CN216840681U - Conveying frame for building construction - Google Patents
Conveying frame for building construction Download PDFInfo
- Publication number
- CN216840681U CN216840681U CN202122729146.8U CN202122729146U CN216840681U CN 216840681 U CN216840681 U CN 216840681U CN 202122729146 U CN202122729146 U CN 202122729146U CN 216840681 U CN216840681 U CN 216840681U
- Authority
- CN
- China
- Prior art keywords
- set firmly
- base
- conveying
- fixedly arranged
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009435 building construction Methods 0.000 title abstract description 11
- 238000010276 construction Methods 0.000 claims description 14
- 238000005096 rolling process Methods 0.000 claims description 9
- 230000002146 bilateral effect Effects 0.000 claims description 3
- 238000000034 method Methods 0.000 abstract description 11
- 239000000463 material Substances 0.000 abstract description 9
- 230000005540 biological transmission Effects 0.000 description 7
- 230000000694 effects Effects 0.000 description 2
- 239000004566 building material Substances 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a conveying frame for building construction, and belongs to the field of building conveying frames. A conveying frame for building construction comprises a base, wherein two first supporting columns are fixedly arranged at the top of the base in a front-back symmetrical structure, a sliding plate is fixedly arranged on the front side of the first supporting column positioned in front of the first supporting column, the top of the base is fixedly provided with an electric push rod, the output end of the top of the electric push rod is fixedly provided with a clamping block, a first hinged support is fixedly arranged on each of the four side walls of the conveying box, a first roller is rotatably connected to the inner wall of the first hinged support, the front surface of the conveying box is provided with two pull rings which are arranged in a left-right symmetrical structure, the bottom of the conveying box is provided with a clamping plate, the device pushes the conveying box to move upwards through an electric push rod, make the gyro wheel on conveying case surface upwards slide along support column one and two inner walls of support column respectively, can improve the stability that conveying case removed the in-process, avoid the material to drop in the transportation, ensured the security of transportation.
Description
Technical Field
The utility model relates to the field of building conveying frames, in particular to a conveying frame for building construction.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. The method comprises foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like. The site of the construction work is called a "construction site" or "job site", also called a worksite.
In the self-building construction process, building materials used for construction are often required to be carried upstairs so as to facilitate construction, the traditional material transportation is mainly carried out through matching of a winch and a fixed pulley bracket, the transportation stability of the mode is poor, the transported materials are easy to fall off, and therefore the conveying frame for building construction is provided and mainly used for solving the problems.
SUMMERY OF THE UTILITY MODEL
1. Technical problem to be solved
The utility model aims to provide a conveying frame for building construction, which solves the problems in the prior art.
2. Technical scheme
A conveying frame for building construction comprises a base, wherein two first supporting columns are fixedly arranged at the top of the base in a front-back symmetrical structure, a sliding plate is fixedly arranged on the front side of the first supporting column positioned in front of the first supporting column, the top of the base is fixedly provided with an electric push rod, the output end of the top of the electric push rod is fixedly provided with a clamping block, a first hinged support is fixedly arranged on each of the four side walls of the conveying box, a first roller is rotatably connected to the inner wall of the first hinged support, the front surface of the conveying box is provided with two pull rings which are arranged in a left-right symmetrical structure, the bottom of the conveying box is provided with a clamping plate, the top of the base is provided with two second supporting columns in a bilateral symmetry structure, the back surfaces of the second supporting columns are provided with first sliding rails, the front surface of the second support column is fixedly provided with a second slide rail, the top of the second support column is fixedly provided with a connecting column, the front surface and the back surface of the connecting column are respectively fixedly provided with a second hinged support, and the inner wall of the second hinged support is rotatably connected with a second roller.
Preferably, fixture block and slide are respectively with cardboard inner wall sliding connection.
Preferably, the second roller is in rolling contact with the inner walls of the first sliding rail and the second sliding rail respectively.
Preferably, the first rollers positioned on the front side and the rear side are respectively in rolling contact with the inner walls of the first support columns, and the first rollers positioned on the left side and the right side are respectively in rolling contact with the second support columns and the connecting columns.
3. Advantageous effects
Compared with the prior art, the utility model has the advantages that:
1. the structure of the utility model is improved, the device pushes the conveying box to move upwards through the electric push rod, so that the rollers on the surface of the conveying box slide upwards along the inner walls of the first supporting column and the second supporting column respectively, the stability of the conveying box in the moving process can be improved, the material is prevented from falling in the transportation process, and the transportation safety is ensured.
2. The structure of the utility model is improved, when the first roller moves to the inside of the connecting column, the hook rod pulls the conveying box, so that the conveying box moves to the inside of the building body, and the second roller fixed on the connecting column slides to the inside of the building body along the first sliding rail and the second sliding rail, so that the unloading of materials in the conveying box can be facilitated, the physical strength of constructors can be saved, and the purpose of convenient operation can be achieved.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic bottom view of the transfer box of the present invention;
FIG. 3 is a partial schematic view of the present invention;
FIG. 4 is a schematic view of a disassembled structure of the connection column and the second support column of the present invention;
the numbering in the figures illustrates: 1. a base; 2. a first supporting column; 3. a slide plate; 4. an electric push rod; 5. a clamping block; 6. a delivery box; 7. a first hinged support; 8. a first roller; 9. a pull ring; 10. clamping a plate; 11. a second supporting column; 12. a first slide rail; 13. a second slide rail; 14. connecting columns; 15. a second hinged support; 16. and a second roller.
Detailed Description
Referring to fig. 1-4, the present invention provides a technical solution:
a conveying frame for building construction comprises a base 1, wherein the top of the base 1 is of a front-back symmetrical structure, two first supporting columns 2 are fixedly arranged, a sliding plate 3 is fixedly arranged on the front side of each first supporting column 2 in front, an electric push rod 4 is fixedly arranged on the top of the base 1, a clamping block 5 is fixedly arranged at the top output end of the electric push rod 4, a conveying box 6 is arranged above the base 1, hinged bases I7 are fixedly arranged on the four side walls of each conveying box 6, the inner walls of the hinged bases I7 are rotatably connected with roller I8, two pull rings 9 are fixedly arranged on the front side of the conveying box 6 in a left-right symmetrical structure, a clamping plate 10 is fixedly arranged at the bottom of the conveying box 6, two supporting columns II 11 are fixedly arranged on the top of the base 1 in a left-right symmetrical structure, slide rails I12 are fixedly arranged on the back sides of the supporting columns II 11, slide rails II 13 are fixedly arranged on the tops of the supporting columns II 11, connecting columns 14 are fixedly arranged on the front sides and the back sides of the connecting columns, and hinged bases II 15 are rotatably connected with roller II 16; in the using process, firstly, the device is fixed, so that two sliding rails II 13 are arranged inside the building body along the direction, the clamping block 5 is pushed by the electric push rod 4 to be clamped with the clamping plate 10 at the bottom of the conveying box 6, the conveying box 6 is pushed to move upwards at the same time, the rollers I8 on the surface of the conveying box 6 slide upwards along the inner walls of the supporting columns I2 and II 11 respectively, when the rollers I8 move inside the connecting column 14, an operator pulls the two pull rings 9 through the hook rods, so that the clamping plate 10 at the bottom of the conveying box 6 slides into the top of the sliding plate 3 and moves towards the inside of the building body, the conveying box 6 drives the connecting column 14 to move when moving, so that the rollers II 16 fixed on the connecting column 14 slide towards the inside of the building body along the sliding rails I12 and the sliding rails II 13, so as to unload materials inside the conveying box 6, and then the hook rods push the conveying box 6 to move towards the upper part of the base 1, until the clamping block 5 slides into the clamping plate 10, the height of the conveying box 6 is reduced by the electric push rod 4; the device pushes the conveying box 6 to move upwards through the electric push rod 4, so that the first roller 8 on the surface of the conveying box 6 slides upwards along the inner walls of the first supporting column 2 and the second supporting column 11 respectively, the stability of the conveying box 6 in the moving process can be improved, materials are prevented from falling in the conveying process, and the safety of conveying is ensured; when roller 8 moves inside spliced pole 14, through hook lever pulling conveying box 6 for conveying box 6 removes to the internal portion of building, thereby makes two 16 of fixed roller on the spliced pole 14 slide to the internal portion of building along slide rail 12 and slide rail 13, thereby can be convenient for unload the material of conveying box 6 inside, save constructor's physical power, reach the purpose of the operation of being convenient for.
Specifically, the fixture block 5 and the sliding plate 3 are respectively connected with the inner wall of the clamping plate 10 in a sliding manner.
Further, the second roller 16 is in rolling contact with the inner walls of the first sliding rail 12 and the second sliding rail 13 respectively.
Furthermore, the rollers I8 positioned on the front side and the rear side are respectively in rolling contact with the inner walls of the supporting columns I2, and the rollers I8 positioned on the left side and the right side are respectively in rolling contact with the supporting columns II 11 and the connecting columns 14.
The working principle is as follows: in the using process, firstly, the device is fixed, two slide rails two 13 are driven to move to the inside of a building body, the electric push rod 4 is used for pushing the clamping block 5 to be clamped with the clamping plate 10 at the bottom of the transmission box 6, and simultaneously, the transmission box 6 is driven to move upwards, so that the roller I8 on the surface of the transmission box 6 slides upwards along the inner walls of the support column I2 and the support column II 11 respectively, when the roller I8 moves to the inside of the connecting column 14, an operator pulls the two pull rings 9 through the hook rods, so that the clamping plate 10 at the bottom of the transmission box 6 slides into the top of the sliding plate 3 and moves towards the inside of the building body, the transmission box 6 drives the connecting column 14 to move when moving, so that the roller II 16 fixed on the connecting column 14 slides towards the inside of the building body along the slide rails one 12 and the slide rails two 13, so as to unload materials in the transmission box 6, and then the hook rods drive the transmission box 6 to move towards the upper part of the base 1, until the fixture block 5 slides into the inside of the clamping plate 10, the height of the conveying box 6 is reduced by the electric push rod 4.
Claims (4)
1. The utility model provides a conveying frame for construction, includes base (1), its characterized in that: the utility model discloses a take the picture of the wall of a building, including base (1), symmetrical structure around being at base (1), two support columns (2) have set firmly, be located the place ahead support column (2) openly set firmly slide (3), electric putter (4) have set firmly at base (1) top, electric putter (4) top output has set firmly fixture block (5), base (1) top is equipped with transfer box (6), transfer box (6) four lateral walls all set firmly free bearing (7), free bearing (7) are connected with gyro wheel (8) to the rotation of free bearing (7) inner wall, transfer box (6) openly is bilateral symmetry structure and has set firmly two pull rings (9), transfer box (6) bottom has set firmly cardboard (10), base (1) top is bilateral symmetry structure and has set firmly two support columns (11), support column two (11) back has set firmly slide rail (12), support column two (11) openly have set firmly slide rail two (13), a connecting column (14) is fixedly arranged at the top of the second supporting column (11), a second hinged support (15) is fixedly arranged on the front face and the back face of the connecting column (14), and a second roller (16) is rotatably connected to the inner wall of the second hinged support (15).
2. The conveyance rack for construction according to claim 1, wherein: the clamping block (5) and the sliding plate (3) are respectively connected with the inner wall of the clamping plate (10) in a sliding manner.
3. The conveyance rack for construction according to claim 1, wherein: and the second roller (16) is in rolling contact with the inner walls of the first sliding rail (12) and the second sliding rail (13) respectively.
4. The conveyance rack for construction according to claim 1, wherein: the rollers I (8) positioned on the front side and the rear side are in rolling contact with the inner walls of the support columns I (2) respectively, and the rollers I (8) positioned on the left side and the right side are in rolling contact with the support columns II (11) and the connecting columns (14) respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122729146.8U CN216840681U (en) | 2021-11-09 | 2021-11-09 | Conveying frame for building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202122729146.8U CN216840681U (en) | 2021-11-09 | 2021-11-09 | Conveying frame for building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216840681U true CN216840681U (en) | 2022-06-28 |
Family
ID=82102227
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202122729146.8U Expired - Fee Related CN216840681U (en) | 2021-11-09 | 2021-11-09 | Conveying frame for building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216840681U (en) |
-
2021
- 2021-11-09 CN CN202122729146.8U patent/CN216840681U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111284539A (en) | House engineering is cargo handling car for building | |
CN104944055A (en) | Transferring and retransferring device for white plate | |
CN205906713U (en) | Die block board automatic feeding device | |
CN216840681U (en) | Conveying frame for building construction | |
CN214942114U (en) | Automatic wall tile sticking device for building construction | |
CN213112441U (en) | Heavy object lifting and retracting device | |
CN110700608A (en) | Automatic wall building method | |
CN213971775U (en) | Prefabricated part napping machine | |
CN109594785B (en) | Plate brick plastering system | |
CN110902562B (en) | Intelligent full-automatic paper processing equipment | |
CN211691505U (en) | A support body platform structure for floor pouring construction for housing construction | |
CN206872065U (en) | A kind of full-automatic fortune brick device | |
CN110371887B (en) | Conveying device for indoor building blocks and using method thereof | |
CN211226194U (en) | Descending movable formwork bridge fabrication machine is demolishd and is used hoisting device template | |
CN219526131U (en) | Material lifting device for building construction | |
CN111439294A (en) | Automatic loading vehicle on ceramic tile production line | |
CN212425193U (en) | Handling device for construction | |
CN206288679U (en) | A kind of rotation material grasping manipulator for light building material processing | |
CN212828445U (en) | Pallet truck | |
CN210285985U (en) | Traveling frame brick unloading and loading equipment | |
CN221090932U (en) | Handling device for building pile foundation construction | |
CN221294956U (en) | Mobile platform for pure water injection | |
CN217024407U (en) | Hollow brick hacking machine handling structure | |
CN218201945U (en) | Material elevator for civil engineering processing material conveying | |
CN213949845U (en) | A feed structure for door plant processing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |