CN217102825U - Big arm compensation arrangement of loader - Google Patents

Big arm compensation arrangement of loader Download PDF

Info

Publication number
CN217102825U
CN217102825U CN202123202361.9U CN202123202361U CN217102825U CN 217102825 U CN217102825 U CN 217102825U CN 202123202361 U CN202123202361 U CN 202123202361U CN 217102825 U CN217102825 U CN 217102825U
Authority
CN
China
Prior art keywords
loader
big arm
force
compensation arrangement
shovel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123202361.9U
Other languages
Chinese (zh)
Inventor
张衍军
纪波
王明
楚国栋
付亮
夏广明
尹扩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Shiheng Special Steel Group Co Ltd
Original Assignee
Shandong Shiheng Special Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Shiheng Special Steel Group Co Ltd filed Critical Shandong Shiheng Special Steel Group Co Ltd
Priority to CN202123202361.9U priority Critical patent/CN217102825U/en
Application granted granted Critical
Publication of CN217102825U publication Critical patent/CN217102825U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Shovels (AREA)

Abstract

The utility model discloses a big arm compensation arrangement of loader, big arm compensation arrangement install on the loader scraper bowl, big arm compensation arrangement is including pushing away material shovel, the H type arm of force, locking base and hoisting device, H type arm of force one end with push away material shovel fixed connection, the H type arm of force other end and locking base activity hinge joint, locking base and the detachable connection of loader bucket, push away material shovel back fixedly connected with cable, hoisting device installs in the loader eminence, hoisting device is used for the pulling cable. The utility model discloses the installation is dismantled conveniently, installs big arm compensation arrangement on the loader scraper bowl, when needs push away the material, and the loader can carry out the shovel material through pushing away the material shovel and push away the material, can prolong the distance between pushing away material shovel and the loader through the H type arm of force to avoid the loader to roll, avoid destroying partial bold coke, cause the coke powder rate to increase, the problem that the coke powder volume increased is returned to the blast furnace.

Description

Large arm compensation device of loader
Technical Field
The utility model relates to a steel mill equipment technical field, more specifically say, in particular to big arm compensation arrangement of loader.
Background
After purchased coke from a steel mill enters the steel mill, the mode of flat pushing and manual bottom cleaning by a loader is adopted for the car unloading of the coke transported by a vehicle. When the loader pushes coke horizontally, the front wheel inevitably rolls partial coke, damages partial large coke, increases the coke powder rate and increases the amount of the coke powder returned by the blast furnace. Therefore, we propose a loader big arm compensation device to solve the above problems.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an avoid loader to roll big arm compensation arrangement of material.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a big arm compensation arrangement of loader, big arm compensation arrangement installs on the loader scraper bowl, big arm compensation arrangement is including pushing away material shovel, the H type arm of force, locking base and hoisting device, H type arm of force one end with push away material shovel fixed connection, the H type arm of force other end and locking base activity hinge joint, locking base and the detachable connection of loader bucket, push away material shovel back fixedly connected with cable, hoisting device installs in the loader eminence, hoisting device is used for the pulling cable.
Preferably, the locking base includes L type layer board and baffle, H type arm of force one end and L type layer board side surface activity hinge joint, the fixed welding of baffle is at L type layer board side surface, forms the intermediate layer mouth that supplies loader bucket bottom plate card to go into between baffle and the L type layer board basal surface, installs a plurality of first knob bolts through the screw hole cooperation on the baffle.
Preferably, the lifting device is a winch, and one end of the stay cable is connected with the winch.
Preferably, both ends of the upper part of the partition board are fixedly welded with protruding plates, and second knob bolts are installed on the protruding plates through another threaded holes in a matched mode.
Preferably, the screw ends of the first knob bolt and the second knob bolt are fixedly provided with top plates.
Preferably, a rubber pad is fixedly bonded to the surface of the top plate.
Compared with the prior art, the utility model has the advantages of:
the utility model discloses the installation is dismantled conveniently, installs big arm compensation arrangement on the loader scraper bowl, when needs push away the material, and the loader can carry out the shovel material through pushing away the material shovel and push away the material, can prolong the distance between pushing away material shovel and the loader through the H type arm of force to avoid the loader to roll, avoid destroying partial bold coke, cause the coke powder rate to increase, the problem that the coke powder volume increased is returned to the blast furnace.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the description below are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a block diagram of a loader boom compensation system according to the present invention;
FIG. 2 is a top view of the loader boom compensation assembly of the present invention;
fig. 3 is a use state diagram of the loader boom compensation device of the present invention.
In the figure: the material pushing device comprises a material pushing shovel 1, a 2H-shaped force arm, a 3L-shaped supporting plate, a partition plate 4, an interlayer opening 5, a first knob bolt 6, a protruding plate 7, a second knob bolt 8, a top plate 9, a stay cable 10 and a winch 11.
Detailed Description
The preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings, so that the advantages and features of the present invention can be more easily understood by those skilled in the art, and the scope of the present invention can be more clearly and clearly defined.
Referring to fig. 1 and fig. 2, the utility model provides a big arm compensation arrangement of loader, big arm compensation arrangement install on the loader scraper bowl, big arm compensation arrangement includes the push away material shovel 1, the H type arm of force 2, locking base and hoisting device, 2 one end of the H type arm of force with push away material shovel 1 fixed connection, the H type arm of force 2 other end and locking base activity hinge joint, locking base and the detachable connection of loader bucket, push away material shovel 1 back fixedly connected with cable 10, hoisting device installs in the loader eminence, and hoisting device is used for pulling cable 10 control push away the lift of material shovel 1, and when needs push away the material, the loader can carry out the shovel material through push away material shovel 1 and push away the material, can prolong the distance between push away material shovel 1 and the loader through the H type arm of force 2 to avoid the loader to roll the material.
In this embodiment, the locking base includes L type layer board 3 and baffle 4, 2 one end of the H type arm of force is articulated with 3 side surface activities of L type layer board, 4 fixed welding of baffle are at 3 side surfaces of L type layer board, form the intermediate layer mouth 5 that supplies loader bucket bottom plate card to go into between 3 basal surfaces of baffle 4 and L type layer board, install a plurality of first knob bolts 6 through the screw hole cooperation on the baffle 4.
In this embodiment, the lifting device is a winch 11, one end of the cable 10 is connected with the winch 11, the winch 11 is installed at a high position of the loader, and the winch 11 can pull the material pushing shovel 1 through the cable 10, so that the lifting of the material pushing shovel is controlled, and the material pushing shovel can be shoveled.
In this embodiment, protruding plates 7 are fixedly welded at two ends of the upper portion of the partition plate 4, and second knob bolts 8 are installed on the protruding plates 7 through another threaded holes in a matched mode.
In this embodiment, the top plate 9 is fixedly mounted at the end of each of the first knob bolt 6 and the second knob bolt 8, so that the contact area is increased, and the clamping stability is improved.
In this embodiment, a rubber pad is fixed and bonded on the surface of the top plate 9, so that the friction force is further improved, and the stability of the attachment of the L-shaped supporting plate 3 and the loader bucket is improved.
The working principle is as follows: referring to fig. 3, when pushing materials, a loader bucket bottom plate is clamped into the interlayer opening 5, the first knob bolt 6 is screwed down to fixedly clamp the loader bucket bottom plate, then the second knob bolt 8 is rotated to tightly attach the top plate 9 to the inner wall of the loader bucket, so that the L-shaped supporting plate 3 is prevented from shaking, the stability is ensured, the lifting and the descending of the material pushing shovel 1 can be controlled through the winch 11, and at the moment, the loader can push materials and shovel materials through the material pushing shovel 1 under the condition of not rolling materials.
Although the embodiments of the present invention have been described with reference to the accompanying drawings, various changes and modifications can be made by the owner within the scope of the appended claims, and the protection scope of the present invention should not be exceeded by the claims.

Claims (6)

1. The utility model provides a big arm compensation arrangement of loader, big arm compensation arrangement installs on the loader bucket which characterized in that: big arm compensation arrangement is including pushing away material shovel, the H type arm of force, locking base and hoisting device, H type arm of force one end with push away material shovel fixed connection, the H type arm of force other end and locking base activity hinge joint, locking base and the detachable connection of loader bucket, push away material shovel back fixedly connected with cable, hoisting device installs in the loader eminence, and hoisting device is used for the pulling cable.
2. The loader big arm compensation device according to claim 1, wherein: the locking base includes L type layer board and baffle, H type arm of force one end and L type layer board side surface swing joint, the fixed welding of baffle is at L type layer board side surface, forms the intermediate layer mouth that supplies loader bucket bottom plate card to go into between baffle and the L type layer board basal surface, installs a plurality of first knob bolts through the screw hole cooperation on the baffle.
3. The loader big arm compensation device according to claim 1, wherein: the lifting device is a winch, and one end of the inhaul cable is connected with the winch.
4. The loader big arm compensation device according to claim 2, wherein: and both ends of the upper part of the partition plate are fixedly welded with protruding plates, and second knob bolts are installed on the protruding plates through another threaded holes in a matched mode.
5. The loader big arm compensation device according to claim 4, wherein: the screw rod end parts of the first knob bolt and the second knob bolt are fixedly provided with top plates.
6. The loader big arm compensation device according to claim 5, wherein: and a rubber pad is fixedly bonded on the surface of the top plate.
CN202123202361.9U 2021-12-20 2021-12-20 Big arm compensation arrangement of loader Active CN217102825U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123202361.9U CN217102825U (en) 2021-12-20 2021-12-20 Big arm compensation arrangement of loader

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123202361.9U CN217102825U (en) 2021-12-20 2021-12-20 Big arm compensation arrangement of loader

Publications (1)

Publication Number Publication Date
CN217102825U true CN217102825U (en) 2022-08-02

Family

ID=82591343

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123202361.9U Active CN217102825U (en) 2021-12-20 2021-12-20 Big arm compensation arrangement of loader

Country Status (1)

Country Link
CN (1) CN217102825U (en)

Similar Documents

Publication Publication Date Title
CN217102825U (en) Big arm compensation arrangement of loader
CN210150623U (en) Mobilizable simple and easy building material hoisting device
CN110171777B (en) Crawler crane for reconstruction of excavator and connector for crawler crane
CN210313231U (en) Crawler crane transformed by excavator and connector used for crawler crane
CN213949071U (en) Special frock is deposited temporarily to ladle plate hook
CN106966286A (en) The multifunctional hanging tool of crane gear
CN110921491B (en) Lifting and turning tool and lifting and turning method for lifting object without lifting lugs
CN213894898U (en) Hoist device is used in building engineering construction
CN210064929U (en) Automatic clamping device of gantry crane
CN209886669U (en) Detachable turnover mechanism
CN206155262U (en) Tipper carriage and preceding wall structure thereof
CN206705510U (en) The multifunctional hanging tool of crane gear
CN214192255U (en) Intelligent anti-swing device for crane grab bucket
CN213805540U (en) Bulldozer blade control and ripper control integrated mechanism
CN219297114U (en) Simple hoisting device for installing subgrade side ditch cover plate
CN214308188U (en) Inclined to one side structure of charging car
CN210264747U (en) Bidirectional mold moving device for tunnel side wall steel template
CN215249048U (en) Large caisson lifting appliance
CN102877455B (en) Dynamic compactor and upper knuckle arm device thereof
CN215926105U (en) Digging machine
CN213037365U (en) Scraper bowl for loader
CN213445946U (en) Supporting seat of winch
CN217322955U (en) Construction elevator adhesion device conversion frame
CN210619979U (en) General cab lifting appliance
CN213679669U (en) Cleaning auxiliary device for forklift

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant