CN216840506U - Building construction device for building top layer - Google Patents

Building construction device for building top layer Download PDF

Info

Publication number
CN216840506U
CN216840506U CN202123108129.9U CN202123108129U CN216840506U CN 216840506 U CN216840506 U CN 216840506U CN 202123108129 U CN202123108129 U CN 202123108129U CN 216840506 U CN216840506 U CN 216840506U
Authority
CN
China
Prior art keywords
chute seat
building
top layer
construction
lower chute
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123108129.9U
Other languages
Chinese (zh)
Inventor
史春伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Hing Construction Group Co ltd
Original Assignee
Zhejiang Hing Construction Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Hing Construction Group Co ltd filed Critical Zhejiang Hing Construction Group Co ltd
Priority to CN202123108129.9U priority Critical patent/CN216840506U/en
Application granted granted Critical
Publication of CN216840506U publication Critical patent/CN216840506U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a building construction equipment to building top layer relates to building construction technical field, including the building main part, the building main part is including the roof, the top fixed mounting of roof has the parapet, one side fixed mounting of parapet has even wall spare, the upside of roof is provided with portable top layer construction mechanism, one side of portable top layer construction mechanism is provided with the additional and stabilizes reinforcing mechanism, portable top layer construction mechanism is including lower chute seat. The utility model discloses an adopt the cooperation between the portable top layer construction mechanism inner structure, utilize the backup pad to fix lower chute seat and last chute seat, through the slip of slide bar between lower chute seat and last chute seat, and then drive the connecting plate and carry out the removal of horizontal direction with the construction hanging flower basket, utilize the connection steel pipe that the butt joint fastener will set up lower chute seat side to carry out fixed connection with even wall spare, improve the stability of portable top layer construction mechanism when the operation.

Description

Building construction device for building top layer
Technical Field
The utility model relates to a construction technical field, concretely relates to building construction equipment to building top layer.
Background
With the increasing development of the building construction technology level, the concept of large space with building functions is applied more and more, in order to meet the building function requirements, the main structure of the building is also designed into a multi-layer high-altitude and large-span large-space structure, for example, in a super high-rise building, one indoor layer is a full floor layer, the full floor layer completely isolates the upper floor and the lower floor where the full floor layer is located, and local floor slabs and floor beams can be arranged on the upper floors or the lower floors of the full floor layer, so that the large-space structure is realized on the building, the function requirements are met, and when the building is constructed, the main structure of the top layer, matched electromechanical pipelines, a finish-up ceiling and the like need to be operated at high altitude and super high altitude.
The following problems exist in the prior art:
1. when the existing building construction device for the top floor of a building is used, the construction device cannot be moved and can only be limited to a certain position, so that the top floor of the building is inconvenient to construct, and the efficiency is low;
2. when the existing building construction device of the top floor of a building is used, because the height of the top floor of the building is higher and the wind speed is higher, the construction device is greatly disturbed when in use, and the stability of the device is to be enhanced.
SUMMERY OF THE UTILITY MODEL
The utility model provides a building construction device for the top floor of a building, which aims at solving the problems that the construction device can only be limited at a certain position, the construction of the top floor is inconvenient and the efficiency is low in order to have the capability of carrying out movable operation on the construction device; the other purpose is to solve the problem that the construction device on the top floor of the building is disturbed by wind power and has larger strength so as to achieve the effect of improving the stability of the device in use.
In order to solve the technical problem, the utility model discloses the technical scheme who adopts is:
the utility model provides a building construction equipment to building top layer, includes the building main part, the building main part is including the roof, the top fixed mounting of roof has the parapet, one side fixed mounting of parapet has even wall spare, the upside of roof is provided with portable top layer construction mechanism, one side of portable top layer construction mechanism is provided with additional stable strengthening mechanism.
Portable top layer construction machinery is including lower chute seat and last chute seat, the inside of lower chute seat is provided with the slide bar, the outside of lower chute seat is provided with fixing device.
The additional stabilizing and reinforcing mechanism comprises a first sucker and a second sucker, and a communicating pipe is arranged on the upper side of the first sucker.
The utility model discloses technical scheme's further improvement lies in: the bottom of lower chute seat and the top fixed connection of roof, the top fixed mounting of lower chute seat has the backup pad, the top of backup pad and the bottom fixed connection of upper chute seat.
The utility model discloses technical scheme's further improvement lies in: the bottom of slide bar and the inner wall swing joint of lower chute seat, the top of slide bar and the inner wall swing joint of last chute seat, fixed mounting has the connecting plate on the surface of slide bar.
The utility model discloses technical scheme's further improvement lies in: portable top layer construction machine constructs including the construction hanging flower basket, one side of construction hanging flower basket and the one end fixed connection of connecting plate, fixing device is including connecting the steel pipe, the one end of connecting the steel pipe and the side fixed connection of lower chute base, the one end fixed mounting of connecting the steel pipe has the butt joint fastener, the one end of butt joint fastener and the one end fixed connection who links the wall spare.
The utility model discloses technical scheme's further improvement lies in: the bottom of the communicating pipe is fixedly connected with the top of the first sucking disc, a fixing rod is fixedly mounted on the outer surface of the communicating pipe, and one end of the fixing rod is fixedly connected with the side face of the lower chute seat.
The utility model discloses technical scheme's further improvement lies in: the top fixed mounting of second sucking disc has the exhaust tube, fixed mounting has the breather pipe on the surface of communicating pipe, the one end of breather pipe and the fixed surface connection of exhaust tube, fixed mounting has the location connecting rod on the surface of exhaust tube, the one end of location connecting rod and the side fixed connection of last chute seat.
Owing to adopted above-mentioned technical scheme, the utility model discloses relative prior art, the technological progress who gains is:
1. the utility model provides a building construction equipment to building top layer, adopt the cooperation between the portable top layer construction mechanism inner structure, utilize the backup pad to fix lower chute seat and last chute seat, through the slip of slide bar between lower chute seat and last chute seat, and then drive connecting plate and construction hanging flower basket and carry out the removal of horizontal direction, utilize the butt joint fastener to carry out fixed connection with the connection steel pipe that sets up the lower chute seat side and even wall spare, improve the stability of portable top layer construction mechanism when the operation.
2. The utility model provides a building construction equipment to building top layer adopts the cooperation between the additional stable strengthening mechanism inner structure, utilizes the fixed rod to fix first sucking disc and communicating pipe, and cooperation location connecting rod carries out fixed mounting with exhaust tube and second sucking disc, communicates communicating pipe and the inside of exhaust tube through the breather pipe, and the device is when using, takes out to the vacuum from the exhaust tube top with first sucking disc and second sucking disc is inside, improves the joint strength between device and the roof.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic perspective view of the structurally movable top layer construction mechanism of the present invention;
fig. 3 is a schematic perspective view of the structure fixing device of the present invention;
fig. 4 is a schematic perspective view of the structure-attached stabilization and reinforcement mechanism of the present invention.
In the figure: 1. a building body; 2. a top plate; 21. a parapet wall; 3. a wall connecting piece; 4. a mobile top layer construction mechanism; 41. a lower chute base; 42. an upper chute seat; 43. a support plate; 44. a slide bar; 45. a connecting plate; 46. constructing a hanging basket; 47. a fixing device; 471. connecting the steel pipes; 472. a butt-joint fastener; 5. a stabilizing and reinforcing mechanism is added; 51. a first suction cup; 52. a communicating pipe; 53. fixing the rod; 54. a second suction cup; 55. an air exhaust pipe; 56. a breather pipe; 57. the connecting rod is positioned.
Detailed Description
The present invention will be described in further detail with reference to the following examples:
example 1
As shown in fig. 1-4, the utility model provides a building construction device for building top layer, which comprises a building main body 1, the building main body 1 comprises a top plate 2, a parapet 21 is fixedly installed on the top of the top plate 2, a wall connecting piece 3 is fixedly installed on one side of the parapet 21, a movable top layer construction mechanism 4 is arranged on the upper side of the top plate 2, an additional stabilizing and reinforcing mechanism 5 is arranged on one side of the movable top layer construction mechanism 4, the movable top layer construction mechanism 4 comprises a lower chute seat 41 and an upper chute seat 42, a slide bar 44 is arranged inside the lower chute seat 41, a fixing device 47 is arranged on the outer side of the lower chute seat 41, the additional stabilizing and reinforcing mechanism 5 comprises a first suction cup 51 and a second suction cup 54, a communicating pipe 52 is arranged on the upper side of the first suction cup 51, the bottom of the lower chute seat 41 is fixedly connected with the top of the top plate 2, a supporting plate 43 is fixedly installed on the top of the lower chute seat 41, the top of the supporting plate 43 is fixedly connected with the bottom of the upper chute seat 42.
In this embodiment, the lower chute seat 41 and the upper chute seat 42 are fixed by the supporting plate 43, the top layer of the building body 1 is conveniently constructed by the movable top layer construction mechanism 4, and the movable top layer construction mechanism 4 is conveniently and fixedly installed by the wall connecting piece 3 fixedly installed on the side surface of the parapet 21.
Example 2
As shown in fig. 1-4, on the basis of embodiment 1, the utility model provides a technical solution: preferably, the bottom of slide bar 44 and the inner wall swing joint of lower chute seat 41, the top of slide bar 44 and the inner wall swing joint of upper chute seat 42, fixed mounting has connecting plate 45 on the surface of slide bar 44, portable top layer construction mechanism 4 is including construction hanging flower basket 46, one side of construction hanging flower basket 46 and the one end fixed connection of connecting plate 45, fixing device 47 is including connecting steel pipe 471, the one end of connecting steel pipe 471 and the side fixed connection of lower chute seat 41, the one end fixed mounting of connecting steel pipe 471 has butt joint fastener 472, the one end of butt joint fastener 472 and the one end fixed connection of wall connecting piece 3.
In this embodiment, the sliding rod 44 slides between the lower chute seat 41 and the upper chute seat 42 to further drive the connecting plate 45 and the construction basket 46 to move in the horizontal direction, and the butt-joint fastener 472 is used to fixedly connect the connecting steel pipe 471 arranged on the side surface of the lower chute seat 41 with the wall connecting piece 3, so as to improve the stability of the mobile top layer construction mechanism 4 during operation.
Example 3
As shown in fig. 1-4, on the basis of embodiment 1, the utility model provides a technical solution: preferably, the bottom of the communication pipe 52 is fixedly connected to the top of the first suction cup 51, a fixing rod 53 is fixedly mounted on the outer surface of the communication pipe 52, one end of the fixing rod 53 is fixedly connected to the side of the lower chute seat 41, an air exhaust pipe 55 is fixedly mounted on the top of the second suction cup 54, an air pipe 56 is fixedly mounted on the outer surface of the communication pipe 52, one end of the air pipe 56 is fixedly connected to the outer surface of the air exhaust pipe 55, a positioning connecting rod 57 is fixedly mounted on the outer surface of the air exhaust pipe 55, and one end of the positioning connecting rod 57 is fixedly connected to the side of the upper chute seat 42.
In this embodiment, the fixing rod 53 is used to fix the first suction cup 51 and the communicating tube 52, the positioning connecting rod 57 is used to fixedly mount the suction tube 55 and the second suction cup 54, the communicating tube 52 is communicated with the inside of the suction tube 55 through the vent tube 56, and when the device is used, the inside of the first suction cup 51 and the inside of the second suction cup 54 are pumped to vacuum from the top of the suction tube 55, so that the connection strength between the device and the top plate is improved.
The working principle of the construction apparatus for the top floor of a building will be described in detail.
As shown in fig. 1-4, when the device is used, the lower chute seat 41 and the upper chute seat 42 are fixed by the supporting plate 43, the mobile top layer construction mechanism 4 is arranged to facilitate the exterior elevation construction of the top layer of the building body 1, the mobile top layer construction mechanism 4 is conveniently fixed by the wall connecting piece 3 fixedly arranged on the side surface of the parapet 21, the connecting plate 45 and the construction hanging basket 46 are driven to move horizontally by the sliding of the sliding rod 44 between the lower chute seat 41 and the upper chute seat 42, the connecting steel pipe 471 arranged on the side surface of the lower chute seat 41 is fixedly connected with the wall connecting piece 3 by the butt-joint fastener 472, the stability of the mobile top layer construction mechanism 4 during operation is improved, the building body 1 has the capability of mobile operation on the construction device, the problem that the construction device can only be limited to a certain position is solved, the construction of the top layer is inconvenient, the problem of low efficiency is caused, the fixing rod 53 is used for fixing the first suction cup 51 and the communicating pipe 52, the matching positioning connecting rod 57 is used for fixedly installing the exhaust pipe 55 and the second suction cup 54, the communicating pipe 52 is communicated with the inside of the exhaust pipe 55 through the vent pipe 56, when the device is used, the first suction cup 51 and the inside of the second suction cup 54 are pumped to vacuum from the top of the exhaust pipe 55, the connection strength between the device and the top plate is improved, the problem that the construction device positioned on the top layer of a building is large in wind disturbance strength is solved, and the stability of the device in use is improved.
The present invention has been described in detail with reference to the above general description, but it will be apparent to one of ordinary skill in the art that modifications and improvements can be made to the invention. Therefore, modifications or improvements without departing from the spirit of the invention are within the scope of the invention.

Claims (6)

1. A building construction device for a building top layer comprises a building main body (1), wherein the building main body (1) comprises a top plate (2), a parapet wall (21) is fixedly mounted at the top of the top plate (2), and a wall connecting piece (3) is fixedly mounted on one side of the parapet wall (21), and is characterized in that: a movable top layer construction mechanism (4) is arranged on the upper side of the top plate (2), and an additional stable reinforcing mechanism (5) is arranged on one side of the movable top layer construction mechanism (4);
the movable top layer construction mechanism (4) comprises a lower chute seat (41) and an upper chute seat (42), a sliding rod (44) is arranged inside the lower chute seat (41), and a fixing device (47) is arranged outside the lower chute seat (41);
the additional stabilizing and reinforcing mechanism (5) comprises a first sucker (51) and a second sucker (54), and a communicating pipe (52) is arranged on the upper side of the first sucker (51).
2. A construction device for a building ceiling according to claim 1, wherein: the bottom of lower chute seat (41) and the top fixed connection of roof (2), the top fixed mounting of lower chute seat (41) has backup pad (43), the bottom fixed connection of the top of backup pad (43) and upper chute seat (42).
3. A construction device for a building ceiling according to claim 1, wherein: the bottom of slide bar (44) and the inner wall swing joint of lower chute seat (41), the top of slide bar (44) and the inner wall swing joint of upper chute seat (42), fixed mounting has connecting plate (45) on the surface of slide bar (44).
4. A construction device for a building ceiling according to claim 1, wherein: portable top layer construction machinery (4) is including construction hanging flower basket (46), one side of construction hanging flower basket (46) and the one end fixed connection of connecting plate (45), fixing device (47) are including connecting steel pipe (471), the side fixed connection of the one end of connecting steel pipe (471) and lower sliding seat (41), the one end fixed mounting of connecting steel pipe (471) has butt joint fastener (472), the one end of butt joint fastener (472) and the one end fixed connection of wall spare (3).
5. A construction device for a building ceiling according to claim 1, wherein: the bottom of the communicating pipe (52) is fixedly connected with the top of the first suction disc (51), a fixing rod (53) is fixedly installed on the outer surface of the communicating pipe (52), and one end of the fixing rod (53) is fixedly connected with the side face of the lower chute seat (41).
6. A construction device for a building ceiling according to claim 1, wherein: the top fixed mounting of second sucking disc (54) has exhaust tube (55), fixed mounting has breather pipe (56) on the surface of communicating pipe (52), the one end of breather pipe (56) and the outer fixed surface connection of exhaust tube (55), fixed mounting has location connecting rod (57) on the surface of exhaust tube (55), the one end of location connecting rod (57) and the side fixed connection of last spout seat (42).
CN202123108129.9U 2021-12-10 2021-12-10 Building construction device for building top layer Active CN216840506U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123108129.9U CN216840506U (en) 2021-12-10 2021-12-10 Building construction device for building top layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123108129.9U CN216840506U (en) 2021-12-10 2021-12-10 Building construction device for building top layer

Publications (1)

Publication Number Publication Date
CN216840506U true CN216840506U (en) 2022-06-28

Family

ID=82106792

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123108129.9U Active CN216840506U (en) 2021-12-10 2021-12-10 Building construction device for building top layer

Country Status (1)

Country Link
CN (1) CN216840506U (en)

Similar Documents

Publication Publication Date Title
CN210127613U (en) Vertical automatic wall tile sticking device for building construction
CN103318742A (en) Pulley telescopic boom type glass sucker hanger
CN216840506U (en) Building construction device for building top layer
CN109025320A (en) A kind of light cellular partition board automated installation of system and light cellular partition board automatic installation method
CN210144604U (en) Glass curtain wall robot
CN108374547A (en) A kind of tile laying device
CN217555190U (en) Liquid crystal glass line code transplanting mechanism
CN114233017A (en) Assembled building wallboard hoisting device and using method thereof
CN205446933U (en) Novel tuber pipe gallows
CN212127443U (en) Protection device for high-rise building construction
CN214756388U (en) Energy data gateway installation auxiliary device
CN215148316U (en) Preparation outdoor sucking disc anchor clamps for elevator accessory
CN215043236U (en) Novel negative pressure foot type wall-climbing robot
CN211201078U (en) Building decoration is with attached device of supplementary
CN208981745U (en) Multifunction scaffold
CN208217860U (en) Handling device
CN209259614U (en) Scaffold
CN112027877A (en) Hoisting device for transferring building curtain wall
CN211622735U (en) Assembled color steel plate house convenient to hoist and mount and fix
CN111176067A (en) Video conference projection fixing device
CN220519908U (en) Sponge type porous sucker structure of vacuum air pipe crane
CN217296897U (en) Glass suspension device in curtain installation
CN218815105U (en) Construction device for elevator shaft
CN213952872U (en) Ceramic tile attaching auxiliary device for building external wall
CN219885505U (en) Oblique hoisting device applicable to sleeve for water supply pipeline

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant