CN216945903U - Steel construction vestibule various steel tile erection equipment - Google Patents

Steel construction vestibule various steel tile erection equipment Download PDF

Info

Publication number
CN216945903U
CN216945903U CN202122910402.3U CN202122910402U CN216945903U CN 216945903 U CN216945903 U CN 216945903U CN 202122910402 U CN202122910402 U CN 202122910402U CN 216945903 U CN216945903 U CN 216945903U
Authority
CN
China
Prior art keywords
vehicle body
color steel
body platform
steel tile
vestibule
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122910402.3U
Other languages
Chinese (zh)
Inventor
李伟
黄兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China First Metallurgical Group Co Ltd
Original Assignee
China First Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China First Metallurgical Group Co Ltd filed Critical China First Metallurgical Group Co Ltd
Priority to CN202122910402.3U priority Critical patent/CN216945903U/en
Application granted granted Critical
Publication of CN216945903U publication Critical patent/CN216945903U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model discloses steel structure vestibule color steel tile installation equipment which comprises a vehicle body platform, wherein moving wheels are installed below the vehicle body platform, a cantilever crane is installed on the vehicle body platform and controlled by a cantilever crane lifting motor, an operation area and a color steel tile placing area are further arranged on the vehicle body platform, and operation ladders and protection fences are arranged on two sides of the vehicle body platform. The steel structure vestibule color steel tile installation equipment can centralize lifting cages for lifting, moving and installing color steel tiles by operators during installation, and complete all procedures for installing the color steel tiles on one equipment. The utility model gets rid of the use of a crane for installing the color steel tiles, thereby saving a large amount of crane use cost. Moreover, the lifting of the color steel tiles and the adjustment of the mounting position can be completed on the vehicle body in a short distance, the operation is convenient, and the position adjustment precision is high. The operation ladder and the protection fence prevent the vehicle body from deflecting to one side, and the safety of the vehicle body is improved.

Description

Steel construction vestibule various steel tile erection equipment
Technical Field
The utility model relates to color steel tile installation equipment, in particular to steel structure vestibule color steel tile installation equipment, and belongs to the technical field of construction.
Background
In the installation of a steel structure corridor, the walls on both sides of the corridor and the top of the corridor are usually covered by color steel tiles. Because the vestibule is the high altitude position mostly, and the vestibule is narrow, the big structure of length again, and the installation of various steel tile is most gone on in the high altitude, even if install in lower position, also need adopt the crane to hoist various steel tile, and the installer hangs the installation on the vestibule structure with the cage, and the construction needs the crane cooperation, and the construction progress is very slow, and construction cost is high, and is dangerous big, and construction quality also is difficult to guarantee. Thus, a quick, safe, efficient, economical and practical installation is needed.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the problems of high difficulty and high danger of mounting color steel tiles on a vestibule in the prior art, and provides safe and quick steel structure vestibule color steel tile mounting equipment.
The utility model is realized by the following steps:
the utility model provides a steel construction vestibule color steel tile erection equipment, includes a vehicle body platform, installs below vehicle body platform and removes the wheel, installs the cantilever crane on vehicle body platform, and the cantilever crane is through cantilever crane motor control, still is provided with operation area and color steel tile on vehicle body platform and places the district, and vehicle body platform's both sides all are provided with operation ladder and protection fence.
The further scheme is as follows:
a circle of protective railing is arranged on the periphery of the vehicle body platform.
The further scheme is as follows:
the moving wheel is controlled to move by a driving motor.
The further scheme is as follows:
the driving motor and the cantilever crane hoisting motor are controlled and operated by the operation box 5.
The further scheme is as follows:
the bottom of the operation ladder is closed.
In the utility model, the operation ladder has the function of facilitating the standing of operators, and is designed to be closed at the bottom in order to ensure the safety of the operators, and the operation ladder and the protection fence can prevent the vehicle body from inclining to one side together, thereby avoiding danger.
The protection railing arranged on the periphery of the vehicle body platform can protect the safety of operators on the vehicle body.
When the device is used specifically, the color steel tile installation equipment of the steel structure corridor is hoisted to the upper surface of the steel structure corridor, so that the wheels are installed on the purlines on the upper part of the corridor. And the operation box is powered on, so that the operation box can control the driving motor and the cantilever hoisting motor. The method comprises the steps of operating a cantilever crane to hoist color steel tiles to be installed on a vehicle body, placing the color steel tiles in a color steel tile placing area, hoisting the color steel tiles one by one during installation, adjusting the cantilever crane to adjust the positions of the color steel tiles to be installed, and completing fixation by constructors on an operation ladder. The operation is the same for both sides. The color steel tiles on the upper part of the corridor are also hoisted in place by the cantilever crane and are fixed by operators to finish installation.
The utility model has at least the following beneficial effects:
the steel structure vestibule color steel tile installation equipment can centralize lifting cages for lifting, moving and installing by operators during color steel tile installation, and complete all procedures of color steel tile installation on one equipment. The utility model gets rid of the use of a crane for installing the color steel tiles, thereby saving a large amount of crane use cost. Moreover, the lifting of the color steel tiles and the adjustment of the mounting position can be completed on the vehicle body in a short distance, the operation is convenient, and the position adjustment precision is high. The operation ladder and the protection fence prevent the vehicle body from deflecting to one side, and the safety of the vehicle body is improved.
Drawings
FIG. 1 is a schematic view of the main structure of the present invention;
FIG. 2 is a schematic top view of the present invention;
FIG. 3 is a schematic view of a structure of one side of the present invention;
fig. 4 is a schematic structural view of the other side of the present invention.
The device comprises a vehicle body platform, an operation ladder 2, a cantilever crane 3, a driving motor 4, an operation box 5, a cantilever crane motor 6, an operation area 7, a color steel tile placing area 8, a moving wheel 9, a protection fence 10 and a protection railing 11.
Detailed Description
The utility model is described in further detail below with reference to the figures and the specific embodiments.
As shown in the attached drawings 1-4, the steel structure vestibule color steel tile installation equipment comprises a vehicle body platform 1, moving wheels 9 are installed below the vehicle body platform 1, a cantilever crane 3 is installed on the vehicle body platform 1, the cantilever crane 3 is controlled by a cantilever crane lifting motor 6, an operation area 7 and a color steel tile placing area 8 are further arranged on the vehicle body platform, and operation ladders 2 and protection fences 10 are arranged on two sides of the vehicle body platform. A circle of protective railing 11 is arranged on the periphery of the vehicle body platform 1.
Wherein the moving wheel 9 is controlled to move by the driving motor 4. The driving motor 4 and the cantilever crane motor 6 are controlled by the operation box 5. The operation ladder 2 is designed to be closed at the bottom in order to ensure the safety of personnel, and the operation ladder and the protection fence 10 prevent the vehicle body from inclining to one side to cause danger.
As a specific embodiment, the number of the moving wheels is determined according to the actual situation of the corridor, wherein 8 are taken as examples, the front 4 wheels and the rear 4 wheels are selected as driving wheels, and the driving wheels are driven by the driving motor 4 to drive the vehicle body to move. The operation area is the area of free activity of operating personnel when the construction, places the various steel tile that needs the installation in the district of placing. The purpose of the mounting guard rail 11 around the vehicle body is to protect the safety of the operator on the vehicle body.
Although the present invention has been described herein with reference to the illustrated embodiments thereof, which are intended to be preferred embodiments of the present invention, it is to be understood that the utility model is not limited thereto, and that numerous other modifications and embodiments can be devised by those skilled in the art that will fall within the spirit and scope of the principles of this disclosure.

Claims (5)

1. The utility model provides a various steel tile erection equipment of steel construction vestibule which characterized in that: the device comprises a vehicle body platform, wherein moving wheels are installed below the vehicle body platform, a cantilever crane is installed on the vehicle body platform, the cantilever crane is controlled by a cantilever crane lifting motor, an operation area and a color steel tile placing area are further arranged on the vehicle body platform, and operation ladders and protection fences are arranged on two sides of the vehicle body platform.
2. The steel structure vestibule color steel tile installation equipment of claim 1, characterized in that:
a circle of protective railing is arranged at the periphery of the vehicle body platform.
3. The steel structure vestibule color steel tile installation equipment of claim 1, characterized in that:
the moving wheel is controlled to move by a driving motor.
4. The steel structure vestibule color steel tile installation equipment of claim 3, characterized in that:
the driving motor and the cantilever crane motor are controlled by the operation box.
5. The steel structure vestibule color steel tile installation equipment of claim 1, characterized in that:
the bottom of the operation ladder is closed.
CN202122910402.3U 2021-11-24 2021-11-24 Steel construction vestibule various steel tile erection equipment Active CN216945903U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122910402.3U CN216945903U (en) 2021-11-24 2021-11-24 Steel construction vestibule various steel tile erection equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122910402.3U CN216945903U (en) 2021-11-24 2021-11-24 Steel construction vestibule various steel tile erection equipment

Publications (1)

Publication Number Publication Date
CN216945903U true CN216945903U (en) 2022-07-12

Family

ID=82305898

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122910402.3U Active CN216945903U (en) 2021-11-24 2021-11-24 Steel construction vestibule various steel tile erection equipment

Country Status (1)

Country Link
CN (1) CN216945903U (en)

Similar Documents

Publication Publication Date Title
US9382099B2 (en) Motorized height access device for tower cranes
CN1990371B (en) Elevator installation method and up-down system used therein
KR100928870B1 (en) Retractable prop
CN107043060A (en) A kind of installation method of inverse formula installation lift
CN216945903U (en) Steel construction vestibule various steel tile erection equipment
CN100526197C (en) Bottom elevation tower crane
CN210312155U (en) Take climbing mechanism's RGV dolly
JPH05199629A (en) Working system for overhead distribution line
CN214942875U (en) Movable workshop
CN114232976A (en) Lifting multi-unit combined construction operation platform
CN212101731U (en) Box girder anti-falling beam stop block mounting system
CN211287732U (en) Novel multifunctional support frame for tunnel construction
CN211687992U (en) Movable shield tunnel construction operation platform with lifting equipment
CN210973660U (en) Temporary tower crane passageway of can overturning suitable for whole hoisting frame
KR101599698B1 (en) Tunnel Operation Platform
CN112853969A (en) Connection structure is dodged to lightweight bridge intellectual detection system car
CN113463897A (en) A remove operation car for high slope protection construction
KR101929753B1 (en) Cableless vertical conveying apparatus installed at scaffolding
CN208827875U (en) A kind of beam sections steel-tooth bank installation accessory cart
CN108425348B (en) Hydraulic overhaul platform for flood discharge flow channel of hydropower station and operation method
RU2114048C1 (en) Contact system maintenance and repair lifting device
CN207377568U (en) The low vcehicular tunnel maintenance and reinforcement platform and device for influencing traffic
CN217975276U (en) Lifting support for building engineering construction
CN217710348U (en) Viaduct bridge body construction platform
CN213681766U (en) Arch bridge arch ring overhauls lift work platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant