CN217079104U CN202220669516.5U CN202220669516U CN217079104U CN 217079104 U CN217079104 U CN 217079104U CN 202220669516 U CN202220669516 U CN 202220669516U CN 217079104 U CN217079104 U CN 217079104U
Authority
CN
China
Prior art keywords
steel
frame
positioning
rod
longitudinal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220669516.5U
Other languages
Chinese (zh)
Inventor
吴星蓉
胡海涛
刘福江
蔡东伟
李强
周岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Construction Investment Science And Technology Research And Development Co ltd
Original Assignee
Gansu Construction Investment Science And Technology Research And Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Construction Investment Science And Technology Research And Development Co ltd filed Critical Gansu Construction Investment Science And Technology Research And Development Co ltd
Priority to CN202220669516.5U priority Critical patent/CN217079104U/en
Application granted granted Critical
Publication of CN217079104U publication Critical patent/CN217079104U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model belongs to the technical field of steel structures, in particular to a high-intensity area steel structure frame, which comprises longitudinal steel, wherein the upper part of the longitudinal steel is provided with transverse steel through a positioning mechanism, the transverse steel is provided with a backing plate towards one end of the longitudinal steel, the positioning mechanism comprises a positioning frame, a rotating shaft, a circular plate, a clamping plate, an oblique block, a positioning rod, a rotating rod and an operating rod, and the outer side of the longitudinal steel is provided with the positioning frame; when indulging steel installation and accomplishing the back and need fixing the dress to horizontal steel, can make earlier the inserted bar that makes horizontal steel end insert in the jack that the locating frame was seted up, the rotating operation pole, then at the inside locating frame of positioning mechanism, the apparatus further comprises a rotating shaft, the plectane, the sloping block, under the cooperation of locating lever and bull stick, make the splint top extrude the backing plate that horizontal steel is connected, at last again through the extension rod, fix the action bars under the cooperation of extension hole and second spring bracket, through can conveniently installing horizontal steel like this, avoid using the step of bolt fastening.

Description

High-intensity area steel structure frame
Technical Field
The utility model belongs to the technical field of the steel construction, concretely relates to high intensity district steel construction frame.
Background
At present, the high-intensity area fabricated building, in particular the fabricated steel structure building, is widely concerned, and the high-intensity area structural framework is a structure mainly made of steel, is one of main building structure types, has the characteristics of high strength, light dead weight, high rigidity and the like, and is particularly suitable for building large-span, ultrahigh and ultra-heavy buildings.
Original steel structural framework mostly assembles through the form of bolt, because the quantity of bolt is more, can increase the operating procedure of work when the installation like this, can not bring more facilities for the staff.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a high-intensity district steel construction frame has the characteristics that make things convenient for steel construction frame to assemble.
In order to achieve the above object, the utility model provides a following technical scheme: a high-intensity area steel structure frame comprises longitudinal steel, wherein transverse steel is installed above the longitudinal steel through a positioning mechanism, the transverse steel faces a base plate installed at one end of the longitudinal steel, the positioning mechanism comprises a positioning frame, a rotating shaft, a circular plate, a clamping plate, an inclined block, a positioning rod, a rotating rod and an operating rod, the positioning frame is installed on the outer side of the longitudinal steel, the rotating rod is installed at the middle position inside the positioning frame and is rotatably connected with the longitudinal steel, the operating rod is installed on the outer side wall of the rotating rod, the circular plate is installed at the end, away from the longitudinal steel, of the rotating rod, the inclined block is installed on the outer side wall of the circular plate, the positioning rod is installed inside the positioning frame and at the position corresponding to the inclined block, the positioning rod extends to the outer side of the positioning frame, the clamping plate is installed at the end, close to the positioning rod, of the outer side of the positioning frame, the clamping plate is connected with the positioning frame through the rotating shaft, and one end of the clamping plate is connected with the backing plate.
As the utility model discloses a preferred technical scheme of high-intensity district steel construction frame, the locating frame face to the jack has been seted up to the one end of backing plate, the inserted bar that the backing plate is connected extends to the inside of jack.
As the utility model discloses a preferred technical scheme of high-intensity district steel construction frame, the action bars is kept away from the one end sliding connection of bull stick has the extension rod, the second spring frame is installed to the lateral wall below of extension rod, the extension rod is kept away from the one end of second spring frame extends to in the extension hole that the locating frame was seted up.
As the utility model discloses a preferred technical scheme of high intensity district steel construction frame, splint towards first spring bracket is installed to the one end below of locating frame.
As the utility model discloses a preferred technical scheme of high intensity district steel construction frame, the sloping block with sliding connection between the locating lever.
As the utility model discloses a preferred technical scheme of high-intensity district steel construction frame, the locating frame is kept away from indulge the one end of steel for leveling the structure.
Compared with the prior art, the beneficial effects of the utility model are that: need fix the time spent to horizontal steel after indulging the steel installation to accomplish, can make earlier the inserted bar that makes horizontal steel end insert in the jack that the locating frame offered, the rotation operation pole, then at the inside locating frame of positioning mechanism, the apparatus further comprises a rotating shaft, the plectane, the sloping block, under the cooperation of locating lever and bull stick, make the splint top extrude the backing plate that horizontal steel is connected, at last again through the extension rod, fix the action bars under the cooperation of extension hole and second spring bracket, through can conveniently installing horizontal steel like this, avoid using the step of bolt fastening.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view showing a split structure of the longitudinal steel and the transverse steel in FIG. 1 according to the present invention;
FIG. 3 is a schematic cross-sectional view of the positioning frame of FIG. 1 according to the present invention;
fig. 4 is a schematic top view of the positioning frame of fig. 1 according to the present invention;
fig. 5 is a schematic bottom view of the positioning frame of fig. 1 according to the present invention;
in the figure: 1. longitudinal steel; 2. transverse steel; 3. a positioning frame; 4. a base plate; 5. inserting a rod; 6. a rotating shaft; 7. a jack; 8. a circular plate; 9. a splint; 10. a sloping block; 11. positioning a rod; 12. a first spring holder; 13. a rotating rod; 14. an extension rod; 15. a second spring holder; 16. an operating lever; 17. an extension aperture.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-5, the present invention provides a technical solution: a high-intensity area steel structure frame comprises longitudinal steel 1, transverse steel 2 is installed above the longitudinal steel 1 through a positioning mechanism, a backing plate 4 is installed at one end, facing the longitudinal steel 1, of the transverse steel 2, the positioning mechanism comprises a positioning frame 3, a rotating shaft 6, a circular plate 8, a clamping plate 9, an inclined block 10, a positioning rod 11, a rotating rod 13 and an operating rod 16, the positioning frame 3 is installed on the outer side of the longitudinal steel 1, the rotating rod 13 is installed at the middle position inside the positioning frame 3, the rotating rod 13 is rotatably connected with the longitudinal steel 1, the operating rod 16 is installed on the outer side wall of the rotating rod 13, the circular plate 8 is installed at one end, far away from the longitudinal steel 1, of the rotating rod 13, the inclined block 10 is installed on the outer side wall of the circular plate 8, the positioning rod 11 is installed in the positioning frame 3 and in a position corresponding to the inclined block 10, the positioning rod 11 extends to the outer side of the positioning frame 3, the clamping plate 9 is installed at one end, the clamping plate 9 is connected with the positioning frame 3 through the rotating shaft 6, and one end of the clamping plate 9 is connected with the backing plate 4.
In this embodiment, when need fix horizontal steel 2 after indulging 1 installation of steel and accomplishing, can make earlier make the inserted bar 5 of horizontal steel 2 end insert the jack 7 that the locating frame 3 seted up in, then rotatory action bars 16, can make the plectane 8 of bull stick 13 top rotate through action bars 16, can make four sloping blocks 10 of lateral wall promote locating lever 11 respectively through plectane 8 and slide towards the outside, then make splint 9 top extrude backing plate 4 that horizontal steel 2 is connected through locating lever 11, make extension rod 14 that action bars 16 connects insert in extending hole 17 at last again, can install horizontal steel 2 through so, avoid using the step of bolt fastening.
Specifically, one end of the positioning frame 3 facing the backing plate 4 is provided with a jack 7, and the inserted link 5 connected with the backing plate 4 extends to the inside of the jack 7.
In this embodiment, when the transverse steel 2 needs to be installed, the insertion rod 5 connected with the backing plate 4 can be inserted into the insertion hole 7, so that the transverse steel 2 can be further limited and fixed.
Specifically, the one end sliding connection that the action bars 16 kept away from the bull stick 13 has extension rod 14, and second spring bracket 15 is installed to extension rod 14's lateral wall below, and the one end that extension rod 14 kept away from second spring bracket 15 extends to in the extension hole 17 that the locating frame 3 was seted up.
In this embodiment, when needs make the action bars 16 rotatory, can make extension bar 14 pull down to make extension bar 14 break away from extension hole 17, when needs fix action bars 16, can become flexible extension bar 14, because extension bar 14 can make second spring frame 15 produce deformation when moving down, when the in-process of not hard up extension bar 14, can make the second spring frame 15 that produces deformation promote extension bar 14 and insert in extending hole 17, can fix action bars 16 through so.
Specifically, a first spring holder 12 is mounted below one end of the clamping plate 9 facing the positioning frame 3.
In this embodiment, install first spring frame 12 in splint 9 towards the one end below of locating frame 3, when splint 9 extrudees toward backing plate 4, can make first spring frame 12 produce deformation, do when sloping block 10 does not promote splint 9, the first spring frame 12 of deformation can stimulate splint 9 and reset to make splint 9 break away from with backing plate 4.
Specifically, the inclined block 10 is slidably connected with the positioning rod 11.
In this embodiment, the swash block 10 and the positioning rod 11 are slidably connected, so that the swash block 10 can more stably push the positioning rod 11.
Specifically, one end of the positioning frame 3, which is far away from the longitudinal steel 1, is of a flat structure.
In this embodiment, the end of the positioning frame 3 away from the longitudinal steel 1 is flat, so that the positioning frame 3 can be in full contact with the backing plate 4.
The utility model discloses a theory of operation and use flow: the utility model discloses install the back, need fix when indulging 1 installation of steel and accomplishing the back to horizontal steel 2, can make earlier make in the inserted bar 5 of horizontal steel 2 ends inserts jack 7 that the locating frame 3 was seted up, then rotatory action bars 16, can make splint 9 top extrude horizontal steel 2 backing plate 4 of connecting through action bars 16, make the extension rod 14 of action bars 16 connection insert in extending hole 17 at last again, through installing horizontal steel 2 like this, avoid using the step of bolt fastening.

Claims (6)

1. The utility model provides a high-intensity district steel construction frame, includes vertical steel (1), its characterized in that: the steel plate is characterized in that the transverse steel (2) is installed above the longitudinal steel (1) through a positioning mechanism, the transverse steel (2) is provided with a base plate (4) facing one end of the longitudinal steel (1), the positioning mechanism comprises a positioning frame (3), a rotating shaft (6), a circular plate (8), a clamping plate (9), an oblique block (10), a positioning rod (11), a rotating rod (13) and an operating rod (16), the positioning frame (3) is installed on the outer side of the longitudinal steel (1), the rotating rod (13) is installed at the middle position inside the positioning frame (3), the rotating rod (13) is rotatably connected with the longitudinal steel (1), the operating rod (16) is installed on the outer side wall of the rotating rod (13), the rotating rod (13) is far away from one end of the longitudinal steel (1) and is provided with the circular plate (8), the oblique block (10) is installed on the outer side wall of the circular plate (8), the positioning rod (11) is installed inside the positioning frame (3) and corresponds to the oblique block (10), locating lever (11) extend to the outside of locating lever (3), the locating lever (3) outside is close to splint (9) are installed to the one end of locating lever (11), splint (9) with connect through pivot (6) between locating lever (3), just the one end of splint (9) with backing plate (4) are connected.
2. The high intensity zone steel structural frame of claim 1, wherein: jack (7) have been seted up towards the one end of locating frame (3) backing plate (4), inserted bar (5) that backing plate (4) are connected extend to the inside of jack (7).
3. The high intensity zone steel structural frame of claim 1, wherein: operating rod (16) are kept away from the one end sliding connection of bull stick (13) has extension rod (14), second spring frame (15) are installed to the lateral wall below of extension rod (14), extension rod (14) are kept away from the one end of second spring frame (15) extends to in extension hole (17) that locating frame (3) were seted up.
4. The high intensity area steel structural frame of claim 1, wherein: the clamping plate (9) faces the lower portion of one end of the positioning frame (3) and is provided with a first spring frame (12).
5. The high intensity zone steel structural frame of claim 1, wherein: the inclined block (10) is connected with the positioning rod (11) in a sliding mode.
6. The high intensity zone steel structural frame of claim 1, wherein: one end, far away from the longitudinal steel (1), of the positioning frame (3) is of a flat structure.
CN202220669516.5U 2022-03-26 2022-03-26 High-intensity area steel structure frame Active CN217079104U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220669516.5U CN217079104U (en) 2022-03-26 2022-03-26 High-intensity area steel structure frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220669516.5U CN217079104U (en) 2022-03-26 2022-03-26 High-intensity area steel structure frame

Publications (1)

Publication Number Publication Date
CN217079104U true CN217079104U (en) 2022-07-29

Family

ID=82551838

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220669516.5U Active CN217079104U (en) 2022-03-26 2022-03-26 High-intensity area steel structure frame

Country Status (1)

Country Link
CN (1) CN217079104U (en)

Similar Documents

Publication Publication Date Title
CN217079104U (en) High-intensity area steel structure frame
CN210374024U (en) Intelligent air conditioner easy to assemble
CN218153436U (en) Portable intelligent weather station
CN206806492U (en) A kind of ceiling mount antenna
CN217151174U (en) Construction is with convenient to detach's supplementary installation device of scaffold frame
CN214330030U (en) Connecting device for building reinforcement construction
CN215803212U (en) Frame post template reinforcing apparatus is built in room
CN215368754U (en) Supporting construction for template
CN211114837U (en) Earthwork supporting template
CN110805316A (en) Container assembly type frame steel assembly structure house
CN216042584U (en) Assembled building production mould convenient to open and shut
CN217054407U (en) Auxiliary device for rapid assembly of assembly type building
CN214461165U (en) Energy-saving building stress frame structure
CN216142458U (en) Independent strutting arrangement of post-cast strip of adjustable support height
CN217508667U (en) But quick assembly disassembly's aluminum alloy photovoltaic support
CN215055238U (en) Assembled frame type hollow building template
CN221030663U (en) Firmly-connected assembled steel structure
CN219386643U (en) Quick connecting device for wall column foot
CN213774603U (en) Building engineering is with consolidating strutting arrangement convenient to installation
CN219910172U (en) Assembled building fixing device for building engineering
CN216111625U (en) Rod mortise and tenon type connecting structure
CN217353086U (en) Assembled building curtain
CN218643548U (en) Assembly type structure component connection structure
CN211037262U (en) Light steel assembled house structure
CN216741545U (en) Concrete structure multi-arch tunnel reinforcing device

Legal Events