CN216920348U CN202220358133.6U CN202220358133U CN216920348U CN 216920348 U CN216920348 U CN 216920348U CN 202220358133 U CN202220358133 U CN 202220358133U CN 216920348 U CN216920348 U CN 216920348U
Authority
CN
China
Prior art keywords
pipe
pvc
template
rod
control device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220358133.6U
Other languages
Chinese (zh)
Inventor
黄之鸣
李海银
黄永铭
林冲
玉宏韬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN202220358133.6U priority Critical patent/CN216920348U/en
Application granted granted Critical
Publication of CN216920348U publication Critical patent/CN216920348U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a pile top elevation control device in the technical field of elevation equipment, which comprises a PVC through pipe and a rod piece, wherein the rod piece can be arranged in the PVC through pipe in a vertically sliding manner, two ends of the rod piece in the length direction are respectively provided with a template, the diameter of each template is equal to the diameter of the pipe orifice of the PVC through pipe, the pipe orifice at the bottom of the PVC through pipe is radially provided with a limiting piece, and when the template at one end of the PVC through pipe is tightly attached to the limiting piece, the template at the other end of the PVC through pipe is flush with the top of the PVC through pipe; the construction period is shortened by accurately observing the concrete pouring condition, and the waste of materials is reduced.

Description

Pile top elevation control device
Technical Field
The utility model relates to the technical field of elevation equipment, in particular to a pile top elevation control device.
Background
Along with the development of the construction industry and the trend of old urban construction, the scale of deep foundation pit engineering is rapidly enlarged and is influenced by the urban building density, the excavation space of the deep foundation pit is more and more limited, the application of supporting forms such as supporting row piles, inner supporting systems, underground continuous wall systems and the like is wider, and along with the application of the steel lattice column and the inner supporting systems, the control of the steel lattice column rotary drilling bored concrete pile empty pile section also becomes a great technical problem.
When the lattice column pile of support was pour concrete in conventional deep basal pit, because steel lattice column pile top design usually and basement elevation position underground, empty pile length is great, the underground pouring condition is difficult to control, difficult to control pile top elevation during concrete pouring, the condition that the pile top was irritated excessively can appear, need carry out the secondary and chisel, just can satisfy the requirement of design and construction, consequently, need a construction method of accurate control elevation, reduce the relevant problem because of the secondary is chiseled and is brought.
SUMMERY OF THE UTILITY MODEL
Aiming at the defects of the prior art, the utility model provides a pile top elevation control device which can observe the underground pouring condition in real time and accurately control the elevation.
The pile top elevation control device provided by the utility model comprises a PVC through pipe and a rod piece, wherein two ends of the rod piece in the length direction are respectively provided with a template, the templates are in sliding connection with the inner wall of the PVC through pipe, a pipe orifice at the first end of the PVC through pipe is radially provided with a limiting piece, and when the template at the first end of the rod piece is in contact with the limiting piece, the template at the second end of the rod piece is flush with the pipe orifice at the second end of the PVC through pipe.
By adopting the pile top elevation control device provided by the utility model, the template and the PVC through pipe are connected in a sliding manner, so that the template and the rod piece can be pushed to move upwards synchronously when the concrete liquid level rises, the concrete pouring condition is judged by the rising height of the template at the second end of the rod piece, and the accurate control of the elevation is realized.
Furthermore, a handle rod is arranged at the position close to the second end of the PVC through pipe, an annular part is connected to one side of the handle rod, and the annular part is sleeved on the outer wall of the PVC through pipe. Through setting up the barre, can with device monolithic stationary on the section of thick bamboo is protected to the outside, can keep firm constantly, do not need the manpower to support.
Further, the rod is a light rigid rod. The lightweight rigid rod piece is adopted, so that the rod piece is lightened, and the rod piece can better rise along with the liquid level of the concrete and cannot sink into the concrete.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without creative efforts.
Fig. 1 is a schematic structural view of a pile top elevation control device according to an embodiment of the present invention.
In the figure: 1-PVC through pipe; 2-a rod member; 3-template; 4-a limiting member; 5-a rod; 6-ring-shaped part.
Detailed Description
The following further describes embodiments of the present invention with reference to the drawings. It should be noted that the description of the embodiments is provided to help understanding of the present invention, but the present invention is not limited thereto. In addition, the technical features involved in the embodiments of the present invention described below may be combined with each other as long as they do not conflict with each other.
Referring to the attached drawing 1, the pile top elevation control device of the utility model is shown, which comprises a PVC through pipe 1 and a rod member 2, wherein two ends of the rod member 2 in the length direction are respectively provided with a template 3, the templates 3 are slidably connected with the inner wall of the PVC through pipe 1, a pipe orifice at the first end of the PVC through pipe is radially provided with a limiting part, and the length specifications of the rod member and the PVC through pipe 1 at least meet the following requirements: when the template at the first end of the rod piece is contacted with the limiting piece, the template at the second end of the rod piece is flush with the pipe orifice at the second end of the PVC through pipe (or slightly higher than the pipe orifice). The second end of the PVC through pipe is provided with a handle bar, one side of the handle bar is connected with an annular part, the annular part is sleeved on the outer wall of the PVC through pipe, and the pile top elevation control device can be positioned by utilizing the handle bar, if the handle bar is fixed on an external pile casing. Wherein, the rod is preferably a light rigid rod.
Specifically, in this embodiment, the PVC pipe 1 is a circular pipe, the template 3 is a circular plate, the shape of the template 3 is consistent with the shape of the pipe orifice of the PVC pipe 1, and the diameter of the template 3 is equal to (or slightly smaller than) the inner diameter of the pipe orifice of the PVC pipe 1, the inner wall of the PVC pipe 1 should be kept smooth or a lubricant should be used to reduce the friction coefficient so as to reduce the friction between the template 3 and the inner wall of the PVC pipe 1, so that the template 3 can slide up and down along the inner wall, when concrete begins to be poured, the template 3 in the device will start to rise synchronously with the rise of the concrete surface, during the use, in order to avoid the template 3 at the first end of the rod 2 falling off, the pipe orifice at the first end of the PVC pipe 1 is provided with a stopper 4 in the radial direction, during the use, the first end of the PVC pipe 1 is aligned to the area to be poured, and at the same time, for the convenience of measurement and calculation, when the template of member 2 first end and locating part 4 contact, the template 3 of member 2 second end is flushed with the second end mouth of pipe of PVC siphunculus 1 (or is a little higher than the mouth of pipe), can calculate like this and confirm that concrete placement is accomplished the face height present ground elevation (measurable) + the come-up height-device length of template 3.
In order to avoid the device to influence the use because of rocking, be close to 1 second end department of PVC siphunculus and be equipped with barre 5, one side of barre 5 is connected with annular portion 6, annular portion 6 cup joints on 1 outer wall of PVC siphunculus, has certain gap between barre 5 and the PVC siphunculus 1, before the operative installations, can be with pour the section of thick bamboo wall embedding gap of district outside protection section of thick bamboo, the device just can rely on barre 5 to fix the one side at outside protection section of thick bamboo like this.
Further, the rod member 2 is a lightweight rigid rod member, and in use, in order to prevent the rod member from falling into the concrete when the concrete surface rises, the rod member 2 must be lightweight so as to float on the concrete surface, and therefore, the rod member 2 is a lightweight rigid rod member, and similarly, the form 3 must be lightweight together, and specifically, the rod member 2 and the form 3 are made of an inorganic composite material using alkali-resistant glass fibers as a reinforcing material and thioaluminate low-alkalinity cement as a cementing material, and may be a lightweight galvanized wire pipe.
The working principle of the utility model is as follows: when the device is required to be used, the PVC through pipe 1 is placed in a region to be poured, the first end of the PVC pipe faces the region to be poured, the rod 5 is fixed on the external protection barrel, the rod 2 is longitudinally placed in the PVC through pipe 1, the template 3 close to the first end of the PVC through pipe 1 is made to contact with the limiting part 4, the template 3 at the second end of the rod 2 is flush with the pipe orifice at the second end of the PVC through pipe 1 at the moment, then pouring is conducted in the pouring region, the concrete surface rises and contacts with the template 3 at the bottom of the rod 2, the template 3 rises along with the rise of the concrete surface, the template 3 at the other end rises along with the rise of the concrete surface, the floating height of the template 3 can be obtained, and therefore the concrete pouring completion surface height, namely the current ground elevation plus the floating height of the template 3, the device length can be observed, and the elevation can be accurately controlled.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "vertical", "inside", "outside", and the like, indicate orientations or positional relationships based on those shown in the drawings, are merely for convenience of description and simplification of description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention.
The terms "first", "second" and "first" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature.
The embodiments of the present invention have been described in detail with reference to the accompanying drawings, but the present invention is not limited to the described embodiments. It will be apparent to those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, and the scope of protection is still within the scope of the utility model.

Claims (3)

1. The utility model provides a pile bolck elevation controlling means, its characterized in that, includes PVC siphunculus and member, member length direction's both ends respectively are equipped with a template, the template with the inner wall sliding connection of PVC siphunculus, the first end mouth of pipe of PVC siphunculus radially is equipped with the locating part, works as the template of the first end of member with during the locating part contact, the template of member second end with the second end mouth of pipe of PVC siphunculus flushes.
2. The pile top elevation control device according to claim 1, wherein a rod is arranged at the second end of the PVC through pipe, an annular portion is connected to one side of the rod, and the annular portion is sleeved on the outer wall of the PVC through pipe.
3. The pile top elevation control device of claim 2, wherein the rod is a lightweight rigid rod.
CN202220358133.6U 2022-02-22 2022-02-22 Pile top elevation control device Active CN216920348U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220358133.6U CN216920348U (en) 2022-02-22 2022-02-22 Pile top elevation control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220358133.6U CN216920348U (en) 2022-02-22 2022-02-22 Pile top elevation control device

Publications (1)

Publication Number Publication Date
CN216920348U true CN216920348U (en) 2022-07-08

Family

ID=82267956

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220358133.6U Active CN216920348U (en) 2022-02-22 2022-02-22 Pile top elevation control device

Country Status (1)

Country Link
CN (1) CN216920348U (en)

Similar Documents

Publication Publication Date Title
CN104747088B (en) A kind of leafy hosqe bit of cast-in-situ bored pile list waist and drilling construction method
CN103821219A (en) Top pipe construction modification inspection well construction method
CN111042185B (en) Construction method of basement raft foundation with tower crane foundation
CN113882375A (en) Anti-floating anchor rod construction process
CN106894422A (en) Complex environment deep foundation pit supporting construction method
CN109706921A (en) The double casing construction technologies of bored concrete pile
CN109778905A (en) Prefabricated assembling type reinforced concrete back block jacking box culvert construct method
CN216920348U (en) Pile top elevation control device
JP7187743B2 (en) Confirmation method of concrete pouring and construction method of concrete structure
CN202925575U (en) Pre-buried structure for core-drilling detection of foundation pile
CN108035357B (en) Filling pile construction scheme and its funnel
CN218148483U (en) Tower crane foundation structure
CN216108526U (en) Underground continuous wall structure for foundation pit support
CN114892648A (en) Construction method for upright post pile and uplift pile
CN115288136A (en) Anti-floating reinforcement cage and construction method of static pressure immersed tube cast-in-place pile
CN110714459A (en) Construction method of cast-in-situ bored pile
CN110195438B (en) Ultra-deep foundation pit construction method for foundation edge under narrow space condition
JP3808983B2 (en) Open caisson structure and its installation method
CN209353382U (en) Long screw auger drilling deposited pile stake top level measurement controller
CN112392077A (en) Method for installing inclinometer tube in inserted tubular pile of triaxial deep mixing pile
CN111335445A (en) Construction method of concrete catch basin by using steel pipe as inner mold
CN109024574B (en) Integrated joint bar concrete pile construction method is perfused in pore-creating
CN209990027U (en) Floor thickness controller
CN114837213A (en) Tower crane foundation structure and construction method thereof
CN211571695U (en) Fabricated precast pile suitable for cast-in-situ bored pile construction

Legal Events

Date Code Title Description
GR01 Patent grant