CN216809669U - Warning device for building engineering - Google Patents

Warning device for building engineering Download PDF

Info

Publication number
CN216809669U
CN216809669U CN202123348643.XU CN202123348643U CN216809669U CN 216809669 U CN216809669 U CN 216809669U CN 202123348643 U CN202123348643 U CN 202123348643U CN 216809669 U CN216809669 U CN 216809669U
Authority
CN
China
Prior art keywords
warning
engineering
installation
lift
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123348643.XU
Other languages
Chinese (zh)
Inventor
潘少典
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202123348643.XU priority Critical patent/CN216809669U/en
Application granted granted Critical
Publication of CN216809669U publication Critical patent/CN216809669U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Audible And Visible Signals (AREA)

Abstract

The utility model discloses a warning device for constructional engineering, which comprises a fixed bottom plate, wherein two supporting stand columns are installed at the upper end of the fixed bottom plate, lifting installation structures are installed at the inner sides of the supporting stand columns, warning board dismounting structures are installed at the upper ends of the lifting installation structures, engineering warning boards are installed at the inner sides of the warning board dismounting structures, illuminating lamps are installed at the front ends and the rear ends of the warning board dismounting structures, and each lifting installation structure comprises a lifting clamping groove, a lifting installation plate and a locking screw. The warning device for the building engineering, disclosed by the utility model, has the advantages that the engineering warning plate is quickly assembled and disassembled, the engineering warning plate is more convenient to install, replace and use, the installation warning height of the engineering warning plate can be adjusted, a plurality of lifting installation plates can be stacked and installed, the stacked installation of the engineering warning plates is realized, and the warning use of the engineering warning plates in different occasions is more convenient.

Description

Warning device for building engineering
Technical Field
The utility model relates to the field of warning devices, in particular to a warning device for constructional engineering.
Background
The warning device for the building engineering is generally a device for warning a construction site by slogans during the construction of the building engineering, and is applied to various construction occasions of the building engineering;
but current warning device for building engineering has certain weak point when using and remains to be improved, at first, can not be to carrying out the quick assembly disassembly of engineering warning board, consequently the installation and the change of inconvenient engineering warning board use, and secondly, can not adjust the installation warning height of engineering warning board to and a plurality of engineering warning board pile up the installation, the warning of inconvenient engineering warning board in different occasions is used.
SUMMERY OF THE UTILITY MODEL
The utility model mainly aims to provide a warning device for constructional engineering, which can effectively solve the technical problems in the background art.
In order to realize the purpose, the utility model adopts the technical scheme that:
the utility model provides a warning device for building engineering, includes PMKD, two support post are installed to PMKD's upper end, lift mounting structure is installed to support post's inboard, warning board dismouting structure is installed to lift mounting structure's upper end, engineering warning board is installed to warning board dismouting structure's inboard, the light is all installed to the front end and the rear end of warning board dismouting structure.
As a further scheme of the utility model, the lifting mounting structure comprises a lifting clamping groove, a lifting mounting plate and locking screws, wherein the lifting clamping groove is formed in the inner side of the supporting upright post, the lifting mounting plate is arranged in the lifting clamping groove, and the locking screws are arranged at two ends of the lifting mounting plate.
As a further scheme of the utility model, the lifting mounting plate is inserted into the lifting clamping groove and connected with the supporting upright post, the lifting mounting plate moves up and down around the lifting clamping groove, and the locking screw penetrates through the lifting clamping groove and is connected with one side of the supporting upright post in an attaching manner.
As a further scheme of the utility model, the warning board dismounting structure comprises an installation bottom frame, a connecting rotating shaft, installation frames and butt screws, wherein the installation bottom frame is installed at the upper end of the lifting installation plate, the connecting rotating shaft is installed at two ends of the installation bottom frame, the installation frames are installed at two ends of the installation bottom frame through the connecting rotating shaft, and the butt screws are installed at the tops of the installation frames.
As a further scheme of the utility model, the mounting frames rotate around the connecting rotating shaft, the mounting bottom frame and the mounting frames are mounted in a triangular arrangement, the engineering warning board is mounted on the inner sides of the mounting bottom frame and the mounting frames, and the illuminating lamps are mounted at the front end and the rear end of the mounting bottom frame.
As a further scheme of the utility model, the engineering warning board is positioned between the two supporting upright columns, and the two supporting upright columns are symmetrically arranged and installed.
Compared with the prior art, the utility model has the following beneficial effects: through the arranged warning plate dismounting structure, when the engineering warning plate is mounted, the engineering warning plate is inserted into the mounting bottom frame and the mounting frames, the mounting frames rotate around the connecting rotating shaft to be moved, so that the tops of the two mounting frames are attached, and then the two mounting frames are fixedly butted by tightening the butting screws, so that the mounting bottom frame and the mounting frames are used for wrapping and mounting the engineering warning plate, otherwise, the engineering warning plate is quickly dismounted, and the engineering warning plate is more convenient to mount, replace and use;
through the lift mounting structure who sets up, the engineering warning board is installed the back, the lift mounting panel through the below inserts and fixes in the inboard lift draw-in groove of support post, it carries out the fixed of lift mounting panel to go up tight locking screw again, and the lift mounting panel can go up and down around the lift draw-in groove, adjust the installation warning height of engineering warning board, can also carry out the installation of piling up of a plurality of lift mounting panels, realize the installation of piling up of a plurality of engineering warning boards, more make things convenient for the warning use of engineering warning board in different occasions.
Drawings
FIG. 1 is a schematic view of the overall structure of a warning device for construction engineering according to the present invention;
FIG. 2 is a disassembled view of a lifting installation structure of the warning device for construction engineering of the present invention;
fig. 3 is a disassembled view of a warning plate disassembling and assembling structure of the warning device for constructional engineering.
In the figure: 1. fixing the bottom plate; 2. supporting the upright post; 3. a lifting mounting structure; 4. a lifting clamping groove; 5. a lifting mounting plate; 6. locking the screw; 7. the warning board is of a dismounting structure; 8. installing a bottom frame; 9. connecting the rotating shaft; 10. installing a frame; 11. butting screws; 12. an engineering warning board; 13. an illuminating lamp.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the utility model easy to understand, the utility model is further described with the specific embodiments.
As shown in fig. 1-3, a warning device for building engineering, includes PMKD 1, and two support posts 2 are installed to PMKD 1's upper end, and lift mounting structure 3 is installed to support post 2's inboard, and warning board dismouting structure 7 is installed to lift mounting structure 3's upper end, and engineering warning board 12 is installed to warning board dismouting structure 7's inboard, and light 13 is all installed to the front end and the rear end of warning board dismouting structure 7.
In this embodiment, in order to carry out lift adjustment to engineering warning board 12 and set up lift mounting structure 3, lift mounting structure 3 is including lift draw-in groove 4, lift mounting panel 5 and locking screw 6, and lift draw-in groove 4 sets up in the inboard of support post 2, and lift mounting panel 5 is installed in the inside of lift draw-in groove 4, and locking screw 6 installs the both ends at lift mounting panel 5.
In this embodiment, the inside that lift mounting panel 5 inserted lift draw-in groove 4 is connected with support post 2, and lift mounting panel 5 goes up and down the activity around lift draw-in groove 4, and locking screw 6 passes lift draw-in groove 4 and is connected with the laminating of one side of support post 2.
In this embodiment, in order to carry out quick dismouting to engineering warning board 12 and set up warning board dismouting structure 7, warning board dismouting structure 7 is including installation underframe 8, connect pivot 9, installation frame 10 and butt joint screw 11, installation underframe 8 is installed in the upper end of lift mounting panel 5, connect pivot 9 and install the both ends at installation underframe 8, installation frame 10 is installed through connecting pivot 9 at the both ends of installation underframe 8, butt joint screw 11 is installed at the top of installation frame 10.
In this embodiment, the installation frame 10 is rotatably movable around the connection rotation shaft 9, the installation base frame 8 and the installation frame 10 are installed in a triangular arrangement, the engineering warning board 12 is installed inside the installation base frame 8 and the installation frame 10, and the illumination lamps 13 are installed at the front end and the rear end of the installation base frame 8.
In this embodiment, the engineering warning board 12 is located in the middle of the two support columns 2, and the two support columns 2 are symmetrically arranged and installed.
It should be noted that, the utility model is a warning device for construction engineering, when in use, the fixed bottom plate 1 and the supporting upright post 2 play a role in installation, supporting and placement, then the supporting upright post 2 is used for installing and fixing the lifting installation plate 5, the installation bottom frame 8 and the installation frame 10 are installed above the lifting installation plate 5, the installation bottom frame 8 and the installation frame 10 are used for installing the engineering warning plate 12, and through the placement of the engineering warning plate 12, the illuminating lamp 13 plays a role in illuminating the engineering warning plate 12, and then the engineering warning plate 12 plays a role in warning.
According to the utility model, through the arranged warning plate dismounting structure 7, when the engineering warning plate 12 is mounted, the engineering warning plate 12 is inserted into the mounting bottom frame 8 and the mounting frames 10, the mounting frames 10 rotate around the connecting rotating shaft 9 to enable the tops of the two mounting frames 10 to be attached, and then the butt screws 11 are tightened to butt and fix the two mounting frames 10, so that the mounting bottom frame 8 and the mounting frames 10 wrap and mount the engineering warning plate 12, otherwise, the engineering warning plate 12 is quickly dismounted, the quick dismounting of the engineering warning plate 12 is realized, and the mounting and the replacement of the engineering warning plate 12 are more convenient; through the lift mounting structure 3 that sets up, engineering warning board 12 installs the back, lift mounting panel 5 through the below inserts and fixes in 2 inboard lift draw-in grooves 4 of support post, it carries out the fixed of lift mounting panel 5 to go up lock screw 6 again, and lift mounting panel 5 can go up and down around lift draw-in grooves 4, adjust engineering warning board 12's installation warning height, can also carry out the installation of piling up of a plurality of lift mounting panels 5, realize the installation of piling up of a plurality of engineering warning boards 12, more make things convenient for engineering warning board 12 to use in the warning of different occasions.
The foregoing shows and describes the general principles and broad features of the present invention and advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the utility model as claimed. The scope of the utility model is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a warning device for building engineering which characterized in that: including PMKD (1), two support post (2) are installed to the upper end of PMKD (1), lift mounting structure (3) are installed to the inboard of support post (2), warning board dismouting structure (7) are installed to the upper end of lift mounting structure (3), engineering warning board (12) are installed to the inboard of warning board dismouting structure (7), light (13) are all installed to the front end and the rear end of warning board dismouting structure (7).
2. The warning device for construction engineering as claimed in claim 1, wherein: the lifting mounting structure (3) comprises a lifting clamping groove (4), a lifting mounting plate (5) and locking screws (6), the lifting clamping groove (4) is formed in the inner side of the supporting stand column (2), the lifting mounting plate (5) is mounted in the lifting clamping groove (4), and the locking screws (6) are mounted at two ends of the lifting mounting plate (5).
3. The warning device for construction engineering as claimed in claim 2, wherein: the inside that lift mounting panel (5) inserted lift draw-in groove (4) is connected with support post (2), and lift mounting panel (5) are around lift draw-in groove (4) lift activity, and locking screw (6) pass one side laminating of lift draw-in groove (4) and support post (2) and are connected.
4. The warning device for construction engineering as claimed in claim 2, wherein: warning board dismouting structure (7) are including installation underframe (8), connection pivot (9), installation frame (10) and butt joint screw (11), and the upper end at lift mounting panel (5) is installed in installation underframe (8), connects pivot (9) and installs the both ends at installation underframe (8), and installation frame (10) are installed through connecting pivot (9) in the both ends of installation underframe (8), and the top at installation frame (10) is installed in butt joint screw (11).
5. The warning device for construction engineering as claimed in claim 4, wherein: installation frame (10) are around connecting pivot (9) rotation activity, and installation underframe (8) and installation frame (10) are the triangle-shaped and arrange the installation, and engineering warning board (12) are installed in the inboard of installation underframe (8) and installation frame (10), and front end and the rear end at installation underframe (8) are installed in light (13).
6. The warning device for construction engineering as claimed in claim 1, wherein: the engineering warning board (12) is positioned in the middle of the two supporting upright posts (2), and the two supporting upright posts (2) are symmetrically arranged and installed.
CN202123348643.XU 2021-12-28 2021-12-28 Warning device for building engineering Active CN216809669U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123348643.XU CN216809669U (en) 2021-12-28 2021-12-28 Warning device for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123348643.XU CN216809669U (en) 2021-12-28 2021-12-28 Warning device for building engineering

Publications (1)

Publication Number Publication Date
CN216809669U true CN216809669U (en) 2022-06-24

Family

ID=82056659

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123348643.XU Active CN216809669U (en) 2021-12-28 2021-12-28 Warning device for building engineering

Country Status (1)

Country Link
CN (1) CN216809669U (en)

Similar Documents

Publication Publication Date Title
CN207048318U (en) A kind of aluminum alloy pattern plate bracing device
CN201488375U (en) Channel-type solar torque box bracket
CN216809669U (en) Warning device for building engineering
CN2593367Y (en) Solar cell mounting structure
CN219322314U (en) Clamping type photovoltaic panel mounting bracket free of bolt fixation
CN215484493U (en) High-stability diagonal tension door type scaffold
CN114336453A (en) Bridge for high-voltage cable
CN215407868U (en) Enclosure baffle convenient to fold and carry for building construction
CN210659233U (en) Optimized general supporting structure for concrete pouring
CN2578987Y (en) Stand solar battery installing structure
CN113965152A (en) Solar photovoltaic panel supporting structure convenient to disassemble and solar photovoltaic module
CN202839648U (en) Single-column impact stake solar stand
CN219569542U (en) Easy-to-detach steel-aluminum frame die
CN218041315U (en) Photovoltaic support with adjustable
CN209486900U (en) A kind of electric power bracket
CN217205836U (en) Pin-connected panel municipal construction bounding wall modular construction
CN216006737U (en) Height limiting frame for municipal road
CN215182455U (en) High-stability signal lamp pole
CN219797046U (en) Stable flange base based on solar street lamp
CN220067300U (en) Roof photovoltaic support convenient to adjust structure
CN214479482U (en) Assembled cable termination platform
CN212230012U (en) Suspension device for advertisement manufacturing
CN220305927U (en) Combined model framework for road and bridge design
CN208570029U (en) A kind of antinose-dive leg of LED display
CN220016662U (en) Detachable measuring instrument mounting platform for rapid installation of steel tower construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant