- CN217076823U CN217076823U CN202220373245.9U CN202220373245U CN217076823U CN 217076823 U CN217076823 U CN 217076823U CN 202220373245 U CN202220373245 U CN 202220373245U CN 217076823 U CN217076823 U CN 217076823U
- Authority
- CN
- China
- Prior art keywords
- pole
- support
- steel pipe
- fastening
- fastening bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012937 correction Methods 0.000 title abstract description 4
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 30
- 239000010959 steel Substances 0.000 claims abstract description 30
- 238000007789 sealing Methods 0.000 claims abstract description 13
- 230000000694 effects Effects 0.000 claims description 2
- 238000009434 installation Methods 0.000 abstract description 6
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 abstract description 5
- 238000012545 processing Methods 0.000 abstract description 3
- 230000006872 improvement Effects 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 230000008569 process Effects 0.000 description 4
- 239000000463 material Substances 0.000 description 3
- 238000004880 explosion Methods 0.000 description 2
- 230000001133 acceleration Effects 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
The utility model discloses a supporter is rectified to distribution rack, including supporting the steel pipe, the bottom fixed mounting who supports the steel pipe has the support channel-section steel, be provided with manual lead screw lift on the support steel pipe. This supporter is rectified to distribution rack, through first pole fixed hoop, the fixed hoop of second pole, fastening bolt, the sealing washer, fastening nut, mutually support between the waterproof sleeve pipe, can prevent that the rainwater from getting into the junction between fastening bolt and the fastening nut, avoid fastening bolt and fastening nut to go up rust, make fastening bolt die together with fastening nut rust, the problem that causes to be difficult to the dismantlement appears, can make this correction supporter dismantle conveniently, can used repeatedly, and the utility model has the advantages of being simple in structure, and convenient for processing, installation convenient to use, characteristics such as safe and reliable, and portable, the transportation of being convenient for, great improvement the device's practicality.
Description
Technical Field
The utility model belongs to the technical field of the support equipment, concretely relates to supporter is rectified to distribution rack.
Background
In recent years, in the construction of electric power engineering, distribution transformer installation is more and more standard along with the acceleration of the construction process of a power distribution network, in order to save land resources, avoid external force damage and beautify environment, a newly-built platform area is basically installed in a rack type, the installation height of a transformer rack is generally more than three meters, in actual work, as constructors do not standardize construction operation, the geological conditions of a construction position cannot meet requirements and the like (ditch edges, pit edges or soil are soft), after the construction is finished, the transformer rack runs for a period of time, is soaked by rainwater or sinks in geology, a part of support racks of the distribution platform area can be inclined, the appearance of the rack is not beautiful, the inclined degree is large, accidents such as high-low-voltage line stretching sections and the like can be caused, the inclined rack needs to be timely adjusted after the inclination, if the adjustment is not in time, the large accident can be developed from small defects, the crane of need hiring in the past is adjusted to the adjustment rack, need have a power failure to go on mostly in the adjustment process, had both increased company's cost and expense like this, caused the user to have a power failure again, probably can lead to the emergence of user complaint incident because of having a power failure even, and the inconvenient dismantlement of rack installation, influence the staff and carry out the dismouting, so propose a distribution rack here and correct the eyelidretractor and solve above-mentioned problem.
Disclosure of Invention
Not enough to prior art, the utility model provides a supporter is rectified to distribution rack has solved the problem that proposes in the above-mentioned background art.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a supporter is rectified to distribution rack, includes the support steel pipe, the bottom fixed mounting who supports the steel pipe has the support channel-section steel, be provided with manual lead screw lift on the support steel pipe, the equal fixedly connected with connecting rod in upper and lower both sides of supporting steel pipe left surface, the fixed hoop of the first pole of the other end fixedly connected with of connecting rod, the left side of the fixed hoop of first pole is provided with the fixed hoop of second pole.
Further, all seted up the closure hole on first pole fixed hoop and the second pole fixed hoop, threaded connection has fastening bolt in the closure hole of seting up on first pole fixed hoop and the second pole fixed hoop, the sealing washer has been cup jointed in the activity of the left and right sides of fastening bolt surface.
Furthermore, the left side and the right side of the fastening bolt are in threaded connection with fastening nuts, waterproof sleeves are fixedly connected to the outer surfaces of the fastening nuts, the middle parts of the waterproof sleeves are circular hollow, and the diameter of the circular hollow in the middle parts of the waterproof sleeves is larger than that of the fastening bolt.
Further, the bottom fixedly connected with of the fixed hoop of first pole supports the shelves, the other end fixed connection of support shelves is on supporting the steel pipe, be the triangle-shaped shape between connecting rod, the fixed hoop of first pole, the support shelves.
Furthermore, the top of the supporting steel pipe is provided with a rain cover, and a measuring tape is arranged at the bottom of the rain cover arranged at the top of the supporting steel pipe.
Further, the sealing ring is located on the inner side of the fastening nut, and the length of the waterproof sleeve is larger than half of that of the fastening bolt.
Has the advantages that:
1. this supporter is rectified to distribution rack can make the device possess the function that the lift can be adjusted through manual lead screw lift, and the effectual cost expense who practices thrift the renting crane has also avoided the power failure in the adjustment process simultaneously to more can avoid the user to lead to the emergence of user complaint incident because of having a power failure.
2. This supporter is rectified to distribution rack, through first pole fixed hoop, the fixed hoop of second pole, fastening bolt, the sealing washer, fastening nut, mutually support between the waterproof sleeve pipe, can prevent that the rainwater from getting into the junction between fastening bolt and the fastening nut, avoid fastening bolt and fastening nut to go up rust, make fastening bolt die together with fastening nut rust, the problem that causes to be difficult to the dismantlement appears, can make this correction supporter dismantle conveniently, can used repeatedly, and the utility model has the advantages of being simple in structure, and convenient for processing, installation convenient to use, characteristics such as safe and reliable, and portable, the transportation of being convenient for, great improvement the device's practicality.
Drawings
FIG. 1 is a schematic side view of the present invention;
FIG. 2 is a front view of the present invention;
fig. 3 is a schematic top view of the present invention;
fig. 4 is a schematic structural view of a three-dimensional explosion at the first electric pole fixing hoop of the present invention;
fig. 5 is a schematic structural diagram of the three-dimensional explosion at the position of the sealing ring of the present invention.
In the figure: 1. supporting the steel pipe; 2. supporting channel steel; 3. a manual lead screw elevator; 4. a connecting rod; 5. a first pole mounting collar; 6. a support rail; 7. a second pole mounting collar; 8. fastening a bolt; 9. a seal ring; 10. fastening a nut; 11. a waterproof sleeve; 12. a tape measure.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1, fig. 2 and fig. 3, the present invention provides a technical solution: a power distribution rack correcting and supporting device comprises a supporting steel pipe 1, a supporting channel steel 2 is fixedly installed at the bottom of the supporting steel pipe 1, a manual lead screw lifter 3 is arranged on the supporting steel pipe 1, the device can have the function of adjusting lifting by utilizing the manual lead screw lifter 3 and the manual lead screw lifter 3, the cost expenditure of a renting crane is effectively saved, meanwhile, the power failure in the adjusting process is avoided, so that the occurrence of a user complaint event caused by the power failure of a user can be further avoided, the upper side and the lower side of the left surface of the supporting steel pipe 1 are both fixedly connected with a connecting rod 4, the other end of the connecting rod 4 is fixedly connected with a first electric pole fixing hoop 5, a second electric pole fixing hoop 7 is arranged on the left side of the first electric pole fixing hoop 5, the device can be conveniently disassembled by the mutual matching between the first electric pole fixing hoop 5 and the second electric pole fixing hoop 7, can be repeatedly used, has the characteristics of simple structure, convenient processing, convenient installation and use, safety, reliability and the like.
Referring to fig. 5, the first pole fixing hoop 5 and the second pole fixing hoop 7 are both provided with fastening holes, fastening bolts 8 are screwed into the fastening holes provided on the first pole fixing hoop 5 and the second pole fixing hoop 7, and the sealing rings 9 are movably sleeved on the left and right sides of the outer surface of the fastening bolts 8, so that rainwater can be prevented from entering the connection place between the first pole fixing hoop 5, the second pole fixing hoop 7 and the fastening bolts 8 by the sealing rings 9, thereby preventing the fastening bolts 8, the first pole fixing hoop 5 and the fastening bolts 8 from rusting, and preventing the fastening bolts 8, the first pole fixing hoop 5 and the fastening bolts 8 from rusting together with the fastening bolts 7, which leads to difficulty in disassembly for workers, and damages the first pole fixing hoop 5 and the second pole fixing hoop 7 after disassembly, thus preventing the first pole fixing hoop 5 and the second pole fixing hoop 7 from being reused, the left side and the right side of the fastening bolt 8 are in threaded connection with fastening nuts 10, the outer surface of the fastening nut 10 is fixedly connected with waterproof sleeves 11, the middle parts of the waterproof sleeves 11 are circular hollow, the diameter of the circular hollow in the middle parts of the waterproof sleeves 11 is larger than that of the fastening bolt 8, the fastening nut 10 is utilized to prevent rainwater from permeating into the joint of the fastening bolt 8 and the fastening nut 10 and causing rust on the joint of the fastening bolt 8 and the fastening nut 10, the lubricity between the fastening nut 10 and the fastening bolt 8 can be better protected, workers can be effectively and conveniently detached, the detaching efficiency of the workers is improved, the sealing rings 9 are made of rubber materials, the sealing rings 9 are located on the inner sides of the fastening nuts 10, the waterproof sleeves 11 are made of rubber materials, the length of the waterproof sleeves 11 is larger than half of the length of the fastening bolt 8, and the waterproof sleeves 11 can protect the fastening bolt 8, the fastening bolt 8 is prevented from being drenched by rainwater and rusted, and the sealing ring 9 and the waterproof sleeve 11 are made of rubber materials, so that the insulating property of the device can be improved, and the safety of the device is enhanced.
Referring to fig. 2 and 4, the bottom of the first pole fixing hoop 5 is fixedly connected with a supporting rail 6, the other end of the supporting rail 6 is fixedly connected to the supporting steel pipe 1, the connecting rod 4, the first pole fixing hoop 5 and the supporting rail 6 are triangular, and by using the triangular stability principle, it will be appreciated that the support stop 6 provides support for the first pole fixing strap 5, making the first pole fixing strap 5 more stable, meanwhile, the stability of the first pole fixing hoop 5 and the second pole fixing hoop 7 can be greatly improved, the top of the support steel pipe 1 is provided with a rain cover, the bottom of the rain cover arranged on the top of the support steel pipe 1 is provided with a measuring tape 12, the measuring tape 12 can be used for more accurately measuring the amplitude of the manual screw lifter 3 to be adjusted, and the problem that the measurement is difficult to be carried out at high altitude because the tool is not fixed by the staff can be avoided.
In conclusion, this supporter is rectified to distribution rack, during the use, at first the staff need merge first pole fixing hoop 5 and second pole fixing hoop 7 together, then wear fastening bolt 8 in the tight fit hole of seting up on first pole fixing hoop 5 and the second pole fixing hoop 7, then tighten fastening nut 10, it needs here to notice that, need cover sealing washer 9 on fastening bolt 8 before tightening fastening nut 10, fix the device on the pole, then utilize tape measure 12 to measure, confirm the range that needs manual lead screw lift 3 to adjust, it can to utilize manual lead screw lift 3 to adjust at last.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a supporter is rectified to distribution rack, includes support steel pipe (1), its characterized in that: the utility model discloses a steel pipe support, including support steel pipe (1), be provided with manual lead screw lift (3) on the support steel pipe (1), support the equal fixedly connected with connecting rod (4) in the upper and lower both sides of steel pipe (1) left surface, the fixed hoop (5) of the first pole of the other end fixedly connected with of connecting rod (4), the left side of the fixed hoop (5) of first pole is provided with the fixed hoop (7) of second pole.
2. A power distribution rack calibration support as claimed in claim 1, wherein: all seted up the fastening hole on first pole fixed hoop (5) and the second pole fixed hoop (7), threaded connection has fastening bolt (8) in the fastening hole seted up on first pole fixed hoop (5) and the second pole fixed hoop (7), sealing washer (9) have been cup jointed in the activity of the left and right sides of fastening bolt (8) surface.
3. A power distribution rack calibration support as claimed in claim 2, wherein: the left and right sides threaded connection of fastening bolt (8) has fastening nut (10), the surface fixed connection of fastening nut (10) has waterproof sleeve pipe (11), the middle part of waterproof sleeve pipe (11) is circular hollow, the circular hollow diameter in waterproof sleeve pipe (11) middle part is greater than the diameter of fastening bolt (8).
4. A power distribution rack calibration support as claimed in claim 1, wherein: the bottom fixedly connected with of the fixed hoop of first pole (5) supports shelves (6), the other end fixed connection of support shelves (6) is on supporting steel pipe (1), be the triangle-shaped shape between connecting rod (4), the fixed hoop of first pole (5), support shelves (6).
5. A power distribution rack calibration support as claimed in claim 1, wherein: the top of the supporting steel pipe (1) is provided with a rain cover, and the bottom of the rain cover arranged at the top of the supporting steel pipe (1) is provided with a measuring tape (12).
6. A power distribution rack calibration support as claimed in claim 3, wherein: the sealing ring (9) is positioned on the inner side of the fastening nut (10), and the length of the waterproof sleeve (11) is greater than one half of the length of the fastening bolt (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220373245.9U CN217076823U (en) | 2022-02-24 | 2022-02-24 | Power distribution rack correction support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220373245.9U CN217076823U (en) | 2022-02-24 | 2022-02-24 | Power distribution rack correction support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217076823U true CN217076823U (en) | 2022-07-29 |
Family
ID=82544931
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220373245.9U Expired - Fee Related CN217076823U (en) | 2022-02-24 | 2022-02-24 | Power distribution rack correction support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217076823U (en) |
-
2022
- 2022-02-24 CN CN202220373245.9U patent/CN217076823U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106760197B (en) | Method for allowing error in installation of steel column structure | |
CN204418022U (en) | Full bolt connects assembled tool type steel pipe post pylon | |
CN105003090A (en) | Temporary support frame for mounting assembly type steel structure | |
CN205719174U (en) | Ultrasonic radar water-level gauge mounting bracket | |
CN113323359A (en) | Novel flower basket pull rod tool type overhanging frame construction method | |
CN217076823U (en) | Power distribution rack correction support | |
CN216613830U (en) | Recoverable tower crane adheres to and buries a structure | |
CN210422095U (en) | Iron tower foundation reinforcing support and iron tower supporting structure | |
CN204876631U (en) | Assembled steel structure installation uses interim support frame | |
CN202642056U (en) | Simple guardrail frame used during process of building ship | |
CN212249434U (en) | Steel angle buckling-restrained reinforcing device for power transmission tower | |
CN209823252U (en) | Transformer overhauls protection frame | |
CN211714720U (en) | Steel construction electric power iron tower | |
CN204435443U (en) | Detachable pile tube beam test device | |
CN202352355U (en) | Protection device of plumb line monitoring system for nuclear island containment deformation | |
CN219757404U (en) | Construction site environment monitoring device | |
CN207110418U (en) | Railway pier top surrounding hanging basket safe operation platform | |
CN220954572U (en) | Rust-resistant device of scaffold | |
CN206948140U (en) | Hydrogenerator machine cheats inner stator mounting platform structure | |
CN212298225U (en) | Measuring instrument fixing support for high-rise frame steel structure | |
CN213115452U (en) | Auxiliary assembly of iron stand assembling machine | |
CN111255290A (en) | Steel angle buckling-restrained reinforcing device for power transmission tower | |
CN219414218U (en) | Reservoir water level station overhauls aggregate unit | |
CN205132954U (en) | Novel dismouting tower machine adheres to frame device | |
CN214818224U (en) | Fan prestressed anchorage bolt dismantles processing frock |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220729 |
|
CF01 | Termination of patent right due to non-payment of annual fee |