CN216811739U - Three-station tunnel anchor rod mounting equipment - Google Patents
Three-station tunnel anchor rod mounting equipment Download PDFInfo
- Publication number
- CN216811739U CN216811739U CN202220010782.7U CN202220010782U CN216811739U CN 216811739 U CN216811739 U CN 216811739U CN 202220010782 U CN202220010782 U CN 202220010782U CN 216811739 U CN216811739 U CN 216811739U
- Authority
- CN
- China
- Prior art keywords
- anchor rod
- extrusion
- station tunnel
- stock
- installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses three-station tunnel anchor rod installation equipment, which comprises a pull wall plate and an extrusion structure, wherein the extrusion structure is arranged on the outer side wall of the wall plate and specifically comprises a rotating shaft, threads, a feed inlet, an extrusion pipe and an extrusion rod, the rotating shaft is arranged on the outer side wall of the wall plate, the extrusion rod is arranged on the right side of the rotating shaft, the threads are arranged on the outer surface of the extrusion rod, the extrusion pipe is connected to the outer surface of the extrusion rod in a sliding manner, the feed inlet is formed in the upper surface of the extrusion pipe, when the anchor rod installation device is used, an anchor rod needs to be poured to fix the anchor rod device after the installation is completed, the device designs that the extrusion device pours the anchor rod while installing the anchor rod, reduces the anchor rod installation operation program, thereby reducing the anchor rod installation time and bringing convenience to constructors.
Description
Technical Field
The utility model relates to the technical field of tunnel anchor rod installation, in particular to three-station tunnel anchor rod installation equipment.
Background
At present, the mainstream methods of tunnel excavation include shield/TBM excavation and drilling and blasting excavation. In the drilling and blasting method construction, the tunnel anchor rod is an indispensable means for reinforcing the stability of tunnel surrounding rocks, and before, the general process of applying the tunnel anchor rod is drilled to obtain an anchor rod hole through an anchor rod trolley, and then the anchor rod is installed and grouted manually, so that the construction method has the defects that the construction process is complicated, the number of the installed anchor rods is small, the number of needed applying personnel is large, the required applying personnel belongs to high-altitude operation, the danger is large, the construction efficiency is general, the construction cost is high and the like. Therefore, in order to solve the defects, the utility model provides the three-station tunnel anchor rod installation equipment.
Patent number CN112392522A discloses a three-station tunnel anchor rod installation device. The utility model relates to a three-station tunnel anchor rod installation device, which comprises an anchor rod installation system, an anchor rod bin mechanism, a grouting system, a drill rod bin mechanism, a drilling system and a station switching system; the anchor rod mounting system is mainly used for mounting the anchor rod and grouting into an anchor rod hole; the anchor rod mounting system is mounted on a left station of the station switching system; the anchor rod bin mechanism is mainly used for storing the anchor rods; the drilling system is mainly used for drilling anchor rod holes; the drilling system is arranged on a right station of the station switching system; the utility model saves the link of manually installing the anchor rod, realizes the operation of automatically installing the anchor rod, greatly reduces the complicated process of manually installing the anchor rod and can effectively ensure the construction efficiency and the installation quality of the anchor rod.
This three station tunnel stock erection equipment has following drawback: the anchor rod process of installing is earlier to the wall punch, at the installation anchor rod, anchor rod stable in structure when the pouring at last, and the process progressively operates the installation time that has increased the operative employee, also has too much waste to the material, does not improve original device, postpones the engineering completion deadline, and this user brings inconveniently.
SUMMERY OF THE UTILITY MODEL
The utility model mainly aims to provide three-station tunnel anchor rod installation equipment which can effectively solve the problems in the background technology.
In order to achieve the purpose, the utility model adopts the technical scheme that:
the utility model provides a three station tunnel stock erection equipment draws the wallboard, still includes the extrusion structure, extrusion structrual installation is on the wallboard lateral wall, the extrusion structure specifically comprises pivot, screw thread, feed inlet, extrusion pipe and stripper bar, install the pivot on the wallboard lateral wall, the stripper bar is installed on the pivot right side, stripper bar surface mounting has the screw thread, stripper bar surface sliding connection has the extrusion pipe, the feed inlet has been seted up to extrusion pipe upper surface.
Furthermore, a rotating shaft is installed on the left side of the wallboard, the left side of the rotating shaft is connected with a motor, the motor is fixedly connected to the upper surface of a bottom plate, a collecting box is installed on the upper surface of the bottom plate, a telescopic column is installed on the right side of the collecting box, a screw rod is installed on the right side of the telescopic column, and a drill bit a is installed on the right side of the screw rod; the motor provides power for the pivot under the effect of external power source, drives the running of extrusion device, and flexible post can be retrieved when drilling is accomplished and is collected in the case, practices thrift the space and does not influence other process operations.
Furthermore, a slide rail is mounted on the upper surface of the collection box, a slide block is connected to the upper surface of the slide rail in a sliding manner, an insertion sleeve is fixedly connected to the right side of the slide block, an insertion column is mounted on the right side of the insertion sleeve, and a baffle is mounted on the right side of the insertion column; the slide rail and slide block system is arranged on the upper surface of the collecting box, so that the anchor rod can be moved, and the anchor rod can be conveniently moved in the installation process.
Further, an anchor rod is fixedly connected to the right side of the baffle, and a drill bit b is installed on the right side of the anchor rod; the baffle is used for preventing not hard up effect after the stock is fixed, at stock right side installation drill bit b, makes things convenient for inside the stock installation process gets into the soil layer, the process progress with higher speed.
Further, the motor is connected with an external power supply; the motor provides power, and the external power supply provides electric power for whole device.
Compared with the prior art, the utility model has the following beneficial effects: use the stock installation device to be, need pour into a mould the stock and fix the stock device at the installation completion, the device has designed extrusion device and has poured into a mould the stock in the installation stock, reduce installation stock operating procedure, thereby the time of installation stock has been reduced, facilitate for the constructor, the motor provides power for the pivot under the effect of external power, drive the extrusion device operation, flexible post can retrieve the collection box power when drilling is accomplished, practice thrift the space and do not influence other process operations, surface mounting slide rail slider system on the collection box, can remove the stock, make things convenient for the stock to remove in the installation.
Drawings
Fig. 1 is an overall structural schematic diagram of a three-station tunnel anchor rod installation device of the utility model.
Fig. 2 is a partially enlarged structural schematic diagram of the three-station tunnel anchor rod installation equipment.
In the figure: 1. extruding the structure; 2. a slide rail; 3. a plug bush; 4. a base plate; 5. a drill bit a; 6. a screw; 7. a telescopic column; 8. a collection box; 9. a drill b; 10. a through hole; 11. an anchor rod; 12. a baffle plate; 13. inserting the column; 14. a slider; 15. a wallboard; 16. a drive shaft; 17. a motor; 101. a rotating shaft; 102. a thread; 103. a feed inlet; 104. extruding the tube; 105. the rod is squeezed.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the utility model easy to understand, the utility model is further described with the specific embodiments.
As shown in fig. 1-2, a three-station tunnel anchor rod erection equipment, draw together and draw wallboard 15, still include extrusion structure 1, extrusion structure 1 is installed on wallboard 15 lateral wall, extrusion structure 1 specifically comprises pivot 101, screw thread 103, feed inlet 103, extrusion pipe 104 and stripper bar 105, install pivot 101 on the wallboard 15 lateral wall, stripper bar 105 is installed on pivot 101 right side, stripper bar 105 surface mounting has screw thread 103, stripper bar 105 surface sliding connection has extrusion pipe 104, feed inlet 103 has been seted up to extrusion pipe 104 upper surface.
The left side of the wall plate 15 is provided with a rotating shaft 101, the left side of the rotating shaft 101 is connected with a motor 17, the motor 17 is fixedly connected to the upper surface of a bottom plate 4, the upper surface of the bottom plate 4 is provided with a collecting box 8, the right side of the collecting box 8 is provided with a telescopic column 7, the right side of the telescopic column 7 is provided with a screw rod 6, and the right side of the screw rod 6 is provided with a drill bit a 5; motor 17 provides power for pivot 101 under the effect of external power source, drives the running of extrusion device, and flexible post 7 can be retrieved in collection box 8 when drilling is accomplished, practices thrift the space and does not influence other process operations.
The upper surface of the collecting box 8 is provided with a sliding rail 2, the upper surface of the sliding rail 2 is connected with a sliding block 14 in a sliding manner, the right side of the sliding block 14 is fixedly connected with an inserting sleeve 3, the right side of the inserting sleeve 3 is provided with an inserting column 13, and the right side of the inserting column 13 is provided with a baffle 12; a sliding rail 2 and a sliding block 14 system are arranged on the upper surface of the collecting box 8, so that the anchor rod 11 can be moved, and the anchor rod 11 can be conveniently moved in the installation process.
An anchor rod 11 is fixedly connected to the right side of the baffle plate 12, and a drill bit b9 is installed on the right side of the anchor rod 11; baffle 12 is used for preventing the effect of becoming flexible after anchor rod 11 is fixed, installs drill bit b9 in anchor rod 11 right side, makes things convenient for anchor rod 11 installation process to get into inside the soil layer, accelerates the process progress.
Wherein the motor 17 is connected with an external power supply; the motor 17 provides power and an external power supply provides power for the whole device.
It should be noted that the utility model is a three-station tunnel anchor rod installation device, when in use, an external power supply is turned on to provide power, the telescopic column 7 extends out of the collection box 8, the screw 6 rotates to drive the drill bit to rotate, the process of drilling is completed, after the drilling is completed, the drilling device is recovered to the collection box 8, the distance of the sliding block 14 on the sliding rail 2 is adjusted, the motor 17 drives the rotating shaft 101, the power drives the extrusion pipe 104 through the transmission shaft 16, the extrusion pipe 104 rotates forwards, the pouring material is put into the feeding hole 103 to be extruded in the extrusion pipe 104 and moves into the insertion column 13, the insertion column 13 enables the pouring material to enter the anchor rod 11 through extrusion force, meanwhile, the anchor rod 11 is installed on the soil layer, and the pouring material flows out from the through hole 10 on the outer surface of the anchor rod 11, so as to fix the anchor rod 11.
The foregoing shows and describes the general principles and broad features of the present invention and advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the utility model as claimed. The scope of the utility model is defined by the appended claims and equivalents thereof.
Claims (5)
1. The utility model provides a three station tunnel stock erection equipment, is including drawing wallboard (15), its characterized in that, still includes extrusion structure (1), extrusion structure (1) is installed on wallboard (15)15 lateral wall, extrusion structure (1) specifically comprises pivot (101), screw thread (102), feed inlet (103), extrusion pipe (104) and stripper bar (105), install pivot (101) on wallboard (15) lateral wall, stripper bar (105) are installed on pivot (101)101 right side, stripper bar (105) surface mounting has screw thread (102), stripper bar (105) surface sliding connection has extrusion pipe (104), feed inlet (103) have been seted up to extrusion pipe (104) upper surface.
2. A three-station tunnel anchor rod installation apparatus according to claim 1, wherein: pivot (101) are installed in wallboard (15) left side, pivot (101) left side is connected with motor (17), motor (17) fixed connection is at bottom plate (4) upper surface, bottom plate (4) upper surface mounting has collecting box (8), flexible post (7) are installed on collecting box (8) right side, screw rod (6) are installed on flexible post (7) right side, drill bit a (5) are installed on screw rod (6) right side.
3. A three-station tunnel anchor rod installation apparatus according to claim 2, wherein: the collecting box (8) upper surface mounting has slide rail (2), slide rail (2) upper surface sliding connection has slider (14), slider (14) right side fixedly connected with plug bush (3), plug post (13) are installed on plug bush (3) right side, baffle (12) are installed on plug post (13) right side.
4. A three-station tunnel anchor rod installation apparatus according to claim 3, wherein: baffle (12) right side fixedly connected with stock (11), drill bit b (9) are installed on stock (11) right side, through-hole (10) have been seted up to stock (11) surface.
5. A three-station tunnel anchor rod installation apparatus according to claim 2, wherein: the motor (17) is connected with an external power supply.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220010782.7U CN216811739U (en) | 2022-01-05 | 2022-01-05 | Three-station tunnel anchor rod mounting equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220010782.7U CN216811739U (en) | 2022-01-05 | 2022-01-05 | Three-station tunnel anchor rod mounting equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216811739U true CN216811739U (en) | 2022-06-24 |
Family
ID=82062100
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220010782.7U Active CN216811739U (en) | 2022-01-05 | 2022-01-05 | Three-station tunnel anchor rod mounting equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216811739U (en) |
-
2022
- 2022-01-05 CN CN202220010782.7U patent/CN216811739U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106888627A (en) | A kind of labour-saving Portable digging machine for planting trees | |
CN205989416U (en) | A kind of horizontal single storekeeper corridor mould | |
CN216811739U (en) | Three-station tunnel anchor rod mounting equipment | |
CN206233865U (en) | Combined type reaming bit | |
CN213538932U (en) | Underpass railway frame bridge foundation reinforcing apparatus and construction equipment | |
CN112539951A (en) | Electric soil sampler and soil sampling method thereof | |
CN211058732U (en) | Anchor rod taking drill rod | |
CN211452909U (en) | Sampling device for concrete material detection | |
CN113152977B (en) | Electric power construction is with supplementary construction equipment | |
CN106401625A (en) | Drillable anchor rod device capable of being anchored in crossed mode and construction method | |
CN201428378Y (en) | Drill for recycling tower crane foundation screws | |
CN218411744U (en) | On-spot exploration device for building engineering | |
CN214271979U (en) | Sampling filling device for highway engineering | |
CN220960660U (en) | Portable geological sampling mechanism | |
CN110607816A (en) | Mechanical arm of earth boring machine | |
CN220415272U (en) | Energy-saving automatic drilling equipment for mineral exploitation | |
CN220927983U (en) | Ground hole enlarging device | |
CN216240460U (en) | Well drilling device easy to operate and used for construction of power pipe well | |
CN216197883U (en) | Drilling tool for hole forming and pipe following of slope reinforcing anchor cable | |
CN213143133U (en) | Cylindrical template fixing device | |
CN212718776U (en) | Be used for mine geological environment monitoring support | |
CN213541588U (en) | Water supply and drainage pipe installation auxiliary tool for building engineering | |
CN112378702B (en) | Detection sampling device for mining | |
CN218991657U (en) | Mine channel supporting device for mining | |
CN216342130U (en) | Automatic piece feeding equipment of shield machine for electric power tunnel construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |