CN216880968U - Engineering construction waste collection device - Google Patents

Engineering construction waste collection device Download PDF

Info

Publication number
CN216880968U
CN216880968U CN202220078874.9U CN202220078874U CN216880968U CN 216880968 U CN216880968 U CN 216880968U CN 202220078874 U CN202220078874 U CN 202220078874U CN 216880968 U CN216880968 U CN 216880968U
Authority
CN
China
Prior art keywords
fixedly connected
motor
working box
construction waste
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220078874.9U
Other languages
Chinese (zh)
Inventor
邵奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Shengchen Construction Group Co ltd
Original Assignee
Liaoning Shengchen Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Shengchen Construction Group Co ltd filed Critical Liaoning Shengchen Construction Group Co ltd
Priority to CN202220078874.9U priority Critical patent/CN216880968U/en
Application granted granted Critical
Publication of CN216880968U publication Critical patent/CN216880968U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/58Construction or demolition [C&D] waste

Landscapes

  • Disintegrating Or Milling (AREA)

Abstract

The utility model relates to the technical field of engineering construction waste collection, and particularly discloses an engineering construction waste collection device which comprises a working box, wherein the bottom of the inner wall of the working box is slidably connected with a material receiving drawer, two first crushing rollers are rotatably connected to the positions, close to the center, in the working box, the top of the working box is fixedly connected with a stirring barrel, the top of a connecting rod is rotatably connected with a stirring rod, the bottom of the connecting rod is fixedly connected with a first motor, the center of the bottom of a top plate is fixedly connected with an electromagnet, the left side and the right side of the working box are both fixedly connected with a feeding frame, the inner part of the feeding frame is rotatably connected with two second crushing rollers, the inner part of the first connecting frame is rotatably connected with two first gears, and the inner part of the second connecting frame is rotatably connected with two second gears; the utility model can separate the recyclable waste such as waste iron from the construction waste, and can crush the construction waste with small volume which is difficult to crush.

Description

Engineering construction waste collection device
Technical Field
The utility model relates to the technical field of engineering construction waste collection, in particular to an engineering construction waste collection device.
Background
The society is developing, the era is advancing, for the convenience of people's life and trip, improve people's quality of life, various building engineering and infrastructure are all in the process of closely densely laying, can produce a large amount of engineering building waste in the in-process of carrying out the infrastructure, these wastes can cause the pollution to the environment if placing regardless of, therefore need after the engineering is accomplished, collect the waste material, current waste material collection mode is mainly to carry out innocent treatment after grinding the waste material, but still contain a large amount of recoverable waste materials such as scrap iron in the building waste material, current collection device can't separate recoverable waste materials such as scrap iron from the building waste material before grinding the building waste material and collecting, some waste materials that the volume is less in the building waste material simultaneously, and current collection device is difficult to grind the waste material that the volume is less.
SUMMERY OF THE UTILITY MODEL
Aiming at the defects of the prior art, the utility model provides an engineering construction waste collecting device which has the advantages that recyclable waste materials such as waste iron and the like can be separated from construction waste materials, the waste materials with smaller volume can be crushed and the like, and the problems that the recyclable waste materials such as waste iron and the like cannot be separated from the construction waste materials and the waste materials with smaller volume are difficult to crush are solved.
The engineering and building waste collecting device comprises a working box, wherein the bottom of the inner wall of the working box is slidably connected with a material receiving drawer, two first grinding rollers are rotatably connected at the position in the working box and close to the center, the top of the working box is fixedly connected with a stirring barrel, the inner part of the stirring barrel is fixedly connected with a connecting rod, the left side and the right side of the inner wall of the stirring barrel are fixedly connected with electric rotating shafts, one side of each electric rotating shaft, close to the center of the stirring barrel, is fixedly connected with a partition plate, the top of the connecting rod is rotatably connected with a stirring rod, the bottom of the connecting rod is fixedly connected with a first motor, the positions at the top of the working box and close to the left side and the right side are fixedly connected with electric telescopic rods, the top of each electric telescopic rod is fixedly connected with a top plate, the center at the bottom of the top plate is fixedly connected with an electromagnet, and the left side and the right side of the working box are fixedly connected with a material feeding frame, the bottom fixedly connected with inlet pipe of feeding frame, the inside of feeding frame is rotated and is connected with two seconds and pulverizes the cylinder, the first connection frame of positive fixedly connected with of work box, the inside of first connection frame is rotated and is connected with intermeshing between two first gears and two first gears, the positive fixedly connected with second connection frame of feeding frame, the inside of second connection frame is rotated and is connected with intermeshing between two second gears and two second gears.
According to the engineering and building waste collection device, the front face of the material receiving drawer penetrates through the front face of the working box, the material guide plates are fixedly connected to the positions, close to the top, of the left side and the right side of the inner wall of the working box, the shape and the structure of the front face of each material guide plate are triangular, and the material guide plates are arranged in a structure mode, so that building waste entering the working box can move to the centers of the two first grinding rollers under the action of the material guide plates, and the building waste can be ground better.
According to the engineering construction waste collecting device, the top of the first motor output shaft penetrates through the top of the connecting rod, the top of the first motor output shaft is fixedly connected to the bottom of the stirring rod, and the structure is arranged, so that the first motor can drive the stirring rod to rotate in the stirring barrel, and construction waste in the stirring barrel is stirred.
The engineering and building waste collection device comprises a first grinding roller, a second grinding roller, a working box, a second connecting frame, a second motor, a first motor, a second motor, a first motor output shaft, a second motor, a first motor, a second motor output shaft, a first gear, a second motor, a second grinding roller and a second grinding roller.
The engineering and building waste collection device is characterized in that the back surface of a second gear penetrates through the front surface of the feeding frame and is fixedly connected with the front surface of the second grinding roller, the front surface of the second connecting frame is fixedly connected with a third motor, the back surface of an output shaft of the third motor penetrates through the front surface of the second connecting frame and is fixedly connected with the front surface of the second gear arranged on the right side of the second connecting frame, the bottom end of the feeding pipe penetrates through the surface of the working box and is positioned inside the working box, and the structure is arranged so that the third motor can drive the second gear to rotate inside the second connecting frame, and the second grinding roller is driven to rotate by the second gear.
According to the engineering and building waste collection device, the storage battery is fixedly connected to the top of the top plate and is electrically connected with the electric telescopic rod, the electromagnet, the first motor, the second motor and the third motor respectively, and the electric telescopic rod, the electromagnet, the first motor, the second motor and the third motor can work normally due to the structural arrangement.
Compared with the prior art, the utility model has the following beneficial effects:
according to the utility model, the top plate and the electromagnet can be driven by the electric telescopic rod to move downwards by matching with the electromagnet and the stirring barrel in the process of stirring the construction waste in the stirring barrel, so that the electromagnet is close to the construction waste in the stirring barrel, the recyclable waste such as waste iron in the construction waste in the stirring barrel is separated from the interior of the construction waste by using the electromagnet, and the construction waste with smaller volume can be crushed under the action of the second crushing roller in the feeding frame by matching with the second connecting frame, the second gear and the third motor through the arranged feeding frame and the second crushing roller, so that the problem that the construction waste with smaller volume is difficult to crush is solved.
Drawings
The accompanying drawings, which are included to provide a further understanding of the application and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the application and together with the description serve to explain the application and not to limit the application. In the drawings:
FIG. 1 is a schematic cross-sectional front view of the present invention;
FIG. 2 is a schematic front sectional view of the first connection frame and the second connection frame of the present invention;
FIG. 3 is a schematic front view of the present invention;
FIG. 4 is a schematic top view of the mixing tank of the present invention.
In the figure: 1. a work box; 11. a material receiving drawer; 2. a first grinding drum; 21. a material guide plate; 3. a stirring barrel; 31. a connecting rod; 4. an electric rotating shaft; 41. a partition plate; 5. a stirring rod; 51. a first motor; 6. an electric telescopic rod; 61. a top plate; 62. an electromagnet; 63. a battery; 7. a feeding frame; 71. a feeding pipe; 72. a second grinding drum; 8. a first connection frame; 81. a first gear; 82. a second motor; 9. a second connection frame; 91. a second gear; 92. a third motor.
Detailed Description
In the following description, for purposes of explanation, numerous implementation details are set forth in order to provide a thorough understanding of the various embodiments of the present invention. It should be understood, however, that these implementation details are not to be interpreted as limiting the utility model. That is, in some embodiments of the utility model, such implementation details are not necessary. In addition, some conventional structures and components are shown in simplified schematic form in the drawings.
In addition, the descriptions related to the first, the second, etc. in the present invention are only used for description purposes, do not particularly refer to an order or sequence, and do not limit the present invention, but only distinguish components or operations described in the same technical terms, and are not understood to indicate or imply relative importance or implicitly indicate the number of indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include at least one such feature. In addition, technical solutions between various embodiments may be combined with each other, but must be realized by a person skilled in the art, and when the technical solutions are contradictory or cannot be realized, such a combination should not be considered to exist, and is not within the protection scope of the present invention.
Referring to fig. 1-4, the engineering and construction waste collecting device of the present invention comprises a working box 1, a material receiving drawer 11 is slidably connected to the bottom of the inner wall of the working box 1, two first grinding rollers 2 are rotatably connected to the inner part of the working box 1 near the center, a stirring barrel 3 is fixedly connected to the top of the working box 1, a connecting rod 31 is fixedly connected to the inner part of the stirring barrel 3, electric rotating shafts 4 are fixedly connected to the left and right sides of the inner wall of the stirring barrel 3, a partition plate 41 is fixedly connected to one side of the electric rotating shaft 4 near the center of the stirring barrel 3, a stirring rod 5 is rotatably connected to the top of the connecting rod 31, a first motor 51 is fixedly connected to the bottom of the connecting rod 31, electric telescopic rods 6 are fixedly connected to the top of the working box 1 near the left and right sides, a top plate 61 is fixedly connected to the top of the electric telescopic rods 6, and an electromagnet 62 is fixedly connected to the center of the bottom of the top plate 61, the equal fixedly connected with feeding frame 7 in the left and right sides of work box 1, the bottom fixedly connected with inlet pipe 71 of feeding frame 7, the internal rotation of feeding frame 7 is connected with two seconds and pulverizes cylinder 72, the first linking frame 8 of positive fixedly connected with of work box 1, the internal rotation of first linking frame 8 is connected with two first gears 81 and intermeshing between two first gears 81, the positive fixedly connected with second linking frame 9 of feeding frame 7, the internal rotation of second linking frame 9 is connected with intermeshing between two second gears 91 and two second gears 91.
Receive the front of material drawer 11 and run through in the front of work box 1, the equal fixedly connected with stock guide 21 in the position department of both sides and being close to the top about the inner wall of work box 1, the positive shape structure of stock guide 21 is triangle-shaped, and this structure sets up for the building waste who gets into in the work box 1 can move two first central authorities that pulverize cylinder 2 under the effect of stock guide 21, thereby makes that building waste can be better pulverize.
The top of first motor 51 output shaft runs through the top of connecting rod 31, and the top fixed connection of first motor 51 output shaft is in the bottom of puddler 5, and this structure sets up for first motor 51 can drive puddler 5 and rotate in the inside of agitator 3, thereby stirs the construction waste in the agitator 3.
The back of the first gear 81 runs through the front of the working box 1 and is fixedly connected with the front of the first grinding roller 2, the front of the first connecting frame 8 is fixedly connected with the second motor 82, the back of the output shaft of the second motor 82 runs through the front of the first connecting frame 8 and is fixedly connected with the front of the first gear 81 arranged on the right side of the first connecting frame 8, and the structure is arranged, so that the second motor 82 can drive the first gear 81 to rotate inside the first connecting frame 8, and the first gear 81 is utilized to drive the first grinding roller 2 to rotate.
The back of the second gear 91 penetrates the front of the feeding frame 7 and is fixedly connected with the front of the second grinding roller 72, the front of the second connecting frame 9 is fixedly connected with a third motor 92, the back of the output shaft of the third motor 92 penetrates the front of the second connecting frame 9 and is fixedly connected with the front of the second gear 91 arranged on the right side of the second connecting frame 9, the bottom end of the feeding pipe 71 penetrates the surface of the work box 1 and is positioned inside the work box 1, and the structure is arranged, so that the third motor 92 can drive the second gear 91 to rotate inside the second connecting frame 9, and the second gear 91 is utilized to drive the second grinding roller 72 to rotate.
The top fixedly connected with battery 63 of roof 61, battery 63 respectively with electric telescopic handle 6, electro-magnet 62, first motor 51, second motor 82 and third motor 92 between electric connection, this structure setting for electric telescopic handle 6, electro-magnet 62, first motor 51, second motor 82 and third motor 92 can normally work.
In the use of the utility model: the working personnel firstly put the construction waste with larger volume into the stirring barrel 3, then start the first motor 51, utilize the first motor 51 to drive the stirring rod 5 to rotate, thereby utilize the stirring rod 5 to stir the construction waste with larger volume in the stirring barrel 3, simultaneously start the electric telescopic rod 6, utilize the electric telescopic rod 6 to drive the top plate 61 and the electromagnet 62 to move downwards, make the electromagnet 62 be close to the construction waste with larger volume in the stirring barrel 3, then start the electromagnet 62, thereby utilize the electromagnet 62 to adsorb the recyclable waste such as the scrap iron doped in the construction waste in the stirring barrel 3, thereby separate the recyclable waste such as the scrap iron from the construction waste in the stirring barrel 3, then start the electric rotating shaft 4, make the rotating shaft drive the partition plate 41 to rotate towards the inside of the working box 1, thereby make the construction waste in the stirring barrel 3 fall into the working box 1, and simultaneously open the second motor 82, the second motor 82 is used to drive the first gear 81 to rotate, the first grinding roller 2 is driven by the first gear 81 to rotate, the construction waste falling into the working box 1 is ground, the ground construction waste can fall into the collection drawer to be collected, the construction waste with smaller volume which cannot be ground by the first grinding roller 2 only needs to be poured into the feeding frame 7, the third motor 92 is started, the third motor 92 is used to drive the second gear 91 to rotate, the third gear drives the second grinding roller 72, and the volume of the second grinding roller 72 is smaller than that of the first grinding roller 2, so that the smaller construction waste can be ground by the second grinding roller 72, and the ground smaller construction waste can finally enter the collection drawer 11 to be collected through the feeding pipe 71.
The above description is only an embodiment of the present invention, and is not intended to limit the present invention. Various modifications and alterations to this invention will become apparent to those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the scope of the claims of the present invention.

Claims (6)

1. The utility model provides an engineering construction waste collection device, includes work box (1), its characterized in that: the material collecting device is characterized in that a material collecting drawer (11) is connected to the bottom of the inner wall of the working box (1) in a sliding manner, two first grinding rollers (2) are connected to the position, close to the center, inside the working box (1) in a rotating manner, a stirring barrel (3) is fixedly connected to the top of the working box (1), a connecting rod (31) is fixedly connected to the inside of the stirring barrel (3), electric rotating shafts (4) are fixedly connected to the left side and the right side of the inner wall of the stirring barrel (3), a partition plate (41) is fixedly connected to one side, close to the center of the stirring barrel (3), of each electric rotating shaft (4), a stirring rod (5) is rotatably connected to the top of each connecting rod (31), a first motor (51) is fixedly connected to the bottom of each connecting rod (31), electric telescopic rods (6) are fixedly connected to the positions, close to the left side and the right side, on the top of the working box (1), and a top plate (61) is fixedly connected to the top of each electric telescopic rod (6), the utility model discloses a hydraulic drive device, including roof (61), the equal fixedly connected with electro-magnet (62) of the central authorities of roof (61) bottom, the equal fixedly connected with feeding frame (7) of the left and right sides of work box (1), the bottom fixedly connected with inlet pipe (71) of feeding frame (7), the inside of feeding frame (7) is rotated and is connected with two seconds and pulverizes cylinder (72), the first connection frame (8) of positive fixedly connected with of work box (1), the inside rotation of first connection frame (8) is connected with between two first gears (81) and two first gears (81), intermeshing between the positive fixedly connected with second connection frame (9) of feeding frame (7), the inside rotation of second connection frame (9) is connected with between two second gears (91) and two second gears (91).
2. The construction waste collecting device according to claim 1, wherein: the front surface of the material receiving drawer (11) penetrates through the front surface of the working box (1), material guide plates (21) are fixedly connected to the left side and the right side of the inner wall of the working box (1) and the positions close to the top, and the front shape structure of the material guide plates (21) is triangular.
3. The construction waste collecting device according to claim 1, wherein: the top of the output shaft of the first motor (51) penetrates through the top of the connecting rod (31), and the top of the output shaft of the first motor (51) is fixedly connected to the bottom of the stirring rod (5).
4. The construction waste collecting device according to claim 1, wherein: the back of the first gear (81) penetrates through the front of the working box (1) and is fixedly connected with the front of the first grinding roller (2), the front of the first connecting frame (8) is fixedly connected with a second motor (82), and the back of an output shaft of the second motor (82) penetrates through the front of the first connecting frame (8) and is fixedly connected with the front of the first gear (81) arranged on the right side of the first connecting frame (8).
5. The construction waste collecting device according to claim 1, wherein: the back of the second gear (91) penetrates through the front of the feeding frame (7) and is fixedly connected with the front of the second grinding roller (72), the front of the second connecting frame (9) is fixedly connected with a third motor (92), the back of an output shaft of the third motor (92) penetrates through the front of the second connecting frame (9) and is fixedly connected with the front of the second gear (91) arranged on the right side of the second connecting frame (9), and the bottom end of the feeding pipe (71) penetrates through the surface of the working box (1) and is positioned inside the working box (1).
6. The construction waste collecting device according to claim 1, wherein: the top fixedly connected with battery (63) of roof (61), battery (63) respectively with electric telescopic handle (6), electro-magnet (62), first motor (51), second motor (82) and third motor (92) between electric connection.
CN202220078874.9U 2022-01-13 2022-01-13 Engineering construction waste collection device Active CN216880968U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220078874.9U CN216880968U (en) 2022-01-13 2022-01-13 Engineering construction waste collection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220078874.9U CN216880968U (en) 2022-01-13 2022-01-13 Engineering construction waste collection device

Publications (1)

Publication Number Publication Date
CN216880968U true CN216880968U (en) 2022-07-05

Family

ID=82213469

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220078874.9U Active CN216880968U (en) 2022-01-13 2022-01-13 Engineering construction waste collection device

Country Status (1)

Country Link
CN (1) CN216880968U (en)

Similar Documents

Publication Publication Date Title
CN206106151U (en) Plastic housing splitter for new energy automobile battery recycling
CN211099223U (en) Reducing mechanism for civil engineering convenient to construction waste retrieves
CN112892697A (en) Old and useless new energy automobile power battery recycle device
CN215843195U (en) Construction waste treatment device
CN216880968U (en) Engineering construction waste collection device
CN213349022U (en) Environment-friendly processing apparatus for building rubbish
CN213222314U (en) Waste product preprocessing device for building site
CN211993558U (en) Efficient lime-soil mixer
CN218798070U (en) Environment-friendly rubbish reducing mechanism
CN216499644U (en) Construction waste treatment device for municipal construction
CN212943409U (en) Financial accounting is with bill rubbing crusher
CN213107683U (en) Plastic mouth of a river waste material smashes recovery unit
CN211563148U (en) Novel construction waste treatment equipment
CN213133514U (en) Glass retrieves breaker for processing
CN220554707U (en) House building engineering construction garbage disposal device
CN210846629U (en) Milling equipment is used in medicine processing
CN212069087U (en) Building rubbish breaker for building engineering
CN211358979U (en) Concrete solid waste resource recovery device
CN218475344U (en) Intelligent recovery unit is used to fitment engineering rubbish
CN221085883U (en) Garbage crushing device for environmental protection engineering
CN211989076U (en) Waste recovery device for road environment-friendly construction
CN218361260U (en) Garbage compression equipment with pre-crushing function
CN112403653A (en) Building engineering garbage collection device
CN219502901U (en) Smashing device for recycling anode material
CN212943408U (en) Energy-concerving and environment-protective building engineering construction waste material processing apparatus

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant