CN217027908U - Garbage pipe buffer for construction - Google Patents

Garbage pipe buffer for construction Download PDF

Info

Publication number
CN217027908U
CN217027908U CN202220071925.5U CN202220071925U CN217027908U CN 217027908 U CN217027908 U CN 217027908U CN 202220071925 U CN202220071925 U CN 202220071925U CN 217027908 U CN217027908 U CN 217027908U
Authority
CN
China
Prior art keywords
block
connecting part
mounting
pipeline
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220071925.5U
Other languages
Chinese (zh)
Inventor
马明
李海涛
任毅翼
谢钰
张永亮
刘静利
符佳磊
侯冰冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Sanjian Construction Group Co ltd
Original Assignee
Henan Sanjian Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Sanjian Construction Group Co ltd filed Critical Henan Sanjian Construction Group Co ltd
Priority to CN202220071925.5U priority Critical patent/CN217027908U/en
Application granted granted Critical
Publication of CN217027908U publication Critical patent/CN217027908U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a garbage pipeline buffering device for building construction, which comprises a garbage pipeline, wherein mounting openings are formed in two sides of the garbage pipeline in a penetrating manner, mounting blocks are connected in the mounting openings, a sliding groove is formed in one side of each mounting block, a movable block and a supporting frame are fixedly connected to one side, close to the sliding groove, of each mounting block, each movable block comprises a first connecting part, a second connecting part and a third connecting part, and the first connecting part, the second connecting part and the third connecting parts are sequentially and fixedly connected. This rubbish pipeline buffer for construction is used for installing the installation piece through setting up the multiunit installing port, and through the movable block, cooperation between supporting shoe and the buffer spring is used for the movable block has the cushioning effect to the rubbish of whereabouts, uses through the cooperation between perforation, constant head tank, installation pole and the installation spring, can realize the swift assembly to the installation piece, and this rubbish pipeline buffer for construction is rational in infrastructure, has improved the life of rubbish pipeline, and the dismouting is simple, and the practicality is high.

Description

Garbage pipeline buffer for construction
Technical Field
The utility model relates to the technical field of vertical transportation of garbage pipelines, in particular to a garbage pipeline buffering device for building construction.
Background
At present, along with the construction of domestic super high-rise buildings, the transportation and treatment problems of construction wastes come into play, the frequently adopted modes of the construction waste transportation include tower crane lifting, elevator transportation, waste pipeline transportation and the like, the transportation applicability of a waste pipeline is strongest, but the wastes falling to the middle part of the pipeline from the super high-rise still can generate impact force, and if the wastes are not buffered, the waste pipeline is easily damaged.
In view of this, a garbage pipeline buffering device for building construction is proposed.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a garbage pipeline buffering device for building construction, which solves the problem that the existing garbage pipeline is easy to damage due to falling impact force at high altitude in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme, the garbage pipeline buffering device for building construction comprises a garbage pipeline, mounting openings are formed in two sides of the garbage pipeline in a penetrating manner, mounting blocks are connected in the mounting openings, a sliding groove is formed in one side of each mounting block, a sliding block is connected in the sliding groove, a movable block and a support frame are fixedly connected to one side, close to the sliding groove, of each mounting block, each movable block comprises a first connecting part, a second connecting part and a third connecting part, the first connecting part, the second connecting part and the third connecting part are sequentially and fixedly connected, a connecting block is fixedly connected between each sliding block and the second connecting part, a buffering spring is fixedly connected between the bottom of each connecting block and the top of the support frame, two groups of fixing blocks are fixedly connected to the position, close to the mounting openings, of the garbage pipeline are fixedly connected with the fixing blocks, through holes are formed in the fixing blocks, and positioning grooves are formed in the top and the bottom of the mounting blocks, the perforation and the positioning groove are connected with an installation rod, one end of the installation rod is fixedly connected with a pulling block, and the bottom of the garbage pipeline is fixedly connected with a bottom pipe.
Preferably, the installing port is equipped with the multiunit along the high extending direction equidistance of rubbish pipeline, and the dislocation set of multiunit installing port on horizontal position.
Preferably, the mounting block and the side surface of the mounting opening are in matched rectangular geometric shapes.
Preferably, the sliding groove and the sliding block are in a horizontal T-shaped structure matched with each other in a overlooking mode.
Preferably, the second connecting part is obliquely arranged, and the first connecting part and the third connecting part are horizontally arranged in parallel.
Preferably, an installation spring is fixedly connected between the pulling block and the fixing block, and the installation rod penetrates through the inner side of the installation spring.
Compared with the prior art, the utility model has the beneficial effects that: this rubbish pipeline buffer for construction is used for installing the installation piece through setting up the multiunit installing port, and through the movable block, cooperation between supporting shoe and the buffer spring is used for the movable block has the cushioning effect to the rubbish of whereabouts, uses through the cooperation between perforation, constant head tank, installation pole and the installation spring, can realize the swift assembly to the installation piece, and this rubbish pipeline buffer for construction is rational in infrastructure, has improved the life of rubbish pipeline, and the dismouting is simple, and the practicality is high.
Drawings
FIG. 1 is a front sectional view of a construction garbage pipe buffering device according to the present invention;
FIG. 2 is a schematic front view of a construction waste pipe buffer device according to the present invention;
FIG. 3 is an enlarged view of the position A in FIG. 1 of the construction waste pipeline buffering device according to the present invention;
fig. 4 is a partial top sectional view of a construction waste pipe buffering device according to the present invention.
In the figure: 1. garbage pipe, 2, installing port, 3, installation piece, 4, spout, 5, slider, 6, movable block, 601, first connecting portion, 602, second connecting portion, 603, third connecting portion, 7, support frame, 8, connecting block, 9, buffer spring, 10, fixed block, 11, perforation, 12, constant head tank, 13, installation pole, 14, draw the piece, 15, installation spring, 16, bottom tube.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: a garbage pipeline buffering device for building construction comprises a garbage pipeline 1, mounting ports 2 are arranged in two sides of the garbage pipeline 1 in a penetrating mode, mounting blocks 3 are connected in the mounting ports 2, the mounting blocks 3 and the sides of the mounting ports 2 are in matched rectangular geometric shapes, the mounting ports 2 have a positioning effect on the mounting blocks 3, the stability of connection of the mounting blocks 3 in the mounting ports 2 is improved, a plurality of groups of the mounting ports 2 are arranged at equal intervals along the height extension direction of the garbage pipeline 1, the groups of the mounting ports 2 are arranged in a staggered mode on a horizontal position and are respectively used for connecting a plurality of groups of the mounting blocks 3 through the groups of the mounting ports 2, a sliding groove 4 is formed in one side of each mounting block 3, a sliding block 5 is connected in the sliding groove 4, the sliding groove 4 and the sliding block 5 are in matched transverse T-shaped structures when the sliding grooves 4 and the sliding blocks 5 are overlooked, the sliding grooves 4 have a positioning effect on the sliding blocks 5 and can prevent the sliding blocks 5 from being separated from the sliding grooves 4, the side, close to the chute 4, of the mounting block 3 is fixedly connected with a movable block 6 and a support frame 7, the movable block 6 comprises a first connecting part 601, a second connecting part 602 and a third connecting part 603, the first connecting part 601, the second connecting part 602 and the third connecting part 603 are sequentially and fixedly connected, a connecting block 8 is fixedly connected between the sliding block 5 and the second connecting part 602, a buffer spring 9 is fixedly connected between the bottom of the connecting block 8 and the top of the support frame 7, the second connecting part 602 is obliquely arranged, the first connecting part 601 and the third connecting part 603 are horizontally and parallelly arranged, the buffer spring 9 has an elastic effect on the connecting block 8 and the movable block 6, the garbage has a buffer function in the process that the garbage falling from a high position is contacted with the movable block 6, the surface of the second connecting part 602 is not easy to accumulate materials, two groups of fixed blocks 10 are fixedly connected to the position, close to the mounting opening 2, the distance between the two groups of the fixed blocks 10 is matched with the height of the mounting block 3, run through in the fixed block 10 and seted up perforation 11, constant head tank 12 has all been seted up in installation piece 3 top and the bottom, perforation 11 and constant head tank 12 in-connection have installation pole 13, installation pole 13 diameter length, constant head tank 12 internal diameter length, perforation 11 internal diameter length homogeneous phase matches, installation pole 13 one end fixedly connected with draws piece 14, draw fixedly connected with installation spring 15 between piece 14 and the fixed block 10, installation pole 13 is worn to locate installation spring 15 inboard, installation spring 15 has the elastic action to drawing piece 14 and installation pole 13, make installation pole 13 stable connect in perforation 11 and constant head tank 12, thereby have spacing fixed effect to installation piece 3, 1 bottom fixedly connected with bottom tube 16 of rubbish pipeline, the 16 upper end of bottom tube is the arc structure, the slope of 16 lower extremes of bottom tube sets up, discharge rubbish in 1 rubbish pipeline through bottom tube 16.
The working principle is as follows: when using this rubbish pipeline buffer for construction, connect installation piece 3 in installing port 2 earlier, make perforation 11 and constant head tank 12 upper and lower position corresponding, connect in perforation 11 and constant head tank 12 through drawing 14 control installation pole 13, thereby to installing 3 spacing fixed of piece, install multiunit installation piece 3 in multiunit installing port 2 respectively with this, 2 when rubbish falls from rubbish pipeline 1 in, rubbish contacts with movable block 6, have the elastic action to movable block 6 through buffer spring 9, thereby have the cushioning effect to rubbish, the rubbish of final whereabouts is discharged from bottom tube 16, above be this rubbish pipeline buffer for construction working process.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that various changes in the embodiments and/or modifications of the utility model can be made, and equivalents and modifications of some features of the utility model can be made without departing from the spirit and scope of the utility model.

Claims (6)

1. The utility model provides a rubbish pipeline buffer for construction, includes rubbish pipeline (1), all link up in rubbish pipeline (1) both sides and seted up installing port (2), its characterized in that: the garbage can is characterized in that a mounting block (3) is connected in the mounting port (2), a sliding groove (4) is formed in one side of the mounting block (3), a sliding block (5) is connected in the sliding groove (4), one side, close to the sliding groove (4), of the mounting block (3) is fixedly connected with a movable block (6) and a support frame (7), the movable block (6) comprises a first connecting part (601), a second connecting part (602) and a third connecting part (603), the first connecting part (601), the second connecting part (602) and the third connecting part (603) are fixedly connected in sequence, a connecting block (8) is fixedly connected between the sliding block (5) and the second connecting part (602), a buffer spring (9) is fixedly connected between the bottom of the connecting block (8) and the top of the support frame (7), two groups of fixed blocks (10) are fixedly connected at the position, close to the mounting port (2), a through hole (11) is formed in the fixed block (10), locating grooves (12) are formed in the top and the bottom of the mounting block (3), mounting rods (13) are connected in the through holes (11) and the locating grooves (12), one end of each mounting rod (13) is fixedly connected with a pull block (14), and a bottom pipe (16) is fixedly connected to the bottom of the garbage pipeline (1).
2. The garbage pipeline buffering device for building construction according to claim 1, wherein: installing port (2) are equipped with the multiunit along the high extending direction equidistance of rubbish pipeline (1), and multiunit installing port (2) dislocation set on horizontal position.
3. The garbage pipe buffering device for building construction according to claim 1, characterized in that: the mounting block (3) and the side surface of the mounting opening (2) are in matched rectangular geometric shapes.
4. The garbage pipeline buffering device for building construction according to claim 1, wherein: the sliding groove (4) and the sliding block (5) are in a transverse T-shaped structure matched with each other in a overlooking mode.
5. The garbage pipeline buffering device for building construction according to claim 1, wherein: the second connecting part (602) is obliquely arranged, and the first connecting part (601) and the third connecting part (603) are horizontally arranged in parallel.
6. The garbage pipe buffering device for building construction according to claim 1, characterized in that: an installation spring (15) is fixedly connected between the pulling block (14) and the fixing block (10), and the installation rod (13) penetrates through the inner side of the installation spring (15).
CN202220071925.5U 2022-01-12 2022-01-12 Garbage pipe buffer for construction Active CN217027908U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220071925.5U CN217027908U (en) 2022-01-12 2022-01-12 Garbage pipe buffer for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220071925.5U CN217027908U (en) 2022-01-12 2022-01-12 Garbage pipe buffer for construction

Publications (1)

Publication Number Publication Date
CN217027908U true CN217027908U (en) 2022-07-22

Family

ID=82444397

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220071925.5U Active CN217027908U (en) 2022-01-12 2022-01-12 Garbage pipe buffer for construction

Country Status (1)

Country Link
CN (1) CN217027908U (en)

Similar Documents

Publication Publication Date Title
CN201801981U (en) Interior wall keel structure
CN217027908U (en) Garbage pipe buffer for construction
CN206801170U (en) A kind of damping type building
CN109736506A (en) Tensioning metal mesh ceiling system and its construction method
CN110429515A (en) A kind of cable laying multiple pulley bracket
CN211646807U (en) Light gauge steel sound insulation construction
CN211898445U (en) Slope edge supporting structure for building
CN203961090U (en) A kind of ceiling structure with angle steel conversion layer
CN212896301U (en) Hydraulic engineering retaining wall drainage structures
CN203079591U (en) Crane wall-attaching steel-structure switch connection support
CN215564879U (en) Hanging piece wear-resistant boot
CN213234472U (en) Shockproof narrow-base steel pipe tower
CN217950463U (en) Tunnel wind bag fixed stay device
CN220150616U (en) Prefabricated shear force wall of assembled building
CN212109037U (en) Firm balcony wall hanging solar collector support
CN220580315U (en) Assembled furred ceiling conversion layer pinning structure
CN208395607U (en) A kind of novel road engineering drainage slot device
CN219119983U (en) Construction support is built in room
CN204929814U (en) A kind of double-deck agricultural booth steelframe
CN210766353U (en) Temporary support for placing prefabricated T-shaped beam
CN219569345U (en) Stable steel structure crossbeam
CN214461560U (en) Novel back bolt type connecting piece for curtain wall
CN219875027U (en) Intertidal submarine cable support frame embedded at two ends
CN220284782U (en) Land-based prefabricated photovoltaic pile system
CN211901848U (en) A antidetonation gallows for tuber pipe supports

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant