CN216810457U - Green curtain wall engineering design mounting structure - Google Patents

Green curtain wall engineering design mounting structure Download PDF

Info

Publication number
CN216810457U
CN216810457U CN202123209479.4U CN202123209479U CN216810457U CN 216810457 U CN216810457 U CN 216810457U CN 202123209479 U CN202123209479 U CN 202123209479U CN 216810457 U CN216810457 U CN 216810457U
Authority
CN
China
Prior art keywords
curtain wall
sides
engineering design
skeleton
branch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123209479.4U
Other languages
Chinese (zh)
Inventor
莫晓嵩
李玉
贾颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Delin United Engineering Design Co ltd
Original Assignee
Delin United Engineering Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Delin United Engineering Design Co ltd filed Critical Delin United Engineering Design Co ltd
Priority to CN202123209479.4U priority Critical patent/CN216810457U/en
Application granted granted Critical
Publication of CN216810457U publication Critical patent/CN216810457U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model relates to the technical field of curtain wall engineering, in particular to an engineering design installation structure of a green environment-friendly curtain wall, which solves the problems that in the prior art, when the curtain wall plates are butted, the curtain wall plates are fixed through a plurality of bolts, the traditional fixing mode wastes time and labor during installation, and simultaneously, when the curtain wall plates are used at a later stage, the bolts can be loosened, so that the curtain wall is unstable. The utility model provides a green curtain wall engineering design mounting structure, includes the skeleton, and the both sides of skeleton all are equipped with curtain wall board, and two curtain wall boards are close to the equal fixedly connected with a plurality of fixed block in one side of skeleton respectively. According to the mode provided by the utility model, the fixing block, the fixing groove and the components thereof are mutually inserted, so that the fixing block and the fixing groove can be quickly connected, the aim of quickly installing the curtain wall plate is further realized, and the problem that a plurality of bolts are wasted time and labor when being used for fixing in the traditional mode is solved.

Description

Green curtain wall engineering design mounting structure
Technical Field
The utility model relates to the technical field of curtain wall engineering, in particular to an engineering design and installation structure of a green environment-friendly curtain wall.
Background
The curtain wall is an outer wall enclosure of a building, does not bear load, is hung like a curtain, is also called as a curtain wall, is a light wall with a decoration effect commonly used by modern large and high-rise buildings, and needs to be butted when the curtain wall is installed.
All fix through a great deal of bolt when carrying out the butt joint of curtain board among the prior art, this kind of traditional fixed mode not only wastes time and energy when installing, when using at the later stage simultaneously, still can cause the not hard up phenomenon of bolt, and then causes the unstable phenomenon of curtain, seems very inconvenient.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide an engineering design installation structure of a green environment-friendly curtain wall, which solves the problems that in the prior art, when the curtain wall plates are butted, the curtain wall plates are fixed through a plurality of bolts, the traditional fixing mode wastes time and labor during installation, and simultaneously, when the curtain wall plates are used at a later stage, the bolts are loosened, so that the curtain wall is unstable.
In order to achieve the purpose, the utility model adopts the following technical scheme:
an engineering design installation structure of a green environment-friendly curtain wall comprises a framework, wherein curtain wall plates are arranged on two sides of the framework, a plurality of fixed blocks are fixedly connected to one sides of the two curtain wall plates respectively close to the framework, fixed grooves are formed in one sides of the two sides of the framework respectively close to all the fixed blocks, and the two sides of the framework respectively close to all the fixed grooves are respectively provided with an adjusting groove, the two sides of the inner side of each fixed groove are respectively and elastically connected with an arc-shaped plate, the inner sides of the two adjusting grooves are respectively provided with a supporting rod, one end of each of the two supporting rods penetrates through the side wall of the fixed groove through the notch, the two supporting rods respectively penetrate through the two arc-shaped plates, wherein, the two sides of the fixed block are both provided with slots used for matching with the two supporting rods, the two supporting rods are respectively arranged on the inner side parts of the two adjusting slots and are both sleeved with extension springs, and one ends of the two supporting rods are respectively and elastically connected with the inner walls of the two adjusting grooves through extension springs.
Preferably, two curtain wall boards are close to the equal fixedly connected with connecting block in one side of skeleton, and the spread groove has all been seted up to one side that the skeleton is close to two connecting blocks, and one side of spread groove is equipped with cross type pole, and on the connecting block with the spread groove lateral wall on all set up the cross type groove that cooperation cross type pole used.
Preferably, one side of the cross-shaped rod is provided with a threaded rod, and one end of the cross-shaped rod is provided with a threaded groove matched with the threaded rod for use.
Preferably, one side of each of the arc plates is elastically connected to the inner walls of the fixing grooves by the pressing springs, respectively.
Preferably, all the struts are respectively connected with all the arc-shaped plates in a sliding manner.
Preferably, the two curtain wall plates are symmetrically distributed along the center of the framework.
The utility model has at least the following beneficial effects:
when the green environment-friendly curtain wall engineering design installation structure is used, all the supporting rods are pulled along the direction far away from the fixing grooves, the fixing blocks on the two curtain wall plates are placed along the positions of the fixing grooves on the framework, the fixing blocks are basically stabilized by the arc-shaped plates, then the supporting rods are loosened, so that the supporting rods move towards the directions of the fixing blocks under the action of the stretching springs, one ends of the supporting rods extend into the slots on the fixing blocks to fix the fixing blocks, and therefore the curtain wall plates can be fixed, compared with the traditional fixing mode that the curtain wall plates are fixed through a plurality of bolts during butt joint in the prior art, the traditional fixing mode not only wastes time and labor during installation, but also causes the phenomenon of bolt looseness during later use, and further causes the problem of unstable curtain walls, the utility model provides a mode, utilize fixed block and fixed slot and the mode that the subassembly was pegged graft each other for the fixed block can carry out quick connection work with the fixed slot, and then has realized the purpose of installing curtain wall board fast, has avoided adopting a great deal of bolt to fix the time-wasting and energy-wasting problem in the tradition.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required to be used in the description of the embodiments are briefly introduced below, and it is obvious that the drawings in the description below are some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings based on the drawings without creative efforts.
FIG. 1 is a schematic overall front view of the present invention;
FIG. 2 is a schematic side view of the present invention;
FIG. 3 is an enlarged view of the area A of the present invention.
In the figure: 1. a framework; 2. a curtain wall plate; 3. a fixed block; 4. fixing grooves; 5. connecting blocks; 6. connecting grooves; 7. a cross-shaped bar; 8. a cross-shaped groove; 9. an adjustment groove; 10. an arc-shaped plate; 11. a strut; 12. a slot; 13. extruding the spring; 14. a notch; 15. an extension spring; 16. a threaded rod; 17. a thread groove.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is described in further detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the utility model and are not intended to limit the utility model.
Referring to fig. 1-3, a green curtain wall engineering design installation structure comprises a framework 1, curtain wall plates 2 are arranged on two sides of the framework 1, a plurality of fixed blocks 3 are fixedly connected to one sides of the two curtain wall plates 2 respectively close to the framework 1, fixed grooves 4 are respectively arranged on one sides of the two sides of the framework 1 respectively close to all the fixed blocks 3, adjusting grooves 9 are respectively arranged on two sides of the framework 1 respectively close to all the fixed grooves 4, arc-shaped plates 10 are elastically connected to two inner sides of the fixed grooves 4, supporting rods 11 are respectively arranged on the inner sides of the two adjusting grooves 9, one ends of the two supporting rods 11 respectively penetrate through the side walls of the fixed grooves 4 through notches 14, the two supporting rods 11 respectively penetrate through the two arc-shaped plates 10, slots 12 matched with the two supporting rods 11 are respectively arranged on two sides of the fixed blocks 3, and extension springs 15 are respectively sleeved on the inner side portions of the two supporting rods 11 respectively located in the two adjusting grooves 9, and the one end of two branch 11 all through extension spring 15 respectively with two between the inner wall of adjustment tank 9 elastic connection, specific, utilize fixed block 3 and fixed slot 4 and the mode that the subassembly was pegged graft each other for fixed block 3 can carry out quick connection work with fixed slot 4, and then has realized the purpose of installing curtain board 2 fast, has avoided adopting a great deal of bolt to fix the problem that wastes time and energy in the tradition.
The scheme has the following working processes:
when the green environment-friendly curtain wall engineering design installation structure is used, all the supporting rods 11 are pulled along the direction far away from the fixing grooves 4, the fixing blocks 3 on the two curtain wall plates 2 are placed along the positions of the fixing grooves 4 on the framework 1, the fixing blocks 3 are basically stabilized by the arc-shaped plates 10, the supporting rods 11 are loosened, the supporting rods 11 move towards the fixing blocks 3 under the action of the stretching springs 15, one ends of the supporting rods 11 extend into the slots 12 in the fixing blocks 3 and are used for fixing the fixing blocks 3, and therefore the curtain wall plates 2 can be fixed.
According to the working process, the following steps are known:
utilize fixed block 3 and fixed slot 4 and the mode that the subassembly was pegged graft each other for fixed block 3 can carry out quick connection work with fixed slot 4, and then has realized the purpose of installing curtain board 2 fast, has avoided adopting a great deal of bolt to fix the time-consuming and energy-consuming problem in the tradition.
Further, two curtain board 2 are close to equal fixedly connected with connecting block 5 in one side of skeleton 1, and skeleton 1 has all seted up spread groove 6 near one side of two connecting blocks 5, one side of spread groove 6 is equipped with cross type pole 7, and on connecting block 5 with all set up the cross type groove 8 that cooperation cross type pole 7 used on the 6 lateral walls of spread groove, it is concrete, utilize connecting block 5 and spread groove 6's cooperation to use, peg graft with cross type groove 8 at utilizing cross type pole 7, and then can further improve the stability of curtain board 2 installation.
Furthermore, a threaded rod 16 is arranged on one side of the cross-shaped rod 7, a threaded groove 17 used for matching with the threaded rod 16 is formed in one end of the cross-shaped rod 7, and specifically, the cross-shaped rod 7 can be limited by matching the threaded rod 16 with the threaded groove 17.
Further, one side of all arc 10 all through extrusion spring 13 respectively with all fixed slot 4 inner wall between elastic connection, specific, utilize extrusion spring 13 to make arc 10 have the dynamics to the fixed block 3 centre gripping.
Furthermore, the joints of all the struts 11 and all the arc plates 10 are connected in a sliding manner.
Furthermore, two curtain wall boards 2 are symmetrically distributed along the center of the framework 1.
In summary, the following steps: utilize the cooperation of connecting block 5 and spread groove 6 to use, peg graft with cross type groove 8 utilizing cross type pole 7, and then can further improve the stability of curtain board 2 installations, utilize threaded rod 16 and thread groove 17's cooperation to use, can carry on spacingly to cross type pole 7, utilize extrusion spring 13 to make arc 10 have the dynamics to the 3 centre gripping of fixed block.
The foregoing shows and describes the general principles, essential features, and advantages of the utility model. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are merely illustrative of the principles of the utility model, but that various changes and modifications may be made without departing from the spirit and scope of the utility model, which fall within the scope of the utility model as claimed. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a green curtain wall engineering design mounting structure, includes skeleton (1), the both sides of skeleton (1) all are equipped with curtain wall board (2), its characterized in that, two curtain wall board (2) are close to equal fixedly connected with a plurality of fixed block (3) in one side of skeleton (1) respectively, the both sides of skeleton (1) are close to one side of all fixed block (3) respectively and have all seted up fixed slot (4), and skeleton (1) is close to the both sides of all fixed slot (4) respectively and has all seted up adjustment tank (9), the inboard both sides of fixed slot (4) all elastically connected with arc (10), two the inboard of adjustment tank (9) all is equipped with branch (11), and the one end of two branch (11) all runs through the lateral wall of fixed slot (4) through notch (14), and two branch (11) run through two arc (10) respectively, wherein slot (12) that two branch (11) of cooperation used are all seted up to the both sides of fixed block (3), two branch (11) are located respectively on two adjustment tank (9) the inside part all the cover be equipped with extension spring (15), and the one end of two branch (11) all through extension spring (15) respectively with two adjustment tank (9) between the inner wall elastic connection.
2. The green curtain wall engineering design installation structure of claim 1, wherein two curtain wall boards (2) are fixedly connected with connecting blocks (5) on one sides close to the framework (1), connecting grooves (6) are formed in one sides of the framework (1) close to the two connecting blocks (5), cross-shaped rods (7) are arranged on one sides of the connecting grooves (6), and cross-shaped grooves (8) matched with the cross-shaped rods (7) for use are formed in the connecting blocks (5) and the side walls of the connecting grooves (6).
3. The green curtain wall engineering design installation structure as claimed in claim 2, wherein one side of the cross-shaped rod (7) is provided with a threaded rod (16), and one end of the cross-shaped rod (7) is provided with a threaded groove (17) matched with the threaded rod (16).
4. The green curtain wall engineering design installation structure as claimed in claim 1, wherein one side of all the arc-shaped plates (10) is elastically connected with the inner walls of all the fixing grooves (4) through the extrusion springs (13).
5. The green curtain wall engineering design installation structure as claimed in claim 1, wherein the joints of all the support rods (11) and all the arc-shaped plates (10) are connected in a sliding manner.
6. The green curtain wall engineering design installation structure as claimed in claim 1, wherein the two curtain wall boards (2) are symmetrically distributed along the center of the framework (1).
CN202123209479.4U 2021-12-20 2021-12-20 Green curtain wall engineering design mounting structure Active CN216810457U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123209479.4U CN216810457U (en) 2021-12-20 2021-12-20 Green curtain wall engineering design mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123209479.4U CN216810457U (en) 2021-12-20 2021-12-20 Green curtain wall engineering design mounting structure

Publications (1)

Publication Number Publication Date
CN216810457U true CN216810457U (en) 2022-06-24

Family

ID=82055122

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123209479.4U Active CN216810457U (en) 2021-12-20 2021-12-20 Green curtain wall engineering design mounting structure

Country Status (1)

Country Link
CN (1) CN216810457U (en)

Similar Documents

Publication Publication Date Title
CN216810457U (en) Green curtain wall engineering design mounting structure
CN213174309U (en) Quick-release wall for assembly type building construction
CN210374024U (en) Intelligent air conditioner easy to assemble
CN217926620U (en) Steel-wood combined furniture assembly process piece special for hotel
CN213508987U (en) Window edge sealing fixing piece of assembled building external wall heat insulation integrated plate
CN214461700U (en) Ceiling structure for building engineering construction
CN202401754U (en) Combined supporting bracket of template keel for buildings
CN216893087U (en) Clean panel frame that heat-proof quality is good
CN216810527U (en) Glass curtain wall convenient to install for architectural design
CN212613289U (en) Stable ceiling keel structure capable of improving overall stability of ceiling keel structure
CN221193850U (en) Assembled wall body structure of interior partition wall
CN220150657U (en) Modular furred ceiling fossil fragments structure
CN215802421U (en) Wall body is used to pre-assembly formula architectural decoration fitment
CN216665076U (en) Assembled wall body auxiliary assembly spare
CN213390799U (en) Honeycomb panel connecting piece
CN220100269U (en) Assembled steel construction wallboard
CN217537554U (en) Assembled steel construction roof truss
CN218540962U (en) Steel construction that can prefabricate
CN217353110U (en) Curtain wall upright post fixing assembly
CN218233959U (en) Firm type furred ceiling fossil fragments block device for building decoration
CN221030938U (en) Furred ceiling fossil fragments docking mechanism
CN217175301U (en) Assembly structure of super high-rise building outer wall
CN217975038U (en) Prefabricated JSC floor
CN221143239U (en) Building decoration assembled dry-hanging suspended ceiling structure
CN219980300U (en) Cabling rack installation butt joint structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant