CN216840100U - Installation mosaic structure that engineering curtain was used - Google Patents

Installation mosaic structure that engineering curtain was used Download PDF

Info

Publication number
CN216840100U
CN216840100U CN202220211042.XU CN202220211042U CN216840100U CN 216840100 U CN216840100 U CN 216840100U CN 202220211042 U CN202220211042 U CN 202220211042U CN 216840100 U CN216840100 U CN 216840100U
Authority
CN
China
Prior art keywords
mounting
plate
installation
curtain
mounting panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220211042.XU
Other languages
Chinese (zh)
Inventor
栾浦宁
黄步龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Yichuan Construction Development Co ltd
Original Assignee
Nanjing Yichuan Construction Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Yichuan Construction Development Co ltd filed Critical Nanjing Yichuan Construction Development Co ltd
Priority to CN202220211042.XU priority Critical patent/CN216840100U/en
Application granted granted Critical
Publication of CN216840100U publication Critical patent/CN216840100U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses an installation mosaic structure that engineering curtain was used, including concatenation shell, second mounting panel and first fixed plate, the back mounted of concatenation shell has a plurality of mountings, the second mounting panel is installed to the back symmetry of concatenation shell, and the second mounting panel is located the below of mounting, the connecting plate is installed to the front symmetry of first fixed plate, the plate body is installed to the bottom of first fixed plate, the connecting block is installed to the bilateral symmetry of plate body, the second fixed plate is installed to the bottom of plate body. The utility model discloses in when demolising it, because the connecting piece does not need the staff to support the curtain in entering into the spread groove, make the staff dismantle light more, when each fastener is dismantled and is accomplished, with curtain rebound, make the connecting piece roll-off spread groove can make the curtain take off to do not need the cooperation of a plurality of staff to dismantle simultaneously, play the effect of saving manpower.

Description

Installation mosaic structure that engineering curtain was used
Technical Field
The utility model relates to an engineering curtain technical field specifically is an installation mosaic structure that engineering curtain was used.
Background
The curtain is the plate body of installing in the building outside, and along with the development of technique, people are to building pleasing to the eye pursuit, and more buildings all begin to use the curtain in the outside, and the curtain need be installed and the concatenation to the curtain with installation concatenation mechanism when installing, makes a plurality of curtains can assemble together and use.
The installation mosaic structure that current engineering curtain wall was used has the defect that:
1. patent document CN211200838U discloses a structure is assembled with assembled curtain for architectural design, "including the base, the upper end fixedly connected with support column of base, the right-hand member fixedly connected with connecting seat of support column, the curtain board is installed to the right-hand member of connecting seat, there is the screw thread piece through threaded connection in the curtain board, the left end fixedly connected with connecting block of screw thread piece, the left end fixedly connected with shell fragment of connecting block, the fixed surface of shell fragment is connected with the fixture block, fixedly connected with bracing piece between the support column. This assembled curtain mosaic structure for architectural design is through designing the connecting seat on the support column, and through installing the curtain at the connecting seat, adopt buckle structure to assemble, simple to operate is swift, adopt the screw thread piece moreover, the connecting block, the integral type connecting piece installation curtain board that shell fragment and fixture block constitute, it can to change the connecting piece when the connecting piece damages, need not to scrap whole curtain board, be favorable to reducing the cost of overhaul, "but this installation mosaic structure, be not convenient for dismantle, need many people to cooperate to dismantle very trouble.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an installation mosaic structure that engineering curtain was used to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an installation mosaic structure that engineering curtain was used, includes concatenation shell, second mounting panel and first fixed plate, the back mounted of concatenation shell has a plurality of mountings, the second mounting panel is installed to the back symmetry of concatenation shell, and the second mounting panel is located the below of mounting, the connecting plate is installed to the front symmetry of first fixed plate, the plate body is installed to the bottom of first fixed plate, the connecting block is installed to the bilateral symmetry of plate body, the second fixed plate is installed to the bottom of plate body.
Preferably, the curtain body is installed in the front of concatenation shell, and the splice groove has been seted up in the outside of concatenation shell, and the back mounted of concatenation shell has first mounting panel, and first mounting panel is located the below of second mounting panel.
Preferably, the back surface of the fixing part is provided with a mounting semi-ring, and the top of the mounting semi-ring is provided with a fixing bolt in a penetrating way.
Preferably, a connector is mounted on the back surface of the second mounting plate.
Preferably, the installation pole is installed in the inboard run-through of connecting plate, and the mounting groove has been seted up in the outside of installation pole, and the mounting hole has been seted up at the top of mounting groove.
Preferably, the front surface of the connecting block is provided with a connecting groove, and the connecting groove is embedded with the connecting piece.
Preferably, a support plate is mounted on the front surface of the second fixing plate.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses an install the installation piece in the both sides of plate body, the spread groove has been seted up in the front of installation piece, there is the second mounting panel at the back mounting of concatenation shell simultaneously, the back mounting of second mounting panel has the connecting piece, the connecting piece can enter into the inside of spread groove, when the curtain is dismantled, can demolish fasteners such as fixing bolt earlier, when demolising, because the connecting piece enters into the spread groove, do not need the staff to support the curtain, it is more light to make the staff dismantle, when each fastener dismantlement is accomplished, with curtain rebound, make the connecting piece roll-off spread groove can make the curtain take off, thereby do not need the cooperation of a plurality of staff to dismantle simultaneously, play the effect of laborsaving power.
2. The utility model discloses an inboard at the connecting plate is run through and is installed the installation pole, the mounting groove has been seted up in the outside of installation pole, the mounting hole has been seted up at the top of mounting groove simultaneously, when this curtain is installed, only need place the installation semi-ring in the mounting groove, enter into the mounting hole through the fixing bolt is rotatory, can install the curtain, first mounting panel can be located the top of backup pad simultaneously, then fix first mounting panel again through the mounting, thereby make the more firm of this curtain installation, it is also more convenient that the staff installs.
Drawings
Fig. 1 is a perspective view of the present invention;
FIG. 2 is a schematic view of the fixing member of the present invention;
fig. 3 is a schematic diagram of a second mounting plate structure of the present invention;
fig. 4 is a schematic diagram of a first fixing plate structure of the present invention.
In the figure: 1. splicing the shells; 101. a curtain wall body; 102. splicing grooves; 103. a first mounting plate; 2. a fixing member; 201. installing a semi-ring; 202. fixing the bolt; 3. a second mounting plate; 301. a connecting member; 4. a first fixing plate; 401. a connecting plate; 402. mounting a rod; 403. mounting grooves; 404. mounting holes; 5. a plate body; 501. connecting blocks; 502. connecting grooves; 6. a second fixing plate; 601. and a support plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-3, the present invention provides an embodiment: an installation splicing structure for an engineering curtain wall;
the first embodiment comprises a splicing shell 1, fixing pieces 2 and a second mounting plate 3, wherein the back surface of the splicing shell 1 is provided with a plurality of fixing pieces 2, the front surface of the splicing shell 1 is provided with a curtain wall body 101, the outer side of the splicing shell 1 is provided with a splicing groove 102, the back surface of the splicing shell 1 is provided with a first mounting plate 103, the first mounting plate 103 is positioned below the second mounting plate 3, the splicing shell 1 is used for mounting the curtain wall body 101, so that the curtain wall body 101 can be spliced or mounted, the curtain wall body 101 is mounted on the surface of a building, so that the building is more attractive, the splicing groove 102 provides a space for splicing curtain walls, so that the curtain walls can be connected, the first mounting plate 103 provides a position for mounting the splicing shell 1, the back surface of the fixing pieces 2 is provided with a semi-ring 201, the top of the semi-ring 201 is provided with a fixing bolt 202 in a penetrating way, the back surface of the splicing shell 1 is symmetrically provided with the second mounting plate 3, and the second mounting panel 3 is located below the fixing element 2, the connecting element 301 is installed on the back surface of the second mounting panel 3, the fixing element 2 provides a position for installing the half installation ring 201, so that the half installation ring 201 can be installed, the half installation ring 201 can be installed outside the installation groove 403, so that the curtain wall can be fixed, the fixing bolt 202 plays a role in fixing and is used for fixing the half installation ring 201, the second mounting panel 3 provides a position for installing the connecting element 301, the connecting element 301 enters the connection groove 502, so that when the curtain wall is disassembled, the weight of the curtain wall does not need to be supported by a worker, and the disassembly by the worker is more convenient.
Referring to fig. 4, the present invention provides an embodiment: an installation splicing structure for an engineering curtain wall;
the second embodiment comprises a first fixing plate 4, wherein connecting plates 401 are symmetrically installed on the front surface of the first fixing plate 4, an installation rod 402 is installed inside the connecting plate 401 in a penetrating manner, an installation groove 403 is formed in the outer side of the installation rod 402, an installation hole 404 is formed in the top of the installation groove 403, the first fixing plate 4 is used for being installed on a wall body, meanwhile, an installation position is provided for the connecting plate 401 to enable installation, the connecting plate 401 provides an installation position for the installation rod 402 to enable the installation rod 402 to be installed, the installation rod 402 enables the installation groove 403 to be formed and enables the installation of the installation half ring 201, the installation groove 403 enables the installation half ring 201 not to slide left and right during installation, installation of the installation half ring 201 is enabled to be more stable, and the installation hole 404 provides a space for fixing the fixing bolt 202.
Referring to fig. 1 and 4, the present invention provides an embodiment: an installation splicing structure for an engineering curtain wall;
embodiment three, including plate body 5 and second fixed plate 6, plate body 5 is installed to the bottom of first fixed plate 4, connecting block 501 is installed to the bilateral symmetry of plate body 5, connecting groove 502 has been seted up in connecting block 501's front, and connecting groove 502 and connecting piece 301 gomphosis mutually, second fixed plate 6 is installed to the bottom of plate body 5, backup pad 601 is installed to the front of second fixed plate 6, plate body 5 provides the mounted position for connecting block 501, also second fixed plate 6 can install simultaneously, connecting block 501 provides the position for seting up of connecting groove 502, the inside of connecting groove 502 is used for installing connecting piece 301, make connecting piece 301 have the position to install, second fixed plate 6 provides the mounted position for backup pad 601, backup pad 601 provides fixed position for first mounting panel 103, make first mounting panel 103 can fix.
The working principle is as follows: before using the installation splicing structure for the curtain wall, whether the installation splicing structure for the curtain wall has the problem of influencing use or not is checked, firstly, the installation splicing structure for the curtain wall is installed on a building needing to be used through the first fixing plate 4 and the second fixing plate 6, when the curtain wall needs to be installed, the installation semi-ring 201 is installed on the installation groove 403 through the fixing bolt 202 by installing the installation semi-ring 201, the first installation plate 103 is installed on the top of the support plate 601, and the connecting piece 301 enters the connection groove 502 from the top of the connection groove 502, so that the curtain wall can be installed.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein, and any reference signs in the claims are not intended to be construed as limiting the claim concerned.

Claims (7)

1. The utility model provides an installation mosaic structure that engineering curtain was used, includes splice shell (1), second mounting panel (3) and first fixed plate (4), its characterized in that: the back mounted of concatenation shell (1) has a plurality of mounting (2), second mounting panel (3) are installed to the back symmetry of concatenation shell (1), and second mounting panel (3) are located the below of mounting (2), connecting plate (401) are installed to the front symmetry of first fixed plate (4), plate body (5) are installed to the bottom of first fixed plate (4), connecting block (501) are installed to the bilateral symmetry of plate body (5), second fixed plate (6) are installed to the bottom of plate body (5).
2. The mounting and splicing structure for the engineering curtain wall as claimed in claim 1, wherein: curtain body (101) are installed in the front of concatenation shell (1), and concatenation groove (102) have been seted up in the outside of concatenation shell (1), and the back mounted of concatenation shell (1) has first mounting panel (103), and just first mounting panel (103) are located the below of second mounting panel (3).
3. The mounting and splicing structure for the engineering curtain wall as claimed in claim 1, wherein: the back of the fixing piece (2) is provided with a mounting semi-ring (201), and the top of the mounting semi-ring (201) is provided with a fixing bolt (202) in a penetrating way.
4. The mounting and splicing structure for the engineering curtain wall as claimed in claim 1, wherein: and a connecting piece (301) is arranged on the back surface of the second mounting plate (3).
5. The mounting and splicing structure for the engineering curtain wall as claimed in claim 1, wherein: the mounting rod (402) is installed in the inner side of the connecting plate (401) in a penetrating mode, a mounting groove (403) is formed in the outer side of the mounting rod (402), and a mounting hole (404) is formed in the top of the mounting groove (403).
6. The mounting and splicing structure for the engineering curtain wall as claimed in claim 1, wherein: the front surface of the connecting block (501) is provided with a connecting groove (502), and the connecting groove (502) is embedded with the connecting piece (301).
7. The mounting and splicing structure for the engineering curtain wall as claimed in claim 1, wherein: and a support plate (601) is arranged on the front surface of the second fixing plate (6).
CN202220211042.XU 2022-01-25 2022-01-25 Installation mosaic structure that engineering curtain was used Active CN216840100U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220211042.XU CN216840100U (en) 2022-01-25 2022-01-25 Installation mosaic structure that engineering curtain was used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220211042.XU CN216840100U (en) 2022-01-25 2022-01-25 Installation mosaic structure that engineering curtain was used

Publications (1)

Publication Number Publication Date
CN216840100U true CN216840100U (en) 2022-06-28

Family

ID=82085981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220211042.XU Active CN216840100U (en) 2022-01-25 2022-01-25 Installation mosaic structure that engineering curtain was used

Country Status (1)

Country Link
CN (1) CN216840100U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115370052A (en) * 2022-09-07 2022-11-22 北京凌云宏达幕墙工程有限公司 Aluminum pipe small ceramic brick curtain wall system and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115370052A (en) * 2022-09-07 2022-11-22 北京凌云宏达幕墙工程有限公司 Aluminum pipe small ceramic brick curtain wall system and construction method thereof
CN115370052B (en) * 2022-09-07 2023-09-22 北京凌云宏达幕墙工程有限公司 Aluminum pipe small ceramic brick curtain wall system and construction method thereof

Similar Documents

Publication Publication Date Title
CN216840100U (en) Installation mosaic structure that engineering curtain was used
CN111980208B (en) Mounting structure of assembled wallboard
CN210263548U (en) Fusiform grid system
CN218952509U (en) Partition system for assembly unit
CN220504279U (en) Modular assembly structure of stone curtain wall
CN220184508U (en) Assembled wallboard mounting system
CN219386664U (en) Light flame-retardant board installation inner frame in energy-saving building
CN214249489U (en) Lamp mounting structure with longitudinal and transverse pressing plates
CN215484314U (en) GRC decorates component convenient to dismouting
CN115012539B (en) Prefabricated heat preservation wallboard of assembled concrete
CN215858457U (en) Exhibition hall curtain of easily buildding fast and dismantling
CN216276618U (en) Combined wallboard for architectural design
CN216216631U (en) Installation mechanism for photovoltaic solar panel
CN210050250U (en) Furred ceiling antidetonation support with shock-absorbing function
CN212453184U (en) Assembled building wall connecting device
CN219100420U (en) Mounting structure of assembled oversized glass screen
CN216588026U (en) Fence of easy dismouting of exhibitions usefulness
CN219548091U (en) Curtain wall mounting fixing frame
CN212298411U (en) Liquid crystal display combined screen fixing frame
CN217875586U (en) Classroom lamp
CN218562699U (en) Building facade module
CN215166946U (en) Unit curtain wall with lamps mounted quickly
CN218295515U (en) Modular LED projecting lamp
CN218911917U (en) Install convenient curtain board
CN219995574U (en) Improved gas water heater shell

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant