CN217053085U - Maintenance structure for rapidly treating asphalt settlement - Google Patents

Maintenance structure for rapidly treating asphalt settlement Download PDF

Info

Publication number
CN217053085U
CN217053085U CN202122636780.7U CN202122636780U CN217053085U CN 217053085 U CN217053085 U CN 217053085U CN 202122636780 U CN202122636780 U CN 202122636780U CN 217053085 U CN217053085 U CN 217053085U
Authority
CN
China
Prior art keywords
asphalt
subsidence
glass fiber
piles
rapidly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122636780.7U
Other languages
Chinese (zh)
Inventor
茅卫生
叶林
陈纲
陶戴邦
王辉
陈凯华
陈德昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction City Operation Group Co ltd
Shanghai Municipal Maintenance & Management Co ltd
Original Assignee
Shanghai Urban Construction City Operation Group Co ltd
Shanghai Municipal Maintenance & Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction City Operation Group Co ltd, Shanghai Municipal Maintenance & Management Co ltd filed Critical Shanghai Urban Construction City Operation Group Co ltd
Priority to CN202122636780.7U priority Critical patent/CN217053085U/en
Application granted granted Critical
Publication of CN217053085U publication Critical patent/CN217053085U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to a maintenance structure of rapid processing pitch subsidence squeezes into a plurality of stake supports below the pitch subsidence district on road surface, and the fine grid of glass is mated formation on the stake to it is fixed with the fine grid of glass and stake top with the apron, the fine thin layer of scattering of paving above the fine grid of glass. The utility model discloses the effectual road surface disease that has solved that the subsidence area is little, the degree of depth is big. The structure does not occupy an expressway excessively, does not need traditional large-area excavation and high-power mechanical rolling, reduces the influence of construction on expressway traffic, and has the characteristics of low cost, high speed and the like.

Description

Maintenance structure for rapidly processing asphalt settlement
Technical Field
The utility model relates to a road surface maintenance structure, especially a maintenance structure of rapid processing pitch subsidence.
Background
With the increase of traffic flow and operation age, pits and sinks appear on the road surface, even the sinks are large, and serious potential safety hazards are caused to driving.
The current methods for treating subsidence mainly comprise two methods:
the first method is excavation of foundation pit at subsidence position and layered compaction, the method has large excavation amount, many working procedures, long time for base layer treatment and maintenance, and is greatly influenced by traffic enclosing conditions on expressway.
The second method is that after the loose part is cleaned, the loose part is directly paved from bottom to top, the method does not reinforce the lower part of the subsidence, and the upper part continues to sink and crack or even sink under the action of the automobile load.
Therefore, the two schemes both have disadvantages, and the fundamental reason is that the reinforcing mode is single, so that the problem of subgrade settlement cannot be fundamentally solved, or rapid construction and rapid traffic opening cannot be realized.
Disclosure of Invention
In order to solve prior art and have implementation cost height, consolidate the single scheduling problem of form, the utility model provides a maintenance structure of rapid processing pitch subsidence, this structure especially is adapted to the driving road environment that the traffic is big, the lane is few, especially the ramp bridge, is not convenient for excavate on a large scale.
In order to realize the purpose, the utility model discloses a technical scheme is: a plurality of timber piles are driven into the lower portion of an asphalt settlement area of a road surface to support, a glass fiber grating is paved on the timber piles, the glass fiber grating is fixed to the top of the timber piles through a cover plate, and a spreading thin layer is paved on the glass fiber grating.
Further, a plurality of the timber piles are arranged in a quincunx shape.
Further, the diameter of the timber pile is 4cm, and the driving depth is 25 cm.
Further, the cover plate adopts nine clamping plates.
Further, the top of the timber pile is flush, and the gradient of the timber pile is consistent with the gradient of the road surface.
Furthermore, polyester glass fiber cloth is placed at the interlayer boundary part of the glass fiber grating.
Further, the sprinkling thin layer is formed by asphalt concrete with the thickness of 6cm and modified asphalt with the thickness of 4cm which are paved in sequence.
Owing to adopted above technique, the utility model discloses following beneficial effect has:
1. effectively reinforcing the damage of the subsidence area and ensuring the driving safety.
2. Through the construction of minizone, reduce and enclose the scope, it is little to occupy the lane.
3. The road sealing operation time is short, the normal traffic of the road is facilitated, and the hidden social benefit is created.
Drawings
FIG. 1 is a schematic view of a maintenance structure for rapidly treating asphalt settlement according to the present invention;
fig. 2 is a schematic plan view of the maintenance structure for rapidly treating asphalt settlement of the present invention.
Detailed Description
The present invention will be further explained with reference to the accompanying drawings and examples.
As shown in fig. 1 and 2, the repair structure for rapidly treating asphalt settlement comprises carbonized wood piles, geogrids, sprinkling thin layers and the like. A plurality of timber piles 1 are driven into an asphalt subhorizontal layer A of an asphalt subsidence area of a pavement for supporting, a glass fiber grating 2 is paved on the timber piles 1, the glass fiber grating 2 is fixed with the top of the timber piles 1 through a cover plate 3, and a spreading thin layer is paved on the glass fiber grating 2. The spreading thin layer is formed by paving asphalt concrete 4 with the thickness of 6cm and modified asphalt 5 with the thickness of 4cm in sequence.
In FIG. 1, B is the height of the top surface of the bridge deck in the original subsidence area.
Use certain ring road as the example, the utility model discloses the reinforced mode of carbonization stake with geogrid has been taken. Wherein the timber piles and geogrids are arranged according to the attached figures 1 and 2. The specific construction process is as follows:
firstly, cleaning the surface garbage and loosening part
(1) Lofting and cutting: cutting according to the principles of 'square compensation of round hole and positive compensation of inclined hole' according to the position of the disease, wherein the cutting depth is 4cm (SMA) +6cm (AC 20);
(2) cleaning a base layer: cleaning loose parts of the base layer until solid parts are exposed;
secondly, the glass fiber grating for driving the timber pile and paving
(1) Measuring and lofting: the wooden piles are arranged in a quincunx mode, and the distance between every two wooden piles is 15 cm.
(2) Drilling: and (4) drilling holes with the depth of 2cm by adopting an electric hand drill.
(3) Driving a timber pile: the diameter of the wood pile is 4cm, the hammering method is adopted for construction, and the driving depth is about 25 cm;
(4) paving a glass fiber grating: the glass fiber grating is fixed by a wooden pile.
Three, wooden pile top cover plate
(1) And (3) finishing and leveling the timber pile: after the timber pile is driven, leveling the timber pile, wherein the gradient of the timber pile is the same as that of the road surface;
(2) a top cover plate: a cover plate at the top of the timber pile, wherein the cover plate adopts nine clamping plates and has the size of (10cm by 2 cm); fourthly, spreading a thin layer for waterproof sealing, and spreading 6cm (AC20) and 4cm (SMA) in sequence.

Claims (7)

1. The utility model provides a maintenance structure of rapid processing pitch subsidence which characterized in that: the method comprises the following steps of driving a plurality of timber pile supports below an asphalt subsidence area of a road surface, paving a glass fiber grating on the timber piles, fixing the glass fiber grating and the tops of the timber piles by using a cover plate, and paving a spreading thin layer on the glass fiber grating.
2. The repair structure for rapidly processing asphalt subsidence according to claim 1, wherein: the multiple wooden piles are arranged in a quincunx shape.
3. The repair structure for rapidly treating asphalt subsidence according to claim 1, wherein: the diameter of the timber pile is 4cm, and the driving depth is 25 cm.
4. The repair structure for rapidly processing asphalt subsidence according to claim 1, wherein: the cover plate adopts nine clamping plates.
5. The repair structure for rapidly treating asphalt subsidence according to claim 1, wherein: the tops of the wood piles are flush, and the gradient of the wood piles is consistent with the gradient of the road surface.
6. The repair structure for rapidly processing asphalt subsidence according to claim 1, wherein: and polyester glass fiber cloth is placed at the interlayer boundary part of the glass fiber grating.
7. The repair structure for rapidly treating asphalt subsidence according to claim 1, wherein: the spreading thin layer is formed by paving asphalt concrete with the thickness of 6cm and modified asphalt with the thickness of 4cm in sequence.
CN202122636780.7U 2021-10-29 2021-10-29 Maintenance structure for rapidly treating asphalt settlement Active CN217053085U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122636780.7U CN217053085U (en) 2021-10-29 2021-10-29 Maintenance structure for rapidly treating asphalt settlement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122636780.7U CN217053085U (en) 2021-10-29 2021-10-29 Maintenance structure for rapidly treating asphalt settlement

Publications (1)

Publication Number Publication Date
CN217053085U true CN217053085U (en) 2022-07-26

Family

ID=82474689

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122636780.7U Active CN217053085U (en) 2021-10-29 2021-10-29 Maintenance structure for rapidly treating asphalt settlement

Country Status (1)

Country Link
CN (1) CN217053085U (en)

Similar Documents

Publication Publication Date Title
CN101368383B (en) Method for treating soft soil roadbed by artificial composite crust layer
CN109972659B (en) Novel municipal inspection well structure and construction method
CN201495468U (en) Structure of highway subgrade on wet soft foundation
CN106567379B (en) Method for reinforcing manual dewatering, bedding course, low-energy replacement dynamic compaction shallow foundation
CN109914173B (en) Foam light soil pouring table back structure in expressway reconstruction and extension project and construction method thereof
CN212452152U (en) Geotechnique's check room adds muscle cement concrete pavement structure
CN101962929B (en) Novel method for processing soft soil subgrade by pile-supporting reinforcing technology
CN106522055A (en) Construction method of widening roadbed of road
CN201296895Y (en) Vertical cracking pavement repair structure
CN102817298B (en) Construction method on permafrost
CN217053085U (en) Maintenance structure for rapidly treating asphalt settlement
CN210529400U (en) Solidified building residue soil road structure
CN112627168A (en) High-density polymer grouting reinforcement method for roadbed at sunken part of bridge and culvert butt strap
CN110029626B (en) Reinforcing treatment method for revetment foundation on soft stratum slope
CN207552833U (en) A kind of elevated bridge basal perimeter ground road structure
CN110205895A (en) A kind of green low-carbon environment-friendly type road structure using regrown material
AU2021102288A4 (en) Composite Replacement Structure and Treatment for Soft Base of Coastal Mudflat
CN212247717U (en) High-fill anti-settlement roadbed structure
CN108316077A (en) One kind underlies shallow embedding cave dwelling roadbed treatment structures and method
CN111206598B (en) Method for cooperatively utilizing construction waste in hillock landscaping project
CN203373764U (en) Concrete core sand-gravel pile composite foundation
CN220579701U (en) Shallow soft foundation changing and filling structure
CN207227880U (en) A kind of cheuch phase weak soil combined type, which is changed, fills out structure and cheuch is mutually soft soil roadbed
CN112281576A (en) Highway disease maintenance method
CN205387721U (en) Highway retaining wall reinforced structure