CN217088797U - Environment-friendly town road greenbelt - Google Patents

Environment-friendly town road greenbelt Download PDF

Info

Publication number
CN217088797U
CN217088797U CN202220888544.6U CN202220888544U CN217088797U CN 217088797 U CN217088797 U CN 217088797U CN 202220888544 U CN202220888544 U CN 202220888544U CN 217088797 U CN217088797 U CN 217088797U
Authority
CN
China
Prior art keywords
cistern
water
pond
planting
environment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220888544.6U
Other languages
Chinese (zh)
Inventor
阳学先
廖述磊
徐琼枝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Zhuoer Architectural Design Co ltd
Original Assignee
Wuhan Zhuoer Architectural Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Zhuoer Architectural Design Co ltd filed Critical Wuhan Zhuoer Architectural Design Co ltd
Priority to CN202220888544.6U priority Critical patent/CN217088797U/en
Application granted granted Critical
Publication of CN217088797U publication Critical patent/CN217088797U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cultivation Receptacles Or Flower-Pots, Or Pots For Seedlings (AREA)

Abstract

The utility model relates to a municipal afforestation technology's field specifically discloses an environment-friendly town road greenbelt, it includes the cistern and erects the planting pond on the cistern, plant green planting in the planting pond, the cistern with it is suitable for with to plant to be provided with between the pond ponding in the cistern is leading-in water guide assembly in the planting pond, one side of cistern is outstanding plant the pond, the apron has been laid to the upper end of one side in the protruding planting pond of cistern, the inlet opening has been seted up on the apron. This application has the effect that reduces sanitation workman and carry out green working strength who plants and water.

Description

Environment-friendly town road greenbelt
Technical Field
The application relates to municipal afforestation technical field especially relates to an environment-friendly town road greenbelt.
Background
Green belt, refers to a strip-shaped zone for greening. By building the green belts on two sides of the road, the green belts not only can effectively separate the roadway from the sidewalk, but also can eliminate visual fatigue of pedestrians, purify air on the road and beautify the city.
Green plants such as short shrubs and trees are frequently planted in green belts, and in order to guarantee the survival rate of the green plants, the green plants in the green belts need to be watered regularly by using watering equipment manually in the daily maintenance process of the existing municipal road green belts. However, the length of the green belt is usually long, and the watering process usually needs to avoid the time period with large vehicle amount and human flow as much as possible, so that sanitation workers need to finish watering large-area green plants in a short time, and the operation intensity of the sanitation workers is high.
SUMMERY OF THE UTILITY MODEL
In order to improve the problem that the green working strength who waters of planting is big of sanitationman, this application provides an environment-friendly town road greenbelt.
The application provides an environment-friendly town road greenbelt adopts following technical scheme:
the utility model provides an environment-friendly town road greenbelt, its includes the cistern and erects the planting pond on the cistern, it has green planting to plant in the pond, the cistern with it is suitable for with to plant to be provided with between the pond ponding in the cistern is leading-in water guide subassembly in the planting pond, one side of cistern is outstanding plant the pond, the apron has been laid to the upper end of one side in the protruding planting pond of cistern, the inlet opening has been seted up on the apron.
By adopting the technical scheme, a sanitation worker supplies water into the water storage tank at the water inlet through the water supply equipment, and then the water guide assembly automatically guides accumulated water in the water storage tank into the planting tank, so that the sanitation worker does not need to sequentially water large green plants in the planting tank, and the working strength of the sanitation worker for watering the green plants is greatly reduced; the cistern still can carry out automatic water supply through the inlet opening in rainy day to reduce the sanitationman and added the frequency of water in the cistern, reduced sanitationman's working strength, also realized the environmental protection utilization of rainwater.
Optionally, the water guide subassembly includes a plurality of ropes that absorb water, and is a plurality of the one end of the rope that absorbs water with the diapire of cistern is connected, and is a plurality of the other end of the rope that absorbs water with the inner chamber in planting the pond is connected.
Through adopting above-mentioned technical scheme, the automatic ponding that absorbs in the cistern of rope that absorbs water, then ponding conduct gradually to planting in the pond along the rope that absorbs water to carry out the interpolation of moisture in the pond through the rope that absorbs water lasts to planting, make the staff need not regularly to water green planting, reduced sanitationman's work load.
Optionally, a conduit is communicated between the planting pond and the water storage tank, and the water absorption rope penetrates through the conduit.
By adopting the technical scheme, the water absorption rope is arranged in the guide pipe, so that environmental sanitation workers can conveniently pump away the aged and corroded water absorption rope in the guide pipe and replace the aged and corroded water absorption rope in the long-term use process of the water absorption rope, and the stability of continuously supplying water to the planting pond in the water storage pond is guaranteed; when excessive rainwater is stored in the planting pond in rainy days, the rainwater permeating into the planting pond can be guided into the water storage pond along the guide pipe, so that the risk of rotting of the roots of the green plants due to excessive moisture is effectively reduced.
Optionally, the cover plate is arranged obliquely and is obliquely and downwards arranged along the direction from the planting pond to the cover plate, and the oblique high side of the cover plate is lower than the upper end face of the planting pond.
Through adopting above-mentioned technical scheme, when rainy day, plant the too much rainwater on pond top layer and can follow the surface inflow to the apron in planting the pond to effectual ponding in planting the pond of having reduced.
Optionally, an accumulated silt groove is formed in the inner bottom wall of the water storage tank, and an opening of the accumulated silt groove faces the cover plate.
Through adopting above-mentioned technical scheme, the rainwater that has the filth gets into the in-process of ponding groove along the inlet opening, and the filth will concentrate the deposit and become silted up the inslot to be convenient for the staff carries out the clearance of filth through opening the apron, makes the filth be difficult for causing the influence to the normal water guide of the rope that absorbs water.
Optionally, be provided with the inlet tube with outside municipal water supply pipe intercommunication in the cistern, set up the control valve that opens and close to the inlet tube on the inlet tube.
Through adopting above-mentioned technical scheme, when ponding in the cistern is less, sanitationman accessible control valve opens the inlet tube to through the inlet tube with rivers leading-in to the cistern in the municipal water supply pipe, thereby realize the quick replenishment of ponding in the cistern, reduce sanitationman's the troublesome poeration of adding water.
Optionally, a water outlet pipe communicated with a municipal sewage pipeline is arranged on the inner bottom wall of the reservoir, and a control assembly for controlling the opening and closing of the water outlet pipe is arranged in the reservoir.
By adopting the technical scheme, when the accumulated water in the water storage tank is excessive, a worker opens the water outlet pipe through the control assembly, and the accumulated water in the water storage tank is discharged into the municipal sewage pipeline through the water outlet pipe, so that the accumulated water in the water storage tank is not easy to overflow to the ground, and the use stability of the water storage tank is ensured; ponding is discharged through the outlet pipe from the bottom of cistern to make during partial filth can discharge municipal sewage pipes along with the outflow of ponding, thereby reduced the frequency that the staff regularly cleared up the long-pending silt groove.
Optionally, the control assembly includes shrouding and cystosepiment, one side of shrouding with the terminal surface of outlet pipe is laminated mutually, the cystosepiment with connect through the tractive rope between the shrouding.
By adopting the technical scheme, the foam plate floats on the surface of accumulated water under the action of buoyancy, when the accumulated water in the water storage tank is excessive, the foam plate pulls up the sealing plate through the pulling rope under the action of buoyancy, and the sealing plate is separated from the end surface of the water outlet pipe at the moment, so that the water outlet pipe is in an open state, and the accumulated water is quickly discharged; when the accumulated water is discharged to a certain amount, the foam plate descends along with the descending of the water level, and at the moment, the sealing plate sinks and plugs the end face of the water outlet pipe again, so that the accumulated water in the water storage tank is not discharged any more.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the water storage tank is supplemented with water through the water inlet pipe or is supplemented with water through rainwater, and then accumulated water in the water storage tank is continuously guided into the planting tank through the plurality of water absorption ropes, so that the working strength of green plant watering of sanitation workers is reduced, and the environmental protection utilization of the rainwater is also realized;
2. when the accumulated water in the water storage tank is excessive, the foam plate pulls up the sealing plate through the pulling rope under the action of buoyancy, the sealing plate is separated from the end face of the water outlet pipe at the moment, so that the water outlet pipe is in an open state, and the accumulated water is quickly discharged to an external municipal sewage pipeline from the water outlet pipe at the moment;
3. the rainwater that has the filth gets into the in-process of ponding groove along the inlet opening, and the filth will concentrate the deposit and deposit in the long-pending silt inslot to the staff of being convenient for carries out the concentrated clearance of filth through opening the apron, makes the filth be difficult for causing the influence to the normal water guide of rope that absorbs water.
Drawings
FIG. 1 is a schematic diagram of the overall structure of an embodiment of the present application;
FIG. 2 is a schematic view showing the installation of the guide tube and the water absorption string in the embodiment of the present application;
fig. 3 is a sectional view taken along line a-a of fig. 1.
Reference numerals: 1. a reservoir; 11. a silt accumulation groove; 2. a planting pond; 3. a water guide assembly; 31. a water absorption rope; 4. a cover plate; 41. a water inlet hole; 5. a support wall; 51. a water guide hole; 6. a conduit; 61. a soil guard plate; 7. a water inlet pipe; 71. a control valve; 8. a water outlet pipe; 9. a control component; 91. closing the plate; 92. a foam board; 93. a pulling rope; 10. and (4) a guide strip.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses environment-friendly town road greenbelt. Referring to fig. 1 and 2, the environment-friendly municipal road green belt comprises a water storage tank 1 and a planting pond 2 erected on the upper end surface of the water storage tank 1, wherein the water storage tank 1 is buried under the road surface, the upper end of the planting pond 2 is positioned above the road surface, and a large amount of soil is stored in the planting pond 2 and green plants are planted in the planting pond. A water guide component 3 is arranged between the water storage tank 1 and the planting tank 2, and the water guide component 3 is suitable for guiding accumulated water in the water storage tank 1 into the planting tank 2; 1 width direction's of cistern one side is outstanding to plant pond 2, and 1 outstanding one side of planting pond 2 of cistern is located one side of pavement, and the upper end of 1 outstanding one side of planting pond 2 of cistern has laid a plurality of apron 4, and a plurality of inlet openings 41 have all been seted up at the interval on a plurality of apron 4.
Referring to fig. 2 and 3, the planting pond 2 and the reservoir 1 are both formed by pouring reinforced concrete, and a plurality of support walls 5 are uniformly built in the reservoir 1 along the length direction of the reservoir 1; the multiple supporting walls 5 are arranged along the width direction of the water storage pool 1, the top walls of the multiple supporting walls 5 are attached to the bottom wall of the planting pool 2, the bottom walls of the multiple supporting walls 5 are attached to the inner bottom wall of the water storage pool 1, and the lateral walls of the multiple supporting walls 5 in the thickness direction are provided with multiple water guide holes 51 in a penetrating mode. The planting ponds 2 are stably supported on the water storage tank 1 by arranging a plurality of support walls 5.
Referring to fig. 1 and 2, a plurality of guide pipes 6 are communicated between the planting pond 2 and the water reservoir 1, the guide pipes 6 are distributed in a matrix shape, one ends of the guide pipes 6 are buried in soil of the planting pond 2, the upper end surfaces of the guide pipes 6 are integrally formed with soil retaining plates 61, and gaps are reserved between the soil retaining plates 61 and the guide pipes 6. The water guide assembly 3 comprises a plurality of water absorption ropes 31, each two of the water absorption ropes 31 form a group, every two water absorption ropes 31 penetrate through one guide pipe 6, one ends of the water absorption ropes 31 extend out of the gap between the guide pipe 6 and the soil retaining plate 61 and are lapped on root systems of green plants, and the other ends of the water absorption ropes 31 are connected with the bottom wall of the reservoir 1. During the use, the ponding in the cistern 1 is absorbed automatically to the rope 31 that absorbs water, then ponding conducts to planting in the pond 2 along the rope 31 that absorbs water gradually to carry out the interpolation of moisture through the rope 31 that absorbs water continuously to planting the green planting in the pond 2, make the staff need not regularly to green planting water.
In other embodiments, the water guide assembly 3 can also be a water suction pump, a water suction pipe and a spray head, and one end of the water suction pipe penetrates through the planting pond 2 and extends into the bottom of the water storage pond 1; the water suction pump is a submersible pump and is fixed on the inner bottom wall of the water storage tank 1 through bolts, and the water outlet end of the water suction pump is communicated with one end of the water suction pipe, which is positioned on the water storage tank 1; a plurality of spray heads are arranged and uniformly distributed on the planting pond 2, spray openings of the spray heads face green plants in the planting pond 2, and water inlets of the spray heads are communicated with a water pumping pipe; the upper end of the inner wall of the water storage tank 1 is provided with a timer, the timer controls the water suction pump to be started for a certain period of time, clear water in the water storage tank 1 is extracted through the started water suction pump, and then the clear water is quantitatively sprayed onto green plants along the water suction pipe and the spray head.
Referring to fig. 1 and 2, the cover plate 4 is inclined and downward along the direction from the planting pond 2 to the cover plate 4, the inclined high side of the cover plate 4 is lower than the upper end face of the planting pond 2, the inclined low side of the cover plate 4 is slightly lower than the height of the road surface, the inner bottom wall of the water storage tank 1 is provided with a silt collecting groove 11, and the opening of the silt collecting groove 11 faces the cover plate 4. When the rainwater was on day, rainwater on the road surface, the excessive rainwater on 2 top soil of planting pond flowed into cistern 1 along inlet opening 41 on apron 4 fast under the effect of gravity in, and impurity accumulation such as silt in the rainwater is in long-pending silt groove 11 to realize the environmental protection recycle of rainwater.
Referring to fig. 1 and 3, in order to facilitate sanitation workers to quickly replenish water into the water storage tank 1 in a non-rainy period, a water inlet pipe 7 communicated with an external municipal water supply pipeline is arranged in the water storage tank 1, a control valve 71 for controlling the opening and closing of the water inlet pipe 7 is installed on the water inlet pipe 7, and a water level alarm (not shown) capable of sending a signal to a remote terminal is arranged on the inner wall of the water storage tank 1. When the accumulated water in the reservoir 1 is lower than the water level alarm, the water level alarm sends a signal to the remote terminal, and then after receiving the signal of the remote terminal, a sanitation worker goes to the reservoir 1 for alarming to open the control valve 71, so that the accumulated water in the reservoir 1 is supplemented by the water flow in the municipal water supply pipe, and the sufficient accumulated water in the reservoir 1 is ensured; in addition, sanitation workers can also open the cover plate 4 regularly to check accumulated water in the water reservoir 1, and manually adjust the control valve 71 to open the water inlet pipe 7, so that the abundance of accumulated water in the water reservoir 1 is guaranteed.
Referring to fig. 1 and 3, in order to quickly discharge a part of accumulated water in the reservoir 1 when the accumulated water in the reservoir 1 is excessive, the excessive accumulated water is prevented from overflowing to a road surface; a water outlet pipe 8 communicated with a municipal sewage pipeline is communicated and arranged on the inner side wall of one side of the silt accumulating groove 11, in the embodiment, the water outlet pipe 8 is a rectangular plate, and in other embodiments, the water outlet pipe 8 can also be a circular pipe; a control component 9 for controlling the opening and closing of the water outlet pipe 8 is arranged in the reservoir 1. The control assembly 9 includes shrouding 91, cystosepiment 92 and pulling rope 93 (in other embodiments, control assembly 9 can also be manual gate, electronic switch valve etc.), the gib block 10 is installed to 8 width direction's bilateral symmetry in outlet pipe on the lateral wall of cistern 1, two gib blocks 10 are the L shaped plate that parallel portion and vertical portion are constituteed, two gib blocks 10 all install on the lateral wall of cistern 1 through expansion bolts, the extending direction of two gib blocks 10 all is unanimous with the vertical direction of cistern 1, the parallel portion of two gib blocks 10 is parallel with a lateral wall that cistern 1 is close to outlet pipe 8. The vertical setting of shrouding 91 is between two gibs 10, and shrouding 91 length direction's both ends and the laminating of two gibs 10 one by one, and one side that outlet pipe 8 was kept away from to shrouding 91 is laminated with the parallel portion of two gibs 10 mutually, and shrouding 91 is laminated with outlet pipe 8's end face seal towards one side of outlet pipe 8. The foam board 92 is placed in the reservoir 1, and the foam board 92 and the closing board 91 are connected through a pulling rope 93; when ponding is too much, the cystosepiment 92 that is located the ponding surface of water floats under the effect of buoyancy, then floated cystosepiment 92 pulls up shrouding 91 through pulling rope 93, and shrouding 91 slides along the direction of height of two gib blocks 10 this moment, realizes opening of shrouding 91 to the port of outlet pipe 8.
The implementation principle of an environment-friendly town road greenbelt of the embodiment of the application is as follows: in the daily use, the rope 31 that absorbs ponding in the cistern 1, then ponding conduct gradually to planting in the pond 2 along the rope 31 that absorbs water to carry out the interpolation of moisture through the rope 31 that absorbs water continuously to planting green in the pond 2, make the staff need not regularly to water green and plant, reduced sanitationman's working strength. When the accumulated water in the water storage tank 1 is insufficient, the staff opens the control valve 71 to enable the water flow in the municipal water supply pipe to flow into the water storage tank 1 along the water inlet pipe 7, so that the accumulated water in the water storage tank 1 is filled; when ponding in the cistern 1 is too much, cystosepiment 92 pulls up shrouding 91 through pull rope 93 under the effect of buoyancy, and shrouding 91 and outlet pipe 8's terminal surface phase separation this moment to make outlet pipe 8 be in the open mode, realize the quick discharge of ponding.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides an environment-friendly town road greenbelt which characterized in that: including cistern (1) and erect planting pond (2) on cistern (1), it has green planting to plant in pond (2), cistern (1) with it is suitable for with to plant to be provided with between pond (2) ponding in cistern (1) is leading-in water guide subassembly (3) in planting pond (2), one side of cistern (1) is outstanding plant pond (2), apron (4) have been laid to the upper end of one side of cistern (1) outstanding planting pond (2), inlet opening (41) have been seted up on apron (4).
2. The environment-friendly municipal road green belt according to claim 1, characterized in that: the water guide assembly (3) comprises a plurality of water absorption ropes (31), one end of each water absorption rope (31) is located on the bottom wall of the water storage tank (1), and the other end of each water absorption rope (31) is located in the inner cavity of the planting pond (2).
3. The environment-friendly municipal road green belt according to claim 2, wherein: the planting pond (2) with communicate between the cistern (1) and be provided with pipe (6), water absorption rope (31) wear to locate in pipe (6).
4. The environment-friendly municipal road green belt according to claim 1, characterized in that: the cover plate (4) is obliquely arranged and obliquely and downwards arranged along the direction from the planting pond (2) to the cover plate (4), and the oblique high side of the cover plate (4) is lower than the upper end face of the planting pond (2).
5. The environment-friendly municipal road green belt according to claim 4, wherein: seted up long-pending silt groove (11) on the interior diapire of cistern (1), the opening orientation of long-pending silt groove (11) apron (4).
6. The environment-friendly municipal road green belt according to claim 1, characterized in that: be provided with inlet tube (7) with outside municipal water supply pipeline intercommunication in cistern (1), set up control valve (71) that open and close inlet tube (7) on inlet tube (7).
7. The environment-friendly municipal road green belt according to claim 1, characterized in that: be provided with outlet pipe (8) with municipal sewage pipes intercommunication on the interior diapire of cistern (1), be provided with control assembly (9) that control outlet pipe (8) opened and close in cistern (1).
8. The environment-friendly municipal road green belt according to claim 7, wherein: control assembly (9) include shrouding (91), cystosepiment (92) and tractive rope (93), one side of shrouding (91) with the terminal surface of outlet pipe (8) is laminated mutually, cystosepiment (92) with connect through tractive rope (93) between shrouding (91).
CN202220888544.6U 2022-04-16 2022-04-16 Environment-friendly town road greenbelt Active CN217088797U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220888544.6U CN217088797U (en) 2022-04-16 2022-04-16 Environment-friendly town road greenbelt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220888544.6U CN217088797U (en) 2022-04-16 2022-04-16 Environment-friendly town road greenbelt

Publications (1)

Publication Number Publication Date
CN217088797U true CN217088797U (en) 2022-08-02

Family

ID=82581335

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220888544.6U Active CN217088797U (en) 2022-04-16 2022-04-16 Environment-friendly town road greenbelt

Country Status (1)

Country Link
CN (1) CN217088797U (en)

Similar Documents

Publication Publication Date Title
CN109267772B (en) Ecological landscape corridor for intelligent three-dimensional rainwater recycling and workflow thereof
CN105544878A (en) Automatic rainwater collection and irrigation system for roof
CN111350233A (en) Northern area field greenhouse area rainfall flood resource utilization device and construction method
CN206674690U (en) A kind of slope vegetation conserves spray irrigation system
CN217088797U (en) Environment-friendly town road greenbelt
CN111622037B (en) Ecological town road in sponge city
CN111644320B (en) Fountain pool and drainage system thereof
CN211090814U (en) Green belt for municipal afforestation
CN217336602U (en) Green vegetation outer wall
CN107574962B (en) A kind of construction sponge city environment protection ecologic roof
CN107750908B (en) Rain collecting pool and automatic water supplementing irrigation system for arid region
CN211241000U (en) Environment-friendly energy-saving building
CN213476776U (en) Ecological slope protection of vwatching of cascaded earth and rockfill dam low reaches dam slope
CN109452138B (en) A collect and cyclic utilization system for gardens rainwater
CN112575845B (en) Building site's water saving system based on BIM
CN112081185A (en) Integral fire-fighting water pool and construction method thereof
CN111364699A (en) Roof greening drainage structure and construction method thereof
CN216855950U (en) Rain sewage treatment plant for building service
CN214143991U (en) Drainage system with sewage interception and storage regulation functions
CN113062426B (en) Roof precipitation treatment system
CN220908652U (en) Rainwater garden structure of transportation junction
CN217439111U (en) Sinking type water storage green pool
CN219395780U (en) Green belt drainage structure
CN218521611U (en) Bridge collecting and draining system
CN217000053U (en) Sponge city recessed greenbelt irrigation structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant