CN217102783U - Large-tonnage crane cart operation interlocking alarm system - Google Patents

Large-tonnage crane cart operation interlocking alarm system Download PDF

Info

Publication number
CN217102783U
CN217102783U CN202221005405.0U CN202221005405U CN217102783U CN 217102783 U CN217102783 U CN 217102783U CN 202221005405 U CN202221005405 U CN 202221005405U CN 217102783 U CN217102783 U CN 217102783U
Authority
CN
China
Prior art keywords
signal lamp
alarm signal
crane
alarm
personnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221005405.0U
Other languages
Chinese (zh)
Inventor
李国华
张德夏
施建强
李修修
王朋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Laigang Yongfeng Steel and Iron Co Ltd
Original Assignee
Shandong Laigang Yongfeng Steel and Iron Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Laigang Yongfeng Steel and Iron Co Ltd filed Critical Shandong Laigang Yongfeng Steel and Iron Co Ltd
Priority to CN202221005405.0U priority Critical patent/CN217102783U/en
Application granted granted Critical
Publication of CN217102783U publication Critical patent/CN217102783U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Control And Safety Of Cranes (AREA)

Abstract

The utility model discloses a large-tonnage crane cart operation interlocking alarm system, which comprises a crane and a cab, wherein the crane is provided with an end beam, and a first alarm signal lamp is arranged on the end beam; the top of the cab is provided with a second alarm signal lamp, a controller is arranged in the cab, the first alarm signal lamp and the second alarm signal lamp are connected in series through a cable, and the first alarm signal lamp and the second alarm signal lamp are controlled by the controller; this system has ensured personnel's safety, has eliminated the jack-up injury, and the crane driver need not step on alarm switch with the foot, has guaranteed the safe handling of hoist again simultaneously in the time of saving, has realized accurate quick point and has examined and maintain of equipment, has improved personnel's operating efficiency, has guaranteed that chain alarm device signal can let upper and lower hoist personnel surveyability, can accomplish in advance to know in advance and foresee the accuse in advance, eliminates the jack-up injury, the ground personnel also can be clear differentiates out the running state of hoist, eliminates the eminence fall injures the accident of pounding.

Description

Large-tonnage crane cart operation interlocking alarm system
Technical Field
The utility model belongs to the technical field of the hoist, concretely relates to large-tonnage crane cart operation interlocking alarm system.
Background
The large-tonnage crane and cart operation interlocking alarm system is an important part of safe operation of an operation mechanism, and the existing interlocking alarm system can meet the requirements, but still has the following phenomena:
1) when each mechanism of the large-tonnage crane runs, the alarm signal device can be switched on only by a pedal switch of a crane driver, so that the warning function can be realized.
2) When a crane driver turns on or off the pedal alarm device and operates the controller to 1-3 gears, the driver is easy to be distracted, the crane driver is mistakenly operated, and the heavy potential safety lifting hazard exists.
3) The alarm foot switch is connected with the power supply through wires outside, and the switch shell is metallic, so that the potential safety hazard of electric shock caused by damage exists.
4) When the inspection and maintenance personnel get on and off the crane and perform inspection or maintenance, the alarm signal device is arranged above the cab, the personnel is far away and cannot hear, and the personnel cannot see the light signal, so that the accident of crushing injury is easily caused.
5) The environment noise of the production site is more, various alarm signals are more, and the lifting injury accidents are easy to happen if the operators go up and down the crane and check and maintain the crane and distinguish bad sounds.
Therefore, a large-tonnage crane cart operation interlocking alarm system is needed.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a large-tonnage crane cart operation interlocking alarm system.
The utility model provides a technical scheme that its technical problem adopted is: a large-tonnage crane and cart operation interlocking alarm system comprises a crane and a cab, wherein the crane is provided with an end beam, and a first alarm signal lamp is arranged on the end beam; the top of driver's cabin is equipped with the second alarm signal lamp, is equipped with the controller in the driver's cabin, and first alarm signal lamp passes through the cable series connection with the second alarm signal lamp, and first alarm signal lamp and second alarm signal lamp are controlled by the controller.
Specifically, the crane is provided with a main trolley and an auxiliary trolley, and the main trolley and the auxiliary trolley are controlled by a controller.
Specifically, a main beam and a secondary beam are arranged between the end beams.
Specifically, the top and the bottom of the end beam are provided with buffers.
The utility model discloses following beneficial effect has:
1) the system ensures personnel safety and eliminates lifting injuries.
2) The driver of the crane does not need to step on the alarm switch by feet, so that the time is saved, and the safe lifting of the crane is ensured.
3) The accurate and quick point inspection and the maintenance of equipment are realized, and the operating efficiency of personnel is improved.
4) The signal of the interlocking alarm device can be clear for the personnel getting on and off the crane at a glance, the anticipating and pre-controlling can be realized in advance, and the lifting injury is eliminated.
5) The ground personnel can also clearly distinguish the running state of the crane and eliminate the accident of falling and smashing at the high place.
Drawings
Fig. 1 is a schematic structural diagram of the crane of the present invention.
Fig. 2 is a schematic structural diagram of the cab of the present invention.
In the figure: 1-a buffer; 2-end beam; 3, a main beam; 4-secondary beam; 5-auxiliary trolley; 6-main trolley; 7-a first alarm signal lamp; 8-a second alarm signal lamp; 9-a cab; 10-a controller; 11-seat.
Detailed Description
The present invention will now be described in further detail with reference to the accompanying drawings.
As shown in fig. 1-2, the large-tonnage crane cart operation interlocking alarm system comprises a crane and a cab, wherein the crane is provided with an end beam 2, and a first alarm signal lamp 7 is arranged on the end beam 2; the top of driver's cabin 9 is equipped with second alarm signal lamp 8, is equipped with controller 10 in the driver's cabin 9, and first alarm signal lamp 7 passes through the cable series with second alarm signal lamp 8, and first alarm signal lamp 7 and second alarm signal lamp 8 are controlled by controller 10.
The crane is provided with a main trolley and an auxiliary trolley, the main trolley 6 and the auxiliary trolley 5 are controlled by a controller 10, and when the main trolley 6 or the auxiliary trolley 5 is started, the controller 10 simultaneously starts a first alarm signal lamp 7 and a second alarm signal lamp 8.
Be equipped with girder 3 and auxiliary girder 4 between end beam 2, the top and the bottom of end beam 2 all are equipped with bumper 1.
The utility model discloses a preparation method: the first alarm signal lamp 7 is arranged on the end beam 2 of the crane and is fixed firmly, and the installation position is obvious to personnel.
The wire tube is installed, the first alarm signal lamp 7 and the second alarm signal lamp 8 are connected in series through cables, a power line leads to the cab controller 10, and the isolating switch is installed before the controller 10, so that the alarm device can be turned on and off conveniently (the isolating switch is in a closed state during the night shift, and the number of spot inspection and maintenance personnel is small, and the isolating switch is in an open state during the day, so that the number of spot inspection and maintenance personnel is large during the day shift).
And a second alarm signal lamp 8 is arranged at the upper edge of the cab, and is easily observed by ground personnel at the installation position.
The power lines are connected in series and then connected into the controller 10, so that when the controller 10 is in a zero position, the lines are disconnected, and the controller 10 realizes that the alarm is in an on state on the gear.
The utility model discloses not be limited to above-mentioned embodiment, anybody should learn the structural change who makes under the teaching of the utility model, all with the utility model discloses have the same or close technical scheme, all fall into the utility model discloses an within the protection scope.
The technology, shape and construction parts which are not described in detail in the present invention are all known technology.

Claims (4)

1. The large-tonnage crane and cart operation interlocking alarm system is characterized by comprising a crane and a cab, wherein the crane is provided with an end beam, and a first alarm signal lamp is arranged on the end beam; the top of driver's cabin is equipped with the second alarm signal lamp, is equipped with the controller in the driver's cabin, and first alarm signal lamp passes through the cable series connection with the second alarm signal lamp, and first alarm signal lamp and second alarm signal lamp are controlled by the controller.
2. The large-tonnage crane cart operation interlock alarm system according to claim 1, wherein the crane is provided with a main trolley and an auxiliary trolley, and the main trolley and the auxiliary trolley are controlled by a controller.
3. The large-tonnage crane cart operation interlocking alarm system as recited in claim 1, wherein a main beam and a secondary beam are arranged between the end beams.
4. The large-tonnage crane cart operation interlock alarm system according to claim 3, wherein buffers are provided at the top and bottom of the end beam.
CN202221005405.0U 2022-04-28 2022-04-28 Large-tonnage crane cart operation interlocking alarm system Active CN217102783U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221005405.0U CN217102783U (en) 2022-04-28 2022-04-28 Large-tonnage crane cart operation interlocking alarm system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221005405.0U CN217102783U (en) 2022-04-28 2022-04-28 Large-tonnage crane cart operation interlocking alarm system

Publications (1)

Publication Number Publication Date
CN217102783U true CN217102783U (en) 2022-08-02

Family

ID=82584389

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221005405.0U Active CN217102783U (en) 2022-04-28 2022-04-28 Large-tonnage crane cart operation interlocking alarm system

Country Status (1)

Country Link
CN (1) CN217102783U (en)

Similar Documents

Publication Publication Date Title
CN105697056B (en) A kind of mine vertically rescues lifting system
CN103117006A (en) Warning system for preventing secondary traffic accident on highways
CN217102783U (en) Large-tonnage crane cart operation interlocking alarm system
CN114333191A (en) Remote sensing alarm system and device for garbage power plant
CN203462416U (en) Lifting height limited gantry system
CN203021204U (en) Upper and lower layer anti-collision device for crane
CN205133499U (en) Be used for electric locomotive buffer stop of dry coke quenching system
CN201473253U (en) Mobile light hydraulic crane
RU169343U1 (en) Emergency technical vehicle for repairing the contact network of trams and trolleybuses
CN203012985U (en) A safety warning system preventing a secondary traffic accident on a highway
CN205503173U (en) Lift system is rescued perpendicularly to mine
CN106477476A (en) Electric power electrical verification maintenance ladder
CN208308308U (en) A kind of harbour container gantry crane
CN202848905U (en) Travelling crane answering device and control system
CN218888590U (en) Grab beam monitoring system
CN215048140U (en) Limit voice alarm prompting device for crane lifting mechanism
CN112382062A (en) Near-electric induction alarm device for construction vehicle
CN217813292U (en) Novel safety device for petroleum operation equipment
CN218754657U (en) Container portal crane alarm system for handling collision of working vehicles
CN205312902U (en) Jack -up mechanical safety monitored control system
CN219948213U (en) Safety precaution device for railway construction
CN211444774U (en) Safety interlocking device for crane and press
CN218539103U (en) Anti-collision device and hoisting equipment
CN212609127U (en) Bridge crane boarding alarm device
CN104876090B (en) For the safety guard without scaffold construction, circuit and method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant