CN216768581U - Pipeline fixing device that construction used - Google Patents

Pipeline fixing device that construction used Download PDF

Info

Publication number
CN216768581U
CN216768581U CN202122951503.5U CN202122951503U CN216768581U CN 216768581 U CN216768581 U CN 216768581U CN 202122951503 U CN202122951503 U CN 202122951503U CN 216768581 U CN216768581 U CN 216768581U
Authority
CN
China
Prior art keywords
base
pipeline
fixing
ring
fixing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122951503.5U
Other languages
Chinese (zh)
Inventor
杨金灵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Yihaocheng Construction Engineering Co ltd
Original Assignee
Beijing Yihaocheng Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Yihaocheng Construction Engineering Co ltd filed Critical Beijing Yihaocheng Construction Engineering Co ltd
Priority to CN202122951503.5U priority Critical patent/CN216768581U/en
Application granted granted Critical
Publication of CN216768581U publication Critical patent/CN216768581U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses a pipeline fixing device for building construction, which comprises a base and a fixing mechanism, wherein the base is provided with a first fixing hole; a base: mounting frames are symmetrically arranged at the front and back of the left end of the upper surface of the base, mounting clamping grooves are formed in the upper ends of the mounting frames, round openings are formed in four corners of the upper surface of the base, a fixing base is arranged at the right end of the upper surface of the base, a sponge block is arranged in the upper cambered surface of the fixing base, and the upper end of the sponge block is in contact with the outer surface of the pipeline; a fixing mechanism: peg graft in installation slot's inside, the extrados contact of fixed establishment and pipeline still includes cassette, fixing belt, buckle and alignment jig, the alignment jig sets up respectively in the upper end of two sides around the fixing base, this pipeline fixing device that construction used, simple to operate dismantles simply, and it is fixed to be fit for the interim pipeline of building site, and ground and wall can all be used, and the commonality is strong, can change not equidimension last ring and lower ring, are suitable for the pipeline of different specifications.

Description

Pipeline fixing device that construction used
Technical Field
The utility model relates to the technical field of pipeline fixing, in particular to a pipeline fixing device for building construction.
Background
The building construction refers to the production activity in the construction implementation stage of engineering construction, is the construction process of various buildings, also can be said to be the process of changing various lines on design drawings into real objects in designated places, and comprises the processes of foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction and the like, the place of construction operation is called as a building construction site or a construction site, also called as a construction site, a large amount of water is needed for various kinds of work in the building construction process, the fixation of pipelines is very important, the existing pipeline fixing device fixes the pipelines through cement nails, U-shaped plates and the like, or a larger fixing base is buried in the soil to fix the pipelines, the fixing devices on the bottom surface and the wall cannot be used universally, the fixing devices are difficult to take down after being fixed, great troubles are caused for later-stage dismantling of the construction site, the practicability is poor, the fixing form is single, the fixing is not firm enough, so a pipeline fixing device for building construction is provided.
SUMMERY OF THE UTILITY MODEL
The technical problem to be solved by the utility model is to overcome the existing defects, provide a pipeline fixing device for building construction, be convenient to disassemble, have wide practicability and can effectively solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: a pipeline fixing device for building construction comprises a base and a fixing mechanism;
base: the left end of the upper surface of the pipe is symmetrically provided with a mounting frame in the front-back direction, mounting clamping grooves are formed in the upper end of the mounting frame, round openings are formed in four corners of the upper surface of the base, a fixing seat is arranged at the right end of the upper surface of the base, a sponge block is arranged in the upper cambered surface of the fixing seat, and the upper end of the sponge block is in contact with the outer surface of the pipe;
a fixing mechanism: peg graft in installation slot's inside, the extrados contact of fixed establishment and pipeline, simple to operate dismantles simply, and it is fixed to be fit for the interim pipeline of building site, and ground and wall all can be used, and the commonality is strong, can dismantle the suitable mechanism of assembly according to the condition, is suitable for the pipeline of different specifications, and the multilayer is fixed more firmly.
Further, still include cassette, fixing belt, buckle and alignment jig, the alignment jig sets up respectively in the upper end of two sides around the fixing base, and the cassette sets up in the right-hand member front side of base upper surface, and the bayonet socket of cassette upper end and fixing belt's front end joint, fixing belt pass the traveller at the alignment jig middle part of rear end and with the traveller fixed connection at the alignment jig middle part of rear end, fixing belt and the outer surface contact of pipeline, the secondary is fixed.
Further, fixed establishment is including round pin axle, lower ring, joint piece and last ring, the joint piece joint is in installation draw-in groove's inside respectively, two joint pieces all with the extrados bottom fixed connection of a lower ring, the upper end rear side of lower ring is connected, fixed pipeline through the round pin axle with the lug rotation of last ring rear end.
Further, fixed establishment still includes the rubber pad, the rubber pad sets up respectively in the intrados of lower ring and last ring, and the extrados contact of intrados of rubber pad and pipeline slows down the impact.
Furthermore, the fixing mechanism further comprises a first bolt, the first bolt penetrates through the circular through holes in the front ends of the lower circular ring and the upper circular ring from top to bottom and is in threaded connection with a nut, and the lower circular ring and the upper circular ring are fixed.
Further, fixed establishment still includes bolt two, and the lateral wall of mounting bracket all is equipped with the locking round hole with the installation slot intercommunication, and bolt two passes the screw thread mouth threaded connection that locking round hole and joint piece side set up, and the realization is further locked after pegging graft fixedly.
Further, still include rectangle piece, transfer line and screw, the symmetry sets up in the left end of base upper surface around the rectangle piece, and the upper end of rectangle piece all is connected with the transfer line through rotating the round pin hub rotation, and the screw passes the fixed round hole of transfer line upper end and with the fixed screw hole threaded connection that the lower ring left surface set up, consolidates the support body structure, prevents that the pipeline from rocking.
Compared with the prior art, the utility model has the beneficial effects that: this pipeline fixing device that construction was used has following benefit:
pass the round mouth with outside bolt and fix the base on the ground or the wall that the pipeline was passed through, choose suitable size ring and last ring down, the joint piece that will be suitable ring and last ring bottom down is pegged graft in installation slot's inside, pass the screw thread mouth threaded connection that locking round hole and joint piece side set up until screwing up bolt two and realize the fixed of joint piece and mounting bracket, flip the ring, put the pipeline on the rubber pad and the sponge piece of lower extreme, fixing belt passes the traveller at the adjustment bracket middle part of rear end, and with the bayonet socket of cassette upper end and the front end joint of fixing belt, fixing belt elastic deformation and the extrados in close contact with of pipeline this moment, fix the pipeline, close the ring, bolt one top-down passes the circular through-hole and the threaded connection of ring front end down and last ring front end has the nut to lock, then the screw passes fixing round hole upper end of transfer line and realizes the support body with the fixed screw hole threaded connection that lower ring left surface set up and add the support body It is firm to guarantee stability, simple to operate dismantles simply, and it is fixed to be fit for building site temporary pipeline, and ground and wall can all be used, and the commonality is strong, can dismantle the suitable mechanism of assembly according to the condition, is suitable for the pipeline of different specifications, and the multilayer is fixed more firm.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic plan view of the fixing base of the present invention;
FIG. 3 is a schematic structural view of a fixing mechanism according to the present invention;
fig. 4 is a schematic view of the internal cross-sectional structure of the fixing mechanism of the present invention.
In the figure: the mounting structure comprises a base 1, a mounting frame 2, a pipeline 3, a fixing mechanism 4, a pin shaft 41, a rubber pad 42, a first bolt 43, a lower ring 44, a clamping block 45, a second bolt 46, an upper ring 47, a fixing seat 5, a clamping seat 6, a fixing belt 7, a buckle 8, a sponge block 9, an adjusting frame 10, a rectangular block 11, a transmission rod 12, a round opening 13, a screw 14 and a mounting clamping groove 15.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-4, the present embodiment provides a technical solution: a pipeline fixing device for building construction comprises a base 1 and a fixing mechanism 4;
base 1: the mounting frame 2 is symmetrically arranged at the front and back of the left end of the upper surface of the base, the mounting frame 2 provides bottom support, mounting clamping grooves 15 are formed in the upper end of the mounting frame 2, round openings 13 are formed in four corners of the upper surface of the base 1, bolts penetrate through the round openings 13 to fix the base 1 on the ground or the wall where the pipeline 3 passes through, a fixing seat 5 is arranged at the right end of the upper surface of the base 1 to play a role in supporting connection, a sponge block 9 is arranged in the upper arc surface of the fixing seat 5, the upper end of the sponge block 9 is in contact with the outer surface of the pipeline 3, and the sponge block 9 plays a role in damping and buffering;
the fixing mechanism 4: the fixing mechanism 4 is inserted into the installation clamping groove 15, the fixing mechanism 4 is contacted with the outer arc surface of the pipeline 3, the fixing mechanism 4 comprises a pin shaft 41, a lower circular ring 44, clamping blocks 45 and an upper circular ring 47, the clamping blocks 45 are respectively clamped in the installation clamping groove 15, two clamping blocks 45 are fixedly connected with the bottom end of the outer arc surface of one lower circular ring 44, the rear side of the upper end of the lower circular ring 44 is rotatably connected with a lug at the rear end of the upper circular ring 47 through the pin shaft 41, the fixing mechanism 4 further comprises a rubber pad 42, the rubber pad 42 is respectively arranged on the inner arc surfaces of the lower circular ring 44 and the upper circular ring 47, the inner arc surface of the rubber pad 42 is contacted with the outer arc surface of the pipeline 3, the fixing mechanism 4 further comprises a first bolt 43, the first bolt 43 penetrates through circular through holes at the front ends of the lower circular ring 44 and the upper circular ring 47 from top to bottom and is in threaded connection with a nut, the fixing mechanism 4 further comprises a second bolt 46, the side wall of the installation frame 2 is provided with a locking circular hole communicated with the installation clamping groove 15, bolt two 46 passes the screw thread mouth threaded connection that locking round hole and joint piece 45 side set up, select ring 44 and last ring 47 under the suitable size, the joint piece 45 of ring 44 and last ring 47 bottom is pegged graft in the inside of installation slot 15 under will being suitable, pass the screw thread mouth threaded connection that locking round hole and joint piece 45 side set up until screwing up bolt two 46 and realize joint piece 45 and mounting bracket 2 fixed, lift ring 47, put pipeline 3 on the rubber pad 42 of lower extreme, close ring 47, bolt 43 top-down passes down the circular through-hole and the threaded connection of ring 47 front end and has the nut to lock.
Wherein: still include cassette 6, fixing belt 7, buckle 8 and alignment jig 10, alignment jig 10 sets up respectively in the upper end of two sides around fixing base 5, cassette 6 sets up in the right-hand member front side of 1 upper surface of base, the bayonet socket of 6 upper ends of cassette and fixing belt 7's front end joint, fixing belt 7 passes the traveller at the alignment jig 10 middle part of rear end and with the traveller fixed connection at the alignment jig 10 middle part of rear end, fixing belt 7 and pipeline 3's surface contact, fixing belt 7 passes the traveller at the alignment jig 10 middle part of rear end, and with the bayonet socket of 6 upper ends of cassette and fixing belt 7's front end joint, fixing belt 7 elastic deformation and pipeline 3's extrados in close contact with this moment, fix pipeline 3.
Wherein: still include rectangular block 11, transfer line 12 and screw 14, the symmetry sets up in the left end of 1 upper surface of base around rectangular block 11, rectangular block 11's upper end all is connected with transfer line 12 through rotating the round pin hub rotation, screw 14 passes the fixed round hole of transfer line 12 upper end and the fixed screw hole threaded connection who sets up with lower ring 44 left surface, from rectangular block 11 rotation transfer line 12, align fixed round hole with fixed screw hole, pass the fixed round hole of transfer line 12 upper end through screw 14 and realize the support body reinforcement with the fixed screw hole threaded connection that lower ring 44 left surface set up, thereby guarantee stability.
The working principle of the pipeline fixing device for building construction provided by the utility model is as follows: an external bolt penetrates through a round opening 13 to fix the base 1 on the ground or the wall through which the pipeline 3 passes, a lower circular ring 44 and an upper circular ring 47 with proper sizes are selected, a clamping block 45 at the bottom end of the lower circular ring 44 and the bottom end of the upper circular ring 47 are inserted into an installation clamping groove 15, a bolt II 46 penetrates through a locking circular hole and a threaded opening arranged on the side surface of the clamping block 45 and is in threaded connection until the bolt II 46 is screwed up to fix the clamping block 45 and the installation frame 2, the upper circular ring 47 is lifted, the pipeline 3 is placed on a rubber pad 42 and a sponge block 9 at the lower end, the fixing belt 7 penetrates through a sliding column in the middle of the adjusting frame 10 at the rear end, a bayonet at the upper end of the clamping seat 6 is clamped with the front end of the fixing belt 7, at the moment, the elastic deformation of the fixing belt 7 is in close contact with the outer arc surface of the pipeline 3, the upper circular ring 47 is closed, a bolt I43 penetrates through round through holes at the front ends of the lower circular ring 44 and the upper circular ring 47 from top to be connected with a nut for locking, then the screw 14 passes through the fixed round hole at the upper end of the transmission rod 12 and is in threaded connection with the fixed threaded hole arranged on the left side surface of the lower ring 44 to realize the reinforcement of the frame body, thereby ensuring the stability.
The above description is only an embodiment of the present invention, and not intended to limit the scope of the present invention, and all modifications of equivalent structures and equivalent processes, which are made by using the contents of the present specification and the accompanying drawings, or directly or indirectly applied to other related technical fields, are included in the scope of the present invention.

Claims (7)

1. The utility model provides a pipeline fixing device that construction used which characterized in that: comprises a base (1) and a fixing mechanism (4);
base (1): the left end of the upper surface of the base is symmetrically provided with mounting frames (2) in a front-back manner, the upper ends of the mounting frames (2) are respectively provided with a mounting clamping groove (15), four corners of the upper surface of the base (1) are respectively provided with a round opening (13), the right end of the upper surface of the base (1) is provided with a fixing seat (5), a sponge block (9) is arranged in the upper cambered surface of the fixing seat (5), and the upper end of the sponge block (9) is in contact with the outer surface of the pipeline (3);
fixing mechanism (4): is inserted into the mounting clamping groove (15), and the fixing mechanism (4) is contacted with the outer arc surface of the pipeline (3).
2. The pipe fixing device for construction according to claim 1, wherein: still include cassette (6), fixing belt (7), buckle (8) and alignment jig (10), alignment jig (10) set up respectively in the upper end of two sides around fixing base (5), and cassette (6) set up in the right-hand member front side of base (1) upper surface, the bayonet socket of cassette (6) upper end and the front end joint of fixing belt (7), fixing belt (7) pass the traveller at the alignment jig (10) middle part of rear end and with the traveller fixed connection at alignment jig (10) middle part of rear end, fixing belt (7) and the external surface contact of pipeline (3).
3. The pipe fixing device for construction according to claim 1, wherein: fixed establishment (4) are including round pin axle (41), lower ring (44), joint piece (45) and last ring (47), joint piece (45) joint respectively in the inside of installation slot (15), two joint pieces (45) all with the extrados bottom fixed connection of a lower ring (44), the upper end rear side of lower ring (44) is connected through round pin axle (41) and the lug rotation of last ring (47) rear end.
4. A pipe fixing device for construction according to claim 3, wherein: the fixing mechanism (4) further comprises a rubber pad (42), the rubber pad (42) is arranged on the inner arc surfaces of the lower ring (44) and the upper ring (47) respectively, and the inner arc surfaces of the rubber pad (42) are in contact with the outer arc surface of the pipeline (3).
5. A pipe fixing device for construction according to claim 3, wherein: the fixing mechanism (4) further comprises a first bolt (43), and the first bolt (43) penetrates through the circular through holes in the front ends of the lower circular ring (44) and the upper circular ring (47) from top to bottom and is in threaded connection with a nut.
6. A pipe fixing device for construction according to claim 3, wherein: fixing mechanism (4) still include bolt two (46), and the lateral wall of mounting bracket (2) all is equipped with the locking round hole with installation slot (15) intercommunication, and bolt two (46) pass the screw thread mouth threaded connection that locking round hole and joint piece (45) side set up.
7. A pipe fixing device for construction according to claim 3, wherein: still include rectangle piece (11), transfer line (12) and screw (14), the symmetry sets up in the left end of base (1) upper surface around rectangle piece (11), and the upper end of rectangle piece (11) all is connected with transfer line (12) through rotating round pin axle rotation, and screw (14) pass the fixed round hole of transfer line (12) upper end and with the fixed screw hole threaded connection that lower ring (44) left surface set up.
CN202122951503.5U 2021-11-29 2021-11-29 Pipeline fixing device that construction used Active CN216768581U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122951503.5U CN216768581U (en) 2021-11-29 2021-11-29 Pipeline fixing device that construction used

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122951503.5U CN216768581U (en) 2021-11-29 2021-11-29 Pipeline fixing device that construction used

Publications (1)

Publication Number Publication Date
CN216768581U true CN216768581U (en) 2022-06-17

Family

ID=81964501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122951503.5U Active CN216768581U (en) 2021-11-29 2021-11-29 Pipeline fixing device that construction used

Country Status (1)

Country Link
CN (1) CN216768581U (en)

Similar Documents

Publication Publication Date Title
CN216768581U (en) Pipeline fixing device that construction used
CN215563850U (en) Double-box stiff column structure
CN216974154U (en) Plate buckle frame support
CN114108846B (en) Concrete prefabricated part connecting structure
CN209958764U (en) Connecting and locking device for building template
CN210562619U (en) Steel structure free of welding installation
CN209585640U (en) Assembled concrete pump line fixes bracket
CN209754566U (en) Box steel fastening device with axial clamping function
CN208644458U (en) A kind of gas cylinder anti-tipping apparatus
CN208981753U (en) Key slot type scaffold is fixedly connected device
CN218644945U (en) Anti-blocking water supply and drainage pipeline
CN216142388U (en) Detachable scaffold draws node device
CN205558258U (en) Horizontal connection rod spare of adjustable length
CN221543940U (en) Wall attaching device for tower crane and tower crane thereof
CN219344160U (en) Formwork support jacking for high-rise overhanging
CN220705137U (en) Building external corner upward-pulling type cantilever I-steel combined device
CN208310157U (en) Anti-sliding type overhanging scaffold section steel fixing device
CN220790527U (en) Support structure for cantilever frame
CN213015550U (en) Support frame for high-rise building construction
CN218070895U (en) Bracket arm for cable bridge
CN214942278U (en) Supporting and connecting device for assembly type building external hanging rack
CN209545495U (en) Rotating connector, photovoltaic bracket and photovoltaic system
CN216429106U (en) Building structure's reinforcement connecting device
CN215977329U (en) Temporary cofferdam for water treatment
CN210344018U (en) Angle adjusting and linking device for anti-seismic support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant