程局有限公司 A kind of positioning device for pile foundation construction
CN110438994A (en) * 2019-07-16 2019-11-12 中交一公局第二工程有限公司 Guide frame for steel casing
CN110424380A (en) * 2019-08-09 2019-11-08 倡创(上海)咨询管理事务所 The accurate guide construction method of cast-in-situ bored pile
CN110424380B (en) * 2019-08-09 2021-01-08 倡创(上海)咨询管理事务所 Accurate guiding construction method for cast-in-situ bored pile
CN110670587A (en) * 2019-10-23 2020-01-10 中建七局安装工程有限公司 Pile foundation construction positioning method
WO2022121554A1 (en) * 2021-07-05 2022-06-16 中铁上海工程局集团有限公司 Protective casing guide frame structure
CN115094897A (en) * 2022-07-21 2022-09-23 中国十七冶集团有限公司 River-crossing steel pipe pile positioning support and using method
CN115094897B (en) * 2022-07-21 2023-09-08 中国十七冶集团有限公司 River-crossing steel pipe pile positioning bracket and use method thereof

Similar Documents

Publication Publication Date Title
CN208815525U (en) A kind of positioning guiding rack for the construction of pile foundation steel pile casting
CN107989380B (en) Steel truss gallery hydraulic synchronizing lifting construction technique
CN104562936B (en) A kind of tie-rod steel pipe arch bridge construction method continuously
CN103437296B (en) Steel tube arch bridge towerless buckling three-section type double-rib folding hoisting construction method
CN105421248A (en) Swivel and closure construction method for large-span continuous beam crossing existing station
CN108265628A (en) One kind rides cable-styled erection crane lifting cable-stayed bridge girder steel and bridge floor board construction method
CN107100187A (en) Tower crane steel girder erection structure and installation method
CN106744351A (en) The method that cable-stayed bridge main-beam lifting is carried out using cable crane
CN108678752A (en) Shaft equipment rapid installation process
CN104989093A (en) Upper-end-hanged and lower-end-pressed overhanging construction work platform
CN109881585A (en) A kind of assembly flow shop platform for high pier construction
CN106012841A (en) Cable crane and installation method thereof
CN110670585A (en) Pile extension construction method
CN109487675A (en) A kind of Techniques of Tunnel-Type Anchorage for Suspension Bridge cable crane and its construction method
CN205474849U (en) Cable -stay bridge king -tower steel anchor beam and steel corbel integral hoisting special lifting device
CN208907223U (en) A kind of pile foundation concreting conduit lifting and fixed device
CN214302811U (en) Self-adaptive all-steel attached lifting scaffold in micro-tilt building
CN104627849A (en) Hoisting equipment and hoisting method for hoisting inner courtyard pipeline
CN210438260U (en) Major diameter steel protects a hoisting structure
CN104790300B (en) Set a roof beam in place by a kind of flexible pier platform and its construction method
CN104818675B (en) The spelling method of reinforcing bar sections
CN104030176B (en) The equalizer bar of hoisting platform truss and hanging method thereof
CN105951683A (en) Construction method for corbel steel reinforcements of gate pier
CN108221697A (en) A kind of entirety steel arch bridge bridge floor panel grider construction method for hanging
CN207375592U (en) A kind of large scale equipment installation system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant