CN217027039U - Be used for steel-pipe pile horizontal coupling construction equipment under water - Google Patents

Be used for steel-pipe pile horizontal coupling construction equipment under water Download PDF

Info

Publication number
CN217027039U
CN217027039U CN202220375899.5U CN202220375899U CN217027039U CN 217027039 U CN217027039 U CN 217027039U CN 202220375899 U CN202220375899 U CN 202220375899U CN 217027039 U CN217027039 U CN 217027039U
Authority
CN
China
Prior art keywords
steel pipe
sleeve
steel
pipe pile
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220375899.5U
Other languages
Chinese (zh)
Inventor
周舒
康彦生
张照川
安晨辉
刘康
刘林
薛超
徐亮
郭奎
李会良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN202220375899.5U priority Critical patent/CN217027039U/en
Application granted granted Critical
Publication of CN217027039U publication Critical patent/CN217027039U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a construction device for a horizontal connection of a steel pipe pile, which realizes onshore installation of the horizontal connection, greatly reduces the difficulty of installation and disassembly, has definite structural stress of the whole device, bears the tensile force of the horizontal connection by depending on a steel wire rope and the temporary fixed connection part of a first steel pipe and a second steel pipe, resists the pressure of the horizontal connection by the first steel pipe, thereby eliminating the potential safety hazard of underwater operation, having fewer working procedures when using the device for construction, simple operation, avoiding the underwater operation, needing no large-scale hoisting equipment, greatly reducing the construction cost, meanwhile, the problem of overlarge pile bottom bending moment of the steel pipe pile is effectively solved, the steel pipe pile, an upper parallel connection structure and the like can be optimized, the construction cost is further reduced, the device is wide in application range, and the device is particularly suitable for terrains with wide shoals and low original ground or accidental situations that the water level rises and exceeds the design estimation in the construction process.

Description

Be used for steel-pipe pile horizontal connection construction equipment under water
Technical Field
The utility model relates to the technical field of bridge girder construction. More specifically, the utility model relates to a device for horizontally connecting steel pipe piles.
Background
The foundation construction of the bridge across the river and the sea generally adopts a construction scheme of constructing an overwater platform beside a foundation and changing overwater operation into land operation, and adopts an overwater steel trestle as an auxiliary channel for communicating two banks of the river or reaching an overwater operation point. With the development of bridge construction technology, deep water pile foundations are emerging continuously, so that the design and construction difficulty of steel trestles and water platforms on water is increased continuously, and due to the fact that a cantilever is long, construction cost is increased correspondingly, large horizontal displacement is prone to occur on the pile top under the action of horizontal force, and potential safety hazards are brought to construction. Meanwhile, along with the increasingly harsh and complex construction environment, the uncertainty of water level fluctuation is greatly increased, and when the steel pipe pile construction process encounters conditions such as sudden water level rising, the actual working condition of the parallel connection of the steel pipe piles of the trestle and the water platform is inconsistent with the design condition, the parallel connection design position of the steel pipe piles is submerged in water, and only underwater operation modes such as underwater welding, underwater operation of constructors and the like can be adopted, so that the construction difficulty is greatly increased.
The utility model patent CN107190735A discloses a steel-pipe pile is parallel to be allied oneself with construction equipment under based on deep water condition, steel-pipe pile is executed and is beaten the back that finishes promptly, and earlier the sleeve cover is put at the steel-pipe pile, utilizes to aerify the pressurization pipe and aerify for the annular gasbag in the sleeve, makes annular gasbag and steel-pipe pile hold tightly, utilizes the slip casting pipe to sleeve injection thick liquid simultaneously, makes the thick liquid be full of the clearance between steel-pipe pile and the sleeve. Although the device realizes the installation of the horizontal connection under water, the device has the advantages of complex process, difficult operation, difficult quality guarantee and inconvenient disassembly, the injected slurry can be sprayed to pollute the water body, the air leakage of the air bag is difficult to find during the use, the hidden danger of the failure of the horizontal connection exists, and the device is particularly not suitable for long-period projects.
SUMMERY OF THE UTILITY MODEL
An object of the present invention is to solve at least the above problems and to provide at least the advantages described later.
The utility model also aims to provide a device for horizontally and horizontally connecting steel pipe piles, which is used for solving the technical problems that the horizontal connecting installation process of the steel pipe piles is complex, the operation is inconvenient and the potential hazard of horizontal connecting failure exists during the construction of the steel pipe piles in the prior art.
To achieve these objects and other advantages in accordance with the present invention, there is provided a horizontal coupling construction device for a steel pipe pile, including:
the first parallel mechanism comprises a first sleeve vertically arranged, the inner diameter of the first sleeve is slightly larger than the outer diameter of the steel pipe pile, a first steel pipe is fixedly connected to the outer side of the first sleeve along the horizontal direction, the length of the first steel pipe is slightly smaller than the distance between two steel pipe piles to be parallel connected, and a guide device is arranged on the outer side of the first sleeve;
the second parallel mechanism comprises a second sleeve which is vertically arranged, the inner diameter of the second sleeve is slightly larger than the outer diameter of the steel pipe pile, a second steel pipe is fixedly connected to the outer side of the second sleeve along the horizontal direction, the second steel pipe and the inner part of the second sleeve are completely arranged in a penetrating manner, the inner diameter of the second steel pipe is slightly larger than the outer diameter of the first steel pipe, the first steel pipe penetrates into the inner part of the second steel pipe and is temporarily and fixedly connected with each other, a fixed end is arranged on the outer side of the second sleeve, and the fixed end and the guide device are located on the same side of the first steel pipe and are consistent in height;
fastening system, it includes wire rope, turn-buckle, and the turn-buckle is connected in the upper end of steel-pipe pile and is set up with guider's position cooperation, and wire rope's one end can be dismantled and connect on the fixed end, the other end is walked around behind the guider and is connected with the turn-buckle.
Preferably, the device further comprises a lowering auxiliary system, the lowering auxiliary system comprises a buoyancy tank, the buoyancy of the buoyancy tank in water is larger than the total weight of the underwater parallel connection construction device for the steel pipe pile, scales are arranged on the buoyancy tank, and suspension wires are hinged between the bottom of the buoyancy tank and the first steel pipe and/or the second steel pipe respectively.
Preferably, a plurality of first notches are formed in the side wall of the first steel pipe at intervals along the axial direction, a plurality of second notches are formed in the side wall of the second steel pipe at intervals along the axial direction, at least one first notch is aligned to one second notch, and a steel bar clamping piece is inserted into the aligned first notch and the aligned second notch.
Preferably, the interval of the first notch on the first steel pipe is different from the interval of the second notch on the second steel pipe, and a reinforcing plate is attached to the periphery of each of the first notch and the second notch respectively.
Preferably, an inclined strut is welded at one end of the first steel pipe close to the first sleeve and used for being connected with a cross beam of the corresponding steel pipe pile.
Preferably, the guide device is a guide pulley, and a device for preventing the steel wire rope from falling off is further arranged on the outer side of the guide pulley.
Preferably, the stiff end is in be provided with two along vertical interval on the second sleeve pipe, wire rope's one end in proper order with two the stiff end is connected.
Preferably, the first sleeve and the second sleeve have the same specification and size, the outer side of each first sleeve and the outer side of each second sleeve are respectively connected with one first steel pipe and one second steel pipe, the outer side of each first sleeve and each second sleeve are respectively connected with one fixing end and one guide device, and the first steel pipe, the second steel pipe, the fixing end and the guide device connected to each first sleeve or the second sleeve are in the same horizontal plane and are sequentially spaced by 90 °.
Preferably, the top of the steel pipe pile is provided with a hanging and buckling end, the hanging and buckling end is an annular hoop fastened on the outer side of the top of the steel pipe pile, and the wire tightener is connected with the hanging and buckling end.
The utility model at least comprises the following beneficial effects:
(1) a potential safety hazard that is used for steel-pipe pile horizontal connection construction equipment structure atress clear and definite, the pulling force that the parallel connection receives relies on wire rope and first steel pipe, the interim fixed connection department of second steel pipe bears, the pressure that the parallel connection receives is resisted by first steel pipe, operation under water has been eliminated from this, the too big problem of moment of flexure at the bottom of effectively having solved steel-pipe pile simultaneously, compare in the deep level platform of no horizontal connection under water, can effectively reduce platform top horizontal displacement, reduce later stage platform use risk.
(2) Transfer auxiliary system accessible control flotation tank and submerge degree of depth and suspension wire length accurate control and transfer the position through setting up, also can prevent that whole device from dropping to the bottom.
(3) The construction device for the horizontal connection of the steel pipe pile realizes the onshore installation of the horizontal connection of the steel pipe pile, greatly reduces the difficulty of installation and disassembly, has fewer construction procedures, is simple to operate, avoids underwater operation, does not need to invest large-scale hoisting and hoisting equipment, can play an optimization role in the steel pipe pile and the upper horizontal connection structure and the like, greatly reduces the construction cost, has wide application range, and is particularly suitable for the accidental situations of terrains with wider beach lands and lower ground or water level rising exceeding the design estimation in the construction process.
Additional advantages, objects, and features of the utility model will be set forth in part in the description which follows and in part will become apparent to those having ordinary skill in the art upon examination of the following or may be learned from practice of the utility model.
Drawings
Fig. 1 is a front view structural view of a first parallel mechanism of the present invention;
FIG. 2 is a top view of a second linkage of the present invention;
fig. 3 is a top view structural view of the device for horizontally connecting a steel pipe pile according to an embodiment of the present invention;
fig. 4 is a side view structural view of a horizontal coupling construction device for a steel pipe pile according to an embodiment of the present invention.
Description reference numbers indicate: 1. the steel pipe pile hoisting device comprises a first parallel mechanism, 2, a second parallel mechanism, 3, a fastening system, 4, a lowering auxiliary system, 5, a steel pipe pile, 6, a hoisting rope, 7, a steel bar clamping piece, 10, a first sleeve, 11, a first steel pipe, 12, a guide device, 13, a first notch, 20, a second sleeve, 21, a second steel pipe, 22, a fixed end, 23, a second notch, 31, a steel wire rope, 32, a tightener, 33, a hanging buckle end, 41, a buoyancy tank, 42 and a suspension wire.
Detailed Description
The present invention is further described in detail below with reference to the attached drawings so that those skilled in the art can implement the utility model by referring to the description text.
It is to be noted that the experimental methods described in the following embodiments are all conventional methods unless otherwise specified, and the materials described therein are commercially available unless otherwise specified; in the description of the present invention, the terms "lateral", "longitudinal", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are only for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
As shown in fig. 1 to 4, the present invention provides a horizontal coupling construction apparatus for a steel pipe pile, comprising:
the first parallel mechanism 1 comprises a first sleeve 10 which is vertically arranged, the inner diameter of the first sleeve 10 is slightly larger than the outer diameter of the steel pipe pile 5, a first steel pipe 11 is fixedly connected to the outer side of the first sleeve 10 along the horizontal direction, the length of the first steel pipe 11 is slightly smaller than the distance between two steel pipe piles 5 to be parallel connected, and a guide device 12 is arranged on the outer side of the first sleeve 10;
the second parallel mechanism 2 comprises a second sleeve 20 which is vertically arranged, the inner diameter of the second sleeve 20 is slightly larger than the outer diameter of the steel pipe pile 5, the outer side of the second sleeve 20 is fixedly connected with a second steel pipe 21 along the horizontal direction, the second steel pipe 21 and the inner part of the second sleeve 20 are completely communicated, the inner diameter of the second steel pipe 21 is slightly larger than the outer diameter of the first steel pipe 11, the first steel pipe 11 penetrates into the second steel pipe 21 and is temporarily and fixedly connected with each other, a fixed end 22 is arranged on the outer side of the second sleeve 20, and the fixed end 22 and the guide device 12 are positioned on the same side of the first steel pipe 11 and are located at the same height;
fastening system 3, it includes wire rope 31, turn-buckle 32, and turn-buckle 32 connects the upper end of steel-pipe pile 5 and sets up with the position cooperation of guider 12, and wire rope 31's one end can be dismantled and connect on stiff end 22, the other end is connected with turn-buckle 32 after walking around guider 12.
The inner diameter of the first sleeve 10 and the second sleeve 20 is slightly larger than the outer diameter of the steel pipe pile 5, on the premise of reducing the inner diameter to the maximum extent, the sheathing requirement of the steel pipe pile 5 on the condition of allowing precision deviation exists after construction is met, one side of the first sleeve 10 is rigidly connected with the first steel pipe 11, a guide device 12 is arranged on the other side of the first sleeve 10, one side of the second sleeve 20 is rigidly connected with a second steel pipe 21, a through hole is formed in the second sleeve 20 corresponding to the second steel pipe 21, the first steel pipe 11 is a long steel pipe, the second steel pipe 21 is a short steel pipe, the inner diameter of the second steel pipe 21 is slightly larger than the outer diameter of the first steel pipe 11 by 1cm, the first steel pipe 11 is conveniently nested and installed in the second steel pipe 21 to achieve relative position movement and penetrates through the through hole of the second sleeve 20 to the inside of the second steel pipe 21, the length of the first steel pipe 11 is slightly smaller than the clear distance of the two steel pipe piles 5 to be flatly connected by 0.5cm, and it is ensured that the subsequent first steel pipe 11 can resist the two steel pipe piles 5 to be fastened to the outer diameter of the steel pipe pile 5 after the steel wire rope 31 of the fastening system 3 is fastened The guide 12 and the fixed end 22 are located on the same side of the first steel pipe 11 and have substantially the same height after the second steel pipe 21 is sleeved on the first steel pipe 11 by the horizontal pressure applied by the first steel pipe 11.
The fastening system 3 can realize that the first sleeve 10 and the second sleeve 20 hold the corresponding steel pipe pile 5 through the traction of a steel wire rope 31 on water, one end of the outer end of the first steel pipe 11 far away from the first sleeve 10 is tightly attached to the steel pipe pile 5 sleeved in the second sleeve 20 after extending into the second steel pipe 21, the requirement of a horizontal connection structure on horizontal compression and tension is met, one end of the steel wire rope 31 is connected with a fixed end 22, the traction force is adjusted from the horizontal direction to the vertical direction through a guide device 12, then the other end of the steel wire rope 31 is connected with a wire grip 32, the wire grip 32 is arranged at the top of the steel pipe pile 5, the wire grip 32 is required to have the functions of conveniently tightening and loosening the steel wire rope 31, the traction force meets the requirement of horizontal connection stress, the wire grip 32 is correspondingly and conveniently installed at the top of the steel pipe pile 5 to be provided with a hanging end 33, one end of the wire grip 32 is conveniently connected with the steel wire rope 31, the other end is conveniently connected with the hanging end 33, the hanging buckle end 33 can be rigidly connected with a rigid structure above the water surface, and the structural strength, rigidity and stability are required to meet the requirements.
The construction method of the horizontal connection construction device for the steel pipe pile 5 comprises the following concrete steps:
(1) and calculating the length of the steel wire rope 31 and the traction force required by the fastening device in advance, and finishing the first parallel structure, the second parallel structure, the fastening system 3 and preparation in the post processing.
(2) And sequentially driving two steel pipe piles 5 according to requirements.
(3) The first parallel connection structure and the second parallel connection structure are embedded and installed through the first steel pipe 11 and the second steel pipe 21 on land and are temporarily fixedly connected into a whole, namely a parallel connection main body structure; one end of the wire rope 31 of the fastening system 3 is inserted into the fixed end 22 of the second sleeve 20 and is connected by shackle fixation, and the other end of the wire rope 31 is connected to one end of the wire grip 32 in a relaxed state by changing the direction of the wire rope 31 through the guide 12.
(4) And hoisting the whole parallel main body structure by using a crane and accurately hoisting the whole parallel main body structure into a designed position, so as to ensure that the first sleeve 10 and the second sleeve 20 are respectively sleeved into one of the steel pipe piles 5.
(5) The tightener 32 is fixedly connected to the upper end of the steel-pipe pile 5 corresponding to the first casing 10.
(6) And (5) lowering a crane hoisting rope 6, and slowly lowering the flat connection main body structure until the preset position is reached.
(7) The wire rope 31 is tightened by the tightener 32 and reaches a designed tightening force.
(8) After the project is completed, the steel wire rope 31 is loosened and slowly lifted to the water surface by using the loosening hoisting rope 6 for dismantling.
The device for the horizontal connection construction of the steel pipe pile 5 in the water realizes the onshore installation of the horizontal connection, greatly reduces the difficulty of installation and disassembly, has definite stress of the whole device, bears the tension on the horizontal connection by the steel wire rope 31 and the temporary fixed connection part of the first steel pipe 11 and the second steel pipe 21, and resists the pressure on the horizontal connection by the first steel pipe 11, thereby eliminating the potential safety hazard of underwater operation; the device has the advantages of fewer construction processes, simplicity in operation, avoidance of underwater operation, no need of investment of large-scale hoisting equipment, capability of greatly reducing construction cost, effective solution of the problem of overlarge pile bottom bending moment of the steel pipe pile 5, optimization of the steel pipe pile 5 and an upper parallel connection structure and the like, further reduction of construction cost, wide application range, and particular suitability for the accidental situation that the water level of the terrain with wider beach lands and lower ground or the construction process rises beyond design estimation.
In another technical solution, as shown in fig. 4, the system further comprises a lowering auxiliary system 4, the lowering auxiliary system 4 comprises a buoyancy tank 41, buoyancy of the buoyancy tank 41 in water is greater than the total weight of the horizontal connection construction device for the steel pipe pile 5, scales are arranged on the buoyancy tank 41, and suspension wires 42 are respectively hinged between the bottom of the buoyancy tank 41 and the first steel pipe 11 and/or the second steel pipe 21.
Put auxiliary system 4 through setting up and can realize parallel connection accurate positioning, the uncertain problem of the steel-pipe pile 5 rock-entering degree of depth has been overcome, the use has played the effect of preventing falling, and made things convenient for earlier stage installation and later stage demolish work, flotation tank 41 requires that the buoyancy that its volume produced in aqueous is greater than this device dead weight, the hanging point of flotation tank 41 bottom is connected to suspension wire 42 one end, the other end and first parallel connection structure, second parallel connection structure ligature connection, both ends all adopt articulated mode, when land installation parallel connection major structure, together connect and transfer auxiliary system 4, put parallel connection major structure down earlier put flotation tank 41 into aqueous, later in-process of slowly putting parallel connection major structure down, observe flotation tank 41 scale, loosen hoist and mount rope 6 of crane after the predetermined scale sinks to parallel connection major structure, namely parallel connection major structure reachs predetermined depth position.
In another technical scheme, as shown in fig. 1 to 4, a plurality of first notches 13 are axially spaced on a side wall of the first steel pipe 11, a plurality of second notches 23 are axially spaced on a side wall of the second steel pipe 21, at least one first notch 13 is aligned with one second notch 23, and the reinforcing steel bar clamping pieces 7 are inserted into the aligned first notch 13 and second notch 23.
A plurality of first notches 13 are axially formed in the design position of the pipe wall of the first steel pipe 11 in advance, a plurality of second notches 23 are axially formed in the design position of the pipe wall of the second steel pipe 21 in advance, reinforcing steel bar clamping pieces 7 are inserted between the first notches 13 and the second notches 23 so as to temporarily and fixedly connect the first steel pipe 11 and the second steel pipe 21, the installation and the disassembly are convenient, the axial lengths of the first notches 13 and the second notches 23 are not more than 2cm, the requirement that the first sleeve 10 and the second sleeve 20 can cling to the steel pipe pile 5 after the traction of a steel wire rope 31 of a fastening system 3 is completed is met, the tension borne by the parallel connection depends on the steel wire rope 31, the first notches 13 and the second notches 23 on the first steel pipe 11 and the second steel pipe 21, the first notches 13 can be symmetrically formed in the axial direction on the pipe wall of the first steel pipe 11, the second notches 23 are symmetrically formed in the axial direction on the pipe wall of the second steel pipe 21, and the first notches 13, the second notches 23 and the second notches 23 are symmetrically formed in the same vertical direction, A reinforcing bar fastener 7 is arranged in the second notch 23.
In another technical solution, as shown in fig. 1 to 3, an interval of the first notch 13 on the first steel pipe 11 is different from an interval of the second notch 23 on the second steel pipe 21, and a reinforcing plate is attached to a periphery of each of the first notch 13 and the second notch 23.
The first steel pipe 11 and the second steel pipe 21 are connected by a plurality of first notches 13 and second staggered cross section arrangements, and reinforcing plates such as steel plates are welded at the peripheries of the first notches 13 and the second notches 23, so that the horizontal stress capacity of the whole parallel connection device is enhanced while the local steel pipes are prevented from being torn.
In another technical solution, an inclined strut is further welded to one end of the first steel pipe 11 close to the first sleeve 10, and is used for being connected with a cross beam of the corresponding steel pipe pile 5.
In another technical solution, as shown in fig. 1, 3 and 4, the guiding device 12 is a guiding pulley, and a device for preventing the steel wire rope 31 from falling off is further disposed outside the guiding pulley.
The one end of the wire rope 31 of the fastening system 3 is connected behind the fixed end 22, and the other end passes through the guide pulley to realize the direction, adjusts the direction of pulling of the wire rope 31 to be vertical direction by the horizontal direction, prevents the device that the wire rope 31 drops through the setting, avoids the unexpected drop of wire rope 31 atress, ensures that construction safety on water is smooth, prevents that the device that the wire rope 31 drops if set up the cover shell outside the guide pulley, reserves the space that the wire rope 31 passed.
In another technical solution, two fixing ends 22 are vertically arranged on the second sleeve 20 at intervals, and one end of the steel wire rope 31 is sequentially connected with the two fixing ends 22. The two fixed ends 22 are arranged along the vertical direction of the second sleeve 20 to ensure the stress balance.
In another technical solution, the first sleeve 10 and the second sleeve 20 have the same specification and size, the outer side of each of the first sleeve 10 and the second sleeve 20 is connected with one of the first steel pipe 11 and one of the second steel pipe 21, the outer side of each of the first sleeve 10 and the second sleeve 20 is connected with one of the fixing ends 22 and one of the guiding devices 12, and the first steel pipe 11, the second steel pipe 21, the fixing end 22 and the guiding device 12 connected to each of the first sleeve 10 or the second sleeve 20 are in the same horizontal plane and are sequentially spaced by 90 °.
For the parallel connection between two steel pipe piles 5, the first parallel connection structure and the second parallel connection structure of the device adopt two sleeve pipe structures, namely the first sleeve pipe 10 and the second sleeve pipe 20, the specification and the size of the first sleeve pipe 10 and the specification and the size of the second sleeve pipe 20 are set to be the same (material, height, wall thickness, outer diameter and the like) and are processed so as to reduce the type of components, the device can also be used for the parallel connection between four steel pipe piles 5, equivalently, the first parallel connection mechanism 1 and the second parallel connection mechanism 2 are overlapped to share one sleeve pipe structure to form a superposed parallel connection mechanism, at the moment, four superposed parallel connection mechanisms are arranged, the positions of the guide device 12 and the fixed end 22 are correspondingly adjusted, the first guide device 12 and the fixed end 22 are ensured to be positioned on the same side, and a set of connecting device and fixed end 22 of the fastening system 3 is arranged between every two adjacent steel pipe piles 5.
In another technical solution, as shown in fig. 4, a buckle end 33 is provided at the top of the steel pipe pile 5, the buckle end 33 is an annular hoop fastened at the outer side of the top of the steel pipe pile 5, and the wire grip 32 is connected to the buckle end 33. The wire grip 32 is convenient to install on the top of the steel pipe pile 5 by arranging the hanging buckle end 33.
A construction method for a steel pipe pile horizontal connection construction device comprises the following steps:
s1, processing the first parallel mechanism 1 and the second parallel mechanism 2 according to the size and the construction interval of the steel pipe pile 5;
s2, driving two steel pipe piles 5;
s3, nesting the first steel pipe 11 and the second steel pipe 21, aligning a first notch 13 and a second notch 23 and inserting the steel bar clamping piece 7 together to connect the first parallel mechanism 1 and the second parallel mechanism 2 into a whole to form a parallel main body structure, and connecting one end of a suspension wire 42 with the parallel main body structure and the other end with the buoyancy tank 41;
s4, one end of a steel wire rope 31 of the fastening system 3 is detachably connected to the fixed end 22, and then the other end of the steel wire rope passes through the guide device 12 and is connected with the wire grip 32 in a loosening state;
s5, hoisting the parallel main body structure and accurately hoisting the parallel main body structure into a designed position, and ensuring that the first sleeve 10 and the second sleeve 20 are sleeved into the two steel pipe piles 5 in the step S2;
s6, arranging a buckle end 33 on the top of the steel pipe pile 5 sleeved in the first sleeve 10, connecting the wire tightener 32 to the buckle end 33, and placing the buoyancy tank 41 into water;
s7, slowly placing the main body structure downwards, observing the scale on the buoyancy tank 41, and separating from the lifting mechanism after sinking to the preset scale;
s8, tightening the steel wire rope 31 by using the wire tightener 32 to achieve the designed fastening force;
and S9, after the construction is finished, loosening the steel wire rope 31, and slowly lifting the parallel connection main body structure to the water surface for dismantling.
While embodiments of the utility model have been described above, it is not limited to the applications set forth in the description and the embodiments, which are fully applicable in various fields of endeavor to which the utility model pertains, and further modifications may readily be made by those skilled in the art, it being understood that the utility model is not limited to the details shown and described herein without departing from the general concept defined by the appended claims and their equivalents.

Claims (9)

1. A be used for steel-pipe pile horizontal connection construction equipment under water, its characterized in that includes:
the first parallel mechanism comprises a first sleeve vertically arranged, the inner diameter of the first sleeve is slightly larger than the outer diameter of the steel pipe pile, a first steel pipe is fixedly connected to the outer side of the first sleeve along the horizontal direction, the length of the first steel pipe is slightly smaller than the distance between the two steel pipe piles to be connected in parallel, and a guide device is arranged on the outer side of the first sleeve;
the second parallel mechanism comprises a second sleeve which is vertically arranged, the inner diameter of the second sleeve is slightly larger than the outer diameter of the steel pipe pile, a second steel pipe is fixedly connected to the outer side of the second sleeve along the horizontal direction, the second steel pipe and the inner part of the second sleeve are completely arranged in a penetrating manner, the inner diameter of the second steel pipe is slightly larger than the outer diameter of the first steel pipe, the first steel pipe penetrates into the inner part of the second steel pipe and is temporarily and fixedly connected with each other, a fixed end is arranged on the outer side of the second sleeve, and the fixed end and the guide device are located on the same side of the first steel pipe and are consistent in height;
fastening system, it includes wire rope, turn-buckle, and the turn-buckle is connected in the upper end of steel-pipe pile and is set up with guider's position cooperation, and wire rope's one end can be dismantled and connect on the fixed end, the other end is connected with the turn-buckle after walking around guider.
2. The device for the horizontal connection construction of the steel pipe pile under water according to claim 1, further comprising a lowering auxiliary system, wherein the lowering auxiliary system comprises a buoyancy tank, buoyancy of the buoyancy tank in water is larger than the total weight of the device for the horizontal connection construction of the steel pipe pile under water, scales are arranged on the buoyancy tank, and suspension wires are hinged between the bottom of the buoyancy tank and the first steel pipe and/or the second steel pipe respectively.
3. The device as claimed in claim 1, wherein the first steel pipe has a plurality of first notches axially spaced apart from each other in a side wall thereof, the second steel pipe has a plurality of second notches axially spaced apart from each other in a side wall thereof, at least one of the first notches is aligned with one of the second notches, and reinforcing bars are inserted into the aligned first and second notches.
4. The device as claimed in claim 3, wherein the first and second slots are spaced apart from each other in the first and second steel pipes, and reinforcing plates are attached to the peripheries of the first and second slots, respectively.
5. The device for horizontally connecting the steel pipe piles under water according to claim 1, wherein an inclined strut is welded at one end of the first steel pipe close to the first sleeve and is used for connecting with a cross beam of the corresponding steel pipe pile.
6. The device as claimed in claim 1, wherein the guide means is a guide pulley, and a wire rope falling prevention means is further provided outside the guide pulley.
7. The device as claimed in claim 1, wherein two of the fixing ends are vertically spaced apart from each other on the second sleeve, and one end of the wire rope is sequentially connected to the two fixing ends.
8. The device as claimed in claim 1, wherein the first sleeve and the second sleeve have the same size, one first steel pipe and one second steel pipe are connected to the outer side of each of the first sleeve and the second sleeve, one fixing end and one guide device are connected to the outer side of each of the first sleeve and the second sleeve, and the first steel pipe, the second steel pipe, the fixing end and the guide device connected to each of the first sleeve and the second sleeve are sequentially spaced by 90 ° in the same horizontal plane.
9. The device as claimed in claim 1, wherein the top of the steel pipe pile is provided with a hook end, the hook end is a ring-shaped anchor ear fastened to the outside of the top of the steel pipe pile, and the tightener is connected to the hook end.
CN202220375899.5U 2022-02-23 2022-02-23 Be used for steel-pipe pile horizontal coupling construction equipment under water Active CN217027039U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220375899.5U CN217027039U (en) 2022-02-23 2022-02-23 Be used for steel-pipe pile horizontal coupling construction equipment under water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220375899.5U CN217027039U (en) 2022-02-23 2022-02-23 Be used for steel-pipe pile horizontal coupling construction equipment under water

Publications (1)

Publication Number Publication Date
CN217027039U true CN217027039U (en) 2022-07-22

Family

ID=82451789

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220375899.5U Active CN217027039U (en) 2022-02-23 2022-02-23 Be used for steel-pipe pile horizontal coupling construction equipment under water

Country Status (1)

Country Link
CN (1) CN217027039U (en)

Similar Documents

Publication Publication Date Title
CA1126522A (en) Method of anchoring a line, such as a pipeline, to a support, and in particular a sea-bed
CN105926628B (en) One kind is floated, fixed convertible pile foundation in water construction platform device
CN109629568A (en) The process for sinking of the steady stake platform of offshore wind farm jacket foundation steel pipe pile floating
US20110283467A1 (en) simple tower instrument construction and its method
CN109853600A (en) Latch steel-pipe pile and I-shaped sheet pile combined cofferdam structure and its construction method
CN108571425B (en) Pile foundation cap foundation of offshore wind turbine generator set and construction method thereof
CN108798065B (en) Integral jacking method for ancient building
CN112411603A (en) Installation and construction process of offshore wind power booster station
CN217027039U (en) Be used for steel-pipe pile horizontal coupling construction equipment under water
CN113897959A (en) Underwater positioning guide frame for offshore wind power foundation pile sinking and pile sinking construction method
CN210917364U (en) Steel pipe pile positioning platform for crane ship
CN107227741B (en) Basement supporting construction
CN111980594B (en) Temporary seabed base plate and method for installing deepwater surface layer conduits in batches
CN114657973A (en) Horizontal connection construction device and method for steel pipe pile
CN109914411A (en) A kind of non-embedding lithotype construction technology of marine four pile leaders frame
JP2002364004A (en) Installation method for underwater foundation
GB1563107A (en) Piling
CN212153427U (en) Peripheral firm high accuracy zero interference weir mould body structure
CN216807752U (en) Pile foundation steel reinforcement cage hoist and mount auxiliary device
CN111379265A (en) Peripherally-stabilized high-precision zero-interference weir-mold integrated structure and construction method thereof
CN218933170U (en) Combined cofferdam
CN111424554A (en) Construction method for suspended formwork of seascape trestle
WO1980002708A1 (en) A method for performing underwater casting of concrete structures,and an apparatus for carrying out the method
CN219862799U (en) Device for assisting pile inserting and positioning of steel pipe pile
CN215562634U (en) Subway station deep basal pit combined type supporting construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant