CN216949787U - Building engineering construction rail - Google Patents

Building engineering construction rail Download PDF

Info

Publication number
CN216949787U
CN216949787U CN202123101468.4U CN202123101468U CN216949787U CN 216949787 U CN216949787 U CN 216949787U CN 202123101468 U CN202123101468 U CN 202123101468U CN 216949787 U CN216949787 U CN 216949787U
Authority
CN
China
Prior art keywords
rod
construction
threaded
fixedly connected
construction fence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123101468.4U
Other languages
Chinese (zh)
Inventor
林凡庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202123101468.4U priority Critical patent/CN216949787U/en
Application granted granted Critical
Publication of CN216949787U publication Critical patent/CN216949787U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fencing (AREA)

Abstract

The utility model relates to the technical field of constructional engineering, in particular to a constructional engineering construction fence which comprises a construction fence, wherein one side of the construction fence is provided with a fixed rod, the fixed rod is provided with a threaded rod, the threaded rod is fixedly connected with a first fixed block, the threaded rod is in threaded connection with a threaded connecting block, the threaded connecting block is fixedly connected with a supporting leg, and the threaded rod is in threaded connection with a nut; be provided with the connecting rod on the dead lever, the slotted hole has been seted up on the connecting rod, be provided with the spring pad in the construction rail, fixedly connected with second fixed block on the spring pad, just be provided with slide mechanism on the spring pad, slide mechanism includes slide bar and spout, the spout has been seted up on the construction rail, slide bar sliding connection is in the inboard of spout, and through above-mentioned structure, it carries and fixed effect is better to make building engineering construction rail convenient dismantlement.

Description

Building engineering construction rail
Technical Field
The utility model relates to the technical field of constructional engineering, in particular to a constructional engineering construction fence.
Background
The construction building fence is common on a construction site, is a fence series which is set by taking a pit dug according to the basic altitude and the basic plane size as a reference, is mainly used for foundation engineering, a plurality of constructors know the foundation pit construction fence, the construction building fence is usually used on a construction site, has yellow-black phases and red-white phases, and striking yellow, red or white is helpful for reminding the constructors of paying attention to safety and is an indispensable construction fence for each construction site.
In current building engineering construction rail, although most of rails also have certain structure to be used for fixing, these structures can not be dismantled yet, carry out the inconvenient carrying of in-process that shifts to the construction rail, to this, we propose a neotype convenient dismantlement and carry and fixed better building engineering construction rail of effect.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a construction fence for constructional engineering, which comprises a construction fence, wherein a fixed rod is arranged on one side of the construction fence, a threaded rod is arranged on the fixed rod, a first fixed block is fixedly connected onto the threaded rod, a threaded connecting block is in threaded connection onto the threaded rod, a supporting leg is fixedly connected onto the threaded connecting block, and a nut is in threaded connection onto the threaded rod;
the construction fence is characterized in that a connecting rod is arranged on the fixing rod, a slotted hole is formed in the connecting rod, a spring pad is arranged in the construction fence, a second fixing block is fixedly connected onto the spring pad, a sliding mechanism is arranged on the spring pad and comprises a sliding rod and a sliding groove, the sliding groove is formed in the construction fence, and the sliding rod is connected to the inner side of the sliding groove in a sliding mode.
Preferably: and the fixed rod is fixedly connected with a light reflecting strip.
Preferably: and the construction fence is fixedly connected with a warning board.
Preferably, the following components: and reinforcing ribs are arranged at the lower ends of the fixing rods.
Preferably: the threaded rod is fixedly connected with a protective pad.
Preferably: the inside of construction rail has seted up the channel, connecting rod sliding connection is inboard at the channel.
Compared with the prior art, the utility model has the beneficial effects that:
according to the utility model, the slide rod is pushed upwards, the slide rod drives the spring pad to compress, and the second fixed block fixedly connected with the spring pad is separated from the clamping groove formed in the connecting rod, so that the fixed rod and the construction fence can be conveniently detached and installed; the supporting legs fixedly connected with the threaded connecting blocks can be fixed by rotating the nuts on the threaded rods; the reinforcing ribs fixedly connected with the lower ends of the fixing rods can enable the fixing structure to achieve a better effect.
Drawings
FIG. 1 is a front view of a construction pen for construction work according to the present invention;
FIG. 2 is a fixed structure view of the construction fence of the construction engineering of the present invention;
FIG. 3 is a structure diagram of a fixing rod of the construction fence of the building engineering of the utility model;
fig. 4 is an enlarged view of the sliding mechanism 14 of the construction fence of the present invention.
In the figure:
1. constructing a fence; 2. fixing the rod; 3. a light-reflecting strip; 4. a protective pad; 5. a threaded connection block; 6. a nut; 7. a first fixed block; 8. a threaded rod; 9. supporting legs; 10. reinforcing ribs; 11. a spring pad; 12. a connecting rod; 13. a second fixed block; 14. a sliding mechanism; 1401. a slide bar; 1402. a chute; 15. a warning board.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be obtained by a person skilled in the art without making any creative effort based on the embodiments in the present invention, belong to the protection scope of the present invention.
Referring to fig. 1-4, the construction fence for the building engineering comprises a construction fence 1, wherein a fixing rod 2 is arranged on one side of the construction fence 1, a threaded rod 8 is arranged on the fixing rod 2, a first fixing block 7 is fixedly connected to the threaded rod 8, a threaded connecting block 5 is in threaded connection with the threaded rod 8, a supporting leg 9 is fixedly connected to the threaded connecting block 5, and a nut 6 is in threaded connection with the threaded rod 8;
the construction fence is characterized in that a connecting rod 12 is arranged on the fixing rod 2, a slotted hole is formed in the connecting rod 12, a spring pad 11 is arranged in the construction fence 1, a second fixing block 13 is fixedly connected to the spring pad 11, a sliding mechanism 14 is arranged on the spring pad 11, the sliding mechanism 14 comprises a sliding rod 1401 and a sliding groove 1402, the sliding groove 1402 is formed in the construction fence 1, and the sliding rod 1401 is slidably connected to the inner side of the sliding groove 1402.
Fixedly connected with reflection of light strip 3 on the dead lever 2, the car light shines can remind the subtend vehicle on reflection of light strip 3 night, prevents that the vehicle from colliding with 1 of construction rail.
Fixedly connected with warning sign 15 on the construction rail 1 is provided with the warning poster on the warning sign 15.
The lower end of the fixing rod 2 is provided with a reinforcing rib 10, and the reinforcing rib 10 can better fix the fixing rod 2.
Fixedly connected with protection pad 4 on the threaded rod 8, protection pad 4 can reduce the wearing and tearing between threaded connection piece 5 and dead lever 2.
The construction fence 1 is internally provided with a channel, the connecting rod 12 is connected to the inner side of the channel in a sliding manner, and the connecting rod 12 can slide in the channel.
The working process and principle of the utility model are as follows: upwards promote slide bar 1402, slide bar 1402 drives the compression of spring pad 11, insert the connecting rod 12 of dead lever 2 one side fixed connection in the channel of seting up on the construction rail 1, loosen slide bar 1402, spring pad 11 is because elasticity promotes second fixed block 13 to the draw-in groove of seting up on connecting rod 12 in, to one side of dead lever 2 rotating nut 6, fixed connection's supporting leg 9 is fixed on the threaded connection piece 5.
While the utility model has been described in further detail in connection with specific embodiments thereof, it will be understood that the utility model is not limited thereto, and that various other modifications and substitutions may be made by those skilled in the art without departing from the spirit of the utility model, which should be considered to be within the scope of the utility model as defined by the appended claims.

Claims (6)

1. The utility model provides a building engineering construction rail, includes construction rail (1), its characterized in that: a fixed rod (2) is arranged on one side of the construction fence (1), a threaded rod (8) is arranged on the fixed rod (2), a first fixed block (7) is fixedly connected onto the threaded rod (8), a threaded connecting block (5) is in threaded connection with the threaded rod (8), a supporting leg (9) is fixedly connected onto the threaded connecting block (5), and a nut (6) is in threaded connection with the threaded rod (8);
the construction fence is characterized in that a connecting rod (12) is arranged on the fixing rod (2), a slotted hole is formed in the connecting rod (12), a spring pad (11) is arranged in the construction fence (1), a second fixing block (13) is fixedly connected to the spring pad (11), a sliding mechanism (14) is arranged on the spring pad (11), the sliding mechanism (14) comprises a sliding rod (1401) and a sliding groove (1402), the sliding groove (1402) is formed in the construction fence (1), and the sliding rod (1401) is connected to the inner side of the sliding groove (1402) in a sliding mode.
2. A construction work construction fence according to claim 1, characterized in that: and the fixed rod (2) is fixedly connected with a light reflecting strip (3).
3. A construction work construction fence according to claim 1, characterized in that: and a warning board (15) is fixedly connected to the construction fence (1).
4. A construction work construction fence according to claim 1, characterized in that: and the lower end of the fixed rod (2) is provided with a reinforcing rib (10).
5. A construction work construction fence according to claim 1, characterized in that: and the threaded rod (8) is fixedly connected with a protective pad (4).
6. A construction work construction fence according to claim 1, characterized in that: the construction fence is characterized in that a channel is formed in the construction fence (1), and the connecting rod (12) is connected to the inner side of the channel in a sliding mode.
CN202123101468.4U 2021-12-03 2021-12-03 Building engineering construction rail Active CN216949787U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123101468.4U CN216949787U (en) 2021-12-03 2021-12-03 Building engineering construction rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123101468.4U CN216949787U (en) 2021-12-03 2021-12-03 Building engineering construction rail

Publications (1)

Publication Number Publication Date
CN216949787U true CN216949787U (en) 2022-07-12

Family

ID=82306530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123101468.4U Active CN216949787U (en) 2021-12-03 2021-12-03 Building engineering construction rail

Country Status (1)

Country Link
CN (1) CN216949787U (en)

Similar Documents

Publication Publication Date Title
CN216949787U (en) Building engineering construction rail
CN204614374U (en) A kind of outdoor LED display screen
CN218373331U (en) Bridge railing for hydraulic engineering
CN203669396U (en) Safety protective fence for civil construction
CN205189502U (en) Rail for electric overhaul equipment
CN211564705U (en) Special-shaped opening device for steel grating
CN219497172U (en) Integrated pedestrian crosswalk signal lamp
CN221566905U (en) Civil engineering safety device
CN205050491U (en) Novel multi -functional aluminum alloy signboard
CN218029446U (en) Electric power rail convenient to maintain and overhaul
CN206971929U (en) A kind of composite extendible construction fence
CN217518394U (en) Movable protective fence for building construction
CN216739211U (en) Pedestrian overpass safety protection structure
CN209261344U (en) A kind of no splicing fence of urban construction
CN220645522U (en) Foundation pit safety protection device for highway engineering
CN215331957U (en) Building engineering protection network
CN221838084U (en) Foundation pit safety warning device
CN218934269U (en) Welding type solid steel invisible protective net
CN216865587U (en) Building envelope of building engineering
CN221530933U (en) Cable trench cover plate convenient to open
CN220869010U (en) Protection railing is built in garden convenient to installation
CN219931843U (en) Construction rail guard is built in room
CN213063215U (en) Warning rail for hydraulic engineering safety
CN214117731U (en) Water conservancy construction safety facility
CN214301434U (en) Novel building engineering rail guard

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant