CN217026771U - Sand-blocking ditch bank in salt rock area - Google Patents
Sand-blocking ditch bank in salt rock area Download PDFInfo
- Publication number
- CN217026771U CN217026771U CN202220824887.6U CN202220824887U CN217026771U CN 217026771 U CN217026771 U CN 217026771U CN 202220824887 U CN202220824887 U CN 202220824887U CN 217026771 U CN217026771 U CN 217026771U
- Authority
- CN
- China
- Prior art keywords
- trench
- dam
- meters
- sand
- slope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses a sand-blocking trench dike in a salt rock area, which comprises a dike with a regular trapezoid cross section and a trench arranged in parallel on one side of the dike, wherein the cross section of the trench is in an inverted trapezoid shape; the height of the dam is 3 meters, the width of the top surface of the dam is 3 meters, and the slope ratio of the two sides of the dam is 1: 1; the width of the bottom surface of the trench is 3 meters, the depth of the trench is 3 meters, and the slope rates of the two sides of the trench are 1: 1; one side slope of the dam is smoothly connected with one side slope of the trench, wherein the trench is arranged on the windward side of the main wind direction. The construction process is simple and convenient to operate, local materials can be obtained, regional resources in the salt rock area can be reasonably utilized according to local conditions, and engineering materials and construction cost are reduced.
Description
Technical Field
The utility model relates to a sand-blocking trench bank in a salt rock area.
Background
Sand is an atypical gas-solid two-phase flow, and sand particles are carried forward by wind. The gas in Xinjiang area of China is remarkable continental arid desert climate, and the main characteristic is that sand storm disasters easily occur due to frequent activities of wind and sand, so that wind erosion and sand burial are formed on railways and highways along the line, the travel of people and the local economic development are seriously influenced, and the problem to be solved urgently is formed. In the practice of sand control, various forms of sand control have been developed. According to the action principle, the sand prevention measures can be divided into four types of 'fixing, blocking, transporting and guiding', and a sand prevention system is formed by multiple combinations in practical application. The sand-blocking measures are generally positioned at the front edge of the wind sand, are important components of a sand-preventing system and have important wind-proof and sand-blocking functions. Newly building apocynum to the apocynum passing through dead sea and life forbidden area of the railway with the Qiang, and the line passes through the apocynum dry salt lake plain area, the earth surface is covered by salt shells, and the apocynum dry salt lake plain area has no vegetation, no human smoke and surface water, and presents salt desert landscape and wind erosion landform. The unfavorable geological phenomena along the line are wind sand which is mainly expressed by wind erosion, gobi wind sand flow and moving sand dunes. The plant sand prevention measures are difficult to implement, and the engineering sand prevention measures put higher requirements on the durability of the whole structure because the surface rock salt has strong corrosivity on common metal and concrete materials.
Disclosure of Invention
The utility model aims to provide a sand-blocking trench dam in a salt rock area, which is made of local materials, is economical and simple and is convenient to construct.
The technical scheme adopted by the utility model is that the sand blocking ditch dyke in the salt rock area comprises a dyke with a regular trapezoid cross section and a ditch arranged in parallel on one side of the dyke, wherein the cross section of the ditch is in an inverted trapezoid shape; the height of the dam is 3 meters, the width of the top surface of the dam is 3 meters, and the slope ratio of the two sides of the dam is 1: 1; the width of the bottom surface of the trench is 3 meters, the depth of the trench is 3 meters, and the slope rates of the two sides of the trench are 1: 1; one side slope of the dam is smoothly connected with one side slope of the trench, wherein the trench is arranged on the windward side of the main wind direction.
On the main wind direction side of a section needing sand blocking along the road, salt rocks are dug by an excavator, and the dug shape is that an inverted trapezoid with the lower bottom width of 3m, the height of 3m and the slope ratio of 1:1 on two sides forms a trench; crushing large-volume rock salt blocks into small-volume rock salt blocks by using a crushing machine; filling the crushed small-volume salt rock, wherein the filling shape is a regular trapezoid with the upper bottom width of 3m, the height of 3m and the slope rate of 1:1 at two sides, and simultaneously trimming the side slopes at two sides to form a dam; and saturated brine is sprayed to the side slopes on the two sides and the upper top surface, and when the water fully permeates the whole structure, the effect of compact salt cementation can be achieved, and the damage of wind and sand disasters can be resisted. The construction process is simple and convenient to operate, local materials can be obtained, regional resources in the salt rock area can be reasonably utilized according to local conditions, and engineering materials and construction cost are reduced. The method can prevent and control the sand storm disaster in the road building process in the salt rock area. The anti-wind and anti-sand composite material is arranged along the railway and the highway, has good economical efficiency, ensures the rapidness and convenience in construction, and can meet the requirements of wind prevention and sand prevention in a short time.
Drawings
FIG. 1 is a cross-sectional view of the present invention.
Detailed Description
As shown in fig. 1, the sand-blocking trench dyke in the salt rock area comprises a dyke 1 with a regular trapezoid cross section and a trench 2 arranged in parallel on one side of the dyke, wherein the cross section of the trench 2 is an inverted trapezoid; the height of the dam 1 is 3 meters, the width of the top surface of the dam 1 is 3 meters, and the slope ratio of the two sides of the dam is 1: 1; the width of the bottom surface of the trench is 3 meters, the depth of the trench is 3 meters, and the slope rates of the two sides of the trench are 1: 1; one side slope of the dam 1 is smoothly connected with one side slope of the trench 2, wherein the trench 2 is arranged on the windward side of the main wind direction. The trench 2 is firstly dug along the wind direction when the wind blows from any direction, and then the dam 1 is built, wherein the trench 2 and the dam 1 are vertical to the wind direction.
Claims (1)
1. A sand blocking trench bank in a salt rock area is characterized in that: the ditch embankment comprises an embankment with a regular trapezoid cross section and a ditch arranged in parallel on one side of the embankment, wherein the cross section of the ditch is in an inverted trapezoid shape; the height of the dam is 3 meters, the width of the top surface of the dam is 3 meters, and the slope rate of the two sides of the dam is 1: 1; the width of the bottom surface of the trench is 3 meters, the depth of the trench is 3 meters, and the slope rates of the two sides of the trench are 1: 1; one side slope of the dam is smoothly jointed with one side slope of the trench, wherein the trench is arranged on the windward side of the main wind direction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220824887.6U CN217026771U (en) | 2022-04-11 | 2022-04-11 | Sand-blocking ditch bank in salt rock area |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220824887.6U CN217026771U (en) | 2022-04-11 | 2022-04-11 | Sand-blocking ditch bank in salt rock area |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217026771U true CN217026771U (en) | 2022-07-22 |
Family
ID=82416397
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220824887.6U Active CN217026771U (en) | 2022-04-11 | 2022-04-11 | Sand-blocking ditch bank in salt rock area |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217026771U (en) |
-
2022
- 2022-04-11 CN CN202220824887.6U patent/CN217026771U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Bird et al. | Beach renourishment | |
CN101736717B (en) | Method for dredging silt and harnessing river | |
CN105862665B (en) | The method in comprehensive treatment of small watersheds-reconstruction good farmland | |
CN111335100A (en) | Embankment structure suitable for coastal region and construction method thereof | |
CN212656350U (en) | Town and river channel complex | |
CN105951667B (en) | Using mud filling tube bag in enclosing tideland for cultivation region pre- profit retention river structure | |
CN213805270U (en) | Prevent that river course from cutting step energy dissipation second grade dam that permeates water of many curved arches that destroys under | |
CN217026771U (en) | Sand-blocking ditch bank in salt rock area | |
CN112144488A (en) | Multi-curved arch water-permeable stepped energy dissipation secondary dam capable of preventing river channel undercut from being damaged | |
CN204676485U (en) | A kind of Eco-economic Type bank protection structure | |
CN107237292B (en) | A kind of area the Lower Reaches of The Yellow River Kuan Tan village Bi Shui platform | |
Hageman | The application of quaternary geology in coastal areas | |
KR101097055B1 (en) | Debris barrier and plastering between rafters constructed by the cast iron panel and method of debris barrier | |
CN215052663U (en) | River course side slope protective structure | |
CN105986560A (en) | Method for constructing building type flood bank and reclaiming and utilizing river bottomland | |
CN109056654A (en) | A kind of geotechnical grid encloses low bank between fields and its construction method | |
KR101170789B1 (en) | Complex debris barrier of eco-friendly | |
CN213867883U (en) | Sand filling pipe bag cofferdam suitable for coastal area | |
Mishra et al. | Liquefaction at mouth of the River Devi: An amphidromic point in the Mahanadi delta, India | |
CN209227482U (en) | A kind of geotechnical grid encloses low bank between fields | |
CN107447720B (en) | A kind of village Lower Reaches of The Yellow River Kuan Tanqu platform method | |
CN111622177A (en) | Bottom sealing nut block slope protection structure for sea wall ecological reconstruction and construction method thereof | |
CN110528539A (en) | A kind of Construction of Civil Engineering method quickly handling mud-rock flow, landslide collapsing using weatherability woven bag | |
JPS5851568B2 (en) | Sabo dam with three-dimensional frame | |
CN212506081U (en) | Protective debris flow blocking dam adopting ecological measures |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |