CN216837825U - Pitch processing is with delaying coking device - Google Patents
Pitch processing is with delaying coking device Download PDFInfo
- Publication number
- CN216837825U CN216837825U CN202220544632.4U CN202220544632U CN216837825U CN 216837825 U CN216837825 U CN 216837825U CN 202220544632 U CN202220544632 U CN 202220544632U CN 216837825 U CN216837825 U CN 216837825U
- Authority
- CN
- China
- Prior art keywords
- pipe
- coking
- case
- fixedly connected
- treatment box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000004939 coking Methods 0.000 title claims abstract description 44
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 25
- 238000012423 maintenance Methods 0.000 claims abstract description 9
- 239000007921 spray Substances 0.000 claims description 21
- 239000010426 asphalt Substances 0.000 claims description 12
- 230000003111 delayed effect Effects 0.000 claims description 7
- 239000007788 liquid Substances 0.000 claims description 5
- 238000005507 spraying Methods 0.000 claims description 4
- 238000009434 installation Methods 0.000 claims 2
- 230000000694 effects Effects 0.000 abstract description 9
- 238000001914 filtration Methods 0.000 abstract description 7
- 125000004122 cyclic group Chemical group 0.000 abstract description 3
- 238000009826 distribution Methods 0.000 abstract description 2
- 239000000571 coke Substances 0.000 description 7
- 239000006253 pitch coke Substances 0.000 description 5
- 238000004519 manufacturing process Methods 0.000 description 4
- 239000004484 Briquette Substances 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000001816 cooling Methods 0.000 description 2
- 238000005520 cutting process Methods 0.000 description 2
- 230000002349 favourable effect Effects 0.000 description 2
- 239000000945 filler Substances 0.000 description 2
- 206010024796 Logorrhoea Diseases 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000000746 purification Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Coke Industry (AREA)
Abstract
The utility model discloses a pitch processing is with delaying coker, the on-line screen storage device comprises a base, the upper surface of base is provided with respectively handles case and two coking jars, the inner wall fixedly connected with a plurality of installing frame of handling the case, the inner wall of installing frame is inserted and is equipped with the filter plate, the bottom of coking jar is inlayed and is equipped with the fluid-discharge tube, the one end that coking jar was kept away from to the fluid-discharge tube extends to the inside of handling the case, the back of handling the case is inlayed and is equipped with circulating pipe, and circulating pipe keeps away from the one end fixedly connected with circulating pump of handling the case, the output fixedly connected with reposition of redundant personnel connecting pipe of circulating pump. This pitch processing is with delaying coker, through setting up processing case, installing frame and filtering screen board, utilize a plurality of crisscross distribution's filtering screen board can play better filter effect, and make things convenient for the staff to maintain and change filtering screen board, reach the purpose of convenient maintenance, and realize retrieving the effect with cyclic utilization with the water under high pressure, reach the water economy resource and save cost's purpose.
Description
Technical Field
The utility model relates to a pitch processing technology field specifically is a pitch processing is with delaying coking device.
Background
The delayed coking of asphalt refers to the asphalt coke production process in which asphalt heating and coking are respectively carried out in different devices in sequence. The asphalt is heated in a tubular furnace to reaction temperature and then fed into coking tower to crack and condense asphalt to produce asphalt coke.
At pitch coking in-process at the coking jar, after pitch in the coking jar generated coke and oil gas, need lead to water and cool off to the inside of coking jar, however, because pitch coke block cooling back can be formed hard piece and adsorb the inner wall at the coking jar, consequently be difficult to arrange the coke block outward and the ejection of compact, can't put into subsequent use with the coke block fast, influenced the efficiency of production and processing. To this end, we propose a delayed coking unit for bitumen processing.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a pitch processing is with delaying coking device to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a pitch processing is with delaying coker, includes the base, the upper surface of base is provided with respectively handles case and two coking jars, the inner wall fixedly connected with a plurality of installing frame of handling the case, the inner wall of installing frame is inserted and is equipped with the filter plate, the bottom of coking jar is inlayed and is equipped with the fluid-discharge tube, the one end that coking jar was kept away from to the fluid-discharge tube extends to the inside of handling the case, the back of handling the case is inlayed and is equipped with circulating pipe, and circulating pipe keeps away from the one end fixedly connected with circulating pump of handling the case, the output fixedly connected with reposition of redundant personnel connecting pipe of circulating pump, the equal fixedly connected with of two outputs of reposition of redundant personnel connecting pipe is the spray line of falling L shape, the spray line is kept away from the one end of reposition of redundant personnel connecting pipe and is extended to the inside of coking jar.
Preferably, a plurality of annular boxes are embedded in the surface of the spray pipe, a plurality of high-pressure spray holes distributed annularly are formed in the outer annular surface of each annular box, and the annular boxes are uniformly distributed on the surface of the spray pipe.
Preferably, a plurality of the crisscross equidistance of installing frame distributes and is handling the front and back inner wall of case, and the inside formation S-shaped water conservancy diversion passageway of case will be handled to a plurality of installing frame.
Preferably, a first control valve is arranged on the surface of the spraying pipe, and a second control valve is arranged on the surface of the liquid discharge pipe.
Preferably, the front surface of the treatment box is provided with a maintenance hole, and the front surface of the treatment box is provided with a maintenance door.
Preferably, the upper surface of the treatment box is embedded with a water feeding pipe, and the surface of the water feeding pipe is provided with a switch valve.
Advantageous effects
The utility model provides a pitch processing is with delaying coking device possesses following beneficial effect:
1. this pitch processing is with delaying coker, through setting up processing case, installing frame and filtering screen board, utilize a plurality of crisscross distribution's filtering screen board can play better filter effect, and make things convenient for the staff to maintain and change filtering screen board, reach the purpose of convenient maintenance, and realize retrieving the effect with cyclic utilization with the water under high pressure, reach the water economy resource and save cost's purpose.
2. This pitch processing is with delaying coker through setting up circulating pipe, circulating pump, reposition of redundant personnel connecting pipe, spray line and ring box, utilizes the spray line setting central point to put in coking jar, can carry out high pressure water impact to the pitch coke block of adsorbing on its inner wall in the coking jar, plays the effect of cutting garrulous, makes the outer ejection of compact of arranging of coke block being convenient for, and convenient operation is favorable to improving the efficiency of production and processing.
Drawings
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic view of a partial three-dimensional cross-sectional structure of a coking tank according to the present invention;
fig. 3 is the utility model discloses handle case side and cut open the structure sketch map.
In the figure: the device comprises a base 1, a treatment box 2, a coking tank 3, a mounting frame 4, a filter screen plate 5, a liquid discharge pipe 6, a circulating water pipe 7, a circulating pump 8, a flow dividing connecting pipe 9, a spray pipe 10, an annular box 11, a high-pressure spray hole 12, a first control valve 13, a second control valve 14 and a water feeding pipe 15.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a pitch processing is with delaying coker, which comprises a base 1, base 1 'S upper surface is provided with respectively handles case 2 and two coking jars 3, the upper surface of handling case 2 inlays and is equipped with filler pipe 15, filler pipe 15' S surface is provided with the ooff valve, the inner wall fixedly connected with a plurality of installing frame 4 of handling case 2, the inner wall of installing frame 4 is inserted and is equipped with filter plate 5, the crisscross equidistance of a plurality of installing frame 4 distributes inner wall around handling case 2, and a plurality of installing frame 4 will handle the inside formation S-shaped water conservancy diversion passageway of case 2, the maintenance hole has been seted up in the front of handling case 2, and the front of handling case 2 is provided with the maintenance door.
Through setting up processing case 2, installing frame 4 and filter screen 5, utilize a plurality of crisscross filter screen 5 that distribute to play better filter effect, and make things convenient for the staff to maintain filter screen 5 and change, reach the purpose of convenient maintenance, and realize retrieving the effect with recycle with the water under high pressure, reach the water economy resource and save cost's purpose.
The bottom of coking jar 3 inlays and is equipped with fluid-discharge tube 6, the surface of fluid-discharge tube 6 is provided with second control flap 14, the one end that coking jar 3 was kept away from to fluid-discharge tube 6 extends to the inside of handling case 2, the back of handling case 2 inlays and is equipped with circulating pipe 7, circulating pipe 7 keeps away from the one end fixedly connected with circulating pump 8 of handling case 2, circulating pump 8's output fixedly connected with reposition of redundant personnel connecting pipe 9, two equal fixedly connected with in output of reposition of redundant personnel connecting pipe 9 are the spray tube 10 of falling L shape.
The surface of spray pipe 10 is provided with first control flap 13, and the one end that shunt connection 9 was kept away from to spray pipe 10 extends to coking tank 3's inside, and spray pipe 10's surface inlays and is equipped with a plurality of ring box 11, and a plurality of is the high pressure orifice 12 that the annular distributes, and a plurality of ring box 11 evenly distributed is on spray pipe 10's surface offered the outer anchor ring of ring box 11.
Through setting up circulating pipe 7, circulating pump 8, reposition of redundant personnel connecting pipe 9, spray pipe 10 and ring box 11, utilize spray pipe 10 to set up central point in coking jar 3 and put, can carry out high pressure water impact to the pitch coke block of adsorbing on its inner wall in coking jar 3, play the effect of cutting up, make the outer ejection of compact of arranging of coke block being convenient for, convenient operation is favorable to improving the efficiency of production and processing.
The working principle is as follows: when using, at first the circulating pump 8 will handle the water in the case 2 and input coking tank 3 through circulating pipe 7, then high pressure water through the high pressure orifice 12 blowout high pressure water of spray pipe 10 surface ring box 11, thereby carry out high pressure water towards and cut apart the processing to the pitch coke briquette that adsorbs on coking tank 3 inner wall, and then be convenient for arrange the pitch coke briquette outward and the ejection of compact, unnecessary water is collected coking tank 3's bottom simultaneously, carry to handling in the case 2 by fluid-discharge tube 6, through the filtration and the purification of a plurality of filter plate 5, in the spray cooling operation of being retrieved and utilizing coking tank 3 again, realize the cyclic utilization of water resource, reach the purpose of saving resources.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a pitch processing is with delaying coker, includes base (1), its characterized in that: the upper surface of the base (1) is respectively provided with a treatment box (2) and two coking tanks (3), the inner wall of the treatment box (2) is fixedly connected with a plurality of mounting frames (4), the inner wall of each mounting frame (4) is inserted with a filter screen (5), a liquid discharge pipe (6) is embedded at the bottom end of the coking tank (3), one end of the liquid discharge pipe (6) far away from the coking tank (3) extends into the treatment box (2), a circulating water pipe (7) is embedded in the back of the treatment tank (2), one end of the circulating water pipe (7) far away from the treatment tank (2) is fixedly connected with a circulating pump (8), the output end of the circulating pump (8) is fixedly connected with a shunt connecting pipe (9), two output ends of the shunt connecting pipe (9) are fixedly connected with an inverted L-shaped spraying pipe (10), one end of the spraying pipe (10) far away from the shunt connecting pipe (9) extends to the interior of the coking tank (3).
2. The delayed coking unit for asphalt processing according to claim 1, characterized in that: the surface of the spray pipe (10) is embedded with a plurality of annular boxes (11), the outer annular surface of each annular box (11) is provided with a plurality of high-pressure spray holes (12) which are distributed annularly, and the plurality of annular boxes (11) are uniformly distributed on the surface of the spray pipe (10).
3. The delayed coking unit for asphalt processing according to claim 1, characterized in that: a plurality of the installation frames (4) are distributed on the front inner wall and the rear inner wall of the treatment box (2) in a staggered and equidistant mode, and the inside of the treatment box (2) forms an S-shaped flow guide channel by the installation frames (4).
4. The delayed coking unit for asphalt processing according to claim 1, characterized in that: the surface of the spraying pipe (10) is provided with a first control valve (13), and the surface of the liquid discharge pipe (6) is provided with a second control valve (14).
5. The delayed coking unit for asphalt processing according to claim 1, characterized in that: the front of the treatment box (2) is provided with a maintenance hole, and the front of the treatment box (2) is provided with a maintenance door.
6. The delayed coking unit for asphalt processing according to claim 1, characterized in that: the upper surface of the treatment box (2) is embedded with a water feeding pipe (15), and the surface of the water feeding pipe (15) is provided with a switch valve.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220544632.4U CN216837825U (en) | 2022-03-14 | 2022-03-14 | Pitch processing is with delaying coking device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220544632.4U CN216837825U (en) | 2022-03-14 | 2022-03-14 | Pitch processing is with delaying coking device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216837825U true CN216837825U (en) | 2022-06-28 |
Family
ID=82093810
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220544632.4U Expired - Fee Related CN216837825U (en) | 2022-03-14 | 2022-03-14 | Pitch processing is with delaying coking device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216837825U (en) |
-
2022
- 2022-03-14 CN CN202220544632.4U patent/CN216837825U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107115852A (en) | A kind of regenerating active carbon cleaning device | |
CN203754715U (en) | Device for producing biogas through integrated two-phase anaerobic fermentation of straw | |
CN216837825U (en) | Pitch processing is with delaying coking device | |
CN203635187U (en) | High-efficiency reaction kettle | |
CN105062870A (en) | Rural biogas tank | |
CN203704702U (en) | Scattered multilayer filler cooling tower | |
CN203295518U (en) | Blast-furnace gas centralized processing system and iron making blast furnace with same | |
CN211734306U (en) | China fir saw-dust water oil separating extraction element | |
CN202532443U (en) | Novel steam condensate water recycling device | |
CN205328932U (en) | Automatic trickle heat sink of quenching in low temperature dry distillation furnace | |
CN204023289U (en) | A kind of even quick-fried seperator of vapour for steam | |
CN203244907U (en) | Chlorine gas absorption device | |
CN204320069U (en) | A kind of reaction system of easy to use, energy saving economy | |
CN211078460U (en) | Methanol pyrolysis hydrogen production device | |
CN206519017U (en) | A kind of negative pressure ammonia tourie | |
CN103993142B (en) | Heat treatment quenching device | |
CN203403035U (en) | Hydroxy propyl cellulose desolvation device | |
CN205740523U (en) | Sewage drainage system | |
CN205313080U (en) | Circulation hydrogen controlling means who uses in crude benzene hydrogenation production technology | |
CN204918473U (en) | Steam coke quenching water coal gas generating device | |
CN205249139U (en) | Self -cleaning solar photovoltaic power station | |
CN203683477U (en) | Waste plastic pyrolysis and oil reaction device | |
CN204932941U (en) | A kind of pre-cold mould refrigerated separation structure | |
CN204694043U (en) | A kind of woven fabric energy-saving dryer heat-energy recovering apparatus | |
CN214681752U (en) | A hydrolysis tower for plant pitch production |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220628 |