CN216740736U - Grouting machine with adjusting function for building leakage stoppage construction - Google Patents

Grouting machine with adjusting function for building leakage stoppage construction Download PDF

Info

Publication number
CN216740736U
CN216740736U CN202220035730.5U CN202220035730U CN216740736U CN 216740736 U CN216740736 U CN 216740736U CN 202220035730 U CN202220035730 U CN 202220035730U CN 216740736 U CN216740736 U CN 216740736U
Authority
CN
China
Prior art keywords
grouting machine
pressure pump
main body
body frame
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220035730.5U
Other languages
Chinese (zh)
Inventor
杨宗林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DAYU HIGHWAY AND MUNICIPAL ADM
Original Assignee
DAYU HIGHWAY AND MUNICIPAL ADM
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DAYU HIGHWAY AND MUNICIPAL ADM filed Critical DAYU HIGHWAY AND MUNICIPAL ADM
Priority to CN202220035730.5U priority Critical patent/CN216740736U/en
Application granted granted Critical
Publication of CN216740736U publication Critical patent/CN216740736U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a grouter with an adjusting function for building leakage stoppage construction, which comprises: the grouting machine comprises a main body frame of the grouting machine and a pressure pump, wherein the surface of the main body frame of the grouting machine is provided with the pressure pump, one end of the pressure pump is provided with a driving electric drill, one end of the pressure pump, which is far away from the driving electric drill, is connected with a high-voltage pipe, the surface of the main body frame of the grouting machine is also provided with a power distribution cabinet, and the surface of the pressure pump is also connected with a charging cup barrel; the connecting plate is connected to the surface of the main body frame of the grouting machine, and an anti-skidding foot support is connected to the inside of the connecting plate in a penetrating mode. This building leaking stoppage construction is with grouter that has regulatory function supports the stable of device through anti-skidding heel brace to reach the device and can carry out the purpose of fixed point braking, and through pressing down the buckle, make the buckle run through in the circular slot of the different positions that the fixed column surface was seted up, thereby reach the purpose that the pole of holding up can carry out the regulation.

Description

Grouting machine with adjusting function for building leakage stoppage construction
Technical Field
The utility model relates to the technical field of building leakage stoppage, in particular to a grouting machine with an adjusting function for building leakage stoppage construction.
Background
The grouter is a professional construction machine for chemical grouting, leakage stoppage and structural reinforcement of cracks, expansion joints, construction joints and structural joints of various buildings and underground concrete engineering;
the high-pressure leaking stoppage grouter comprises a host, wherein supporting legs are arranged at the bottom of the host, a driving electric drill is arranged on the host, a connector lug is arranged on the driving electric drill, a reduction box is arranged below the driving electric drill, a switch is arranged on the right side of the connector lug, a first rotating shaft is arranged below the switch, a second rotating shaft corresponding to the first rotating shaft is arranged on the reduction box, a first fixing sleeve is arranged on the first rotating shaft, a sliding groove is formed in the first fixing sleeve, after the first transverse fixing of the first fixing sleeve and the positioning groove is carried out through a positioning lug, the first fixing sleeve is longitudinally fixed with the second fixing sleeve through a threaded connection through a fixing ring, the situation that the first fixing sleeve is separated from the host due to vibration when the driving electric drill works can be effectively prevented, the practicability is higher, when the material is mixed, the space in the material storage tank can be divided into two parts through a partition plate, and the mixed grouting material can be stored at the bottom of the first fixing sleeve, the space above the mixing machine can be used for mixing materials by using the same formula, so that the mixing machine is more convenient and quicker to use.
This prior art solution also presents the following problems when in use:
1. when the existing grouting machine is used, fixed-point braking on uneven ground is inconvenient, and workers need to clamp bricks or wood blocks at a roller of the grouting machine to limit the movement of the grouting machine;
2. the existing grouting machine is not provided with a clamping mechanism, so that a longer high-pressure pipe cannot be fixed after the grouting machine is used;
3. the length of a grab rail of the existing grouting machine is fixed, so that the pushing operation of operators with different heights is inconvenient;
improvements are needed to address the above issues to meet market demands.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a grouting machine with an adjusting function for building leakage stoppage construction, and aims to solve the problems that the existing grouting machine proposed in the background technology is inconvenient to perform fixed-point braking on uneven ground, workers need to clamp bricks or wood blocks at a roller of the grouting machine to limit the movement of the grouting machine, and the existing grouting machine is not provided with a clamping mechanism, so that a long high-pressure pipe cannot be fixed after the grouting machine is used, and the length of a handrail rod of the existing grouting machine is fixed, so that operators with different heights are inconvenient to push and operate.
In order to achieve the purpose, the utility model provides the following technical scheme: the utility model provides a building leaking stoppage construction is with grouter that has regulatory function, includes: the grouting machine comprises a main body frame of the grouting machine and a pressure pump, wherein the surface of the main body frame of the grouting machine is provided with the pressure pump, one end of the pressure pump is provided with a driving electric drill, one end of the pressure pump, which is far away from the driving electric drill, is connected with a high-voltage pipe, the surface of the main body frame of the grouting machine is also provided with a power distribution cabinet, and the surface of the pressure pump is also connected with a charging cup barrel;
the connecting plate is connected the surface of grouter main part frame, the inside through connection of connecting plate has anti-skidding heel brace, connecting spring has been cup jointed to the outer wall of anti-skidding heel brace, the inside horizontal through connection of connecting plate has the spacer pin, the block spring has been cup jointed to the outer wall of spacer pin.
Preferably, the surface of antiskid heel brace is seted up with spacer pin tip assorted slot, and the spacer pin passes through to constitute the elasticity linkage structure between block spring and the connecting plate, through above-mentioned structure, when the operating personnel stepped on and presses antiskid heel brace, the elasticity of spacer pin accessible block spring inserts in antiskid heel brace surface sets up the slot to in fixing antiskid heel brace.
Preferably, the goblet bucket comprises:
the clamping block is connected to the edge face of the opening end of the charging cup barrel in a sliding mode, the anti-slip pad is bonded to the surface of the clamping block, and through the structure, the clamping block can achieve an anti-slip effect when clamping a high-pressure pipe.
Preferably, the bottom of clamp splice is connected with the slider, the internal thread of slider is connected with the lead screw, the one end of lead screw is connected with the commentaries on classics piece, through above-mentioned structure, when rotating the lead screw to in the interval to between the clamp splice adjust.
Preferably, the clamping blocks are symmetrically distributed about the longitudinal middle parting line of the charging cup barrel, and the clamping blocks and the sliding blocks are integrated into a whole, so that the sliding blocks can drive the clamping blocks to slide on the charging cup barrel.
Preferably, the thread structures on the surface of the screw rod are symmetrically distributed about the longitudinal middle parting line of the charging cup barrel, the screw rod is in rotating connection with the charging cup barrel through the rotating block, and the screw rod can move in opposite directions or opposite directions when the screw rod is rotated.
Preferably, the grouter main body frame includes:
the fixed column is connected on the surface of the main body rack of the grouting machine, a holding rod is connected to the inside of the fixed column in a sliding mode, a fixing spring is arranged inside the holding rod, and one end of the fixing spring is connected with a buckle.
Preferably, circular slots which are distributed at equal intervals are formed in the surface of the fixing column, the buckles form an elastic telescopic structure between the fixing spring and the supporting rod, the buckles are pressed through the structure to be contracted, the clamping connection between the fixing column and the supporting rod can be removed, and therefore the telescopic length of the supporting rod can be adjusted conveniently.
Compared with the prior art, the utility model has the beneficial effects that: this building leaking stoppage construction is with grouter that has regulatory function, through the outrigger of antiskid heel brace to the device, in order to reach the device and to carry out the purpose of fixed point braking, and after the construction is accomplished, through rotating the lead screw, it is fixed to make two sets of clamp splices carry out the centre gripping to the high-pressure line, thereby reach the purpose of preventing to put in disorder after the high-pressure line construction is accomplished, and through pressing the buckle, make the buckle run through in the circular slot of the different positions that the fixed column surface was seted up, thereby reach and hold up the pole and can carry out the purpose of adjusting.
1. Place the device in required position, operating personnel steps on through hoisting device and presses anti-skidding heel brace, makes anti-skidding heel brace support the device, and the spacer pin can pass through the elasticity of block spring simultaneously, and automatic inserting is in the slot that anti-skidding heel brace surface was seted up to in the shrink of restriction anti-skidding heel brace, thereby make anti-skidding heel brace can stabilize to support the device, in order to reach the purpose of fixed point braking.
2. After the construction is completed, the high-pressure pipe can be placed between the two groups of clamping blocks, and the two groups of clamping blocks move oppositely through rotating the screw rod, so that the high-pressure pipe can be clamped and fixed by the two groups of clamping blocks, and the purpose of preventing the high-pressure pipe from being randomly placed after the construction is completed is achieved.
3. When different operating personnel passed the operation, the buckle was pressed to the accessible, made buckle extrusion fixed spring to shrink the inside of holding up the pole, thereby can remove to hold up being connected between pole and the fixed column, the pole is held up to suitable position in sliding again, and fixed in running through the circular slot of the different positions that the fixed column surface was seted up through the buckle, thereby reach and hold up the pole and can carry out the purpose of adjusting.
Drawings
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is a side view of the present invention;
FIG. 3 is a schematic side sectional view of the clamping block according to the present invention;
FIG. 4 is a cross-sectional view of the connecting plate of the present invention;
fig. 5 is a schematic cross-sectional view of the fixing post according to the present invention.
In the figure: 1. a main frame of the grouting machine; 2. a pressure pump; 3. driving the electric drill; 4. a high pressure pipe; 5. a power distribution cabinet; 6. a charging bucket; 7. a connecting plate; 8. anti-skid foot supports; 9. a connecting spring; 10. a spacing pin; 11. clamping a spring; 12. a clamping block; 13. a non-slip mat; 14. a slider; 15. a screw rod; 16. rotating the block; 17. fixing a column; 18. a support rod; 19. fixing the spring; 20. and (5) buckling.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: the utility model provides a building leaking stoppage construction is with grouter that has regulatory function, includes: the grouting machine comprises a main body frame 1 and a pressure pump 2, wherein the pressure pump 2 is installed on the surface of the main body frame 1, a driving electric drill 3 is installed at one end of the pressure pump 2, a high-voltage pipe 4 is connected to one end, far away from the driving electric drill 3, of the pressure pump 2, a power distribution cabinet 5 is also installed on the surface of the main body frame 1, and a material cup barrel 6 is also connected to the surface of the pressure pump 2;
connecting plate 7, connect on the surface of grouter main part frame 1, the inside through connection of connecting plate 7 has anti-skidding heel brace 8, connecting spring 9 has been cup jointed to the outer wall of anti-skidding heel brace 8, the inside horizontal through connection of connecting plate 7 has spacer pin 10, the outer wall of spacer pin 10 has been cup jointed block spring 11, anti-skidding heel brace 8's surface seted up with 10 tip assorted slots of spacer pin, and spacer pin 10 constitutes the elastic linkage structure through between block spring 11 and the connecting plate 7, through the structure, when the operating personnel trampled anti-skidding heel brace 8, the elasticity of spacer pin 10 accessible block spring 11 inserts in the anti-skidding heel brace 8 surface sets up the slot, so that fix anti-skidding heel brace 8.
The material cup bucket 6 comprises: the clamping block 12 is connected to the opening end edge surface of the charging cup barrel 6 in a sliding mode, the surface of the clamping block 12 is bonded with an anti-slip pad 13, through the structure, the clamping block 12 can play an anti-slip effect when clamping the high-pressure pipe 4, the bottom of the clamping block 12 is connected with the sliding block 14, the inner portion of the sliding block 14 is connected with the screw rod 15 in a threaded mode, one end of the screw rod 15 is connected with the rotating block 16, through the structure, when the screw rod 15 is rotated, the distance between the clamping blocks 12 can be adjusted conveniently, the clamping blocks 12 are symmetrically distributed relative to the longitudinal middle parting line of the charging cup barrel 6, the clamping blocks 12 and the sliding block 14 are in an integrated structure, through the structure, the sliding block 14 can drive the clamping block 12 to slide on the charging cup barrel 6, the threaded structure on the surface of the screw rod 15 is symmetrically distributed relative to the longitudinal middle parting line of the charging cup barrel 6, and the screw rod 15 is connected with the charging cup barrel 6 in a rotating mode through the rotating block 16, so that the sliders 14 can move in opposite or opposite directions when the screw 15 is rotated.
Grouter main part frame 1 includes: the fixing column 17 is connected to the surface of the main frame 1 of the grouting machine, a holding rod 18 is connected to the inside of the fixing column 17 in a sliding mode, a fixing spring 19 is arranged inside the holding rod 18, one end of the fixing spring 19 is connected with a buckle 20, circular slots distributed at equal intervals are formed in the surface of the fixing column 17, an elastic telescopic structure is formed between the buckle 20 and the holding rod 18 through the fixing spring 19, the buckle 20 is pressed through the structure, the buckle 20 is contracted, the clamping connection between the fixing column 17 and the holding rod 18 can be released, and therefore the telescopic length of the holding rod 18 can be adjusted conveniently.
In summary, the following steps: as shown in fig. 1-5, when using the grouting machine with adjustment function for building leakage stoppage construction, firstly, the device is placed at a desired position, an operator presses the anti-slip heel brace 8 by lifting the device, so that the anti-slip heel brace 8 supports the device, and the limit pin 10 can be automatically inserted into the slot formed on the surface of the anti-slip heel brace 8 through the elasticity of the clamping spring 11, so as to limit the shrinkage of the anti-slip heel brace 8, so that the anti-slip heel brace 8 can stably support the device, so as to achieve the purpose of fixed point braking, after the construction is completed, the high-pressure pipe 4 can be placed between the two sets of clamping blocks 12, and then the two sets of clamping blocks 12 can move in opposite directions by rotating the screw rod 15, so that the two sets of clamping blocks 12 can clamp and fix the high-pressure pipe 4, thereby achieving the purpose of preventing the high-pressure pipe 4 from being randomly placed after the construction is completed, and when different operators carry out pushing operation, the buckle 20 can be pressed to enable the buckle 20 to extrude the fixing spring 19 and contract into the holding rod 18, so that the connection between the holding rod 18 and the fixing column 17 can be released, the holding rod 18 is slid to a proper position, and the buckle 20 penetrates through circular slots in different positions formed in the surface of the fixing column 17 to be fixed, so that the purpose that the holding rod 18 can be adjusted is achieved, and the grouting machine for building leakage stoppage construction has the characteristic of being provided with an adjusting function.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides a building leaking stoppage construction is with grouter that has regulatory function, includes: the grouting machine comprises a main body frame (1) of the grouting machine and a pressure pump (2), and is characterized in that the surface of the main body frame (1) of the grouting machine is provided with the pressure pump (2), one end of the pressure pump (2) is provided with a driving electric drill (3), one end, far away from the driving electric drill (3), of the pressure pump (2) is connected with a high-voltage pipe (4), the surface of the main body frame (1) of the grouting machine is also provided with a power distribution cabinet (5), and the surface of the pressure pump (2) is also connected with a material cup barrel (6);
connecting plate (7) are connected the surface of grouter main part frame (1), the inside through connection of connecting plate (7) has anti-skidding heel brace (8), connecting spring (9) have been cup jointed to the outer wall of anti-skidding heel brace (8), the inside of connecting plate (7) transversely through connection has spacer pin (10), block spring (11) have been cup jointed to the outer wall of spacer pin (10).
2. The grouting machine with the adjusting function for the building leakage stoppage construction as recited in claim 1, characterized in that the surface of the anti-slip heel brace (8) is provided with a slot matched with the end of the limit pin (10), and the limit pin (10) forms an elastic linkage structure with the connecting plate (7) through the clamping spring (11).
3. Grouting machine with regulation function for building leakage stoppage construction according to claim 1, characterized in that said cup bucket (6) comprises:
the clamping block (12) is connected to the edge face of the opening end of the material cup barrel (6) in a sliding mode, and an anti-slip pad (13) is bonded to the surface of the clamping block (12).
4. The grouting machine with the adjusting function for the building leakage stoppage construction as recited in claim 3, characterized in that a slide block (14) is connected to the bottom of the clamping block (12), a screw rod (15) is connected to the inner thread of the slide block (14), and a rotating block (16) is connected to one end of the screw rod (15).
5. The grouting machine with the adjusting function for the building leakage stoppage construction as recited in claim 3, characterized in that the blocks (12) are symmetrically distributed about the longitudinal median line of the charging cup barrel (6), and the blocks (12) and the sliding blocks (14) are of an integral structure.
6. The grouting machine with the adjusting function for the building leakage stoppage construction as recited in claim 4, characterized in that the thread structures on the surface of the screw rod (15) are symmetrically distributed about the longitudinal median line of the charging cup barrel (6), and the screw rod (15) is rotatably connected with the charging cup barrel (6) through the rotary block (16).
7. The grouting machine with adjusting function for building leakage stoppage construction according to claim 1, characterized in that the grouting machine main body frame (1) comprises:
the grouting machine comprises a fixing column (17) connected to the surface of a main body frame (1) of the grouting machine, a holding rod (18) is connected to the inside of the fixing column (17) in a sliding mode, a fixing spring (19) is arranged inside the holding rod (18), and one end of the fixing spring (19) is connected with a buckle (20).
8. The grouting machine with the adjusting function for the building leaking stoppage construction as recited in claim 7, wherein the surface of the fixing column (17) is provided with circular slots distributed at equal intervals, and the buckle (20) forms an elastic telescopic structure through the fixing spring (19) and the holding rod (18).
CN202220035730.5U 2022-01-07 2022-01-07 Grouting machine with adjusting function for building leakage stoppage construction Active CN216740736U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220035730.5U CN216740736U (en) 2022-01-07 2022-01-07 Grouting machine with adjusting function for building leakage stoppage construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220035730.5U CN216740736U (en) 2022-01-07 2022-01-07 Grouting machine with adjusting function for building leakage stoppage construction

Publications (1)

Publication Number Publication Date
CN216740736U true CN216740736U (en) 2022-06-14

Family

ID=81911337

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220035730.5U Active CN216740736U (en) 2022-01-07 2022-01-07 Grouting machine with adjusting function for building leakage stoppage construction

Country Status (1)

Country Link
CN (1) CN216740736U (en)

Similar Documents

Publication Publication Date Title
CN216740736U (en) Grouting machine with adjusting function for building leakage stoppage construction
CN210864144U (en) Underground optical cable laying device
CN211817720U (en) Mortar plastering device for building roof
CN212743389U (en) Fixing device of concrete structure template
CN212405158U (en) Impervious type nail wall supporting construction of convenient change fixed position
CN213391110U (en) Building brick device for building house
CN213461027U (en) Simple cable trench support structure
CN208546128U (en) A kind of Portable safety type finishing ladder
CN212338406U (en) Fixed pipe clamp with clamping structure
CN212336281U (en) Prefabricated lifting pump station with integrated automatic deodorization function
CN213173756U (en) Deep foundation pit slope supporting structure
CN210978734U (en) Supporting device for laying water conservancy and hydropower pipelines
CN221160574U (en) Pipe orifice machining device of cable protection pipe
CN220139105U (en) Cable laying auxiliary device
CN211493503U (en) Positioning fixture for splicing six-edge block
CN220156133U (en) Cable support guide clamp for tunnel construction
CN211007937U (en) Foundation ditch safety device for engineering construction
CN212975608U (en) Spraying device for telegraph pole
CN218493309U (en) A splice rail temporarily for water conservancy construction
CN213840229U (en) Functional support is used in mining machinery installation
CN220775216U (en) Hydraulic engineering construction buried pipe pay-off
CN215055395U (en) Special support frame structure for vertical template of building engineering
CN216713931U (en) Building outer wall reinforcing equipment for building repair service
CN217631751U (en) Protection device for building engineering building
CN215488045U (en) Steel bar winding steel cylinder concrete pipe convenient to dismantle

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant