CN216923453U - Pipeline installation device for heating and ventilation engineering construction - Google Patents

Pipeline installation device for heating and ventilation engineering construction Download PDF

Info

Publication number
CN216923453U
CN216923453U CN202220652863.7U CN202220652863U CN216923453U CN 216923453 U CN216923453 U CN 216923453U CN 202220652863 U CN202220652863 U CN 202220652863U CN 216923453 U CN216923453 U CN 216923453U
Authority
CN
China
Prior art keywords
gear
installation device
engineering construction
heating
threaded rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220652863.7U
Other languages
Chinese (zh)
Inventor
程超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220652863.7U priority Critical patent/CN216923453U/en
Application granted granted Critical
Publication of CN216923453U publication Critical patent/CN216923453U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to the technical field of pipeline installation devices, in particular to a pipeline installation device for heating and ventilation engineering construction. The pipeline installation device solves the problems that the existing pipeline installation device cannot adapt to pipelines with different sizes, and the pipeline installation device of the same type is inconvenient to use to fix the pipelines when various types of pipelines need to be installed, so that the working efficiency is low.

Description

Pipeline installation device for heating and ventilation engineering construction
Technical Field
The utility model relates to the technical field of pipeline installation devices, in particular to a pipeline installation device for heating and ventilation engineering construction.
Background
The heating ventilation is an important component of a building, and comprises three aspects of heating, ventilation and air conditioning, and with the improvement of the living standard of residents and the increasing progress of building technology in recent years, people increasingly use building heating ventilation pipelines to exchange air.
In the building warm-air pipeline laying, because the pipelines used by the building warm-air pipelines are not integrated, the pipeline installation device is needed at the moment, the existing pipeline installation device cannot adapt to pipelines with different sizes, the pipeline installation device is inconvenient to use the installation device of the same type to fix the pipelines when various types of pipelines need to be installed, and the working efficiency is low.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problems in the background, and provides a pipeline installation device for heating and ventilation engineering construction.
In order to achieve the purpose, the utility model adopts the following technical scheme: the utility model provides a warm for engineering construction pipe installation device that leads to, includes bottom plate, support frame and adjusting device, the surface of support frame is equipped with adjusting device, adjusting device includes two U templates, two U template symmetric distribution is on the surface of support frame, one of them fixed mounting has the slide bar between the both ends inner wall of U template, one of them another it is connected with the threaded rod to rotate between the both ends inner wall of U template, the fixed surface of threaded rod installs first gear, the surface screw thread of threaded rod uses first gear as the center each other for reverse screw, and the setting of U template has played the effect of supporting slide bar and threaded rod, and the setting of first gear has played and has driven threaded rod pivoted effect.
Preferably, the surface threaded connection of threaded rod has two fly leafs, the fly leaf has played the effect that drives the fly leaf and remove on the surface of slide bar with the help of threaded rod and slide bar sliding connection, the setting of threaded rod.
Preferably, one of them the fixed surface of U template installs the backup pad, the fixed surface of backup pad installs the motor, the output fixed mounting of motor has the second gear, the second gear is with the help of motor and first gear engagement, one of them logical groove has been seted up on the surface of U template, and the effect of supporting the motor has been played in the setting of backup pad, and the setting of motor has played and has driven second gear pivoted effect, and the setting of second gear has played and has driven first gear pivoted effect.
Preferably, two the equal fixed mounting in surface of fly leaf has two bracing pieces, the one end that the fly leaf was kept away from to the bracing piece is fixed mounting respectively has bottom bracket and punch holder, and the effect of supporting bottom bracket and punch holder has been played in the setting of bracing piece, and the setting of bottom bracket and punch holder has played and has carried out the fixed effect of centre gripping to the pipeline.
Preferably, the surface of bottom plate is equipped with elevating gear, elevating gear includes the spout, the spout is seted up on the surface of bottom plate, the inside sliding connection of spout has two slides, the one end that the spout was kept away from to the slide articulates there is the traction lever, the one end that the slide was kept away from to the traction lever is articulated with the support frame, and the setting of spout has played the effect that lets the slide can move, and the setting of slide has played the effect that drives the traction lever and remove, and the setting of traction lever has played the effect that drives the support frame and go up and down.
Preferably, two grooves are formed in the side face of the bottom plate, a moving block is slidably connected inside each groove, a connecting rod is fixedly mounted on the surface of the moving block, one end, away from the moving block, of the connecting rod is fixedly connected with the sliding plate, the moving block is arranged to drive the connecting rod to move, and the connecting rod is arranged to drive the sliding plate to move inside the sliding groove.
Preferably, the side face of the bottom plate is fixedly provided with a fixed plate, the surfaces of the two sides of the fixed plate are fixedly provided with air cylinders, the output end of each air cylinder is fixedly connected with the corresponding moving block, the fixed plate is arranged to play a role in supporting the air cylinders, and the air cylinders are arranged to play a role in driving the moving blocks to move in the grooves.
Compared with the prior art, the utility model has the advantages and positive effects that:
1. in the utility model, through arranging the adjusting device, when the pipeline is required to be clamped and fixed, the pipeline is firstly placed in the lower bracket, after the pipeline is placed, when the distance between the lower bracket and the upper clamp plate is required to be adjusted according to the size of the pipeline, the motor is turned on, the motor drives the second gear to rotate, the second gear is meshed with the first gear, so that the first gear rotates, the first gear rotates to drive the threaded rod to rotate, because the threads on the surface of the threaded rod are mutually reverse threads by taking the first gear as the center, when the first gear drives the threaded rod to rotate, the two movable plates in threaded connection on the surface of the first gear can move towards the direction of approaching each other on the surface of the sliding rod, the two movable plates move towards the direction of approaching each other on the surface of the sliding rod to drive the upper clamp plate and the lower bracket to move towards the direction of approaching each other, and the lower bracket and the upper clamp plate move towards the direction of approaching each other, and then firmly the centre gripping is fixed inside it, and after the pipeline was fixed by punch holder and bottom end bracket, at this moment can install the butt joint to the pipeline for through the cooperation of above-mentioned structure, make the distance between punch holder and the bottom end bracket adjustable and then can adapt to not unidimensional pipeline in a flexible way, flexibility when further increasing the device and using.
2. According to the pipeline installation device, the lifting device is arranged, when the height of the supporting frame needs to be adjusted, the two cylinders are firstly opened at the same time, the cylinders are started to drive the moving block to move in the groove, the moving block moves in the groove to drive the connecting rod to move, the connecting rod moves to drive the sliding plate to move in the sliding groove, the sliding plate moves in the sliding groove to drive the traction rod to move, so that an included angle between the traction rod and the sliding plate by taking the pin shaft as a vertex can be changed, the supporting frame is driven by the traction rod to move downwards when the included angle is reduced, the installation height of a pipeline is reduced, otherwise, the installation height of the pipeline is increased, through the matching of the structures, the convenience in installation of pipelines with different heights is achieved, and the applicability of the pipeline installation device is further improved.
Drawings
Fig. 1 is a schematic perspective view of a pipe installation device for heating and ventilation engineering construction according to the present invention;
fig. 2 is a left side view structural schematic diagram of a pipe installation device for heating and ventilation engineering construction according to the present invention;
fig. 3 is a schematic structural view of a pipe installation device for heating and ventilation engineering construction shown in fig. 1 at a point a;
fig. 4 is a schematic structural diagram of a pipe installation device for heating and ventilation engineering construction shown in fig. 2 at B.
Illustration of the drawings:
1. a base plate; 2. a support frame; 3. an adjustment device; 31. a U-shaped plate; 32. a slide bar; 33. a threaded rod; 34. a first gear; 35. a movable plate; 36. a support plate; 37. a motor; 38. a second gear; 39. a through groove; 4. a support bar; 5. an upper splint; 6. a lower bracket; 7. a lifting device; 71. a chute; 72. a slide plate; 73. a draw bar; 74. a groove; 75. a moving block; 76. a connecting rod; 77. a fixing plate; 78. and a cylinder.
Detailed Description
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a pipeline installation device is used in warm engineering construction, includes bottom plate 1, support frame 2 and adjusting device 3, and the surface of support frame 2 is equipped with adjusting device 3.
In this embodiment: adjusting device 3 includes two U type boards 31, and two U type boards 31 symmetric distribution are on the surface of support frame 2, and fixed mounting has slide bar 32 between the both ends inner wall of one of them U type board 31, and wherein rotate between the both ends inner wall of another U type board 31 and be connected with threaded rod 33, and the fixed surface of threaded rod 33 installs first gear 34, and the surface screw thread of threaded rod 33 uses first gear 34 as the center each other for reverse screw thread.
In this embodiment: the U-shaped plate 31 is arranged to support the sliding rod 32 and the threaded rod 33, and the first gear 34 is arranged to drive the threaded rod 33 to rotate.
Specifically, two movable plates 35 are connected to the surface of the threaded rod 33 in a threaded manner, and the movable plates 35 are slidably connected to the sliding rod 32 via the threaded rod 33.
In this embodiment: the threaded rod 33 is arranged to drive the movable plate 35 to move on the surface of the sliding rod 32.
Specifically, a supporting plate 36 is fixedly mounted on the surface of one of the U-shaped plates 31, a motor 37 is fixedly mounted on the surface of the supporting plate 36, a second gear 38 is fixedly mounted at the output end of the motor 37, the second gear 38 is engaged with the first gear 34 by means of the motor 37, and a through groove 39 is formed in the surface of one of the U-shaped plates 31. The supporting plate 36 is arranged to support the motor 37, the motor 37 is arranged to drive the second gear 38 to rotate, and the second gear 38 is arranged to drive the first gear 34 to rotate.
Specifically, two support rods 4 are fixedly mounted on the surfaces of the two movable plates 35, and a lower bracket 6 and an upper clamp plate 5 are respectively and fixedly mounted at one ends of the support rods 4 far away from the movable plates 35. The setting of bracing piece 4 has played the effect of supporting lower bracket 6 and punch holder 5, and the setting of lower bracket 6 and punch holder 5 has played the effect of carrying out the centre gripping fixed to the pipeline.
In this embodiment: the surface of the bottom plate 1 is provided with a lifting device 7, the lifting device 7 comprises a sliding chute 71, the sliding chute 71 is arranged on the surface of the bottom plate 1, two sliding plates 72 are slidably connected inside the sliding chute 71, one end of each sliding plate 72, which is far away from the corresponding sliding chute 71, is hinged with a traction rod 73, and one end of each traction rod 73, which is far away from the corresponding sliding plate 72, is hinged with the support frame 2. When the height of the supporting frame 2 needs to be adjusted, firstly, the two air cylinders 78 are opened simultaneously, the air cylinders 78 are started to drive the moving block 75 to move in the grooves 74, the moving block 75 moves in the grooves 74 to drive the connecting rods 76 to move, the connecting rods 76 move to drive the sliding plates 72 to move in the sliding grooves 71, the sliding plates 72 move in the sliding grooves 71 to drive the traction rods 73 to move, so that an included angle between the traction rods 73 and the sliding plates 72 can be changed by taking the pin shafts as vertexes, the traction rods 73 drive the supporting frame 2 to move downwards when the included angle is reduced, the installation height of pipelines is reduced, otherwise, the installation height of the pipelines is increased, and through the matching of the structures, the convenience in installation of the pipelines with different heights is achieved, and the applicability of the device is further improved.
Specifically, two grooves 74 are formed in the side surface of the base plate 1, a moving block 75 is connected to the inside of the grooves 74 in a sliding manner, a connecting rod 76 is fixedly mounted on the surface of the moving block 75, and one end, far away from the moving block 75, of the connecting rod 76 is fixedly connected with the sliding plate 72.
In this embodiment: the arrangement of the moving block 75 has an effect of moving the connecting rod 76, and the arrangement of the connecting rod 76 has an effect of moving the slide plate 72 inside the slide groove 71.
Specifically, a fixing plate 77 is fixedly installed on the side surface of the base plate 1, an air cylinder 78 is fixedly installed on both side surfaces of the fixing plate 77, and an output end of the air cylinder 78 is fixedly connected with the moving block 75.
In this embodiment: the fixing plate 77 is provided to support the cylinder 78, and the cylinder 78 is provided to move the moving block 75 inside the groove 74.
The working principle is as follows: by arranging the adjusting device 3, when the pipeline needs to be clamped and fixed, the pipeline is firstly placed in the lower bracket 6, after the placement is finished, when the distance between the lower bracket 6 and the upper clamp plate 5 needs to be adjusted according to the size of the pipeline, at this time, the motor 37 is turned on, the motor 37 drives the second gear 38 to rotate, the second gear 38 rotates and is meshed with the first gear 34, the first gear 34 rotates and drives the threaded rod 33 to rotate, because the threads on the surface of the threaded rod 33 are mutually reverse threads by taking the first gear 34 as the center, when the first gear 34 drives the threaded rod 33 to rotate, the two movable plates 35 in threaded connection with the surfaces of the two movable plates 35 move towards each other on the surfaces of the slide bars 32, and the two movable plates 35 move towards each other on the surfaces of the slide bars 32 to drive the upper clamp plate 5 and the lower bracket 6 to move towards each other, the lower bracket 6 and the upper clamp plate 5 move towards the direction close to each other, and then firmly fix the pipeline inside, after the pipeline is fixed by the upper clamp plate 5 and the lower bracket 6, at this moment, the butt joint can be installed to the pipeline, and through the cooperation of the above structure, the distance between the upper bracket and the lower clamp plate is adjustable, so that the pipeline can flexibly adapt to pipelines of different sizes, and the flexibility of the device during use is further increased.
When the height of the supporting frame 2 needs to be adjusted, firstly, the two air cylinders 78 are opened simultaneously, the air cylinders 78 are started to drive the moving block 75 to move in the grooves 74, the moving block 75 moves in the grooves 74 to drive the connecting rods 76 to move, the connecting rods 76 move to drive the sliding plates 72 to move in the sliding grooves 71, the sliding plates 72 move in the sliding grooves 71 to drive the traction rods 73 to move, so that an included angle between the traction rods 73 and the sliding plates 72 can be changed by taking the pin shafts as vertexes, the traction rods 73 drive the supporting frame 2 to move downwards when the included angle is reduced, the installation height of pipelines is reduced, otherwise, the installation height of the pipelines is increased, and through the matching of the structures, the convenience in installation of the pipelines with different heights is achieved, and the applicability of the device is further improved.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood by those of ordinary skill in the art through specific situations.

Claims (7)

1. The utility model provides a warm for engineering construction pipe-line installation device that leads to, includes bottom plate (1), support frame (2) and adjusting device (3), its characterized in that: the surface of support frame (2) is equipped with adjusting device (3), adjusting device (3) include two U template (31), two U template (31) symmetric distribution is on the surface of support frame (2), one of them fixed mounting has slide bar (32) between the both ends inner wall of U template (31), wherein another it is connected with threaded rod (33) to rotate between the both ends inner wall of U template (31), the fixed surface of threaded rod (33) installs first gear (34), the surface thread of threaded rod (33) uses first gear (34) as the center each other to be reverse screw thread.
2. The pipe installation device for heating and ventilation engineering construction according to claim 1, wherein: the surface of the threaded rod (33) is in threaded connection with two movable plates (35), and the movable plates (35) are in sliding connection with the threaded rod (33) and the sliding rod (32).
3. The pipe installation device for heating and ventilation engineering construction according to claim 1, wherein: the surface of one of them U template (31) fixed mounting has backup pad (36), the surface fixed mounting of backup pad (36) has motor (37), the output fixed mounting of motor (37) has second gear (38), second gear (38) are with the help of motor (37) and first gear (34) meshing, and logical groove (39) have been seted up on one of them U template (31) surface.
4. The pipe installation device for heating and ventilation engineering construction according to claim 2, wherein: two equal fixed mounting in surface of fly leaf (35) has two bracing pieces (4), the one end that fly leaf (35) were kept away from in bracing piece (4) is fixed mounting respectively has lower bracket (6) and punch holder (5).
5. The pipe installation device for heating and ventilation engineering construction according to claim 1, wherein: the surface of bottom plate (1) is equipped with elevating gear (7), elevating gear (7) include spout (71), the surface at bottom plate (1) is seted up in spout (71), the inside sliding connection of spout (71) has two slide (72), the one end that slide (72) kept away from spout (71) articulates there is traction rod (73), the one end that slide (72) were kept away from in traction rod (73) is articulated with support frame (2).
6. The pipe installation device for heating and ventilation engineering construction according to claim 1, wherein: two grooves (74) are formed in the side face of the bottom plate (1), a moving block (75) is connected to the inner portion of each groove (74) in a sliding mode, a connecting rod (76) is fixedly installed on the surface of each moving block (75), and one end, far away from the moving block (75), of each connecting rod (76) is fixedly connected with the sliding plate (72).
7. The pipe installation device for heating and ventilation engineering construction according to claim 1, wherein: the side face of the bottom plate (1) is fixedly provided with a fixing plate (77), the surfaces of two sides of the fixing plate (77) are fixedly provided with air cylinders (78), and the output ends of the air cylinders (78) are fixedly connected with a moving block (75).
CN202220652863.7U 2022-03-23 2022-03-23 Pipeline installation device for heating and ventilation engineering construction Expired - Fee Related CN216923453U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220652863.7U CN216923453U (en) 2022-03-23 2022-03-23 Pipeline installation device for heating and ventilation engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220652863.7U CN216923453U (en) 2022-03-23 2022-03-23 Pipeline installation device for heating and ventilation engineering construction

Publications (1)

Publication Number Publication Date
CN216923453U true CN216923453U (en) 2022-07-08

Family

ID=82229402

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220652863.7U Expired - Fee Related CN216923453U (en) 2022-03-23 2022-03-23 Pipeline installation device for heating and ventilation engineering construction

Country Status (1)

Country Link
CN (1) CN216923453U (en)

Similar Documents

Publication Publication Date Title
CN108163700B (en) Clamping device is used in a kind of tubing lifting in construction place
CN111136774B (en) Prefabricated plate maintenance is with full-automatic laminating machine
CN218255036U (en) Pipeline installation support frame
CN218503217U (en) Building material device of buckling
CN216923453U (en) Pipeline installation device for heating and ventilation engineering construction
CN109368487B (en) Anti-falling direction-adjustable gearbox hanging seat for railway forging
CN113236866A (en) Assembled pipeline bracket for municipal administration
CN214982186U (en) Chamfering device suitable for toughened glass
CN212444924U (en) Adjustable fixture for processing air conditioner liquid separator
CN109015477B (en) Automatic installation robot for agricultural plastic film greenhouse
CN111604840A (en) Clamping device is used in convertible machining convenient to adjust
CN218504341U (en) Clamp for removing tenon structure of building block
CN219967740U (en) Building ventilation pipeline mounting fixture
CN107591985B (en) Novel energy-saving speed regulation type permanent magnet magnetic coupling speed regulator
CN219493311U (en) Heating and ventilation pipeline fixing device
CN219882320U (en) Mounting bracket of heating and ventilation pipeline
CN213174644U (en) Automatic pipe clamp installation equipment in groove of building decoration construction wall surface
CN113020345A (en) Material bending device for building construction
CN220163957U (en) Conveyer is used in central air conditioning installation
CN219067655U (en) SVG reactive power compensator positioning mechanism
CN217251860U (en) Metal strip adjusting device for furnace pipe production
CN220816764U (en) Pressure pipeline laying device for town gas engineering
CN215999524U (en) Clamp for machining fastener
CN220334713U (en) Central air conditioning installs auxiliary device
CN215789712U (en) Butt joint device for installation of heating and ventilation pipeline

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220708