CN217027087U - Concrete pouring equipment - Google Patents

Concrete pouring equipment Download PDF

Info

Publication number
CN217027087U
CN217027087U CN202220643758.7U CN202220643758U CN217027087U CN 217027087 U CN217027087 U CN 217027087U CN 202220643758 U CN202220643758 U CN 202220643758U CN 217027087 U CN217027087 U CN 217027087U
Authority
CN
China
Prior art keywords
drilling rig
rotary drilling
conduit
connection
concrete pouring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220643758.7U
Other languages
Chinese (zh)
Inventor
仇意
赵永杰
刘颖
樊德东
王俊伟
张超
李迪
陈思行
张来民
石凯凯
宋欢
李丰男
刘兰桂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Highway Engineering Co Ltd
Third Engineering Co Ltd of Highway Engineering Bureau of CCCC
Original Assignee
CCCC First Highway Engineering Co Ltd
Third Engineering Co Ltd of Highway Engineering Bureau of CCCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Highway Engineering Co Ltd, Third Engineering Co Ltd of Highway Engineering Bureau of CCCC filed Critical CCCC First Highway Engineering Co Ltd
Priority to CN202220643758.7U priority Critical patent/CN217027087U/en
Application granted granted Critical
Publication of CN217027087U publication Critical patent/CN217027087U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

本实用新型提供了一种混凝土浇筑设备,涉及混凝土浇筑的技术领域,混凝土浇筑设备包括:旋挖钻机、导管、护筒和连接管,所述旋挖钻机包括钻头连接部,所述连接管的上端与钻头连接部上对应设置有第一连接结构,以使二者连接;所述连接部的下端与所述导管的上端对应设置有第二连接结构,以使二者连接。现有技术中,护筒的拔出是利用旋挖钻机进行的,本实施例中,对现有的旋挖钻机和导管进行了改进,依靠分别与旋挖钻机和导管连接的连接管,实现旋挖钻机与导管的连接,从而实现利用旋挖钻机将导管和护筒拔出的目的,仅用一台旋挖钻即可完成导管与护筒的安装与拆卸,可以解放汽车吊,提高工序衔接,经济效益好。

Figure 202220643758

The utility model provides a concrete pouring equipment, which relates to the technical field of concrete pouring. The concrete pouring equipment comprises: a rotary drilling rig, a conduit, a protective cylinder and a connecting pipe, the rotary drilling rig comprises a drill bit connecting part, and the connecting pipe A first connection structure is correspondingly provided on the upper end and the drill bit connection part to connect the two; the lower end of the connection part and the upper end of the conduit are correspondingly provided with a second connection structure to connect the two. In the prior art, the pulling out of the protective tube is carried out by using a rotary drilling rig. In this embodiment, the existing rotary drilling rig and conduit are improved. The connection between the rotary drilling rig and the conduit, so as to achieve the purpose of pulling out the conduit and the casing by using the rotary drilling rig. Only one rotary drilling rig can complete the installation and disassembly of the conduit and the casing, which can liberate the truck crane and improve the process. Connection, good economic benefits.

Figure 202220643758

Description

混凝土浇筑设备Concrete pouring equipment

技术领域technical field

本实用新型涉及混凝土浇筑技术领域,尤其是涉及一种混凝土浇筑设备。The utility model relates to the technical field of concrete pouring, in particular to a concrete pouring equipment.

背景技术Background technique

全护筒咬合桩施工中,混凝土浇筑使用导管,当混凝土液面到达一定程度时,需要拆除导管,目前通常用一台汽车吊进行导管的拔除与安装。In the construction of the full-shield occlusal pile, the concrete is poured using a conduit. When the concrete liquid level reaches a certain level, the conduit needs to be removed. At present, a truck crane is usually used to remove and install the conduit.

具体施做方法是,利用旋挖钻机(全回转钻机)将护筒300拆除后,需要拆除相应高度的导管200,导管200用一个月牙卡120卡住,月牙卡120通过钢丝绳110串联,当汽车吊向上提动时,月牙卡120卡于导管200管口节点,带动导管200向上移动,到达位置后进行导管200的拆除。The specific implementation method is as follows: after the protective casing 300 is removed by a rotary drilling rig (full rotary drilling rig), the guide pipe 200 of the corresponding height needs to be removed. When the hoist is lifted upward, the crescent clip 120 is stuck on the nozzle node of the conduit 200, and drives the conduit 200 to move upward, and the conduit 200 is removed after reaching the position.

使用汽车吊吊运和拆除导管,必须与旋挖钻机拔护筒分步进行,工序衔接差,施工时间长,且需额外占用一台汽车吊,经济效益差。The use of a truck crane to lift and remove the conduit must be carried out step by step with the rotary drilling rig pulling the casing, the process connection is poor, the construction time is long, and an additional truck crane is required, resulting in poor economic benefits.

实用新型内容Utility model content

本实用新型的目的在于提供一种混凝土浇筑设备,以缓解现有的导管与护筒拆除时遇到的施工时间长,过程复杂的技术问题。The purpose of the utility model is to provide a concrete pouring equipment, so as to alleviate the technical problems of long construction time and complicated process encountered when the existing conduit and the protective cylinder are removed.

本实用新型实施例提供的一种混凝土浇筑设备,包括:旋挖钻机、导管、护筒和连接管,所述旋挖钻机包括钻头连接部,所述连接管的上端与钻头连接部上对应设置有第一连接结构,以使二者连接;The concrete pouring equipment provided by the embodiment of the present invention includes: a rotary drilling rig, a guide pipe, a protective tube and a connecting pipe, the rotary drilling rig includes a drill bit connecting part, and the upper end of the connecting pipe is correspondingly arranged on the drill bit connecting part There is a first connection structure to connect the two;

所述连接部的下端与所述导管的上端对应设置有第二连接结构,以使二者连接。The lower end of the connecting portion is provided with a second connection structure corresponding to the upper end of the conduit, so as to connect the two.

进一步的,所述连接管的上端与钻头连接部销接。Further, the upper end of the connecting pipe is pinned to the connecting portion of the drill bit.

进一步的,所述第一连接结构包括位于所述钻头连接部上的第一销孔、位于连接管上的第二销孔,以及贯穿第一销孔和第二销孔并将钻头连接部和连接管销接的锁销。Further, the first connecting structure includes a first pin hole located on the drill bit connecting part, a second pin hole located on the connecting pipe, and a first pin hole and a second pin hole passing through the drill bit connecting part and the drill bit. Connect the locking pin of the pipe pinning.

进一步的,所述导管和连接管螺纹连接。Further, the conduit and the connecting pipe are threadedly connected.

进一步的,所述第二连接结构包括位于所述导管和连接管上的内螺纹和外螺纹,以使导管和连接管螺纹连接。Further, the second connection structure includes internal threads and external threads on the conduit and the connecting pipe, so that the conduit and the connecting pipe are threadedly connected.

进一步的,所述旋挖钻机和护筒上对应设置有第三连接结构,以使二者连接。Further, a third connection structure is correspondingly provided on the rotary drilling rig and the casing to connect the two.

进一步的,所述旋挖钻机上具有围板,所述第三连接结构包括分别位于所述围板和护筒上的通孔,以使围板与护筒能够通过螺纹锁紧组件锁紧。Further, the rotary drilling rig is provided with a shroud, and the third connection structure includes through holes respectively located on the shroud and the protective tube, so that the shroud and the protective tube can be locked by a screw locking assembly.

进一步的,所述钻头连接部的底端具有导向结构,自下而上,所述导向结构的直径之间增加。Further, the bottom end of the drill bit connecting portion has a guide structure, and the diameters of the guide structures increase from bottom to top.

进一步的,所述导向结构的周向侧面为曲面。Further, the circumferential side surface of the guide structure is a curved surface.

进一步的,所述围板和护筒上对应设置有定位结构,以使所述围板和护筒上的通孔对齐。Further, a positioning structure is correspondingly provided on the enclosure plate and the protective sleeve, so that the through holes on the enclosure plate and the protective sleeve are aligned.

本实用新型实施例提供的混凝土浇筑设备包括:旋挖钻机、导管、护筒和连接管,所述旋挖钻机包括钻头连接部,所述连接管的上端与钻头连接部上对应设置有第一连接结构,以使二者连接;所述连接部的下端与所述导管的上端对应设置有第二连接结构,以使二者连接。现有技术中,护筒的拔出是利用旋挖钻机进行的,本实施例中,对现有的旋挖钻机和导管进行了改进,依靠分别与旋挖钻机和导管连接的连接管,实现旋挖钻机与导管的连接,从而实现利用旋挖钻机将导管和护筒拔出的目的,仅用一台旋挖钻即可完成导管与护筒的安装与拆卸,可以解放汽车吊,提高工序衔接,经济效益好。The concrete pouring equipment provided by the embodiment of the present invention includes: a rotary drilling rig, a guide pipe, a protective tube and a connecting pipe, the rotary drilling rig includes a drill bit connecting part, and the upper end of the connecting pipe and the drill bit connecting part are correspondingly provided with a first A connection structure is used to connect the two; the lower end of the connection part is provided with a second connection structure corresponding to the upper end of the conduit to connect the two. In the prior art, the pulling out of the protective tube is carried out by using a rotary drilling rig. In this embodiment, the existing rotary drilling rig and conduit are improved. The connection between the rotary drilling rig and the conduit, so as to achieve the purpose of pulling out the conduit and the casing by using the rotary drilling rig. Only one rotary drilling rig can complete the installation and disassembly of the conduit and the casing, which can liberate the truck crane and improve the process. Connection, good economic benefits.

附图说明Description of drawings

为了更清楚地说明本实用新型具体实施方式或现有技术中的技术方案,下面将对具体实施方式或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图是本实用新型的一些实施方式,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the accompanying drawings required for the description of the specific embodiments or the prior art. Obviously, the following descriptions The accompanying drawings are some embodiments of the present invention. For those of ordinary skill in the art, other drawings can also be obtained based on these drawings without creative efforts.

图1为现有技术中的导管的提升示意图;Fig. 1 is the lifting schematic diagram of the conduit in the prior art;

图2为本实用新型实施例提供的混凝土浇筑设备的示意图;Fig. 2 is the schematic diagram of the concrete pouring equipment provided by the embodiment of the present utility model;

图3为本实用新型实施例提供的混凝土浇筑设备的连接管的示意图。3 is a schematic diagram of a connecting pipe of a concrete pouring equipment provided by an embodiment of the present invention.

图标:110-钢丝绳;120-月牙卡;Icon: 110- steel wire rope; 120- crescent card;

200-导管;300-护筒;310-凸起;200-catheter; 300-protection tube; 310-protrusion;

400-钻头连接部;500-连接管;510-第二销孔;520-外螺纹;600-锁销;710-插槽;800-通孔;900-围板。400-drill connection part; 500-connecting pipe; 510-second pin hole; 520-external thread; 600-lock pin; 710-slot; 800-through hole; 900-enclosure.

具体实施方式Detailed ways

下面将结合实施例对本实用新型的技术方案进行清楚、完整地描述,显然,所描述的实施例是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions of the present invention will be clearly and completely described below with reference to the embodiments. Obviously, the described embodiments are a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

如图1-图3所示,本实用新型实施例提供的混凝土浇筑设备包括:旋挖钻机、导管200、护筒300和连接管500。旋挖钻机主体结构为现有技术,是混凝土浇筑过程中常用的设备,本申请中,对旋挖钻机的钻头连接部400进行改进,具体如下:As shown in FIGS. 1-3 , the concrete pouring equipment provided by the embodiment of the present invention includes: a rotary drilling rig, a conduit 200 , a casing 300 and a connecting pipe 500 . The main structure of the rotary drilling rig is in the prior art, and it is a commonly used equipment in the concrete pouring process. In this application, the drill bit connection part 400 of the rotary drilling rig is improved, and the details are as follows:

所述旋挖钻机包括钻头连接部400,所述连接管500的上端与钻头连接部400上对应设置有第一连接结构,以使二者连接;所述连接部的下端与所述导管200的上端对应设置有第二连接结构,以使二者连接。现有技术中,护筒300的拔出是利用旋挖钻机进行的,本实施例中,对现有的旋挖钻机和导管200进行了改进,依靠分别与旋挖钻机和导管200连接的连接管500,实现旋挖钻机与导管200的连接,从而实现利用旋挖钻机将导管200和护筒300拔出的目的,仅用一台旋挖钻即可完成导管200与护筒300的安装与拆卸,可以解放汽车吊,提高工序衔接,经济效益好。The rotary drilling rig includes a drill bit connecting part 400, and a first connecting structure is correspondingly provided on the upper end of the connecting pipe 500 and the drill bit connecting part 400 to connect the two; The upper end is correspondingly provided with a second connection structure to connect the two. In the prior art, the protection tube 300 is pulled out by using a rotary drilling rig. In this embodiment, the existing rotary drilling rig and the conduit 200 are improved, relying on the connection with the rotary drilling rig and the conduit 200 respectively. The pipe 500 realizes the connection between the rotary drilling rig and the conduit 200, so as to realize the purpose of pulling out the conduit 200 and the casing 300 by using the rotary drilling rig. Only one rotary drilling machine can complete the installation and installation of the conduit 200 and the casing 300. Dismantling can liberate the car crane, improve the process connection, and have good economic benefits.

所述连接管500的上端与钻头连接部400可以采用销接的方式进行连接。具体的,所述第一连接结构可以包括位于所述钻头连接部400上的第一销孔,第一销孔沿钻头连接部400的径行延伸,贯穿所述钻头连接部400。第二销孔510对称设置在连接管500的管壁上。将钻头连接部400插入到连接管500内,并使第一销孔和第二销孔510对齐,最后利用锁销600贯穿第一销孔和第二销孔510,从而实现连接管500与钻头连接部400的连接。The upper end of the connecting pipe 500 and the drill bit connecting part 400 may be connected by means of pin connection. Specifically, the first connection structure may include a first pin hole located on the drill bit connection portion 400 , and the first pin hole extends along the diameter of the drill bit connection portion 400 and penetrates the drill bit connection portion 400 . The second pin holes 510 are symmetrically arranged on the pipe wall of the connecting pipe 500 . Insert the drill bit connection part 400 into the connection pipe 500, align the first pin hole and the second pin hole 510, and finally use the locking pin 600 to penetrate the first pin hole and the second pin hole 510, so as to realize the connection pipe 500 and the drill bit Connection of the connection part 400 .

所述导管200和连接管500可以采用螺纹连接。具体的,所述第二连接结构包括位于所述导管200和连接管500上的内螺纹和外螺纹520,以使导管200和连接管500螺纹连接。The conduit 200 and the connecting pipe 500 may be connected by screw threads. Specifically, the second connection structure includes internal threads and external threads 520 located on the conduit 200 and the connecting pipe 500 , so that the conduit 200 and the connecting pipe 500 are threadedly connected.

连接管500的安装过程如下:首先,将连接管500与导管200上端口螺纹连接在一起;然后,移动旋挖钻钻头连接部400,使第一销孔和第二销孔510对齐,用锁销600插入孔中,实现钻头连接部400与连接管500的连接。其中,锁销600一端具有锁帽,另一端插拔有插销,锁帽和插销用于阻止锁销600脱开。The installation process of the connecting pipe 500 is as follows: first, connect the connecting pipe 500 to the upper port of the conduit 200 by screwing together; then, move the rotary drill bit connecting part 400 to align the first pin hole and the second pin hole 510, and use a lock The pin 600 is inserted into the hole to realize the connection between the drill bit connecting part 400 and the connecting pipe 500 . Wherein, one end of the lock pin 600 has a lock cap, and the other end is inserted with a plug pin, and the lock cap and the plug pin are used to prevent the lock pin 600 from disengaging.

所述旋挖钻机和护筒300上对应设置有第三连接结构,以使二者连接。具体的,所述旋挖钻机上具有围板900,所述第三连接结构包括分别位于所述围板900和护筒300上的通孔800,可以利用螺栓将围板900与护筒300连接。A third connection structure is correspondingly provided on the rotary drilling rig and the casing 300 to connect the two. Specifically, the rotary drilling rig is provided with an enclosure plate 900, and the third connection structure includes through holes 800 respectively located on the enclosure plate 900 and the casing 300, and the enclosure plate 900 and the casing 300 can be connected by bolts .

为了方便旋挖钻机的钻头插入到连接管500内,所述钻头连接部400的底端具有导向结构,自下而上,所述导向结构的直径之间增加。为了减少磕碰,所述导向结构的周向侧面为曲面。In order to facilitate the insertion of the drill bit of the rotary drilling rig into the connecting pipe 500, the bottom end of the drill bit connecting portion 400 has a guide structure, and the diameters of the guide structures increase from bottom to top. In order to reduce bumping, the circumferential side surfaces of the guide structure are curved surfaces.

所述围板900和护筒300上对应设置有定位结构,可以包括设置在围板900上的插槽710,以及设置在护筒300上的凸起310,凸起310与插槽710对应插接后,从而使所述围板900和护筒300上的通孔800对齐。The enclosure plate 900 and the protective tube 300 are correspondingly provided with positioning structures, which may include a slot 710 provided on the enclosure plate 900, and a protrusion 310 provided on the protective cylinder 300. The protrusion 310 is correspondingly inserted into the slot 710. After connecting, the enclosure plate 900 is aligned with the through hole 800 on the protective sleeve 300 .

最后应说明的是:以上各实施例仅用以说明本实用新型的技术方案,而非对其限制;尽管参照前述各实施例对本实用新型进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分或者全部技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本实用新型各实施例技术方案的范围。Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present utility model, but not to limit them; although the present utility model has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that : it can still modify the technical solutions recorded in the foregoing embodiments, or perform equivalent replacements on some or all of the technical features; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the various embodiments of the present utility model Scope of technical solutions.

Claims (10)

1. A concrete pouring apparatus, comprising: the rotary drilling rig comprises a rotary drilling rig, a guide pipe (200), a protective cylinder (300) and a connecting pipe (500), wherein the rotary drilling rig comprises a drill bit connecting part (400), and the upper end of the connecting pipe (500) and the drill bit connecting part (400) are correspondingly provided with a first connecting structure so as to be connected;
the lower end of the connecting part and the upper end of the guide pipe (200) are correspondingly provided with second connecting structures so as to connect the two.
2. The concrete pouring device according to claim 1, wherein the upper end of the connection pipe (500) is pinned with a drill connection part (400).
3. The concrete placement apparatus according to claim 1, characterized in that the first connection structure includes a first pin hole on the drill connection part (400), a second pin hole (510) on the connection pipe (500), and a locking pin (600) penetrating the first and second pin holes (510) and pinning the drill connection part (400) and the connection pipe (500).
4. Concrete pouring device according to claim 1, characterized in that said conduit (200) and connecting pipe (500) are screwed.
5. Concrete casting equipment according to claim 1, characterized in that said second connection structure comprises internal and external threads (520) on said conduit (200) and connection pipe (500) to screw-connect the conduit (200) and connection pipe (500).
6. The concrete pouring device according to the claim 3, characterized in that a third connecting structure is correspondingly arranged on the rotary drilling rig and the pile casing (300) so as to connect the rotary drilling rig and the pile casing.
7. The concrete pouring device according to claim 6, wherein the rotary drilling rig is provided with a coaming (900), and the third connecting structure comprises through holes (800) respectively formed in the coaming (900) and the casing (300) so that the coaming (900) and the casing (300) can be locked through a threaded locking assembly.
8. Concrete casting equipment according to claim 7, characterized in that the bottom end of the drill head connecting part (400) has a guide structure, which increases between its diameters from bottom to top.
9. A concrete casting apparatus according to claim 8, wherein the circumferential sides of the guide formations are curved.
10. Concrete pouring equipment according to claim 7, characterized in that the coaming (900) and the casing (300) are provided with corresponding positioning structures to align the through holes (800) of the coaming (900) and the casing (300).
CN202220643758.7U 2022-03-22 2022-03-22 Concrete pouring equipment Active CN217027087U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220643758.7U CN217027087U (en) 2022-03-22 2022-03-22 Concrete pouring equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220643758.7U CN217027087U (en) 2022-03-22 2022-03-22 Concrete pouring equipment

Publications (1)

Publication Number Publication Date
CN217027087U true CN217027087U (en) 2022-07-22

Family

ID=82412499

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220643758.7U Active CN217027087U (en) 2022-03-22 2022-03-22 Concrete pouring equipment

Country Status (1)

Country Link
CN (1) CN217027087U (en)

Similar Documents

Publication Publication Date Title
CN205206779U (en) Fracture drilling rod fishing device
CN217027087U (en) Concrete pouring equipment
CN206071487U (en) Plug-in type cementing wellhead power set
CN111608587A (en) Construction system and construction method for hard rock drilling of occlusal piles in foundation pit in restricted height area
US9435178B2 (en) Oil and gas reservoir electric logging overflow safety control wireline hanger
CN107167840B (en) A recyclable microseismic sensor
CN212223855U (en) Double casing type full rotation super long pile construction tool
CN104452751A (en) Secondary pouring pile forming device and method for bored pile
CN219733845U (en) Detachable rectangular pipe-jacking pipe joint connecting device
CN218175900U (en) Underwater barrel-shaped foundation mud entering righting base plate
WO2024093629A1 (en) Optical fiber layout device and method for borehole measurement
CN110195436A (en) A kind of device quickly drawn except stake heart sand
CN201908300U (en) Offshore bored pile device
CN206769846U (en) A kind of rat hole device applied to drilling platforms
CN221299122U (en) Sealing anti-theft device for oil extraction wellhead
CN212837070U (en) Fixing structure of oil field wellhead fence
CN107059872A (en) Oblique cord pile extracting method and oblique cord pile pulling system
CN207420512U (en) Circulating sleeve withdrawing device
CN220450854U (en) Underwater barrel-shaped pile foundation sinking and penetration mud straightening construction device
CN112065302B (en) Multi-specification anti-tipping operation device for internal insertion cementing and cementing method thereof
CN204754813U (en) Special elevator for drilling horizontal hole of conventional core drilling machine
CN209040772U (en) An oil pipe elevator
CN218479804U (en) Rat hole tool suitable for rope core drill
CN204199295U (en) A kind of device for A/C in antiseepage wall chase section casting process
CN206158683U (en) Can high position installed automatic rigger's quadruple board platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant