CN216839153U - Traffic engineering uses interim guardrail - Google Patents

Traffic engineering uses interim guardrail Download PDF

Info

Publication number
CN216839153U
CN216839153U CN202220028961.3U CN202220028961U CN216839153U CN 216839153 U CN216839153 U CN 216839153U CN 202220028961 U CN202220028961 U CN 202220028961U CN 216839153 U CN216839153 U CN 216839153U
Authority
CN
China
Prior art keywords
frame
supporting leg
butt joint
joint hole
round pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220028961.3U
Other languages
Chinese (zh)
Inventor
潘涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220028961.3U priority Critical patent/CN216839153U/en
Application granted granted Critical
Publication of CN216839153U publication Critical patent/CN216839153U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a traffic engineering uses interim guardrail, including frame, pole setting, a round pin section of thick bamboo, a screw section of thick bamboo, round pin post, connecting seat, half tooth double-screw bolt, twist the wheel, butt joint hole, constant head tank, equipment supporting leg, the frame is rectangle frame structure, the pole setting of many equidistances has been welded in the frame, the welding of frame right-hand member has a round pin section of thick bamboo and a screw section of thick bamboo, the welding of frame left end has round pin post and connecting seat, half tooth double-screw bolt is located the connecting seat, half tooth double-screw bolt top is fixed with twists the wheel, the butt joint hole has been opened respectively to frame left and right-hand member bottom, it has the constant head tank, two to open butt joint hole bottom the equipment supporting leg is installed with two butt joint holes respectively. The utility model discloses the equipment supporting leg can break away from the frame, and the frame of being convenient for can save space when concluding the transportation, and magnet increases the adsorption affinity of supporting leg and frame, avoids losing.

Description

Traffic engineering uses interim guardrail
Technical Field
The utility model relates to a temporary guardrail especially relates to a traffic engineering uses temporary guardrail.
Background
In traffic engineering maintenance or construction, usually can not leave the effect of guardrail, interim guardrail can play the warning effect, also can protect the construction site not destroyed, plays isolated vehicle and crowd's effect. Common interim guardrail is fixed welded structure with the supporting leg, can't carry out the dismouting, leads to a plurality of guardrails can't save space after accomodating, secondly breaks away from easily between the adjacent guardrail, lacks the steadiness of structure.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a traffic engineering uses interim guardrail to solve above-mentioned technical problem.
In order to realize the purpose, the utility model adopts the following technical scheme:
the utility model provides a traffic engineering uses interim guardrail, includes frame, pole setting, round pin section of thick bamboo, barrel, round pin post, connecting seat, half tooth double-screw bolt, twists the wheel, butt joint hole, constant head tank, equipment supporting leg, the frame is rectangle frame structure, the pole setting of many equidistances is welded in the frame, the welding of frame right-hand member has round pin section of thick bamboo and barrel, the welding of frame left end has round pin post and connecting seat, half tooth double-screw bolt is located the connecting seat, half tooth double-screw bolt top is fixed with twists the wheel, open respectively the butt joint hole bottom the right-hand member bottom of frame left side, it has the constant head tank to open butt joint hole bottom, two the equipment supporting leg is installed with two butt joint holes respectively.
On the basis of the technical scheme, the assembled supporting leg comprises a supporting leg, a central column, a positioning block and a magnet, the central column is welded at the center of the top of the supporting leg, the positioning block is fixed on the outer wall of the central column, and the magnet is fixed at the top of the central column.
On the basis of the technical scheme, the central column is connected with the butt joint hole in an inserting mode and is adsorbed by the magnet, and the positioning block is correspondingly buckled with the positioning groove.
On the basis of the technical scheme, the adjacent frames are hinged with the pin barrel through the pin columns, and the half-tooth stud is in threaded fit with the screw barrel.
Compared with the prior art, the utility model has the advantages of it is following: the utility model discloses a can be connected with the barrel through round pin post and round pin section of thick bamboo rotation angle between the adjacent frame, can be connected through half tooth double-screw bolt again, avoid breaking away from, increase the structure steadiness, the equipment supporting leg can break away from the frame moreover, the frame of being convenient for can save space when concluding the transportation, the supporting leg can pass through the fixed angle of locating piece, avoids rotatory steadiness that reduces the supporting leg, magnet increases the adsorption affinity of supporting leg and frame, avoids losing.
Drawings
Fig. 1 is a schematic view of the appearance structure of the present invention.
Fig. 2 is the schematic view of the appearance structure of the butt-joint hole and the positioning groove of the present invention.
Fig. 3 is the utility model discloses equipment supporting leg outward appearance structure sketch map.
In the figure: 1. the device comprises a frame, 2, a vertical rod, 3, a pin cylinder, 4, a screw cylinder, 5, a pin column, 6, a connecting seat, 7, a half-tooth stud, 8, a screwing wheel, 9, a butt joint hole, 10, a positioning groove, 11, an assembling supporting leg, 12, a supporting leg, 13, a central column, 14, a positioning block, 15 and a magnet.
Detailed Description
The invention is explained in further detail below with reference to the figures and the embodiments.
As shown in fig. 1-3, a traffic engineering uses interim guardrail, including frame 1, pole setting 2, a round pin section of thick bamboo 3, a spiral shell section of thick bamboo 4, round pin post 5, connecting seat 6, half tooth double-screw bolt 7, twist wheel 8, butt joint hole 9, constant head tank 10, equipment supporting leg 11, frame 1 is the rectangle frame structure, many equidistance pole setting 2 have been welded in frame 1, 1 right-hand member welding of frame has round pin section of thick bamboo 3 and a spiral shell section of thick bamboo 4, 1 left end welding of frame has round pin post 5 and connecting seat 6, half tooth double-screw bolt 7 is located connecting seat 6, half tooth double-screw bolt 7 top is fixed with twists wheel 8, frame 1 left and right ends bottom do not has butt joint hole 9, open there is constant head tank 10 butt joint hole 9 bottom, two equipment supporting leg 11 is installed with two butt joint holes 9 respectively.
The assembly supporting leg 11 comprises a supporting leg 12, a center column 13, a positioning block 14 and a magnet 15, the center of the top of the supporting leg 12 is welded with the center column 13, the positioning block 14 is fixed on the outer wall of the center column 13, and the magnet 15 is fixed on the top of the center column 13.
The central column 13 is inserted into the butt-joint hole 9 and is adsorbed by the magnet 15, and the positioning block 14 is correspondingly buckled with the positioning groove 10.
The adjacent frame 1 is hinged with the pin barrel 3 through the pin 5, and the half-thread stud 7 is in threaded fit with the screw barrel 4.
The utility model discloses a theory of operation: the adjacent frame realizes articulatedly through round pin post and cotter, and half tooth double-screw bolt also can realize the rotation between the frame with screw section of thick bamboo screw-thread fit, and the center post is pegged graft with the butt joint hole to through locating piece and constant head tank lock joint, avoid the center post rotatory, magnet and butt joint hole top adsorb, avoid the supporting leg to break away from.
The foregoing is a preferred embodiment of the present invention, and for those skilled in the art to understand the teaching of the present invention, the changes, modifications, replacements and variations to the embodiments will still fall within the protection scope of the present invention without departing from the principle and spirit of the present invention.

Claims (4)

1. The utility model provides a traffic engineering uses interim guardrail, includes frame (1), pole setting (2), cotter (3), barrel (4), round pin post (5), connecting seat (6), half tooth double-screw bolt (7), twists wheel (8), butt joint hole (9), constant head tank (10), equipment supporting leg (11), its characterized in that: frame (1) is the rectangle frame structure, the welding has many equidistance pole setting (2) in frame (1), frame (1) right-hand member welding has round pin section of thick bamboo (3) and barrel (4), frame (1) left end welding has round pin post (5) and connecting seat (6), half tooth double-screw bolt (7) are located connecting seat (6), half tooth double-screw bolt (7) top is fixed with twists wheel (8), frame (1) is controlled the end bottom and is do not opened butt joint hole (9), open butt joint hole (9) bottom has constant head tank (10), two equipment supporting leg (11) are installed with two butt joint hole (9) respectively.
2. A temporary guard rail for traffic engineering according to claim 1, characterized in that: the assembly supporting leg (11) comprises a supporting leg (12), a central column (13), a positioning block (14) and a magnet (15), wherein the central column (13) is welded at the center of the top of the supporting leg (12), the positioning block (14) is fixed on the outer wall of the central column (13), and the magnet (15) is fixed at the top of the central column.
3. A temporary guard rail for traffic engineering according to claim 2, characterized in that: the center post (13) is inserted into the butt joint hole (9) and is adsorbed by the magnet (15), and the positioning block (14) is correspondingly buckled with the positioning groove (10).
4. A temporary guard rail for traffic engineering according to claim 1, characterized in that: the adjacent frame (1) is hinged with the pin barrel (3) through the pin column (5), and the half-thread stud (7) is in threaded fit with the screw barrel (4).
CN202220028961.3U 2022-01-07 2022-01-07 Traffic engineering uses interim guardrail Expired - Fee Related CN216839153U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220028961.3U CN216839153U (en) 2022-01-07 2022-01-07 Traffic engineering uses interim guardrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220028961.3U CN216839153U (en) 2022-01-07 2022-01-07 Traffic engineering uses interim guardrail

Publications (1)

Publication Number Publication Date
CN216839153U true CN216839153U (en) 2022-06-28

Family

ID=82114987

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220028961.3U Expired - Fee Related CN216839153U (en) 2022-01-07 2022-01-07 Traffic engineering uses interim guardrail

Country Status (1)

Country Link
CN (1) CN216839153U (en)

Similar Documents

Publication Publication Date Title
US4194338A (en) Construction components, assemblies thereof, and methods of making and using same
CN110295669B (en) Reinforced concrete structure and reinforcing method
CN216839153U (en) Traffic engineering uses interim guardrail
CN111893902B (en) End-to-end connection structure of rotating bridge
CN206495162U (en) A kind of easily assembling safety barrier
CN108277759A (en) Adjustable-angle combines guardrail and its installation method
CN204608656U (en) A kind of novel isolation strip opening movable guard rail
CN209779515U (en) Separation type isolation guardrail for municipal road
CN220224914U (en) Prefabricated hollow thin-wall pier structure
CN207405782U (en) A kind of pre-buried connecting elements structure between connecting wall
CN208563180U (en) A kind of guardrail cross beams bindiny mechanism
CN208563179U (en) Adjustable-angle combines guardrail
CN209584926U (en) A kind of netted protective fence of highway
CN207552986U (en) A kind of column and the hinged steel profile railing of transverse tube
CN209757407U (en) Safe type motorcycle lower connecting plate subassembly
CN206943188U (en) A kind of guarding against theft type screw
CN218204064U (en) Plastic steel guardrail of structure enhancement mode
CN214697187U (en) High-strength shockproof cement telegraph pole
CN213114279U (en) Public road bridge roof beam shock-absorbing support
CN108265653A (en) A kind of guardrail cross beams bindiny mechanism
CN204920627U (en) Injection molding's anti chongmen frame of integral type
CN213449772U (en) Guardrail used after construction of building site
CN214271504U (en) Anti-loosening device for rail
CN215052280U (en) Windproof screen damping unit plate
CN204112343U (en) Based on the new Joining Structure of protective screening steel column and pedestal

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220628