CN216839435U - High pile extractor of stability is used in hydraulic engineering construction - Google Patents

High pile extractor of stability is used in hydraulic engineering construction Download PDF

Info

Publication number
CN216839435U
CN216839435U CN202123271335.1U CN202123271335U CN216839435U CN 216839435 U CN216839435 U CN 216839435U CN 202123271335 U CN202123271335 U CN 202123271335U CN 216839435 U CN216839435 U CN 216839435U
Authority
CN
China
Prior art keywords
pile
pile pulling
wall
fixedly connected
hydraulic engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123271335.1U
Other languages
Chinese (zh)
Inventor
郭雨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Qianyi Construction Development Co ltd
Original Assignee
Fujian Qianyi Construction Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Qianyi Construction Development Co ltd filed Critical Fujian Qianyi Construction Development Co ltd
Priority to CN202123271335.1U priority Critical patent/CN216839435U/en
Application granted granted Critical
Publication of CN216839435U publication Critical patent/CN216839435U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a pile extractor that stability is high for hydraulic engineering construction relates to hydraulic engineering technical field, including hydraulic push rod, pinch bar, mounting bracket, pile pulling platform, support frame and pile pulling frame, the equal fixed mounting in both ends has the mounting bracket about the top of pile pulling platform, the inner wall top fixed mounting of mounting bracket has hydraulic push rod, the top fixedly connected with support frame of pile pulling platform. The utility model discloses a driving motor who sets up, the raceway, the spray pipe, the shunt tubes, the holding ring, electric telescopic handle, cooperation between mounting plate and the friction pad piece, can be convenient for make mounting plate and friction pad piece fix the stake through electric telescopic handle, the holding ring can be convenient for fix a position the ring simultaneously, and then can be convenient for drive interior sleeve pipe through driving motor and the stake rotates, the spray pipe can spray water simultaneously, thereby avoid the silt adhesion on outer sheathed tube surface, and then can be convenient for pull out the stake.

Description

High pile extractor of stability is used in hydraulic engineering construction
Technical Field
The utility model relates to a hydraulic engineering technical field, concretely relates to hydraulic engineering construction is with high pile extractor of stability.
Background
Along with the continuous improvement of urbanization level, more and more hydraulic engineering needs to be built, piles under original hydraulic engineering become obstacles of hydraulic engineering construction, pile bodies need to be pulled out, and a pile pulling machine is a piling machine which utilizes vibration, static force or hammering action to pull the piles out of strata.
Disclose a pile extractor for hydraulic engineering if in chinese patent CN211523211U, the one end of pinch bar is pushed down to the pneumatic cylinder, forms lever principle sled between pinch bar and the hinge bar and moves anchor clamps, makes to lift on the anchor clamps, and the traction force that provides is big, and the range of single pile extraction is big, and then has improved the efficiency of construction, at the in-process of carrying out the pile extraction, because some pile surfaces have a large amount of silt to for lead to not being convenient for pull out the stake.
SUMMERY OF THE UTILITY MODEL
The utility model provides a hydraulic engineering construction is with high pile extractor of stability, one of them purpose is extracted in order to possess the stake that can be convenient for be stained with silt mud on the surface, solves because there is silt on the surface of stake, is not convenient for extract the problem of stake.
In order to solve the technical problem, the utility model discloses the technical scheme who adopts is:
the utility model provides a hydraulic engineering construction is with high pile extractor of stability, includes hydraulic pressure push rod, pinch bar, mounting bracket, pile pulling platform, support frame and pile pulling frame, the equal fixed mounting in both ends has the mounting bracket about the top of pile pulling platform, the inner wall top fixed mounting of mounting bracket has hydraulic pressure push rod, the top fixedly connected with support frame of pile pulling platform, the top of support frame articulates there is the pinch bar, the one end of pinch bar and hydraulic pressure push rod's bottom overlap joint, the other end of pinch bar articulates there is the pile pulling frame, the pile pulling frame is located pile pulling platform directly over, the inner wall top fixed mounting of pile pulling frame has driving motor, interior sleeve pipe of driving motor's drive end fixedly connected with, interior sheathed tube outer wall fixedly connected with outer tube.
The utility model discloses technical scheme's further improvement lies in: the inner wall of the inner sleeve is fixedly connected with an electric telescopic rod, the telescopic end of the electric telescopic rod is fixedly connected with a fastening piece, the inner wall of the fastening piece is fixedly connected with a friction gasket, and the inner wall of the inner sleeve is fixedly connected with a positioning ring right above the fastening piece.
The utility model discloses technical scheme's further improvement lies in: the inner wall fixedly connected with shunt tubes of outer tube, the outer wall of shunt tubes inlays the solid and is connected with the spray pipe, the other end of spray pipe runs through the outer wall of outer tube, the outer wall top of shunt tubes inlays the solid and is connected with the raceway, the other end of raceway runs through the outer wall of pile pulling frame, outer tube respectively.
The utility model discloses technical scheme's further improvement lies in: the length of the inner sleeve is greater than that of the outer sleeve.
The utility model discloses technical scheme's further improvement lies in: the pile pulling platform is characterized in that a rectangular groove is formed in the center of the top of the pile pulling platform, a lifting frame is fixedly connected to the top of the pile pulling platform, and the bottom of the lifting frame is fixedly connected with the edge of the bottom of the pile pulling frame.
Owing to adopted above-mentioned technical scheme, the utility model discloses relative prior art, the technological progress who gains is:
the utility model provides a hydraulic engineering construction is with high pile extractor of stability, driving motor through setting up, the raceway, the spray pipe, the shunt tubes, the holding ring, electric telescopic handle, cooperation between mounting plate and the friction pad piece, can be convenient for make mounting plate and friction pad piece fix the stake through electric telescopic handle, the holding ring can be convenient for fix a position the ring simultaneously, and then can be convenient for drive interior sleeve pipe through driving motor and the stake rotates, the spray pipe can spray water simultaneously, thereby avoid the silt adhesion on outer sheathed tube surface, and then can be convenient for pull out the stake.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a structural sectional view of the pile pulling frame of the present invention;
fig. 3 is a structural sectional view of the inner sleeve of the present invention.
In the figure: 1. a hydraulic push rod; 2. a pry bar; 3. a mounting frame; 4. pile pulling platform; 5. a support frame; 6. Pile pulling frames; 7. a lifting frame; 8. a drive motor; 9. a water delivery pipe; 10. an outer sleeve; 11. an inner sleeve; 12. a water spray pipe; 13. a shunt tube; 14. a positioning ring; 15. a fastening tab; 16. an electric telescopic rod; 17. And rubbing the gasket.
Detailed Description
The present invention will be described in further detail with reference to the following examples:
example 1
As shown in FIGS. 1-3, the utility model provides a pile extractor with high stability for hydraulic engineering construction, which comprises a hydraulic push rod 1, a pry bar 2, a mounting frame 3, a pile extracting platform 4, a support frame 5 and a pile extracting frame 6, wherein the mounting frame 3 is fixedly mounted at both the left and right ends of the top of the pile extracting platform 4, the hydraulic push rod 1 is fixedly mounted at the top of the inner wall of the mounting frame 3, the support frame 5 is fixedly connected to the top of the pile extracting platform 4, the pry bar 2 is hinged to the top of the support frame 5, one end of the pry bar 2 is lapped with the bottom of the hydraulic push rod 1, the pile extracting frame 6 is hinged to the other end of the pry bar 2, the pile extracting frame 6 is positioned right above the pile extracting platform 4, a driving motor 8 is fixedly mounted at the top of the inner wall of the pile extracting frame 6, the driving end of the driving motor 8 is fixedly connected with an inner sleeve 11, the outer wall of the inner sleeve 11 is fixedly connected with an outer sleeve 10, a rectangular groove is formed at the center of the top of the pile extracting platform 4, pile pulling platform 4's top fixedly connected with crane 7, crane 7's bottom and pile pulling frame 6's bottom edge fixed connection, crane 7 can be convenient for highly adjusting pile pulling frame 6, and then be convenient for pull out the pile to the stake.
As shown in fig. 1-3, preferably, the inner wall of the inner sleeve 11 is fixedly connected with an electric telescopic rod 16, the telescopic end of the electric telescopic rod 16 is fixedly connected with a fastening plate 15, the inner wall of the fastening plate 15 is fixedly connected with a friction gasket 17, the inner wall of the inner sleeve 11 is fixedly connected with a positioning ring 14 directly above the fastening plate 15, the fastening plate 15 and the friction gasket 17 can be adjusted by the electric telescopic rod 16, so that the pile can be conveniently fixed, and the pile is driven to rotate by the driving motor 8.
As shown in fig. 1-3, preferably, the inner wall of the outer sleeve 10 is fixedly connected with a shunt tube 13, the outer wall of the shunt tube 13 is fixedly connected with a spray pipe 12, the other end of the spray pipe 12 penetrates through the outer wall of the outer sleeve 10, the top end of the outer wall of the shunt tube 13 is fixedly connected with a water delivery pipe 9, the other end of the water delivery pipe 9 penetrates through the pile pulling frame 6 and the outer wall of the outer sleeve 10 respectively, the length of the inner sleeve 11 is greater than that of the outer sleeve 10, the shunt tube 13 can uniformly spray water through the spray pipe 12, so that excessive sludge can be prevented from adhering to the surface of the outer sleeve 10, and the pile can be pulled up conveniently.
The working principle of the pile extractor with high stability for hydraulic engineering construction is described in detail below.
As shown in fig. 1-3, pile pulling platform 4 moves to the top of pile when pulling out the pile, make interior sleeve pipe 11 can aim at the pile and move down through crane 7, thereby make fastening piece 15 and friction pad 17 fix the pile through electric telescopic handle 16, make holding ring 14 fix a position the ring simultaneously, and then through starting driving motor 8, thereby drive interior sleeve pipe 11 and pile and rotate, make spray pipe 12 spray water when the pivoted, thereby avoid silt adhesion on the surface of outer sleeve pipe 10, promote crow bar 2 through hydraulic push rod 1 and move down, and then make crow bar 2 promote pile pulling frame 6 and move up, can be convenient for pull out the pile.
The present invention has been described in detail with reference to the above general description, but it will be apparent to one of ordinary skill in the art that modifications and improvements can be made to the invention. Therefore, modifications or improvements without departing from the spirit of the invention are within the scope of the invention.

Claims (5)

1. The utility model provides a hydraulic engineering construction is with high pile extractor of stability, includes hydraulic rod (1), pinch bar (2), mounting bracket (3), pile pulling platform (4), support frame (5) and pile pulling frame (6), the equal fixed mounting in both ends has mounting bracket (3) about the top of pile pulling platform (4), the inner wall top fixed mounting of mounting bracket (3) has hydraulic rod (1), the top fixedly connected with support frame (5) of pile pulling platform (4), the top of support frame (5) articulates there is pinch bar (2), the one end of pinch bar (2) and the bottom overlap joint of hydraulic rod (1), the other end of pinch bar (2) articulates there is pile pulling frame (6), pile pulling frame (6) are located pile pulling platform (4) directly over, its characterized in that: the pile pulling device is characterized in that a driving motor (8) is fixedly mounted at the top of the inner wall of the pile pulling frame (6), an inner sleeve (11) is fixedly connected to the driving end of the driving motor (8), and an outer sleeve (10) is fixedly connected to the outer wall of the inner sleeve (11).
2. The pile extractor that hydraulic engineering construction is with high stability of claim 1, its characterized in that: the inner wall fixedly connected with electric telescopic handle (16) of interior sleeve pipe (11), the flexible end fixedly connected with mounting plate (15) of electric telescopic handle (16), the inner wall fixedly connected with friction pad piece (17) of mounting plate (15), the inner wall of interior sleeve pipe (11) just is located mounting plate (15) directly over fixedly connected with holding ring (14).
3. The pile extractor that hydraulic engineering construction is with high stability of claim 1, its characterized in that: the inner wall fixedly connected with shunt tubes (13) of outer tube (10), the outer wall of shunt tubes (13) is set firmly and is connected with spray pipe (12), the outer wall of outer tube (10) is run through to the other end of spray pipe (12), the outer wall top of shunt tubes (13) is set firmly and is connected with raceway (9), the outer wall of pile pulling frame (6), outer tube (10) is run through respectively to the other end of raceway (9).
4. The pile extractor that hydraulic engineering construction is with high stability of claim 1, its characterized in that: the length of the inner sleeve (11) is greater than that of the outer sleeve (10).
5. The pile extractor that hydraulic engineering construction is with high stability of claim 1, its characterized in that: the rectangular groove has been seted up in the top center department of pile pulling platform (4), the top fixedly connected with crane (7) of pile pulling platform (4), the bottom of crane (7) and the bottom edge fixed connection of pile pulling frame (6).
CN202123271335.1U 2021-12-23 2021-12-23 High pile extractor of stability is used in hydraulic engineering construction Active CN216839435U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123271335.1U CN216839435U (en) 2021-12-23 2021-12-23 High pile extractor of stability is used in hydraulic engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123271335.1U CN216839435U (en) 2021-12-23 2021-12-23 High pile extractor of stability is used in hydraulic engineering construction

Publications (1)

Publication Number Publication Date
CN216839435U true CN216839435U (en) 2022-06-28

Family

ID=82111390

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123271335.1U Active CN216839435U (en) 2021-12-23 2021-12-23 High pile extractor of stability is used in hydraulic engineering construction

Country Status (1)

Country Link
CN (1) CN216839435U (en)

Similar Documents

Publication Publication Date Title
CN216839435U (en) High pile extractor of stability is used in hydraulic engineering construction
CN110039637B (en) Synchronous hydraulic T-beam template assembling auxiliary tool
CN106836202A (en) Bored in efficient pile tube soil, piling, dust, whitewash all-in-one and its construction technology
CN216034591U (en) Simple hoisting trolley for constructional engineering
CN115613575A (en) Be suitable for civil engineering concrete pile scavenging machine
CN211735403U (en) Pile digging device for concrete pipe piles in constructional engineering
CN211171969U (en) Pile pressing and hammer combined type tubular pile construction equipment
CN209444301U (en) A kind of tube drawing system of jumbolter
JP2599346B2 (en) Reaction force device
JP3719920B2 (en) Tubing device
CN218292068U (en) High-strength excavator sleeve arm
JP2002129566A (en) Press-in and pull-out device for pile
JP2017043917A (en) Pile press-in method, reaction frame and pile press-in/pull-out machine
CN214143707U (en) Amphibious low-position side-holding type steel pipe pile vibration sinking and pulling equipment
JP2001182060A (en) Pile press-in system and pile press-in method
CN220352816U (en) Auxiliary device for static pressure pile placement of reinforced concrete anchor rod
CN218027674U (en) Joint box pulling device
CN220666218U (en) Anti-drop pile extractor
CN214570569U (en) Municipal administration is applicable to well lid hoisting accessory
CN216739619U (en) Pile drawing machine draws set mechanism
CN109372560A (en) The tube drawing system of jumbolter
CN216156672U (en) Hydraulic engineering desilting device
CN218712969U (en) Piling device for constructional engineering
CN220332561U (en) Water conservancy pile foundation handling device
CN211909565U (en) Land reclamation is with leveling device