CN216840965U - Building construction protective fence - Google Patents

Building construction protective fence Download PDF

Info

Publication number
CN216840965U
CN216840965U CN202122959098.1U CN202122959098U CN216840965U CN 216840965 U CN216840965 U CN 216840965U CN 202122959098 U CN202122959098 U CN 202122959098U CN 216840965 U CN216840965 U CN 216840965U
Authority
CN
China
Prior art keywords
sliding
protective
mounting
building construction
locking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202122959098.1U
Other languages
Chinese (zh)
Inventor
李�浩
杜雪丰
刘宇
刘晓辉
王超
张海龙
徐艇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaji Construction Engineering Group Co ltd
Original Assignee
Huaji Construction Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaji Construction Engineering Group Co ltd filed Critical Huaji Construction Engineering Group Co ltd
Priority to CN202122959098.1U priority Critical patent/CN216840965U/en
Application granted granted Critical
Publication of CN216840965U publication Critical patent/CN216840965U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The application relates to a building construction protective guard, relates to the field of building protection technology, and comprises a mounting component, wherein the mounting component is provided with a protection component, one side of the mounting component, which is far away from the protection component, is provided with a sliding part, the sliding part is provided with a connecting piece for connecting adjacent protective guards, and the sliding part is provided with a locking component for fixing the sliding part. This application has the effect that improves convenience when the connector link is connected on the different mounting height rail guards.

Description

Building construction protective fence
Technical Field
The application relates to the field of building protection technology, in particular to a building construction protective guard.
Background
The guardrail is visible everywhere in our life, and is mainly used for protecting and protecting personal safety and equipment and facilities in occasions such as houses, roads, commercial districts, public places and the like. The building construction protective guard is generally arranged on a building site, plays a role in reminding, and avoids potential safety hazards caused by the fact that non-constructors mistakenly enter a construction area.
At present, the structure of a building construction protective guard is as follows: the guard rails are connected with each other through the connecting buckles and the connecting bolts, so that a construction site is surrounded in a guard wall formed by the guard rails.
In view of the above-mentioned related arts, the inventor believes that each protective fence is always in the same fixed shape for the sake of manufacturing convenience, and thus the height of the connector used for connecting each protective fence is also fixed, and the height of the connector of two adjacent protective fences is easy to be kept consistent on a flat ground, and when the protective fence faces a ground with uneven height, the installation height of the protective fence is difficult to be kept consistent, and the existing protective fence has the defects that the connector is difficult to be connected with the connector of the adjacent protective fence, and the stability of the connection position is poor.
SUMMERY OF THE UTILITY MODEL
In order to improve the convenience when the connector link is connected on the not co-altitude rail guard of installation, this application provides a construction rail guard is built in room.
The application provides a building construction rail guard adopts following technical scheme:
the utility model provides a construction rail guard is built in room, includes the installing component, be provided with protective part on the installing component, keep away from on the installing component one side of protective part is provided with the slider, be provided with the connecting piece that is used for connecting adjacent rail guard on the slider, set up the locking part who is used for fixed self on the slider.
By adopting the technical scheme, when the building construction protective guard is installed, the installation parts of the two protective guards are arranged and fixed on the installation ground, then the sliding parts on the two protective guards are adjusted to enable the two connecting pieces on the sliding parts to be positioned at the same height, then the sliding parts are fixed on the installation parts through the locking parts, and finally the two connecting pieces are connected and fixed, so that the convenience of connecting the connecting pieces between different protective guards is greatly improved through the height adjusting function of the sliding parts in the installation process.
Optionally, the mounting component includes two mounting columns and a mounting base, the two mounting columns are disposed on the mounting base, and the protective component is disposed between the two mounting columns; the installation stand is provided with the sliding tray along self direction of height, the slider slides and sets up in the sliding tray.
Through adopting above-mentioned technical scheme, handheld connecting piece drives the slider of being connected with the connecting piece and reciprocates in the sliding tray to be favorable to further improving the convenience of adjusting the connecting piece height.
Optionally, a rolling member is disposed on an inner side wall of the sliding groove close to the protective member, the rolling member abuts against the sliding member, and a rolling direction of the rolling member is consistent with a sliding direction of the sliding member.
Through adopting above-mentioned technical scheme, the rolling member helps reducing the friction between slider and the sliding tray when slider slides from top to bottom to further improve the convenience of adjusting the connecting piece height.
Optionally, the locking component includes a locking screw and a locking nut, a sliding groove is arranged on the mounting upright column along the sliding direction of the sliding part, the locking screw is arranged on the sliding part and is arranged in the locking groove in a sliding manner, and one end of the locking screw, which is far away from the sliding part, extends to the outside of the locking groove and is matched with the locking nut.
Through adopting above-mentioned technical scheme, loosen lock nut and make the slider can slide from top to bottom in the sliding tray, screw up lock nut after sliding suitable height and make lock nut top tighten on the installation stand to realize the fixed of slider, improved the fixed stability of slider.
Optionally, the connecting piece is hinged on the sliding piece.
By adopting the technical scheme, when a bent part is encountered, a certain angle exists at the joint of the two guard railings, and the connecting pieces on the two guard railings can be kept to be attached through the rotation of the hinged part, so that the stability of the joint of the guard railings is further facilitated.
Optionally, the protective component includes a cross rod and a vertical rod, the cross rod is disposed on the mounting component, and the vertical rods are disposed as multiple pieces and disposed on the cross rod.
Through adopting above-mentioned technical scheme, the horizontal pole is used for fixed montant, and the montant be provided with and do benefit to the degree of difficulty that turns over that improves the rail guard to be favorable to avoiding personnel to turn over the potential safety hazard that brings more.
Optionally, a skirting board is arranged on the protective part, and the skirting board is close to the mounting base.
Through adopting above-mentioned technical scheme, the baseboard sets up near the installation base and has blockked the space between protective member and the installation face to be favorable to preventing article and falling or personnel's roll-off.
Optionally, a warning member is disposed on the protection component.
Through adopting above-mentioned technical scheme, the setting of warning piece plays the warning effect to the intruder of intention or unconsciousness to reduce the potential safety hazard that non-constructor got into the construction site and probably brought.
In summary, the present application includes at least one of the following beneficial technical effects:
1. when the building construction protective guard is installed, the installation parts of the two protective guards are arranged and fixed on the installation ground, then the sliding parts on the two protective guards are adjusted to enable the two connecting pieces on the sliding parts to be positioned at the same height, then the sliding parts are fixed on the installation parts through the locking parts, and finally the two connecting pieces are connected and fixed, so that the installation of the whole protective wall is finally completed, and the convenience of the connection of the connecting pieces between the different protective guards is greatly improved through the height adjusting effect of the sliding parts in the installation process;
2. the rolling piece is beneficial to reducing the friction between the sliding piece and the sliding groove when the sliding piece slides up and down, so that the convenience of adjusting the height of the connecting piece is further improved;
3. when the bent part is met, a certain angle exists at the joint of the two protective guards, and the connecting pieces on the two protective guards can keep fit through the rotation of the hinged part, so that the stability of the joint of the protective guards is further facilitated.
Drawings
Fig. 1 is a schematic structural diagram of a first embodiment of the present application.
Fig. 2 is a partial sectional view of the first embodiment of the present application.
Fig. 3 is an enlarged view of a point a in fig. 2.
Fig. 4 is a partial sectional view of the second embodiment of the present application.
Description of reference numerals: 1. a mounting member; 11. installing a base; 12. mounting the upright post; 2. a shielding component; 21. a cross bar; 22. a vertical rod; 3. a slider; 31. a sliding part; 32. a clamping part; 4. a locking member; 41. locking the screw rod; 42. locking the nut; 5. a rolling member; 6. skirting boards; 7. a warning board; 8. a connecting member; 9. a sliding groove; 10. and (4) locking the groove.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses construction rail guard is built in room.
Example 1:
referring to fig. 1 and 2, a building construction protective guard includes installation component 1, installation component 1 is including installation base 11 and installation stand 12, and installation stand 12 can choose for use for cuboid metal column, and the number of installation stand 12 can be two, and two installation stands 12 are vertical setting respectively on two installation bases 11, are provided with protective component 2 between two installation stands 12. All be provided with slider 3 on two installation stands 12, slider 3's slip direction sets up along the length direction of installation stand 12, is provided with connecting piece 8 on slider 3, and connecting piece 8 can select for use for the guardrail limit ear, is provided with the locking part 4 that is used for fixed slider 3 on slider 3. When the installation heights of two adjacent guard rails are different, the two connecting pieces 8 on the two guard rails can be adjusted to be positioned at the same height by sliding the sliding piece 3 on the installation upright 12, so that the two guard rails are connected.
Referring to fig. 2 and 3, the mounting column 12 is provided with a sliding groove 9 along the sliding direction of the sliding part 3, the sliding part 3 includes a sliding portion 31 and a clamping portion 32, the cross section of the sliding portion 31 is the same as that of the sliding groove 9 and is slidably disposed in the sliding groove 9, the clamping portion 32 is fixedly connected with the sliding portion 31, and one end of the clamping portion 32, which is far away from the sliding portion 31, extends to the outside of the sliding groove 9 and is slidably abutted to the outer side surface of the mounting column 12. The connecting piece 8 is fixedly arranged on the side wall of the clamping portion 32 far away from the sliding portion 31, so that the sliding piece 3 moves up and down in the sliding groove 9 and drives the connecting piece 8 on the clamping portion 32 to move up and down.
Referring to fig. 3, the locking member 4 includes a locking screw 41 and a locking nut 42, a locking groove 10 is provided on the adjacent side wall of the mounting post 12 near the sliding groove 9, the locking groove 10 is communicated with the sliding groove 9, the locking groove 10 is provided along the length direction of the mounting post 12, and the length of the locking groove 10 is equal to the length of the sliding groove 9. The locking screw 41 horizontally penetrates and is fixed on the sliding part 3, and one end of the locking screw 41 extends out of the locking groove 10. The locking nut 42 is arranged at one end of the locking screw rod 41 extending out of the locking groove 10 through threaded connection, the size of the locking nut 42 is larger than the width of the locking groove 10, when the connecting piece 8 is moved to the connecting height, the locking nut 42 is tightly propped against the side face of the mounting upright post 12 by screwing the locking nut 42 on the locking screw rod 41, and therefore the fixing of the connecting piece 8 on the sliding piece 3 is achieved.
Referring to fig. 1, the level is provided with two horizontal poles 21 that are parallel to each other between two installation stands 12, and two horizontal poles 21 are close to the setting of installation base 11 for one, and one is close to the setting of installation stand 12 top, and the vertical montant 22 that evenly is provided with many parallels each other between two horizontal poles 21, and the vertical setting of montant 22 can block personnel and get into the construction site, increases the degree of difficulty more that turns over of rail guard again to be favorable to avoiding personnel to turn over the potential safety hazard or the loss of property that bring more.
One side of the protective component 2 close to the mounting base 11 is provided with a rectangular skirting board 6, the skirting board 6 is connected with mounting columns 12 on two sides of the protective component 2, and the distance between the skirting board 6 and the mounting base 11 can be set to be 10mm, so that the distance between the skirting board 6 and the mounting ground is small, and articles can be prevented from falling or people can slide out.
The implementation principle of the embodiment is as follows: when the protective wall is erected on the building construction site, the distance is adjusted, and the mounting bases 11 of the two adjacent protective plates are fixed on the ground on the periphery of the building construction site through expansion bolts. When the height difference does not exist on the installation ground of the two protective railings, the two connecting pieces 8 on the two protective railings are fixedly connected together by directly using connecting bolts; when the installation ground of the two protective guards has a height difference so that the original positions of the two connecting pieces 8 are not at the same height, the locking nuts 42 on the locking bolts are loosened to enable the sliding pieces 3 in the sliding grooves 9 to be in a slidable state, the sliding pieces 3 are adjusted to enable the connecting pieces 8 on the sliding pieces 3 to be at the same height with the connecting pieces 8 of the other protective guard, and the locking nuts 42 are locked after the adjustment is completed to connect and fix the two connecting pieces 8. And by parity of reasoning, the installation of the peripheral protective guard of the whole building construction site is gradually completed.
Example 2:
referring to fig. 4, the difference between the embodiment and the embodiment is that a plurality of sets of rolling members 5 are uniformly arranged on a side wall of the sliding groove 9 close to the protective component 2, the rolling members 5 can be rolling rollers, the rolling direction of the rolling members 5 is arranged along the sliding direction of the sliding member 3, and a side wall of the sliding member 3 away from the connecting member 8 slides in the sliding process all the time in contact with the plurality of sets of rolling members 5, so that the sliding friction generated by the sliding member 3 in the sliding process is greatly reduced, and the convenience of adjusting the height of the connecting member 8 is further improved.
The connecting piece 8 is hinged on the clamping part 32 of the sliding piece 3 through the rotating shaft, and the connecting piece 8 can rotate around the hinged part, so that the connecting piece 8 can be kept mutually attached through rotation when an angle difference exists between the two protective guards, and further the fixation of the connecting part is facilitated.
Be provided with the warning piece on the protective member 2, the metal sheet for fat liquoring fluorescent layer can be selected for use to the warning piece, and the warning piece is fixed to be set up on the montant 22 of protective member 2 to play warning protective action.
The implementation principle of the embodiment is as follows: the rolling member 5 greatly reduces the friction between the sliding member 3 and the inner side wall of the sliding groove 9, thereby further facilitating the position adjustment of the connecting member 8; the connecting pieces 8 are hinged on the sliding pieces 3, when the connecting pieces meet the bent position, a certain angle exists at the connecting position of the two protective guards, and the connecting pieces 8 on the two protective guards can keep fit through the rotation of the hinged position, so that the stability of the connecting position of the protective guards is further facilitated; the warning piece is arranged to further improve the protection effect of the protective guard.
The above are preferred embodiments of the present application, and the scope of protection of the present application is not limited thereto, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a construction rail guard is built in room which characterized in that: the protective guard is characterized by comprising a mounting part (1), wherein a protective part (2) is arranged on the mounting part (1), a sliding part (3) is arranged on one side, far away from the protective part (2), of the mounting part (1), a connecting part (8) used for connecting adjacent protective guards is arranged on the sliding part (3), and a locking part (4) used for fixing the protective guard is arranged on the sliding part (3).
2. The building construction protective guard of claim 1, wherein: the mounting part (1) comprises two mounting upright columns (12) and a mounting base (11), the two mounting upright columns (12) are arranged on the mounting base (11), and the protective part (2) is arranged between the two mounting upright columns (12); the mounting upright post (12) is provided with a sliding groove (9) along the height direction of the mounting upright post, and the sliding piece (3) is arranged in the sliding groove (9) in a sliding manner.
3. The building construction protective guard of claim 2, wherein: the inner side wall, close to the protective component (2), of the sliding groove (9) is provided with a rolling piece (5), the rolling piece (5) is abutted to the sliding piece (3), and the rolling direction of the rolling piece (5) is consistent with the sliding direction of the sliding piece (3).
4. The building construction protective guard of claim 2, characterized in that: locking part (4) include locking screw (41), lock nut (42), follow on installation stand (12) slider (3) slip direction is provided with sliding tray (9), be close to on installation stand (12) be provided with locking groove 10 on the adjacent lateral wall of sliding tray (9), locking screw (41) set up slider (3) are gone up and slide the setting and be in locking groove (10), locking screw (41) are kept away from the one end of slider (3) extends to outside locking groove (10) and with lock nut (42) cooperate.
5. The building construction protective guard of claim 1, characterized in that: the connecting piece (8) is hinged on the sliding piece (3).
6. The building construction protective guard of claim 1, characterized in that: the protective component (2) comprises a cross rod (21) and a vertical rod (22), the cross rod (21) is arranged on the mounting component (1), and the vertical rod (22) is arranged into a plurality of parts and arranged on the cross rod (21).
7. The building construction protective guard of claim 2, wherein: a skirting board (6) is arranged on the protective part (2), and the skirting board (6) is close to the mounting base (11).
8. The building construction protective guard of claim 1, characterized in that: and a warning board (7) is arranged on the protective component (2).
CN202122959098.1U 2021-11-29 2021-11-29 Building construction protective fence Expired - Fee Related CN216840965U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122959098.1U CN216840965U (en) 2021-11-29 2021-11-29 Building construction protective fence

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122959098.1U CN216840965U (en) 2021-11-29 2021-11-29 Building construction protective fence

Publications (1)

Publication Number Publication Date
CN216840965U true CN216840965U (en) 2022-06-28

Family

ID=82105201

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122959098.1U Expired - Fee Related CN216840965U (en) 2021-11-29 2021-11-29 Building construction protective fence

Country Status (1)

Country Link
CN (1) CN216840965U (en)

Similar Documents

Publication Publication Date Title
US9512619B2 (en) Deck system and components thereof, and methods of assembling and disassembling deck systems and components
EA026639B1 (en) Guardrail for protecting persons being present on open floors of buildings or scaffolds
CA2921612C (en) Deck system and components thereof, and methods of assembling and disassembling deck systems and components
CN210598422U (en) Concatenation formula municipal administration rail guard
CN216840965U (en) Building construction protective fence
CN210563509U (en) Combined type limb protective rail with simple structure, extension and angle change
CN114427304B (en) Assembled type edge protection device for cast-in-place concrete stairway
CN211736475U (en) A face frontier defense guardrail for balcony
CN105484570A (en) Hexagonal fence
CN212612161U (en) Portable assembled safety guardrail
CN210976873U (en) Environmental protection rail for construction
CN213539928U (en) Folding iron horse guardrail
CN218912489U (en) Protective fence for house building construction
CN215563990U (en) Glass balcony guardrail with combined structure
CN216517282U (en) Lightning protection job site safety device
CN220301919U (en) Bury formula gardens guardrail structure
CN214498626U (en) Building construction protective fence
CN217711460U (en) A installation component for assembly of indoor river blocking
CN216476677U (en) Protection fence assembly for house construction
CN219622439U (en) Safety protective fence
CN213597651U (en) Adjustable construction rail guard of highway
CN214697231U (en) Fire protection fence capable of being rapidly disassembled
CN217678782U (en) Road central isolation guardrail connecting component
CN220336396U (en) Mobile operation platform for decoration of bottom of indoor corridor
CN211313143U (en) Rail guard for building convenient to dismantle

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220628