CN216840537U - Protection frame is piled up with scaffold to construction engineering construction - Google Patents
Protection frame is piled up with scaffold to construction engineering construction Download PDFInfo
- Publication number
- CN216840537U CN216840537U CN202220170825.8U CN202220170825U CN216840537U CN 216840537 U CN216840537 U CN 216840537U CN 202220170825 U CN202220170825 U CN 202220170825U CN 216840537 U CN216840537 U CN 216840537U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- plate
- protection frame
- positioning
- plywood
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 35
- 239000011120 plywood Substances 0.000 claims abstract description 19
- 239000004744 fabric Substances 0.000 claims description 9
- 238000003780 insertion Methods 0.000 claims description 5
- 230000037431 insertion Effects 0.000 claims description 5
- 238000009825 accumulation Methods 0.000 claims 6
- 239000011148 porous material Substances 0.000 claims 2
- 239000000463 material Substances 0.000 abstract description 25
- 238000007664 blowing Methods 0.000 abstract description 2
- 238000005192 partition Methods 0.000 abstract description 2
- 230000001360 synchronised effect Effects 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 7
- 238000004891 communication Methods 0.000 description 5
- 230000008569 process Effects 0.000 description 4
- 230000009471 action Effects 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 230000004075 alteration Effects 0.000 description 1
- 230000000712 assembly Effects 0.000 description 1
- 238000000429 assembly Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model relates to a protection frame is piled up with scaffold frame to construction engineering construction, comprising a base plate, the left and right sides of bottom plate all is provided with the curb plate, and two curb plates all are provided with elevator motor to the one side that deviates from, and elevator motor's output shaft is provided with the threaded rod, and the outside threaded connection of threaded rod has the lifter plate, is provided with the plywood between the relative one side of two lifter plates. This protection frame is piled up to scaffold frame for construction engineering construction, through elevator motor synchronous drive threaded rod, thereby drive lifter plate and plywood and go up and down, fall to when being close to the bottom plate at the plywood, carry out the blowing, then rise again, two-layer structure, increase inside holistic capacity, and carry out two partitions with inside, deposit with the plywood of higher position is separated, thereby guarantee the height of being convenient for to take on the bottom plate, and, after the material on the bottom plate takes the completion, the plywood falls, thereby take again at the material of safe high on the plywood, the safe material of taking of being convenient for.
Description
Technical Field
The utility model relates to a building engineering technical field specifically is a protection frame is piled up with scaffold frame to construction engineering construction.
Background
The building engineering refers to an engineering entity formed by the construction of various building buildings and their auxiliary facilities and the installation activities of lines, pipelines and equipment matched with the building buildings, wherein the building buildings refer to the engineering which has a top cover, a beam column, a wall, a foundation and can form an internal space and meet the requirements of production, living, learning and public activities of people, and the scaffold is a working platform which is erected for ensuring the smooth proceeding of each construction process and is divided into an external scaffold and an internal scaffold according to the erected position.
Scaffold frame generally piles up in ordinary protection frame at the building site, and protection frame protectiveness is ordinary, and the scaffold frame that single protection frame can be deposited is limited, and to taking of scaffold frame, need follow earlier taking of top, and the scaffold frame at top is higher again, is unfavorable for taking, and the scaffold frame of higher department when taking, takes place to drop easily, causes unnecessary unexpected incident.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a protection frame is piled up with scaffold frame to construction engineering construction possesses and is convenient for deposit, and is convenient for advantage such as safely take, and it is limited to have solved current scaffold frame and piled up protection frame and deposit scaffold frame, and is not convenient for the problem of safely taking to scaffold frame.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a protection frame is piled up with scaffold frame to construction engineering construction, includes the bottom plate, the left and right sides of bottom plate all is provided with the curb plate, and two curb plates all are provided with elevator motor to the one side that deviates from, and elevator motor's output shaft is provided with the threaded rod, and the outside threaded connection of threaded rod has the lifter plate, is provided with the plywood between the relative one side of two lifter plates, two be provided with the screen cloth between the top support of curb plate, the bottom of screen cloth is provided with four locating levers, the front and the back of curb plate all are provided with the positioning seat, the front and the back of curb plate all are provided with locating component.
Furthermore, the outer sides of the side plates are provided with sliding holes, the lifting plate is connected with the corresponding sliding holes in a sliding mode, and the laminate is located between the two opposite sides of the two side plates.
Furthermore, the top of the positioning seat is provided with a jack, and the positioning rod is inserted into the corresponding jack.
Furthermore, the positioning assembly is located below the corresponding positioning seat, and the bottom end of the positioning rod penetrates through the insertion hole and extends to the lower side of the positioning seat.
Furthermore, locating component includes the spring case of fixed connection on the curb plate, sets up the joint spring in the spring case inboard to and set up the inserted bar of keeping away from spring case one side at the joint spring.
Furthermore, the outer side of the positioning rod is provided with a positioning hole, and the inserting rod is inserted into the corresponding positioning hole.
Furthermore, the front of the positioning rod is provided with a pull rod, the front of the spring cylinder is provided with a communication hole, and the pull rod is connected with the communication hole in a sliding mode.
(III) advantageous effects
Compared with the prior art, the technical scheme of the application has the following beneficial effects:
1. this protection frame is piled up to scaffold frame for construction engineering construction, through elevator motor synchronous drive threaded rod, thereby drive lifter plate and plywood and go up and down, fall to when being close to the bottom plate at the plywood, carry out the blowing, then rise again, two-layer structure, increase inside holistic capacity, and carry out two partitions with inside, deposit with the plywood of higher position is separated, thereby guarantee the height of being convenient for to take on the bottom plate, and, after the material on the bottom plate takes the completion, the plywood falls, thereby take again at the material of safe high on the plywood, the safe material of taking of being convenient for.
2. This protection frame is piled up to scaffold frame for construction engineering construction nets through the material of screen cloth on with the plywood to prevent that the material of eminence from droing, cause unnecessary danger, promote the security, peg graft through the locating hole on inserted bar on the locating component and the locating lever, can be convenient carry out the top of pulling down to the screen cloth front and back side, thereby net the front and back side of material on the plywood.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a partial cross-sectional view of the structure of the present invention;
FIG. 3 is an enlarged view of part A of the structure of FIG. 2;
fig. 4 is a right side view of the structural side plate of the present invention.
In the figure: 100 bottom plates, 200 side plates, 201 lifting motors, 202 threaded rods, 203 lifting plates, 204 sliding holes, 300 layers of plates, 400 meshes, 401 positioning rods, 402 positioning holes, 500 positioning seats, 501 insertion holes, 600 positioning components, 610 spring cylinders, 620 clamping springs, 630 insertion rods, 601 pull rods and 602 communication holes.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 4, the scaffold piling protection frame for construction engineering in the embodiment includes a bottom plate 100, side plates 200 are disposed on both left and right sides of the bottom plate 100, a lifting motor 201 is disposed on each of two side plates 200 facing away from each other, a threaded rod 202 is disposed on an output shaft of the lifting motor 201, a lifting plate 203 is connected to an outer side of the threaded rod 202 through a thread, a laminate 300 is disposed between two opposite sides of the lifting plate 203, the laminate 300 is disposed between two opposite sides of the two side plates 200, a mesh 400 is disposed between top supports of the two side plates 200, four positioning rods 401 are disposed at the bottom of the mesh 400, the four positioning rods 401 are disposed at front sides of the two side plates 200, the two positioning rods 401 are disposed at rear sides of the two side plates 200, positioning seats 500 are disposed at front and back sides of the side plates 200, and positioning assemblies 600 are disposed at front and back sides of the side plates 200.
The outer side of the side plate 200 is provided with a sliding hole 204, the lifting plate 203 is connected with the corresponding sliding hole 204 in a sliding manner, and the lifting is limited and guided by the sliding connection of the lifting plate 203 and the sliding hole 204.
In addition, jack 501 has been seted up at the top of positioning seat 500, and locating lever 401 is pegged graft with corresponding jack 501, pegs graft through locating lever 401 and jack 501 and carries out preliminary location to locating lever 401's position.
In addition, locating component 600 is located the below of corresponding positioning seat 500, the bottom of locating lever 401 runs through jack 501 and extends to the below of positioning seat 500, locating component 600 includes spring barrel 610 of fixed connection on curb plate 200, the setting is at the inboard joint spring 620 of spring barrel 610, and set up the inserted bar 630 of keeping away from spring barrel 610 one side at joint spring 620, locating hole 402 has been seted up in the outside of locating lever 401, inserted bar 630 pegs graft with corresponding locating hole 402, peg graft with locating hole 402 through inserted bar 630, thereby fix a position the front and back side that mesh 400 pulled down.
In addition, a pull rod 601 is arranged on the front surface of the positioning rod 401, a communication hole 602 is formed in the front surface of the spring barrel 610, the pull rod 601 is connected with the communication hole 602 in a sliding mode, and the positioning rod 401 is pulled to move conveniently through the pull rod 601.
The working principle of the above embodiment is as follows:
(1) drive threaded rod 202 through elevator motor 201 and rotate, threaded rod 202 drives lifter plate 203 and removes, lifter plate 203 and sliding hole 204 relative slip, thereby it goes up and down to drive plywood 300, pile up some earlier on plywood 300 with the material, then rise plywood 300, drop positioning rod 401 down, insert in the jack 501, fix a position, then pulling pull rod 601, compression joint spring 620, thereby align locating hole 402 with inserted bar 630, then loosen pull rod 601, joint spring 620 promotes inserted bar 630 and inserts in locating hole 402, thereby carry out the pull-down location to screen cloth 400, protect the material of eminence.
(2) When the materials need to be taken, the materials on the bottom plate 100 are taken from the top, the top height of the materials on the bottom plate 100 is low, the taking is convenient, after the materials are taken, the laminate 300 is lowered, the materials on the laminate 300 are taken from the top, and the tops of the materials on the lowered laminate 300 are also low, so that the materials are convenient to take.
Compared with the prior art: the threaded rod 202 is synchronously driven by the lifting motor 201, so that the lifting plate 203 and the laminate 300 are driven to lift, when the laminate 300 falls to be close to the bottom plate 100, the materials are discharged and then lifted, the two layers of structures are arranged, the integral capacity of the interior is increased, the interior is divided into two parts, the laminate 300 at a higher position is separated and stored, so that the height of the laminate 300 on the bottom plate 100 convenient to take is ensured, after the materials on the bottom plate 100 are taken, the laminate 300 is lowered, the materials on the laminate 300 are taken at a safe height, the materials are taken safely, the materials on the laminate 300 are meshed through the mesh cloth 400, the falling of the materials at a high position is prevented, unnecessary danger is avoided, the safety is improved, the inserting rod 630 on the positioning assembly 600 is inserted into the positioning hole 402 on the positioning rod 401, the top of the front side and the back side of the mesh cloth 400 can be pulled down conveniently, thereby the front and back side of material on the net live plywood 300 has solved current scaffold and has piled up the protection frame and deposit the scaffold frame limitedly, and the problem of being not convenient for take safely to scaffold frame.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (7)
1. The utility model provides a protection frame is piled up with scaffold frame to construction engineering construction, includes bottom plate (100), its characterized in that: the left and right sides of bottom plate (100) all is provided with curb plate (200), and two curb plates (200) all are provided with elevator motor (201) to the one side that deviates from, and the output shaft of elevator motor (201) is provided with threaded rod (202), and the outside threaded connection of threaded rod (202) has lifter plate (203), is provided with plywood (300) between the relative one side of two lifter plates (203), two be provided with screen cloth (400) between the top support of curb plate (200), the bottom of screen cloth (400) is provided with four locating levers (401), the front and the back of curb plate (200) all are provided with positioning seat (500), the front and the back of curb plate (200) all are provided with locating component (600).
2. The scaffold accumulation protection frame for construction engineering construction according to claim 1, characterized in that: the outer sides of the side plates (200) are provided with sliding holes (204), the lifting plate (203) is connected with the corresponding sliding holes (204) in a sliding mode, and the layer plate (300) is located between the opposite sides of the two side plates (200).
3. The scaffold accumulation protection frame for construction engineering construction according to claim 1, characterized in that: jack (501) have been seted up at the top of positioning seat (500), locating lever (401) are pegged graft with corresponding jack (501).
4. The scaffold accumulation protection frame for construction engineering construction according to claim 3, wherein: the positioning assembly (600) is located below the corresponding positioning seat (500), and the bottom end of the positioning rod (401) penetrates through the insertion hole (501) and extends to the position below the positioning seat (500).
5. The scaffold accumulation protection frame for construction engineering construction according to claim 4, wherein: the positioning assembly (600) comprises a spring barrel (610) fixedly connected to the side plate (200), a clamping spring (620) arranged on the inner side of the spring barrel (610), and an insertion rod (630) arranged on one side, far away from the spring barrel (610), of the clamping spring (620).
6. The scaffold accumulation protection frame for construction engineering construction according to claim 5, wherein: positioning holes (402) are formed in the outer side of the positioning rod (401), and the inserting rods (630) are inserted into the corresponding positioning holes (402).
7. The scaffold accumulation protection frame for construction engineering construction according to claim 6, wherein: the front of locating lever (401) is provided with pull rod (601), intercommunicating pore (602) has been seted up to the front of spring case (610), and pull rod (601) and intercommunicating pore (602) sliding connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220170825.8U CN216840537U (en) | 2022-01-21 | 2022-01-21 | Protection frame is piled up with scaffold to construction engineering construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220170825.8U CN216840537U (en) | 2022-01-21 | 2022-01-21 | Protection frame is piled up with scaffold to construction engineering construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216840537U true CN216840537U (en) | 2022-06-28 |
Family
ID=82085746
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220170825.8U Expired - Fee Related CN216840537U (en) | 2022-01-21 | 2022-01-21 | Protection frame is piled up with scaffold to construction engineering construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216840537U (en) |
-
2022
- 2022-01-21 CN CN202220170825.8U patent/CN216840537U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4095380A (en) | Building and elevator module for use therein | |
CN115012634B (en) | Steel platform deformation construction structure and method for core tube inclined wall construction | |
CN111395730A (en) | Curtain wall construction system and method suitable for high-rise building with special-shaped giant columns | |
CN216840537U (en) | Protection frame is piled up with scaffold to construction engineering construction | |
CN108005373B (en) | Integrated lifting platform system and assembling method thereof | |
CN114150857A (en) | Construction method of attached type automatic climbing elevator shaft safety protection platform | |
CN110905204B (en) | Method for transferring formwork supporting materials of wood formwork of building outer frame column | |
CN202866261U (en) | Operation hanging rack for civil construction | |
KR101961319B1 (en) | Construction Method for Base Piles using Steel Pipe Casing Withdraw and Suction-type Cofferdam | |
CN213572930U (en) | Self-locking hinged elevator shaft construction platform device | |
CN214424009U (en) | Hole reservation device for building engineering | |
JP3186519B2 (en) | Lift-up method | |
CN213573164U (en) | Ancient building clear water wall body migration bottom reinforcing apparatus | |
CN105113777A (en) | Structural construction equipment with cooperative transmission by beams in multiple layers and climb method thereof | |
CN110387872B (en) | Multilayer wailing steel sheet pile construction method | |
CN218204433U (en) | Recyclable foundation pit supporting device | |
CN217326481U (en) | I-steel subassembly fast combination construction structures | |
JP2890341B2 (en) | Method and apparatus for lifting up top-level frame for structure construction | |
CN218229796U (en) | Combined finished product prefabricated beam and column storage rack | |
CN215671063U (en) | Roofing high altitude structure template supporting platform that encorbelments | |
JP3241896B2 (en) | Steel frame stair hang down method | |
CN215888276U (en) | Steel supporting construction of interior outer steel mould assembled | |
CN212613654U (en) | Curtain wall construction system suitable for high-rise building with special-shaped giant columns | |
CN206722407U (en) | A kind of integrated form carpenter machining shed | |
CN212271700U (en) | Cage ladder for foundation pit construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220628 |
|
CF01 | Termination of patent right due to non-payment of annual fee |