CN216839368U - Hydraulic engineering construction equipment - Google Patents

Hydraulic engineering construction equipment Download PDF

Info

Publication number
CN216839368U
CN216839368U CN202220409319.XU CN202220409319U CN216839368U CN 216839368 U CN216839368 U CN 216839368U CN 202220409319 U CN202220409319 U CN 202220409319U CN 216839368 U CN216839368 U CN 216839368U
Authority
CN
China
Prior art keywords
rod
hydraulic engineering
construction equipment
engineering construction
movable block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220409319.XU
Other languages
Chinese (zh)
Inventor
王宜政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220409319.XU priority Critical patent/CN216839368U/en
Application granted granted Critical
Publication of CN216839368U publication Critical patent/CN216839368U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model discloses a hydraulic engineering construction equipment, including loading board, driving motor and pressure roller, the upper left side of loading board is provided with first backup pad, driving motor's output is connected with the connection pad, the place ahead of awl ring gear is connected with the taper tooth, the middle part outside of connecting rod is provided with the second backup pad, the right side of connection pad is provided with the regulation pole, the right-hand member of movable block is connected with the catch bar, the gag lever post is all installed to both ends top around the board of pounding. This hydraulic engineering construction equipment, at the rotatory in-process of connection pad, the accessible catch bar promotes the vibrating plate and carries out stable reciprocating type lift, realizes carrying out continuous striking compaction to soil, and the efficiency of construction is high to personally submit the regulation pole of screw-pile structure through rotatory outward surface, steerable movable block slides, and then can adjust the lifting range of vibrating plate, the realization is to the convenient control of soil dynamics of strikeing.

Description

Hydraulic engineering construction equipment
Technical Field
The utility model relates to a hydraulic engineering construction technical field specifically is a hydraulic engineering construction equipment.
Background
Hydraulic engineering need vibrate soft ground to using construction equipment at the in-process of construction, makes ground soil compacter, improves the engineering quality, but hydraulic engineering construction equipment in the existing market still has following problem:
1. the existing hydraulic engineering construction equipment is inconvenient for prepressing soil, and the device is inconvenient to push in the vibrating and compacting process;
2. conventional hydraulic engineering construction equipment, the inefficiency of vibrating, the construction effect of equipment is poor.
Aiming at the problems, the novel design is carried out on the basis of the original hydraulic engineering construction equipment.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a hydraulic engineering construction equipment to solve common hydraulic engineering construction equipment on the existing market that proposes in the above-mentioned background art, be not convenient for carry out the pre-compaction to soil, there is the device to impel inconvenient condition at the in-process of the tamp of vibrating, and the inefficiency of vibrating, the poor problem of construction effect of equipment.
In order to achieve the above object, the utility model provides a following technical scheme: a hydraulic engineering construction device comprises a bearing plate, a driving motor and a pressure roller, wherein a first supporting plate is arranged at the upper left of the bearing plate, and the left side of the top end of the first supporting plate is provided with a driving motor, the output end of the driving motor is connected with a connecting disc, and the left end of the connecting disc is provided with a conical tooth ring, the front of the conical tooth ring is connected with a conical tooth, the front end of the conical tooth is fixedly connected with a connecting rod, a second supporting plate is arranged on the outer side of the middle part of the connecting rod, a chain is connected with the outer side of the front end of the connecting rod, and the tail end of the chain is provided with a pressure roller, the right side of the connecting disc is provided with an adjusting rod, the outer side of the adjusting rod is provided with a movable block, the right end of the movable block is connected with a push rod, and the end of catch bar is provided with the board that vibrates, the gag lever post is all installed to both ends top around the board that vibrates, and the top outside of gag lever post is provided with the locating piece.
Preferably, the connecting disc and the bevel gear ring are fixedly connected to form an integrated structure, the connecting disc and the connecting rod form a linkage mechanism through the bevel gear ring, and the connecting rod is connected with the second supporting plate in a rotating mode.
Preferably, the adjusting rod is connected with the connecting disc in a rotating manner, the outer surface of the adjusting rod is in a thread-shaped structure, the adjusting rod penetrates through the inside of the movable block, and the movable block forms a sliding structure through the adjusting rod.
Preferably, the connecting mode of catch bar and movable block and vibrating plate is articulated, and vibrating plate passes through the catch bar and constitutes elevation structure.
Preferably, the connection mode of vibrating plate and gag lever post is the welding, and the gag lever post sets up about vibrating plate's axis symmetry around to the locating piece is the one-to-one setting with the gag lever post.
Preferably, the limiting rod penetrates through the inside of the positioning block, the positioning block is fixedly connected with the bearing plate, and a rectangular groove-shaped structure is formed in the middle of the bearing plate.
Compared with the prior art, the beneficial effects of the utility model are that: the hydraulic engineering construction equipment is characterized in that,
1. by arranging the connecting disc, the chain and the pressure roller, when the connecting disc is controlled to rotate by the driving motor, the conical teeth can be driven to rotate by the conical teeth, so that the connecting rod can be controlled to continuously rotate in the top end of the second supporting plate, the pressure roller can be controlled to rotate under the action of the chain, the device can be conveniently pushed to use, meanwhile, the soil can be prepressed, and the subsequent vibrating compaction is facilitated;
2. through setting up regulation pole, catch bar and the board of pounding, at the rotatory in-process of connection pad, the accessible catch bar promotes the board of pounding and carries out stable reciprocating type lift, realizes carrying out continuous the compaction of strikeing to soil, and the efficiency of construction is high to personally submit the regulation pole of screw-pile structure through rotatory outward surface, steerable movable block slides, and then can adjust the lifting range of the board of pounding, realize the convenient control to the soil dynamics of strikeing.
Drawings
FIG. 1 is a schematic view of the overall front view structure of the present invention;
FIG. 2 is a schematic view of the overall rear view structure of the present invention;
FIG. 3 is a schematic view of the structure of the working state of the present invention;
fig. 4 is the schematic view of the whole structure of the stop lever and the positioning block connection of the present invention.
In the figure: 1. a carrier plate; 2. a first support plate; 3. a drive motor; 4. a connecting disc; 5. a conical gear ring; 6. tapered teeth; 7. a connecting rod; 8. a second support plate; 9. a chain; 10. a pressure roller; 11. adjusting a rod; 12. a movable block; 13. a push rod; 14. vibrating a plate; 15. a limiting rod; 16. and (5) positioning the blocks.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, fig. 2 and fig. 3, the present invention provides a technical solution: a hydraulic engineering construction device comprises a bearing plate 1, a driving motor 3 and a pressure roller 10, in order to pre-compact soil, a first supporting plate 2 is arranged at the upper left of the bearing plate 1, the driving motor 3 is arranged at the left side of the top end of the first supporting plate 2, a connecting disc 4 is connected with the output end of the driving motor 3, a bevel gear ring 5 is arranged at the left end of the connecting disc 4, a bevel gear 6 is connected with the front of the bevel gear ring 5, a connecting rod 7 is fixedly connected with the front end of the bevel gear 6, a second supporting plate 8 is arranged at the outer side of the middle part of the connecting rod 7, the connecting disc 4 and the bevel gear ring 5 are fixedly connected to form an integrated structure, the connecting disc 4 and the connecting rod 7 form a linkage mechanism through the bevel gear ring 5, the connecting rod 7 and the second supporting plate 8 are connected in a rotating mode, a chain 9 is connected with the outer side of the front end of the connecting rod 7, the pressure roller 10 is arranged at the tail end of the chain 9, connecting pad 4 control awl ring gear 5 rotatory in-process, accessible tapered tooth 6 and chain 9 drive pressure roller 10 and rotate, also can carry out the pre-compaction to soil when the facilitate device promotes the use, the subsequent compaction of vibrating of being convenient for.
Referring to fig. 1, 3 and 4, in order to improve the construction efficiency of the device, an adjusting rod 11 may be disposed on the right side of the connecting disc 4, a movable block 12 is mounted on the outer side of the adjusting rod 11, the adjusting rod 11 is rotatably connected to the connecting disc 4, the outer surface of the adjusting rod 11 is in a thread structure, the adjusting rod 11 penetrates through the movable block 12, the movable block 12 forms a sliding structure through the adjusting rod 11, a push rod 13 is connected to the right end of the movable block 12, a vibrating plate 14 is disposed at the end of the push rod 13, the push rod 13 is hinged to the movable block 12 and the vibrating plate 14, the vibrating plate 14 forms a lifting structure through the push rod 13, limit rods 15 are mounted above the front and rear ends of the vibrating plate 14, a positioning block 16 is disposed on the outer side of the top end of the limit rod 15, and the vibrating plate 14 is welded to the limit rod 15, and gag lever post 15 sets up about the axis symmetry of vibrating plate 14, and locating piece 16 is the one-to-one setting with gag lever post 15, gag lever post 15 runs through in locating piece 16's inside, and locating piece 16 and 1 fixed connection of loading board, and rectangular groove-shaped structure has been seted up at the middle part of loading board 1, at the rotatory in-process of connection pad 4, can drive vibrating plate 14 through catch bar 13 and reciprocate to go up and down, the improvement is to the compaction efficiency of soil, and through the setting of adjusting pole 11, can adjust vibrating plate 14's lifting range, be convenient for the construction of controlling of equipment.
The working principle is as follows: when the hydraulic engineering construction equipment is used, the construction equipment is firstly pushed to a construction site needing hydraulic construction, then the driving motor 3 installed at the top end of the first supporting plate 2 is started, the connecting disc 4 is controlled to rotate, the vibrating plate 14 is driven to reciprocate through the pushing rod 13, the foundation soil is continuously hit and compacted, the construction efficiency is high, and the lifting and striking stability of the vibrating plate 14 can be improved through the limiting rod 15 penetrating through the positioning block 16;
the adjusting rod 11 can be controlled to rotate by tools such as a screwdriver and the like according to the actual requirement of soil compaction, and the outer surface of the adjusting rod 11 is in a thread-shaped structure, so that the movable block 12 can be controlled to slide in the rotating process of the adjusting rod, the lifting and knocking range of the vibrating plate 14 can be conveniently adjusted, and the practicability of the construction equipment is enhanced;
at connection pad 4 drive the rotatory in-process of fixed connection in its left awl ring gear 5, can drive connecting rod 7 through awl tooth 6 and rotate at the top of second backup pad 8 inside, simultaneously under the effect of chain 9, steerable pressure roller 10 is rotatory, also can carry out the pre-compaction to soil when making things convenient for this construction equipment to promote the use, the subsequent compaction that vibrates of being convenient for, above be the course of operation of whole device, and the content of not making detailed description in this specification all belongs to the prior art that technical personnel known in the field.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a hydraulic engineering construction equipment, includes loading board (1), driving motor (3) and pressure roller (10), its characterized in that: the upper left side of the bearing plate (1) is provided with a first supporting plate (2), a driving motor (3) is installed on the left side of the top end of the first supporting plate (2), the output end of the driving motor (3) is connected with a connecting disc (4), the left end of the connecting disc (4) is provided with a conical ring gear (5), the front side of the conical ring gear (5) is connected with conical teeth (6), the front end of each conical tooth (6) is fixedly connected with a connecting rod (7), the middle outer side of each connecting rod (7) is provided with a second supporting plate (8), the front end outer side of each connecting rod (7) is connected with a chain (9), the tail end of each chain (9) is provided with a pressure roller (10), the right side of the connecting disc (4) is provided with an adjusting rod (11), the outer side of each adjusting rod (11) is provided with a movable block (12), and the right end of each movable block (12) is connected with a push rod (13), and the tail end of the pushing rod (13) is provided with a vibrating plate (14), limiting rods (15) are arranged above the front end and the rear end of the vibrating plate (14), and positioning blocks (16) are arranged on the outer side of the top end of each limiting rod (15).
2. The hydraulic engineering construction equipment according to claim 1, characterized in that: connection pad (4) are integral structure with awl ring gear (5) fixed connection, and connection pad (4) constitute link gear through awl ring gear (5) and connecting rod (7), the connected mode of connecting rod (7) and second backup pad (8) is for rotating the connection.
3. The hydraulic engineering construction equipment according to claim 1, characterized in that: the connection mode of adjusting pole (11) and connection pad (4) is connected for rotating, and adjusts the surface of pole (11) and be the setting of screw thread column structure, adjust pole (11) and run through in the inside of movable block (12), and movable block (12) constitute sliding construction through adjusting pole (11).
4. The hydraulic engineering construction equipment according to claim 1, characterized in that: the push rod (13) is hinged with the movable block (12) and the vibrating plate (14), and the vibrating plate (14) forms a lifting structure through the push rod (13).
5. The hydraulic engineering construction equipment according to claim 1, characterized in that: the vibrating plate (14) is connected with the limiting rod (15) in a welding mode, the limiting rod (15) is symmetrically arranged around the central axis of the vibrating plate (14), and the positioning blocks (16) are in one-to-one correspondence with the limiting rod (15).
6. The hydraulic engineering construction equipment according to claim 1, characterized in that: the limiting rod (15) penetrates through the inside of the positioning block (16), the positioning block (16) is fixedly connected with the bearing plate (1), and the middle of the bearing plate (1) is provided with a rectangular groove-shaped structure.
CN202220409319.XU 2022-02-28 2022-02-28 Hydraulic engineering construction equipment Expired - Fee Related CN216839368U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220409319.XU CN216839368U (en) 2022-02-28 2022-02-28 Hydraulic engineering construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220409319.XU CN216839368U (en) 2022-02-28 2022-02-28 Hydraulic engineering construction equipment

Publications (1)

Publication Number Publication Date
CN216839368U true CN216839368U (en) 2022-06-28

Family

ID=82091914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220409319.XU Expired - Fee Related CN216839368U (en) 2022-02-28 2022-02-28 Hydraulic engineering construction equipment

Country Status (1)

Country Link
CN (1) CN216839368U (en)

Similar Documents

Publication Publication Date Title
CN210086216U (en) Composite foundation course pretreatment integration device
CN109811750A (en) A kind of consolidation machine being conveniently adjusted travelling route
CN213709073U (en) Rail-mounted paver for highway construction
CN109826075A (en) A kind of road tamping unit synchronous with slope and its application method
CN216982452U (en) Land leveling and compacting device for landscaping
CN216839368U (en) Hydraulic engineering construction equipment
US3507015A (en) Apparatus for molding concrete,asphalt,and like mixes
CN209082472U (en) A kind of hydraulic engineering dykes and dams slope tamping unit
CN214329027U (en) Slope cutting device for mine environment treatment
CN204160573U (en) A kind of novel four side moulder
CN211850870U (en) Novel building engineering formwork supports device
CN108589475A (en) A kind of road engineering tamping unit
CN111691393A (en) Saline soil foundation treatment device
CN205530210U (en) Rammer compactor with adjustable
CN211596735U (en) Rammer compactor convenient to adjust tamping force
CN216930770U (en) Ridge forming device for agricultural technical service
CN109644591B (en) Ridging machine for paddy field
CN221480770U (en) Foundation rammer compactor
CN215714457U (en) Safe and reliable type paver for plastic place
CN219395512U (en) Soil pressing device for seedling planting
CN211164695U (en) Concrete slab drilling equipment for building construction
CN220413934U (en) Municipal road construction pavement tamping equipment
CN110685269B (en) Construction equipment for town road
CN205557497U (en) Novel double -end rammer compactor
CN214459417U (en) Automatic cloth machine of concrete for building site

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220628

CF01 Termination of patent right due to non-payment of annual fee