CN109778905A - Prefabricated assembling type reinforced concrete back block jacking box culvert construct method - Google Patents

Prefabricated assembling type reinforced concrete back block jacking box culvert construct method Download PDF

Info

Publication number
CN109778905A
CN109778905A CN201910008680.4A CN201910008680A CN109778905A CN 109778905 A CN109778905 A CN 109778905A CN 201910008680 A CN201910008680 A CN 201910008680A CN 109778905 A CN109778905 A CN 109778905A
Authority
CN
China
Prior art keywords
box culvert
back block
concrete back
armored concrete
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910008680.4A
Other languages
Chinese (zh)
Inventor
李吉先
李健源
章继树
张日锦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Nanning Survey and Design Institute Co Ltd of China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Nanning Survey and Design Institute Co Ltd of China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd, Nanning Survey and Design Institute Co Ltd of China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201910008680.4A priority Critical patent/CN109778905A/en
Publication of CN109778905A publication Critical patent/CN109778905A/en
Pending legal-status Critical Current

Links

Abstract

The present invention relates to Framed underpass bridge technical field of construction, provide a kind of prefabricated assembling type reinforced concrete back block jacking box culvert construct method, comprising: prefabricated box culvert and distribution beam on armored concrete slide plate;Prefabricated armored concrete back block is mounted on the side of the distribution beam, and the armored concrete back block is abutted with the distribution beam;Box culvert advancing dynamical system is installed between the box culvert and distribution beam, by the box culvert advancing dynamical system the box culvert advancing to installation position.The prefabricated assembling type reinforced concrete back block jacking box culvert construct method, using prefabricated armored concrete back block jacking construction, construction technology is simple, and armored concrete back block structure is secured, can be recycled, will shorten the construction period, and reduce project cost.

Description

Prefabricated assembling type reinforced concrete back block jacking box culvert construct method
Technical field
The present invention relates to Framed underpass bridge technical field of construction, after a kind of prefabricated assembling type reinforced concrete Carry on the back block jacking box culvert construct method.
Background technique
Framed underpass bridge back form mainly uses mortar flag stone back, rail pile back and caisson back at present. Wherein mortar flag stone back quantity of masonry is larger, is only applicable to need to push up the lesser jacking of power;Rail pile back is beaten, pulls out the rail duration It is long, and it is not suitable for boulder bed;Caisson back hand excavation is long in time limit, and cost is relatively high.
Also, building the underground street crossing pedestrian passage construction method best in the case where not influencing traffic is using box culvert Jacking construction.However box culvert advancing is relatively high to the intensity requirement of rear parados, it must be able to bear the maximum top in jack-in process Power, natural back are optimal selections, but if under conditions of not natural back and when maximum top power it is larger when, It builds general back and not only takes up an area larger, but also compare material of taking a lot of work, and be not necessarily able to satisfy in jack-in process maximum top power Requirement, such jacking work is just difficult to carry out.
Summary of the invention
(1) technical problems to be solved
The object of the present invention is to provide a kind of prefabricated assembling type reinforced concrete back block jacking box culvert construct methods, it is intended to It solves at least one of the technical problems existing in the prior art or related technologies.
(2) technical solution
In order to solve the above technical problem, the present invention provides a kind of prefabricated assembling type reinforced concrete back block jacking box culverts Construction method, comprising: prefabricated box culvert and distribution beam on armored concrete slide plate;
Prefabricated armored concrete back block is mounted on the side of the distribution beam, and the armored concrete back block It is abutted with the distribution beam;
Box culvert advancing dynamical system is installed between the box culvert and distribution beam, the box culvert advancing dynamical system is passed through The box culvert advancing to installation position.
Wherein, the inside of the armored concrete back block is embedded with reinforcing bar and steel pipe;The armored concrete back The reinforcing bar of block protrudes into the steel pipe of the adjacent armored concrete back block to be assembled into armored concrete back Block combination is mounted on armored concrete back block combination at the side of the distribution beam, and the armored concrete back Block combination is abutted with the distribution beam.
Wherein, after the armored concrete back block being mounted on the side of the distribution beam, in the reinforced concrete Earth filling tamping between native back block and the inner wall for the foundation pit that works.
Wherein, three oily two felt sliding layers are provided on the armored concrete slide plate.
Wherein, guiding pier is provided on the armored concrete slide plate, the guiding pier is along the jacking direction of the box culvert Setting, the box culvert is between the guiding pier.
Wherein, the bottom of the armored concrete slide plate is provided with the reinforced concrete anchor beam arranged vertically.
Wherein, the bottom of the armored concrete slide plate is provided with blotter.
Wherein, steel plate is installed between the box culvert advancing dynamical system and the distribution beam.
(3) beneficial effect
Compared with prior art, the invention has the following advantages that
A kind of prefabricated assembling type reinforced concrete back block jacking box culvert construct method provided by the invention, in reinforced concrete Prefabricated box culvert and distribution beam on native slide plate;Prefabricated armored concrete back block is mounted on the side of distribution beam, and reinforcing bar Concrete back block is abutted with distribution beam;Box culvert advancing dynamical system is installed between box culvert and distribution beam, box culvert top is passed through Precession Force system is box culvert advancing to installation position.Using prefabricated armored concrete back block jacking construction, construction technology is simple, Armored concrete back block structure is secured, can be recycled, will shorten the construction period, and reduce project cost.
Detailed description of the invention
Fig. 1 is a kind of process of prefabricated assembling type reinforced concrete back block jacking box culvert construct method of the embodiment of the present invention Figure;
Fig. 2 is the steel in a kind of prefabricated assembling type reinforced concrete back block jacking box culvert construct method of the embodiment of the present invention The schematic view of the mounting position of reinforced concrete back block;
Fig. 3 is reinforcing bar in a kind of prefabricated assembling type reinforced concrete back block jacking box culvert construct method of the embodiment of the present invention The structural schematic diagram of concrete back block;
Fig. 4 is reinforcing bar in a kind of prefabricated assembling type reinforced concrete back block jacking box culvert construct method of the embodiment of the present invention The structural schematic diagram of concrete back block combination;
Description of symbols:
1, armored concrete back block;2, distribution beam;3, armored concrete slide plate;4, reinforced concrete anchor beam;5, blotter; 6, terrestrial reference line;7, work foundation pit;8, box culvert;9, soil horizon;10, reinforcing bar;11, steel bar stress;12, steel pipe.
Specific embodiment
With reference to the accompanying drawings and examples, specific embodiments of the present invention will be described in further detail.Following instance For illustrating the present invention, but it is not intended to limit the scope of the invention.
In the description of the present invention, it is to be understood that, term " center ", " longitudinal direction ", " transverse direction ", " length ", " width ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside", " up time The orientation or positional relationship of the instructions such as needle ", " counterclockwise ", " axial direction ", " radial direction ", " circumferential direction " be orientation based on the figure or Positional relationship is merely for convenience of description of the present invention and simplification of the description, rather than the device or element of indication or suggestion meaning must There must be specific orientation, be constructed and operated in a specific orientation, therefore be not considered as limiting the invention.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include at least one this feature.In the description of the present invention, the meaning of " plurality " is at least two, such as two, three It is a etc., unless otherwise specifically defined.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " fixation " etc. Term shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral;It can be mechanical connect It connects, is also possible to be electrically connected or can communicate each other;It can be directly connected, can also indirectly connected through an intermediary, it can be with It is the interaction relationship of the connection or two elements inside two elements, unless otherwise restricted clearly.For this field For those of ordinary skill, the specific meanings of the above terms in the present invention can be understood according to specific conditions.
Fig. 1 is a kind of process of prefabricated assembling type reinforced concrete back block jacking box culvert construct method of the embodiment of the present invention Figure, as shown in Figure 1, prefabricated assembling type reinforced concrete back block jacking box culvert construct method provided in an embodiment of the present invention, packet It includes:
S101, prefabricated box culvert and distribution beam on armored concrete slide plate;
Work foundation pit 7 is excavated, in work 7 the inside pouring reinforcement concrete slide plate 3 of foundation pit, the length of armored concrete slide plate 3 Degree, thickness and width need to be configured according to practical calculate, and are not especially limited in embodiments of the present invention.It is pouring At armored concrete slide plate 3 on prefabricated box culvert 8 and distribution beam 2, be spaced a distance between box culvert and distribution beam 2.
S201 is mounted on prefabricated armored concrete back block 1 side of distribution beam 2, and armored concrete back block 1 It is abutted with distribution beam 2;
Prefabricated armored concrete back block makes different sizes in combination with different top power demand.Reinforced concrete when construction Native back block is assembled using hanging device, substantially reduces difficulty of construction, and armored concrete back block is stronger, mentions High construction efficiency, has a good application prospect.
S301 is installed on box culvert advancing dynamical system between box culvert 8 and distribution beam 2, passes through box culvert advancing dynamical system 8 jacking of box culvert to installation position.
Wherein, box culvert advancing dynamical system includes oil pump control platform, jack and load transfer device.Box culvert advancing is maximum pre- The calculation method of power is: P=k [N1f1+ (N1+N2) f2+2Ef3+RA];
In formula: P-maximum pushes up power, unit T;
Load on N1-bridges and culverts top surface, unit T;
The coefficient of friction of f1-bridges and culverts top surface and load thereon, applying paraffin wax is 0.17~0.34, powder coating 0.30;
N2-bridges and culverts gravity, T;
F2-bridges and culverts bottom surface and base soil coefficient of friction, take 0.7~0.8;
Two lateral earth pressure of E-bridges and culverts, T;
F3-side coefficient of friction;
The positive unit area resistance of R-steel in soil basil, fine grained soil be 500~550kPa, coarse-grained soil be 1500~ 1700kPa;
A-positive the area of the steel basil, m2
K-coefficient, generally with 1.2.
In embodiments of the present invention, prefabricated box culvert and distribution beam on armored concrete slide plate;Prefabricated reinforcing bar is mixed Solidifying soil back block is mounted on the side of distribution beam, and armored concrete back block is abutted with distribution beam;Box culvert advancing dynamical system System is installed between box culvert and distribution beam, by box culvert advancing dynamical system box culvert advancing to installation position.Using prefabricated steel Reinforced concrete back block jacking construction, construction technology is simple, and armored concrete back block structure is secured, can be recycled, will contract The short construction period, and reduce project cost.
In a specific embodiment, as shown in Figure 2, Figure 3 and Figure 4, the inside of armored concrete back block 1 is embedded with Reinforcing bar 10 and steel pipe 12;The reinforcing bar 10 of armored concrete back block 1 is protruded into the steel pipe 12 of adjacent armored concrete back block 1 In to be assembled into the combination of armored concrete back block, the combination of armored concrete back block is mounted on the side of distribution beam 2, and steel The combination of reinforced concrete back block is abutted with distribution beam 2.
In embodiments of the present invention, prefabricated armored concrete back block makes different rulers in combination with different top power demand It is very little.Steel bar stress 11 is provided in armored concrete back block 1 to improve the intensity of structure, while can be multiple reinforced concretes Native back block is assembled into an armored concrete back block combination.Below two armored concrete back blocks are assembled into one It is illustrated for the combination of armored concrete back block.The reinforcing bar 10 of first armored concrete back block 1 is protruded into second In the steel pipe 12 of armored concrete back block 1, the reinforcing bar 10 of second armored concrete back block 1 protrudes into first reinforced concrete In the steel pipe 12 of native back block 1, an armored concrete back block combination assembly is completed at this time.
In a specific embodiment, as shown in Fig. 2, armored concrete back block 1 is mounted on the side of distribution beam 2 Later, the earth filling tamping between armored concrete back block 1 and the inner wall for the foundation pit 7 that works.
In embodiments of the present invention, reasonable 1 size of armored concrete back block is designed and the soil horizon 9 to be formed that bankets Highly, make jack top power axis and 1 pressure resultant force position of armored concrete back block substantially in sustained height, avoid reinforcing bar Concrete back block 1 topples.
In a specific embodiment, three oily two felt sliding layers are provided on armored concrete slide plate 3.
In embodiments of the present invention, the oily two felt sliding layers of setting three on the armored concrete slide plate 3 for pour completion, later The prefabricated box culvert 8 on three oily two felt sliding layers again.Box culvert 8 and armored concrete can be reduced by the oily two felt sliding layers of setting three Frictional force between slide plate 3.
In a specific embodiment, it is provided with guiding pier on armored concrete slide plate 3, is oriented to pier along the top of box culvert 8 It is arranged into direction, box culvert 8 is located between guiding pier.
In embodiments of the present invention, by being provided with two rows of guiding piers on armored concrete slide plate 3, to ensure that box culvert 8 pushes up Into not being subjected to displacement in the process.And box culvert 8 is located between two rows of guiding piers.
In a specific embodiment, the bottom of armored concrete slide plate 3 is provided with the reinforced concrete anchor beam arranged vertically 4。
In embodiments of the present invention, the bottom of armored concrete slide plate 3 is provided with the reinforced concrete anchor beam 4 arranged vertically, energy Frictional resistance between enough enhancings and the soil body.More reinforced concrete anchor beams 4 are arranged at equal intervals along the jacking direction along box culvert 8.
In a specific embodiment, the bottom of armored concrete slide plate 3 is provided with blotter 5.
In embodiments of the present invention, the bottom of armored concrete slide plate 3 is provided with blotter 5, can enhance and the soil body Between frictional resistance.
In a specific embodiment, steel plate is installed between box culvert advancing dynamical system and distribution beam 2.
In embodiments of the present invention, steel plate is set between jack and distribution beam 2, top power is evenly transferred to reinforcing bar and is mixed Solidifying soil back block 1, avoids distribution beam from being led to the concrete cracking of distribution beam by concentrated force effect.
Prefabricated assembling type reinforced concrete back block jacking box culvert construct method provided in an embodiment of the present invention, including excavate Work foundation pit 7, and work foundation pit is located at terrestrial reference line 6 hereinafter, in work 7 the inside pouring reinforcement concrete slide plate 3 of foundation pit, in steel Prefabricated box culvert 8 and distribution beam 2 on reinforced concrete slide plate 3;The armored concrete back block combination assembled is mounted on distribution The side of beam 2, and the combination of armored concrete back block is abutted with distribution beam 2;Box culvert advancing dynamical system is installed on 8 He of box culvert Between distribution beam 2, by box culvert advancing dynamical system 8 jacking of box culvert to installation position.Using prefabricated armored concrete back Block jacking construction, construction technology is simple, and armored concrete back block structure is secured, can be recycled, will shorten the construction period, and Reduce project cost.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (8)

1. a kind of prefabricated assembling type reinforced concrete back block jacking box culvert construct method characterized by comprising mixed in reinforcing bar Prefabricated box culvert and distribution beam on solidifying soil slide plate;
Prefabricated armored concrete back block is mounted on the side of the distribution beam, and the armored concrete back block and institute State distribution beam abutting;
Box culvert advancing dynamical system is installed between the box culvert and distribution beam, by the box culvert advancing dynamical system institute Box culvert advancing is stated to installation position.
2. prefabricated assembling type reinforced concrete back block jacking box culvert construct method as described in claim 1, which is characterized in that The inside of the armored concrete back block is embedded with reinforcing bar and steel pipe;The reinforcing bar of the armored concrete back block is stretched Enter to be assembled into the combination of armored concrete back block in the steel pipe of the adjacent armored concrete back block, the steel Reinforced concrete back block combines the side for being mounted on the distribution beam, and armored concrete back block combination and the distribution Beam abuts.
3. prefabricated assembling type reinforced concrete back block jacking box culvert construct method as described in claim 1, which is characterized in that After the armored concrete back block is mounted on the side of the distribution beam, in the armored concrete back block and work Earth filling tamping between the inner wall of foundation pit.
4. prefabricated assembling type reinforced concrete back block jacking box culvert construct method as described in claim 1, which is characterized in that Three oily two felt sliding layers are provided on the armored concrete slide plate.
5. prefabricated assembling type reinforced concrete back block jacking box culvert construct method as described in claim 1, which is characterized in that Guiding pier is provided on the armored concrete slide plate, the guiding pier is arranged along the jacking direction of the box culvert, the box culvert Between the guiding pier.
6. prefabricated assembling type reinforced concrete back block jacking box culvert construct method as described in claim 1, which is characterized in that The bottom of the armored concrete slide plate is provided with the reinforced concrete anchor beam arranged vertically.
7. prefabricated assembling type reinforced concrete back block jacking box culvert construct method as described in claim 1, which is characterized in that The bottom of the armored concrete slide plate is provided with blotter.
8. prefabricated assembling type reinforced concrete back block jacking box culvert construct method as described in claim 1, which is characterized in that Steel plate is installed between the box culvert advancing dynamical system and the distribution beam.
CN201910008680.4A 2019-01-04 2019-01-04 Prefabricated assembling type reinforced concrete back block jacking box culvert construct method Pending CN109778905A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910008680.4A CN109778905A (en) 2019-01-04 2019-01-04 Prefabricated assembling type reinforced concrete back block jacking box culvert construct method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910008680.4A CN109778905A (en) 2019-01-04 2019-01-04 Prefabricated assembling type reinforced concrete back block jacking box culvert construct method

Publications (1)

Publication Number Publication Date
CN109778905A true CN109778905A (en) 2019-05-21

Family

ID=66499249

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910008680.4A Pending CN109778905A (en) 2019-01-04 2019-01-04 Prefabricated assembling type reinforced concrete back block jacking box culvert construct method

Country Status (1)

Country Link
CN (1) CN109778905A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110241744A (en) * 2019-06-18 2019-09-17 中国十七冶集团有限公司 The construction method of jacking frame box culvert is worn under a kind of railway
CN111041995A (en) * 2019-12-30 2020-04-21 中铁六局集团天津铁路建设有限公司 Construction method for U-shaped frame structure to penetrate high-speed rail bridge obliquely downwards
CN111305074A (en) * 2020-03-23 2020-06-19 中铁七局集团郑州工程有限公司 Construction method for integrally dropping jacking box bridge with upward floating exceeding standard
CN114808735A (en) * 2022-05-20 2022-07-29 中铁建大桥工程局集团第四工程有限公司 Jacking construction control method for frame-structure bridge

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100538272B1 (en) * 2005-05-10 2005-12-21 건양씨엔이 (주) The methods of trenchless underway construction using pre-cast assembly concrete box
CN104695343A (en) * 2015-01-19 2015-06-10 中铁三局集团有限公司 Long-distance jacking construction method based on back wall pushing technology
CN106015824A (en) * 2016-07-05 2016-10-12 长江勘测规划设计研究有限责任公司 Hydrostatic test plugging device and method for prestressed concrete cylinder pipe

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100538272B1 (en) * 2005-05-10 2005-12-21 건양씨엔이 (주) The methods of trenchless underway construction using pre-cast assembly concrete box
CN104695343A (en) * 2015-01-19 2015-06-10 中铁三局集团有限公司 Long-distance jacking construction method based on back wall pushing technology
CN106015824A (en) * 2016-07-05 2016-10-12 长江勘测规划设计研究有限责任公司 Hydrostatic test plugging device and method for prestressed concrete cylinder pipe

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
中国建筑技术发展中心市政技术情报部: "《城市立体交叉设计实例1986》", 31 December 1986 *
程海维: "铁路箱涵顶进施工技术探讨", 《内蒙古公路与运输》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110241744A (en) * 2019-06-18 2019-09-17 中国十七冶集团有限公司 The construction method of jacking frame box culvert is worn under a kind of railway
CN111041995A (en) * 2019-12-30 2020-04-21 中铁六局集团天津铁路建设有限公司 Construction method for U-shaped frame structure to penetrate high-speed rail bridge obliquely downwards
CN111041995B (en) * 2019-12-30 2021-06-25 中铁六局集团天津铁路建设有限公司 Construction method for U-shaped frame structure to penetrate high-speed rail bridge obliquely downwards
CN111305074A (en) * 2020-03-23 2020-06-19 中铁七局集团郑州工程有限公司 Construction method for integrally dropping jacking box bridge with upward floating exceeding standard
CN114808735A (en) * 2022-05-20 2022-07-29 中铁建大桥工程局集团第四工程有限公司 Jacking construction control method for frame-structure bridge
CN114808735B (en) * 2022-05-20 2023-09-12 中铁建大桥工程局集团第四工程有限公司 Frame bridge jacking construction control method

Similar Documents

Publication Publication Date Title
CN109778905A (en) Prefabricated assembling type reinforced concrete back block jacking box culvert construct method
CN105696622B (en) A kind of prefabricated city piping lane and its construction method
US20190127941A1 (en) Sheet pile retaining wall system
CN103821060B (en) A kind of construction method of existing highway soft foundation Treating technology
CN109914472B (en) Soft soil area assembled comprehensive pipe gallery and construction method thereof
CN105648892A (en) Arch bridge structure adopting foam concrete and corrugated steel sheets and construction method of arch bridge structure
CN104631440B (en) A kind of existing large-section in-situ concrete pile strength core increases foundation pit supporting construction and constructional method
CN102277880A (en) Large-sized box jacking control construction method capable of enhancing accuracy
CN105953078A (en) Protection device and protection method of high-pressure gas pipeline
CN111456081A (en) Pile foundation retaining wall structure and construction method
CN109778903B (en) Detachable assembly type reinforced concrete retaining wall structure and construction method
CN107090848A (en) A kind of ripple steel arch retaining wall
Gil-Martín et al. Developments in excavation bracing systems
CN103711139A (en) Semi-rigid connection structure between pile foundation and bearing platform
CN108385693B (en) Equal-generation anchor bolt supporting method and system for staged basement supporting
CN112879026A (en) Temporary backrest support structure for rectangular pipe jacking construction and construction method thereof
CN111021378A (en) Highway subgrade slope broken line type anchoring pile retaining structure and construction method thereof
CN215801560U (en) Steel sheet pile and soil cement mixing pile wall combination supporting construction
CN213016369U (en) Transverse elliptical deformation resistant shield tunnel reinforcing structure with embedded steel plates
CN108755758A (en) The construction method of full prefabrication and assembly construction superposed type empty stomach wallboard underground pipe gallery
CN104532787B (en) A kind of high-piled slab & girder wharf rear connects the gear indigenous method of bank
CN211447265U (en) Laminated plate type edge member and solid shear wall horizontal connection structure
CN206902721U (en) A kind of foundation pit supporting system
CN106120853A (en) A kind of inverted construction method of frame bridge
CN202280053U (en) Construction equipment of energy-saving pressure distributive cemented soil anti-floating pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190521

RJ01 Rejection of invention patent application after publication