CN216974126U - Elevator shaft construction operation platform - Google Patents

Elevator shaft construction operation platform Download PDF

Info

Publication number
CN216974126U
CN216974126U CN202220706151.9U CN202220706151U CN216974126U CN 216974126 U CN216974126 U CN 216974126U CN 202220706151 U CN202220706151 U CN 202220706151U CN 216974126 U CN216974126 U CN 216974126U
Authority
CN
China
Prior art keywords
operation platform
elevator shaft
elevator
shaft construction
triangular supports
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220706151.9U
Other languages
Chinese (zh)
Inventor
甘涛
林凯麟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Engineering Macau Co Ltd
Original Assignee
China Construction Engineering Macau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Engineering Macau Co Ltd filed Critical China Construction Engineering Macau Co Ltd
Priority to CN202220706151.9U priority Critical patent/CN216974126U/en
Application granted granted Critical
Publication of CN216974126U publication Critical patent/CN216974126U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

The utility model discloses an elevator shaft construction operation platform which comprises an elevator shaft, wherein a stereotyped operation platform is arranged on the inner side of the elevator shaft, triangular support frames are fixedly arranged at the left end and the right end of the lower side of the stereotyped operation platform respectively, the triangular support frames and the inner wall of the elevator shaft are fixedly connected through a plurality of bolts, traction ropes are tied on the triangular support frames, turning plates are arranged on the periphery of the stereotyped operation platform respectively, and a plurality of lifting lugs are fixed on the upper side of the stereotyped operation platform. Compared with the prior art, the method has the advantages that: the elevator shaft operation platform capable of being shaped and circulated solves the problems that a floor scaffold is often used as an operation platform in the construction process of the existing elevator shaft of high-rise building engineering, and further a large amount of manpower, material resources and financial resources are needed to be consumed, is simple in principle, easy to operate, convenient to circulate, safe and rapid in construction and high in practicability.

Description

Elevator shaft construction operation platform
Technical Field
The utility model relates to the technical field of building construction equipment, in particular to an elevator shaft construction operating platform.
Background
In the building construction process, for the construction of high buildings, constructors often can install fixed scaffolds on a building wall in advance, and then complete the construction operation of high buildings by means of the support of the scaffolds. However, the above construction methods often consume a large amount of manpower, material resources and financial resources, and are inefficient. Here, in order to solve the above problems, we propose an elevator shaft construction operation platform.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problems and provide the elevator shaft construction operation platform which is simple in structure, easy to operate, convenient to turn over and safe and convenient to construct.
In order to solve the technical problems, the technical scheme provided by the utility model is as follows:
the utility model provides an elevartor shaft construction operation platform, includes the elevator well, elevator well inboard is equipped with regularization operation platform, both ends punishment do not fixedly are equipped with the triangular supports frame about regularization operation platform downside, it is fixed through a plurality of bolted connection between triangular supports frame and the elevator well inner wall, and the tie-up has the haulage rope on the triangular supports frame, it turns over the board to be provided with respectively around the regularization operation platform, and regularization operation platform upside is fixed with a plurality of lug.
As an improvement, the number of the triangular support frames is four, and the four triangular support frames are respectively distributed on the left side and the right side of the regularization operating platform in a mirror image mode.
As an improvement, the triangular support frame and the shaping operation platform are fixed together through a connecting rope.
As an improvement, bolt holes are respectively formed in the positions, corresponding to the bolts, on the inner wall of the elevator shaft.
As an improvement, the number of the lifting lugs is four and the lifting lugs are respectively positioned at four corners of the upper side of the sizing operation platform.
Compared with the prior art, the utility model has the advantages that: the elevator shaft operation platform solves the problem that a floor scaffold is often used as an operation platform in the construction process of the elevator shaft of the existing high-rise building engineering, so that a large amount of manpower, material resources and financial resources are required to be consumed.
Drawings
Fig. 1 is a schematic structural view of a front view direction of an elevator shaft construction operating platform of the utility model.
Fig. 2 is a schematic structural view of a triangular support frame of an elevator shaft construction operating platform.
Fig. 3 is a top view of a stylized operating platform of an elevator hoistway construction operating platform of the present invention.
As shown in the figure: 1. an elevator hoistway; 2. a sizing operation platform; 3. a triangular support frame; 4. a bolt; 5. a hauling rope; 6. turning over a plate; 7. lifting lugs; 8. and connecting ropes.
Detailed Description
In the description of the present invention, it is to be understood that the terms "center", "lateral", "upper", "lower", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate orientations or positional relationships based on those shown in the drawings, and are used only for convenience in describing the present invention and for simplicity in description, and do not indicate or imply that the referenced devices or elements must have a particular orientation, be constructed in a particular orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless otherwise specified. Furthermore, the term "comprises" and any variations thereof is intended to cover non-exclusive inclusions.
The present invention will be described in further detail with reference to the accompanying drawings.
The utility model provides an elevartor shaft construction operation platform, includes elevator well 1, 1 inboard of elevator well is equipped with regularization operation platform 2, both ends punishment do not are fixed to be equipped with triangular supports frame 3 about 2 downside of regularization operation platform, be in the same place through connecting rope 8 is fixed between triangular supports frame 3 and the regularization operation platform 2, be connected fixedly through a plurality of bolt 4 between triangular supports frame 3 and the 1 inner wall of elevator well, the bolt hole has been seted up respectively to the position that corresponds each bolt 4 on the 1 inner wall of elevator well, and triangular supports frame 3 goes up the tying-up and has haulage rope 5, be provided with respectively all around of regularization operation platform 2 and turn over board 6, 2 upsides of regularization operation platform are fixed with a plurality of lug 7.
Specifically, the number of the triangular supports 3 is four, and the four triangular supports are respectively distributed on the left side and the right side of the sizing operation platform 2 in a mirror image manner; in this novel use the number of lug 7 is four and is located the four corners department of regularization operation platform 2 upside respectively as the embodiment.
This novel concrete embodiment in the building engineering construction, earlier fix triangular supports frame 3 at elevator well 1 inboard through a plurality of bolt 4, then with regularization operation platform 2 through tower crane handling to elevator well 1 inboard relevant position, and four corners space department tightly makes regularization operation platform 2 stable with the wooden wedge stopper, triangular supports frame 3 fixes on regularization operation platform 2 through connecting rope 8, it is 2 ~ 3 times longer than the length of triangular supports frame 3 to connect rope 8, make regularization operation platform 2 when making the turnover of upper strata handling, when loosening the bolt 4 of triangular supports frame 3, can follow regularization operation platform 2 and rise together, in addition, fix haulage rope 5 in every bolt 4 department, haulage rope 5 length needs to be greater than the floor maximum height, so that the workman can aim at fast through operating in indoor when having enough to meet the need to the superstructure, The triangular support frame 3 is positioned and fixed, and finally, in order to eliminate potential safety hazards caused by surrounding gaps, the turning plates 6 around the sizing operation platform 2 are opened, so that the whole elevator shaft 1 can be horizontally sealed.
The present invention and its embodiments have been described above, and the description is not intended to be limiting, and the drawings are only one embodiment of the present invention, and the actual structure is not limited thereto. In summary, those skilled in the art should be able to conceive of the present invention without creative design of the similar structural modes and embodiments without departing from the spirit of the present invention, and all such modifications should fall within the protection scope of the present invention.

Claims (5)

1. An elevator shaft construction operation platform comprises an elevator shaft (1), and is characterized in that: elevator well (1) inboard is equipped with regularization operation platform (2), both ends punishment do not fixedly about regularization operation platform (2) downside is equipped with triangular supports frame (3), be connected fixedly through a plurality of bolt (4) between triangular supports frame (3) and elevator well (1) inner wall, the tie-up has haulage rope (5) on triangular supports frame (3), be provided with respectively all around of regularization operation platform (2) and turn over board (6), and regularization operation platform (2) upside is fixed with a plurality of lug (7).
2. An elevator shaft construction operation platform according to claim 1, characterized in that: the number of the triangular supports (3) is four, and the four triangular supports are respectively distributed on the left side and the right side of the sizing operation platform (2) in a mirror image mode.
3. An elevator shaft construction operation platform according to claim 1, characterized in that: the triangular support frame (3) and the shaping operation platform (2) are fixed together through a connecting rope (8).
4. An elevator shaft construction operation platform according to claim 1, characterized in that: bolt holes are respectively formed in the inner wall of the elevator hoistway (1) corresponding to the positions of the bolts (4).
5. An elevator shaft construction operation platform according to claim 1, characterized in that: the number of the lifting lugs (7) is four, and the four lifting lugs are respectively positioned at four corners of the upper side of the sizing operation platform (2).
CN202220706151.9U 2022-03-29 2022-03-29 Elevator shaft construction operation platform Expired - Fee Related CN216974126U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220706151.9U CN216974126U (en) 2022-03-29 2022-03-29 Elevator shaft construction operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220706151.9U CN216974126U (en) 2022-03-29 2022-03-29 Elevator shaft construction operation platform

Publications (1)

Publication Number Publication Date
CN216974126U true CN216974126U (en) 2022-07-15

Family

ID=82340517

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220706151.9U Expired - Fee Related CN216974126U (en) 2022-03-29 2022-03-29 Elevator shaft construction operation platform

Country Status (1)

Country Link
CN (1) CN216974126U (en)

Similar Documents

Publication Publication Date Title
KR100634465B1 (en) Reinforcement Device for Tower Crane
KR20110014341A (en) Tower ctane wall bracing with a safety fence
CN216974126U (en) Elevator shaft construction operation platform
CN214495499U (en) Specially-made underframe for tower crane
CN214783820U (en) Lifting point reinforced overweight underground continuous wall reinforcement cage
CN214329956U (en) Ring rail hoisting device for curtain wall installation
CN214462401U (en) Double-layer protection frame with novel structure
CN211714541U (en) Special handling frame for installing shear wall template in elevator shaft
CN113605659A (en) Elevator shaft tool type safe operation platform and construction method thereof
CN208294101U (en) A kind of large-span steel girder mounting slip and promote coupling apparatus
CN113445723A (en) Construction platform for mounting overhanging structure curtain wall and mounting method
CN111196566A (en) Construction structure and construction method of super high-rise inner climbing tower crane
CN201099690Y (en) Steel-smelting converter repairing equipment
CN221070906U (en) Upper space limited operation platform mounting and dismounting structure
CN216187330U (en) Skid-mounted cold box
CN216305342U (en) Suspension cage for installing external climbing tower crane oblique beam
CN218912360U (en) Basement reinforced structure
CN212893471U (en) Lifting appliance for T-shaped beam template
CN221094877U (en) Cantilever type connecting channel for bridge construction
CN220888323U (en) Liftable formula steel bar binding platform for high mound of rectangle is applicable to
CN219840354U (en) Aerial work platform for installing suspended ceiling in ultra-high steel structure
CN218538899U (en) Stand column structure and elevator shaft
CN106006307B (en) A kind of elevator(lift) machine room structure
CN220954539U (en) Elevator well operation platform
CN215828215U (en) Self-balancing large-span net rack lifting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220715

CF01 Termination of patent right due to non-payment of annual fee