CN216756586U - Building rubbish collection device for building engineering - Google Patents
Building rubbish collection device for building engineering Download PDFInfo
- Publication number
- CN216756586U CN216756586U CN202220388692.1U CN202220388692U CN216756586U CN 216756586 U CN216756586 U CN 216756586U CN 202220388692 U CN202220388692 U CN 202220388692U CN 216756586 U CN216756586 U CN 216756586U
- Authority
- CN
- China
- Prior art keywords
- gear
- box
- compression
- construction waste
- crushing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The application belongs to the technical field of building engineering and discloses a building garbage collecting device for building engineering, which comprises a crushing box, wherein the top of the crushing box is provided with a feeding hole, the front side of the crushing box is welded with a motor frame, the inner wall of the motor frame is provided with a rotating motor, an output shaft of the rotating motor is welded with a first gear and a second gear, the first gear is connected with a third gear through a conveyor belt, the second gear is connected with a fourth gear through a conveyor belt, the inside of the third gear and the fourth gear is welded with a rotating rod, the surface of the rotating rod is fixedly provided with a crushing roller, the bottom of the crushing box is fixedly connected with a compression box, the left side and the right side of the compression box are welded with mounting frames, the inner side of the mounting frames is provided with an electric push rod, the side of the electric push rod is fixedly provided with a compression plate, the inside of the compression box is provided with a baffle frame, the bottom of the inner wall of the compression box is welded with a guide plate, and the bottom of the compression box is provided with a discharge hole, can compress the construction waste, conveniently deposit and transport the construction waste better.
Description
Technical Field
This application belongs to building engineering technical field, specifically is a building rubbish collection device for building engineering.
Background
The construction waste refers to construction waste generated by human or natural reasons in engineering, and comprises waste residue soil, abandoned soil, residual mud, abandoned materials and the like, the construction waste has a wide erosion effect on the living environment of people, the quality of the soil can be reduced if the construction waste is subjected to a long-term regardless attitude, the production capacity of the soil is reduced, the air quality is influenced, some dust particles can be suspended in the air and are harmful to the health of human bodies, meanwhile, the long-term accumulation of the construction waste in the stacking process means that harmful substances of the construction waste permeate into underground water areas to pollute the water environment, the stacking of the construction waste can have certain potential safety hazards, and accidents can occur at any time, so people pay attention to the collection of the construction waste.
The existing construction waste collecting device for construction engineering only simply stores construction waste in a centralized manner and does not have a compacting function, so that the whole volume of the construction waste is large, and the construction waste is inconvenient to transport.
SUMMERY OF THE UTILITY MODEL
The purpose of this application lies in: in order to solve the problem that the building garbage collection device for the building engineering does not have the compaction function, the building garbage collection device for the building engineering is provided.
The technical scheme adopted by the application is as follows: a construction waste collecting device for construction engineering comprises a crushing box, wherein a feeding hole is formed in the top of the crushing box, a motor frame is welded on the front of the crushing box, a rotating motor is arranged on the inner wall of the motor frame, a first gear and a second gear are welded on an output shaft of the rotating motor, the first gear is connected with a third gear through a conveying belt, the second gear is connected with a fourth gear through the conveying belt, a rotating rod is welded inside the third gear and the fourth gear, a crushing roller is fixedly installed on the surface of the rotating rod, a compression box is fixedly connected to the bottom of the crushing box, mounting frames are welded on the left side and the right side of the compression box, an electric push rod is arranged on the inner side of the mounting frames, a compression plate is fixedly installed on the side surface of the electric push rod, a baffle frame is arranged inside the compression box, and a guide plate is welded on the bottom of the inner wall of the compression box, and a discharge hole is formed in the bottom of the compression box.
Through adopting above-mentioned technical scheme, the drive rotates the motor and drives first gear and second gear revolve, under the effect of gear and conveyer belt for dwang and crushing roller can rotate, can carry out shredding to the construction waste who smashes the incasement, and the construction waste who smashes gets into the compression incasement, and the interior removal of compression board is driven to the redrive electric putter again, can compress construction waste, and convenient follow-up can be deposited and transport construction waste better.
In a preferred embodiment, a bearing seat is fixedly installed on the inner walls of the crushing box and the motor frame, and the bearing seat is rotatably connected with the rotating rod.
Through adopting above-mentioned technical scheme, avoid the dwang to shift at the rotation in-process, lead to two direct clearance grow of crushing roller to can not play crushing effect.
In a preferred embodiment, the number of the rotating rods and the number of the crushing rollers are two, and the rotating rods and the crushing rollers are distributed in a bilateral symmetry mode by taking a middle line of the crushing box as a symmetry axis.
Through adopting above-mentioned technical scheme, two crushing rollers rotate, can carry out shredding to the construction waste who smashes the incasement.
In a preferred embodiment, a connecting pipe is fixedly connected to the bottom of the crushing box, the compression box is fixedly connected to the bottom of the connecting pipe, and a control valve is arranged outside the connecting pipe.
Through adopting above-mentioned technical scheme, can control the connecting pipe switch through the control valve for construction waste can get into the compression case from smashing the case.
In a preferred embodiment, a base is fixedly connected to the bottom of the compression box, a collection box is arranged on the top of the base, and a handle is fixedly mounted on the front face of the collection box.
Through adopting above-mentioned technical scheme, can collect construction waste through the collecting box, conveniently take the collecting box through the handle.
In a preferred embodiment, the upper surface of the base is provided with a sliding seat sliding groove, the bottom of the collecting box is welded with a sliding seat, and the sliding seat sliding groove is connected with the sliding seat in a sliding manner.
Through adopting above-mentioned technical scheme, the pulling collecting box for the collecting box just can be pulled down to sliding seat roll-off sliding seat spout, and the collecting box dismouting is simple swift more.
In conclusion, due to the adoption of the technical scheme, the beneficial effects of the application are as follows:
1. in this application, the drive rotates the motor and drives first gear and second gear revolve, under the effect of gear and conveyer belt for dwang and crushing roller can rotate, can carry out shredding to the construction waste who smashes the incasement, and the construction waste who smashes gets into the compression incasement, and the electric putter of redriving drives the compression board and inwards moves, can compress the construction waste, and convenient follow-up can deposit and transport the construction waste better.
2. In this application, can collect construction waste through the collecting box, outside pulling handle for the collecting box just can be pulled down to sliding seat roll-off sliding seat spout, and the collecting box dismouting is simple swift more.
Drawings
FIG. 1 is a schematic front view of the overall structure of the present application;
FIG. 2 is a schematic cross-sectional structural diagram of the overall structure of the present application;
FIG. 3 is a schematic diagram of a cross-sectional structure of the crushing box and the motor frame according to the present application.
The labels in the figure are: 1. a crushing box; 2. a feeding port; 3. a motor frame; 4. rotating the motor; 5. a first gear; 6. a second gear; 7. a third gear; 8. a fourth gear; 9. rotating the rod; 10. a bearing seat; 11. a crushing roller; 12. a compression box; 13. a connecting pipe; 14. a control valve; 15. a mounting frame; 16. an electric push rod; 17. a compression plate; 18. a baffle frame; 19. a material guide plate; 20. a discharge port; 21. a base; 22. a collection box; 23. a handle; 24. a sliding seat chute; 25. a sliding seat.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the embodiments of the present application, and it is obvious that the described embodiments are some embodiments of the present application, but not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
A construction waste collecting device for construction engineering according to an embodiment of the present application will be described in detail with reference to fig. 1 to 3.
The embodiment of the application discloses building rubbish collection device for building engineering. Referring to fig. 1-3, a construction waste collection device for building engineering includes a crushing box 1, wherein a material inlet 2 is provided at the top of the crushing box 1, during operation, construction waste can enter the crushing box 1 through the material inlet 2, and simultaneously, a motor frame 3 is welded on the front side of the crushing box 1, and a rotating motor 4 is provided on the inner wall of the motor frame 3.
Wherein, the welding has first gear 5 and second gear 6 at the output shaft of rotating motor 4, and the drive rotates motor 4 and drives first gear 5 and the rotation of second gear 6, and simultaneously, first gear 5 is connected with third gear 7 through the conveyer belt, and second gear 6 is connected with fourth gear 8 through the conveyer belt, and in addition, all welds dwang 9 in third gear 7 and fourth gear 8's inside, and under the effect of gear and conveyer belt, dwang 9 can rotate.
In addition, there is bearing frame 10 at the equal fixed mounting of the inner wall of crushing case 1 and motor frame 3, and bearing frame 10 rotates with dwang 9 to be connected, avoid dwang 9 to take place to shift at the rotation in-process, lead to two direct clearance grow of crushing roller, thereby can not play the crushing effect, and simultaneously, fixed surface at dwang 9 installs crushing roller 11, and crushing roller 11 wholly lies in dwang 9 and extends to crushing case 1 inside lateral wall, dwang 9 and crushing roller 11's quantity is two, and use the intermediate line of crushing case 1 to be the symmetry axis bilateral symmetry distribution, dwang 9 drives crushing roller 11 and rotates, can carry out shredding to the construction waste in crushing case 1.
Referring to fig. 1 and 2, a compression box 12 is fixedly connected to the bottom of the crushing box 1, and a connection pipe 13 is fixedly connected to the bottom of the crushing box 1, wherein the compression box 12 is fixedly connected to the bottom of the connection pipe 13, a control valve 14 is arranged outside the connection pipe 13, and the opening and closing of the connection pipe 13 can be controlled by the control valve 14, so that construction waste can enter the compression box 12 from the crushing box 1.
In addition, the left side and the right side of the compression box 12 are welded with mounting frames 15, the inner side of the mounting frame 15 is provided with an electric push rod 16, the side surface of the electric push rod 16 is fixedly provided with a compression plate 17, the crushed construction waste enters the compression box 12, and then the electric push rod 16 is driven to drive the compression plate 17 to move inwards, so that the construction waste can be compressed, and the construction waste can be conveniently stored and transported, in addition, the bottom inside the compression box 12 is horizontally provided with a baffle frame 18, the baffle frame 18 consists of two groups of baffles, the baffle frame 18 can be opened and closed by controlling the movement of the inner baffles, so that the construction waste falls, meanwhile, the bottom of the inner wall of the compression box 12 is welded with a guide plate 19, the surface of the guide plate 19 is an inclined plane, so that the construction waste can conveniently fall, in addition, the bottom of the compression box 12 is provided with a discharge hole 20, during blanking, by driving the baffle frame 18, so that the inside barrier is received in the outside barrier, enabling construction waste to be discharged from the discharge hole 20.
Referring to fig. 1 and 2, the bottom fixedly connected with base 21 of compression case 12, the top of base 21 is provided with collecting box 22, can collect construction waste through collecting box 22, in addition, there is handle 23 at the positive fixed mounting of collecting box 22, simultaneously, sliding seat spout 24 has been seted up at the upper surface of base 21, and the welding has sliding seat 25 in the bottom of collecting box 22, wherein, sliding seat spout 24 and sliding seat 25 sliding connection, during the ejection of compact, outwards stimulate handle 23, make sliding seat 25 roll-off sliding seat spout 24, thereby can pull down collecting box 22, make collecting box 22 dismouting can be simple more swift.
The implementation principle of a building rubbish collection device for building engineering of this application embodiment is:
when compacting construction waste, the drive rotates motor 4 and drives first gear 5 and second gear 6 and rotate, under the effect of gear and conveyer belt, dwang 9 and crushing roller 11 can rotate, can carry out shredding to the construction waste in smashing case 1, smashed construction waste gets into in the compression case 12, redrive electric putter 16 drives compression board 17 and inwards moves, can compress construction waste, conveniently deposit and transport construction waste better, in addition, drive baffle frame 18, make construction waste can discharge from discharge gate 20, get into in collecting box 22, thereby can collect construction waste, in addition, outwards stimulate handle 23, make sliding seat 25 roll-off sliding seat spout 24, and then can pull down collecting box 22, make collecting box 22's dismouting can be simple more swift.
The above embodiments are only used to illustrate the technical solutions of the present application, and not to limit the same; although the present application has been described in detail with reference to the foregoing embodiments, it should be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions in the embodiments of the present application.
Claims (6)
1. The utility model provides a construction waste collection device for building engineering, is including smashing case (1), its characterized in that: the feed inlet (2) is formed in the top of the crushing box (1), a motor frame (3) is arranged on the front of the crushing box (1), a rotating motor (4) is arranged on the inner wall of the motor frame (3), an output shaft of the rotating motor (4) is provided with a first gear (5) and a second gear (6), the first gear (5) is connected with a third gear (7) through a conveyor belt, the second gear (6) is connected with a fourth gear (8) through a conveyor belt, rotating rods (9) are arranged inside the third gear (7) and the fourth gear (8), crushing rollers (11) are fixedly arranged on the surfaces of the rotating rods (9), a compression box (12) is fixedly connected to the bottom of the crushing box (1), mounting frames (15) are arranged on the left side and the right side of the compression box (12), and an electric push rod (16) is arranged on the inner side of the mounting frame (15), the side fixed mounting of electric putter (16) has compression board (17), the inside of compression case (12) is provided with baffle frame (18), the bottom of compression case (12) inner wall is provided with stock guide (19), the bottom of compression case (12) is provided with discharge gate (20).
2. The construction waste collection device for construction engineering according to claim 1, wherein: smash case (1) with the inner wall fixed mounting of motor frame (3) has bearing frame (10), bearing frame (10) with dwang (9) rotate to be connected.
3. The construction waste collection device for construction engineering according to claim 1, wherein: dwang (9) with the quantity of crushing roller (11) is two, and with the intermediate line of smashing case (1) distributes for symmetry axis bilateral symmetry.
4. The construction waste collection device for construction engineering according to claim 1, wherein: the bottom fixedly connected with connecting pipe (13) of smashing case (1), the bottom fixedly connected with of connecting pipe (13) compression case (12), the outside of connecting pipe (13) is provided with control valve (14).
5. The construction waste collection device for construction engineering according to claim 1, wherein: the bottom of the compression box (12) is fixedly connected with a base (21), the top of the base (21) is provided with a collection box (22), and the front of the collection box (22) is fixedly provided with a handle (23).
6. The construction waste collection device for construction engineering according to claim 5, wherein: the upper surface of the base (21) is provided with a sliding seat sliding groove (24), the bottom of the collecting box (22) is provided with a sliding seat (25), and the sliding seat sliding groove (24) is in sliding connection with the sliding seat (25).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220388692.1U CN216756586U (en) | 2022-02-24 | 2022-02-24 | Building rubbish collection device for building engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220388692.1U CN216756586U (en) | 2022-02-24 | 2022-02-24 | Building rubbish collection device for building engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN216756586U true CN216756586U (en) | 2022-06-17 |
Family
ID=81959343
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220388692.1U Active CN216756586U (en) | 2022-02-24 | 2022-02-24 | Building rubbish collection device for building engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN216756586U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115228899A (en) * | 2022-07-21 | 2022-10-25 | 安徽富江天诚家具有限公司 | Waste recovery device for furniture production |
CN116833202A (en) * | 2023-08-04 | 2023-10-03 | 侯根合 | Building rubbish recovery unit for construction |
-
2022
- 2022-02-24 CN CN202220388692.1U patent/CN216756586U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115228899A (en) * | 2022-07-21 | 2022-10-25 | 安徽富江天诚家具有限公司 | Waste recovery device for furniture production |
CN116833202A (en) * | 2023-08-04 | 2023-10-03 | 侯根合 | Building rubbish recovery unit for construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN216756586U (en) | Building rubbish collection device for building engineering | |
CN210146646U (en) | House construction is with building rubbish compressor arrangement | |
CN210171660U (en) | Building rubbish crushing apparatus | |
CN211463296U (en) | Screening device is smashed to building rubbish | |
CN208975895U (en) | It is a kind of with screening function and the solid refuse crushing device to get stuck to be prevented | |
CN109731632A (en) | A kind of civil engineering concrete waste material recyclable device | |
CN212468243U (en) | Construction waste crushing equipment | |
CN111974490B (en) | Integrative equipment of broken flotation of building rubbish | |
CN214234204U (en) | Screening plant is smashed to building solid waste | |
CN112090494A (en) | Screening discharge apparatus is smashed in circulation of building rubbish collection for building engineering | |
CN111153089A (en) | Make things convenient for stifled type rubbish compression equipment that blocks up of material loading | |
CN213966846U (en) | Coal gangue grinding device | |
CN211755348U (en) | A garbage collection device for green building construction | |
CN212493137U (en) | A garbage collection device for green building construction | |
CN212348888U (en) | Gardens are with fallen leaves processing apparatus | |
CN210058413U (en) | Building engineering refuse treatment device | |
CN207312379U (en) | Trash compactor scraper-type feeding device | |
CN216936202U (en) | Garbage crushing treatment device for environmental protection | |
CN213761943U (en) | Building rubbish classification equipment | |
CN213287019U (en) | Prevent building rubbish processing apparatus of jam | |
CN212309693U (en) | Construction waste classification treatment equipment | |
CN212237461U (en) | Garbage disposal equipment for construction to dust is handled | |
CN201148001Y (en) | Airproof compression type garbage storage machine | |
CN209985499U (en) | Cold aluminum ash treatment system | |
CN111135927A (en) | Building field construction waste treatment equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |