CN216864753U - Lime pay-off for road and bridge engineering - Google Patents

Lime pay-off for road and bridge engineering Download PDF

Info

Publication number
CN216864753U
CN216864753U CN202122490109.6U CN202122490109U CN216864753U CN 216864753 U CN216864753 U CN 216864753U CN 202122490109 U CN202122490109 U CN 202122490109U CN 216864753 U CN216864753 U CN 216864753U
Authority
CN
China
Prior art keywords
rod
containing barrel
ash containing
wall
road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122490109.6U
Other languages
Chinese (zh)
Inventor
王萌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Yitong Construction Engineering Co ltd
Original Assignee
Jiangxi Yitong Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Yitong Construction Engineering Co ltd filed Critical Jiangxi Yitong Construction Engineering Co ltd
Priority to CN202122490109.6U priority Critical patent/CN216864753U/en
Application granted granted Critical
Publication of CN216864753U publication Critical patent/CN216864753U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Repair (AREA)

Abstract

The utility model discloses a lime pay-off device for road and bridge engineering, and belongs to the field of road and bridge engineering. A lime pay-off device for road and bridge engineering comprises an ash containing barrel, wherein the side wall of the ash containing barrel is connected with a side door in a sliding way, a gland is arranged in the ash containing barrel, a connecting rod is fixedly arranged at the top of the ash containing barrel, a chute is arranged on the outer surface of the connecting rod, a pressure lever is arranged on the inner wall of the connecting rod, a slide bar is fixedly arranged on the outer surface of the pressure lever, a discharge rod is fixedly arranged at the bottom of the ash containing barrel, the inner wall of the discharge rod is rotatably connected with a rotating shaft, the outer surface of the rotating shaft is fixedly provided with a partition plate, the circumferential outer wall of the partition plate is fixedly provided with a rubber ring, the outer surface of the discharging rod is in an annular symmetrical structure and is provided with two slots, the device improves the construction efficiency and is convenient for operators to construct, through set up the gland in flourishing grey section of thick bamboo inside to be connected with the depression bar at the gland top, can be convenient for operating personnel know the lime surplus of flourishing grey section of thick bamboo inside, thereby in time add.

Description

Lime pay-off is used in road bridge engineering
Technical Field
The utility model relates to the field of road and bridge engineering, in particular to a lime pay-off device for road and bridge engineering.
Background
The road and bridge engineering originally refers to the work of reconnaissance, design, construction, maintenance, management and the like of roads and bridges; according to the structure can be divided into: roadbed, road surface, bridge, culvert, tunnel, drainage, protection, greening, traffic engineering, electromechanical engineering and other engineering. The unit project according to the standard is divided into: roadbed engineering, pavement engineering, bridge engineering, interchange engineering, tunnel engineering, environmental protection engineering, traffic safety facilities, electromechanical engineering and house building engineering.
Road and bridge engineering often need carry out the unwrapping wire with lime at the in-process of construction, and traditional unwrapping wire mainly is operated through artifical manual grey that spills, and comparatively consuming time and wasting force to the unwrapping wire appears crooked easily, for this reason, we provide a lime pay-off for road and bridge engineering, mainly used for solving above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
The utility model aims to provide a lime pay-off device for road and bridge engineering, which aims to solve the problems in the background technology.
2. Technical scheme
A lime pay-off device for road and bridge engineering comprises an ash containing barrel, wherein the side wall of the ash containing barrel is connected with a side door in a sliding manner, a gland is arranged inside the ash containing barrel, a connecting rod is fixedly arranged at the top of the ash containing barrel, a sliding groove is formed in the outer surface of the connecting rod, a press rod is arranged on the inner wall of the connecting rod, a slide rod is fixedly arranged on the outer surface of the press rod, a discharge rod is fixedly arranged at the bottom of the ash containing barrel, a rotating shaft is rotatably connected with the inner wall of the discharge rod, a partition plate is fixedly arranged on the outer surface of the rotating shaft, a rubber ring is fixedly arranged on the circumferential outer wall of the partition plate, two slots are formed in an annular symmetrical structure on the outer surface of the discharge rod, two mounting plates are arranged below the ash containing barrel in a symmetrical structure, one sides, which are relatively close to each other, of the two mounting plates are rotatably connected with front wheels, one sides, which are relatively far away from each other, are respectively rotatably connected with an inserted rod, the outer surface of the inserted bar is sleeved with a spring.
Preferably, the bottom of the pressure lever is fixedly connected with the top of the gland, and the sliding rod is connected with the inner wall of the sliding groove in a sliding manner.
Preferably, the rubber ring is in friction contact with the inner wall of the discharging rod, and two ends of the rotating shaft respectively penetrate through the discharging rod to be connected and fixed with the two mounting plates.
Preferably, the inserted bar is in inserting fit with the slot, the inner end of the spring is fixedly connected with the mounting plate, and the outer end of the spring is fixedly connected with the inserted bar.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages that:
1. the device improves the structure, improves the construction efficiency, is convenient for operators to construct, and can facilitate the operators to know the residual amount of lime in the ash containing barrel by arranging the gland in the ash containing barrel and connecting the top of the gland with the pressure rod, thereby adding the lime in time.
2. The structure of the utility model is improved, the insertion rod and the spring are arranged on the mounting plate, the slot is arranged on the surface of the discharging rod, the front wheel of the device can be grounded and the rear wheel can move away from the ground by turning over the ash containing barrel and fixing the discharging rod through the insertion rod, and when the device is used for paying off wires on a bumpy ground, the stability of the device can be improved and the bumpy degree of the device can be reduced.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the internal structure of the present invention;
FIG. 3 is a schematic view of the internal structure of the discharge bar of the present invention;
FIG. 4 is a partial schematic view of the present invention;
FIG. 5 is a schematic view of a folded-over partial structure of the mounting plate of the present invention;
the reference numbers in the figures illustrate: 1. an ash containing cylinder; 2. a side door; 3. a gland; 4. a connecting rod; 5. a chute; 6. a pressure lever; 7. a slide bar; 8. a discharge rod; 9. a rotating shaft; 10. a partition plate; 11. a rubber ring; 12. a slot; 13. mounting a plate; 14. a front wheel; 15. a rear wheel; 16. a rod is inserted; 17. a spring.
Detailed Description
Referring to fig. 1-5, the present invention provides a technical solution:
a lime pay-off device for road and bridge engineering comprises an ash containing barrel 1, the side wall of the ash containing barrel 1 is connected with a side door 2 in a sliding way, a gland 3 is arranged inside the ash containing barrel 1, a connecting rod 4 is fixedly arranged at the top of the ash containing barrel 1, a chute 5 is arranged on the outer surface of the connecting rod 4, a pressure rod 6 is arranged on the inner wall of the connecting rod 4, a slide rod 7 is fixedly arranged on the outer surface of the pressure rod 6, a discharge rod 8 is fixedly arranged at the bottom of the ash containing barrel 1, the inner wall of the discharge rod 8 is rotatably connected with a rotating shaft 9, a partition plate 10 is fixedly arranged on the outer surface of the rotating shaft 9, a rubber ring 11 is fixedly arranged on the circumferential outer wall of the partition plate 10, two slots 12 are arranged on the outer surface of the discharge rod 8 in an annular symmetrical structure, two mounting plates 13 are arranged below the ash containing barrel 1 in a symmetrical structure, a front wheel 14 is rotatably connected to one side of the two mounting plates 13 which are relatively far away from each other, a rear wheel 15 is respectively rotatably connected to one side of the two mounting plates 13 which is relatively far away from each other in a sliding way, an inserted rod 16 is respectively connected with each other, the outer surface of the inserted link 16 is sleeved with a spring 17; by rotating the connecting rod 4, the connecting rod 4 drives the ash containing barrel 1 and the discharging rod 8 to rotate around the rotating shaft 9, at this time, the partition plate 10 and the rubber ring 11 are inclined on the inner wall of the discharging rod 8, the sliding rod 7 is pulled upwards, the sliding rod 7 drives the pressing rod 6 and the pressing cover 3 to move upwards along the ash containing barrel 1, the white ash is poured into the ash containing barrel 1 through the upwards sliding side door 2, then the sliding rod 7 is loosened, the pressing cover 3 is positioned at the top of the white ash, a user enables the front wheel 14 and the rear wheel 15 at the bottom of the device to roll on the ground through the dragging device, the white ash in the ash containing barrel 1 flows out through the discharging rod 8, so that paying-off is carried out, as the white ash in the ash containing barrel 1 is reduced, the pressing cover 3 can move downwards in the ash containing barrel 1, when the ground is relatively bumpy, the discharging rod 8 is kept horizontal by overturning the inserting rod 1, and the inserting rod 16 is pulled, the inserting rod 16 is inserted into the slot 12 on the surface of the discharging rod 8, so that the discharging rod 8 is fixed, at the moment, the front wheel 14 of the device is grounded, and an operator moves through the device, so that the jolt generated when the device moves is reduced, and the device is convenient to move; the device improves the construction efficiency, is convenient for operators to construct, and can be used for knowing the residual amount of lime in the ash containing barrel 1 conveniently by arranging the gland 3 in the ash containing barrel 1 and connecting the top of the gland 3 with the pressure rod 6 so as to add the lime in time; through setting up inserted bar 16 and spring 17 on mounting panel 13 to seted up slot 12 on the surface of discharge bar 8, through the flourishing ash barrel of upset 1, and fix discharge bar 8 through inserted bar 16, can make the front wheel 14 of device land, and rear wheel 15 breaks away from ground and removes, and when the device was when jolting ground unwrapping wire, can improve the stability of device, reduces the degree of jolting of device.
Specifically, the bottom of the pressure lever 6 is fixedly connected with the top of the gland 3, and the slide rod 7 is in sliding connection with the inner wall of the chute 5.
Further, the rubber ring 11 is in friction contact with the inner wall of the discharging rod 8, and two ends of the rotating shaft 9 penetrate through the discharging rod 8 respectively and are fixedly connected with the two mounting plates 13.
Furthermore, the inserted bar 16 is inserted into the slot 12, the inner end of the spring 17 is fixedly connected to the mounting plate 13, and the outer end of the spring 17 is fixedly connected to the inserted bar 16.
The working principle is as follows: in the using process, firstly, the connecting rod 4 is rotated to enable the connecting rod 4 to drive the ash containing barrel 1 and the discharging rod 8 to rotate by taking the rotating shaft 9 as a center, at the moment, the partition plate 10 and the rubber ring 11 are inclined on the inner wall of the discharging rod 8, the sliding rod 7 is pulled upwards to enable the sliding rod 7 to drive the pressing rod 6 and the pressing cover 3 to move upwards along the ash containing barrel 1, the lime is poured into the ash containing barrel 1 through the upwards sliding side door 2, then the sliding rod 7 is loosened, the pressing cover 3 is positioned at the top of the lime, a user enables the front wheel 14 and the rear wheel 15 at the bottom of the device to roll on the ground through the dragging device, the lime in the ash containing barrel 1 flows out through the discharging rod 8, so that the wire is paid out, the pressing cover 3 can move downwards in the ash containing barrel 1 along with the reduction of the lime in the ash containing barrel 1, when the ground is bumpy, the discharging rod 8 is enabled to be kept horizontal by overturning the ash containing barrel 1, through pulling the inserted bar 16, make the inserted bar 16 insert inside the slot 12 on the surface of the discharge arm 8 to fix the discharge arm 8, at this moment, the device front wheel 14 lands, and operating personnel removes through the device, thereby alleviates the jolt that produces when the device removes, the removal of the device of being convenient for.

Claims (4)

1. The utility model provides a lime pay-off is used to road and bridge engineering, includes flourishing ash barrel (1), its characterized in that: the side door (2) is connected with the side wall in a sliding manner in the ash containing barrel (1), a gland (3) is arranged inside the ash containing barrel (1), a connecting rod (4) is fixedly arranged at the top of the ash containing barrel (1), a sliding groove (5) is formed in the outer surface of the connecting rod (4), a pressing rod (6) is arranged on the inner wall of the connecting rod (4), a sliding rod (7) is fixedly arranged on the outer surface of the pressing rod (6), a discharging rod (8) is fixedly arranged at the bottom of the ash containing barrel (1), the inner wall of the discharging rod (8) is rotatably connected with a rotating shaft (9), a partition plate (10) is fixedly arranged on the outer surface of the rotating shaft (9), a rubber ring (11) is fixedly arranged on the outer wall of the circumference of the partition plate (10), two slots (12) are formed in an annular symmetrical structure in the outer surface of the discharging rod (8), two mounting plates (13) are arranged in a symmetrical structure below the ash containing barrel (1), one side of the mounting plates (13) is rotatably connected with a front wheel (14), two one side that mounting panel (13) kept away from relatively rotates respectively and is connected with rear wheel (15), two one side that mounting panel (13) kept away from relatively has inserted bar (16) sliding connection respectively, the surface cover of inserted bar (16) is equipped with spring (17).
2. The lime pay-off device for road and bridge engineering according to claim 1, wherein: the bottom of the pressure lever (6) is fixedly connected with the top of the gland (3), and the sliding rod (7) is connected with the inner wall of the sliding groove (5) in a sliding manner.
3. The lime pay-off device for road and bridge engineering according to claim 1, wherein: rubber circle (11) and discharge bar (8) inner wall frictional contact, pivot (9) both ends are passed discharge bar (8) respectively and are connected fixedly with two mounting panels (13).
4. The lime pay-off device for road and bridge engineering according to claim 1, wherein: inserted bar (16) and slot (12) are pegged graft and are cooperated, spring (17) inner is connected fixedly with mounting panel (13), spring (17) outer end is connected fixedly with inserted bar (16).
CN202122490109.6U 2021-10-15 2021-10-15 Lime pay-off for road and bridge engineering Active CN216864753U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122490109.6U CN216864753U (en) 2021-10-15 2021-10-15 Lime pay-off for road and bridge engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122490109.6U CN216864753U (en) 2021-10-15 2021-10-15 Lime pay-off for road and bridge engineering

Publications (1)

Publication Number Publication Date
CN216864753U true CN216864753U (en) 2022-07-01

Family

ID=82120862

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122490109.6U Active CN216864753U (en) 2021-10-15 2021-10-15 Lime pay-off for road and bridge engineering

Country Status (1)

Country Link
CN (1) CN216864753U (en)

Similar Documents

Publication Publication Date Title
CN109183565A (en) A kind of road construction edge ground compaction apparatus
CN205529816U (en) Novel full -automatic cement way making machine
CN216864753U (en) Lime pay-off for road and bridge engineering
CN215976717U (en) Road surface compaction device that municipal works were used
CN215857634U (en) Rammer is used in foundation rammer construction
CN108265579B (en) Roadbed leveling device for asphalt road
CN2273330Y (en) Automatic tamper
CN207739112U (en) A kind of self-propelled ramming machine
CN209338971U (en) It is a kind of with the municipal administration ground repair apparatus for evening structure out
CN108945062A (en) It a kind of construction site uses to topple over the transfer cart with regulation handle height
CN209652710U (en) A kind of levelling means of construction of the highway
CN107842014A (en) A kind of tamping unit of energy foundation ditch backfill
CN208395631U (en) A kind of HIGHWAY MAINTENANCE auxiliary device
CN106677018A (en) Anti-skid road roller for constructional engineering
CN107815947A (en) A kind of road construction laying water baffle plate device
CN206298806U (en) Road automatic detection, safety blanking, reinforcement mechanism based on rammer compacter application
CN212294262U (en) Brick paving device for landscaping
CN107059566A (en) Road automatic detection, safety blanking based on rammer compacter application, reinforcement mechanism
CN210916899U (en) Pre-buried compaction device of using of cable
CN207143659U (en) A kind of cold regenerative machine stock stop
CN208121649U (en) A kind of civil engineering ground smoothing machine
CN113073722A (en) Demolishing and backfilling integrated device suitable for underground flexible pipeline and working method thereof
CN105970866B (en) A kind of complicated road automatically walk platform in city
CN106677024A (en) Pedal type road roller for constructional engineering
CN205617438U (en) Novel manhole cover combination

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant