CN216713952U - Strutting arrangement is used in steel house room construction - Google Patents

Strutting arrangement is used in steel house room construction Download PDF

Info

Publication number
CN216713952U
CN216713952U CN202122709027.6U CN202122709027U CN216713952U CN 216713952 U CN216713952 U CN 216713952U CN 202122709027 U CN202122709027 U CN 202122709027U CN 216713952 U CN216713952 U CN 216713952U
Authority
CN
China
Prior art keywords
rod
fixedly connected
plate
supporting
annular plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202122709027.6U
Other languages
Chinese (zh)
Inventor
李宝全
刘婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Lanhua Construction Co ltd
Original Assignee
Jiangsu Lanhua Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Lanhua Construction Co ltd filed Critical Jiangsu Lanhua Construction Co ltd
Priority to CN202122709027.6U priority Critical patent/CN216713952U/en
Application granted granted Critical
Publication of CN216713952U publication Critical patent/CN216713952U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a supporting device for steel structure house construction, which belongs to the technical field of house construction and comprises a supporting rod, wherein an inner cavity of the supporting rod is movably connected with a movable rod, the surfaces of the supporting rod and the movable rod are movably connected with assembling plates, one side of each assembling plate is fixedly connected with two arc-shaped plates, one side of each arc-shaped plate is movably connected with a bearing, and the inner wall of an inner ring of each bearing is fixedly connected with a rotating rod. According to the utility model, by arranging the positioning mechanism, a user can set a supporting point according to the height of the wall, the second annular plate is pulled, the second annular plate drives the movable rod and the supporting plate to move, the supporting plate drives the spring to deform under stress, after the length of the movable rod is adjusted, the second annular plate is loosened, the spring deforms under stress to drive the limiting rod to be clamped into the limiting groove, the positioning effect on the movable rod is achieved, and after the angles of the assembling plate and the arc-shaped plate are adjusted, the assembling plate and the wall surface and the ground are supported, so that the assembling plate and the arc-shaped plate are conveniently accommodated when not in use, and the transportation convenience is realized.

Description

Support arrangement for steel house building
Technical Field
The utility model relates to the field of house construction, in particular to a supporting device for steel structure house construction.
Background
Buildings such as houses are built on the land where infrastructure construction is completed, and the buildings comprise residential buildings, industrial plants, commercial buildings, office buildings and other special houses, and are buildings made of reinforced concrete for people or things. The house is a base body of a family, the house is a trusting for human survival, people can avoid all interference from the outside, and the house can enjoy the free and free feeling with own relatives, and the house purpose is divided according to the purpose specified by the design. If a house has two or more uses related to a residential house and a commercial business house, the building area should be calculated according to the use specified by the design. If the basement of a residential building does not live people, one floor is a shop, and the rest are family houses, the area of the basement is taken as the area of other purposes, the area of the shop is taken as a commercial business house, and the rest areas are taken as the areas of the houses, for example, one house is provided with a living room and an office, and the areas of the houses can be taken as the areas of the plants.
The prior technical problems are as follows: current strutting arrangement is mostly fixed, can't adjust according to wallboard height and place width, and strutting arrangement length is fixed, and the space that occupies when transport and transportation is great, increases the cost of transportation, lacks a convenient strutting arrangement who adjusts and fix and solves this problem, and the person of not being convenient for uses.
SUMMERY OF THE UTILITY MODEL
In order to remedy the above-mentioned deficiencies, the present invention provides a support device for the construction of steel houses that overcomes or at least partially solves the above-mentioned technical problems.
The utility model is realized by the following steps:
the utility model provides a supporting device for steel structure house construction, which comprises a supporting rod, wherein a movable rod is movably connected to the inner cavity of the supporting rod, assembling plates are movably connected to the surfaces of the supporting rod and the movable rod, two arc-shaped plates are fixedly connected to one sides of the two assembling plates, a bearing is movably connected to one side of each arc-shaped plate, rotating rods are fixedly connected to the inner wall of the inner ring of the bearing, one end of each rotating rod is fixedly connected with the surfaces of the movable rod and the supporting rod, and a positioning mechanism matched with the movable rod for use is arranged at one end of the supporting rod.
In an embodiment of the utility model, the positioning mechanism includes a first annular plate, an inner wall of the first annular plate is fixedly connected with one end surface of the support rod, a second annular plate is movably connected with the top of the first annular plate, a limiting rod is fixedly connected with the bottom of the second annular plate, and a plurality of limiting grooves matched with the limiting rod are formed in the top of the movable rod.
In an embodiment of the present invention, two sides of an inner cavity of the first annular plate are both provided with a clamping groove, an inner cavity of the clamping groove is movably connected with a support plate, a top of the support plate is fixedly connected with a moving rod, and a top of the moving rod is fixedly connected with a bottom of the second annular plate.
In an embodiment of the utility model, a spring is sleeved on the surface of the moving rod, the top of the spring is fixedly connected with the inner wall of the clamping groove, and the bottom of the spring is fixedly connected with the top of the supporting plate.
In one embodiment of the utility model, sliding grooves are formed in two sides of the inner wall of the clamping groove, a sliding block is movably connected to an inner cavity of each sliding groove, and one side of each sliding block is fixedly connected with the surface of the supporting plate.
In one embodiment of the utility model, an adjusting rod is arranged at the bottom of the supporting rod, an inner cavity of the adjusting rod is movably connected with a telescopic rod, the bottom of the telescopic rod is movably connected with a friction plate, and the adjusting rod and the telescopic rod are fixed through bolts.
In one embodiment of the utility model, a threaded rod is fixedly connected to the bottom of the telescopic rod, and a threaded groove matched with the threaded rod is formed in the top of the friction plate.
In one embodiment of the utility model, two fixing blocks are fixedly connected to the surface of the supporting rod, a rotating shaft is movably connected between the two fixing blocks, and the surface of the rotating shaft is fixedly connected with one end of the adjusting rod.
The utility model has the beneficial effects that:
1. according to the utility model, through the matched use of the positioning mechanism, the supporting rod and the movable rod, a user can set a supporting point according to the height of a wall, the second annular plate is pulled, the second annular plate drives the movable rod and the supporting plate to move, the supporting plate drives the spring to deform under stress, after the length of the movable rod is adjusted, the second annular plate is loosened, the spring deforms under stress and drives the limiting rod to be clamped into the limiting groove, the positioning effect on the movable rod is achieved, and after the angles of the assembling plate and the arc-shaped plate are adjusted, the assembling plate and the wall surface and the ground are supported and fixed, the adjusting effect is increased, the accommodating is convenient when the assembling plate is not used, and therefore, the transportation convenience is realized;
2. through setting up the telescopic link, adjusting pole and friction plate, after bracing piece and movable rod location, the user drives through the pivot rotation and adjusts the pole rotation to drive telescopic link angle regulation, played the effect of conveniently accomodating when not using, be connected with the friction plate through threaded rod and thread groove, the friction plate increase with the friction dynamics on ground, thereby increased the supplementary support effect of bracing piece bottom, further increased stable effect.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings that are required to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
FIG. 1 is a perspective view provided by an embodiment of the present invention;
FIG. 2 is a schematic perspective view of a positioning mechanism provided in accordance with an embodiment of the present invention;
FIG. 3 is a front cross-sectional view of a partial structure provided by an embodiment of the present invention;
fig. 4 is a left side sectional view of a partial structure provided in an embodiment of the present invention.
In the figure: 1. a support bar; 2. a movable rod; 3. assembling a plate; 4. an arc-shaped plate; 5. a bearing; 6. a rotating rod; 7. a positioning mechanism; 701. a first annular plate; 702. a second annular plate; 703. A limiting rod; 704. a limiting groove; 8. a card slot; 9. a support plate; 10. a travel bar; 11. A spring; 12. a chute; 13. a slider; 14. adjusting a rod; 15. a telescopic rod; 16. a friction plate; 17. a threaded rod; 18. a thread groove; 19. a fixed block; 20. a rotating shaft.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention more apparent, the technical solutions of the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings of the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all embodiments of the present invention. All other embodiments, which can be obtained by a person skilled in the art without any inventive step based on the embodiments of the present invention, are within the scope of the present invention.
Examples
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a strutting arrangement is used in steel house building construction, including bracing piece 1, the inner chamber swing joint of bracing piece 1 has movable rod 2, the equal swing joint in surface of bracing piece 1 and movable rod 2 has equipment board 3, two arc 4 of the equal fixedly connected with in one side of two equipment boards 3, the equal swing joint in one side of every arc 4 has bearing 5, the inner wall fixedly connected with bull stick 6 of bearing 5 inner circle, the one end of every bull stick 6 respectively with movable rod 2 and bracing piece 1 fixed surface be connected, the one end of bracing piece 1 is provided with the positioning mechanism 7 that uses with the cooperation of movable rod 2.
Referring to fig. 1-3, the positioning mechanism 7 includes a first annular plate 701, the inner wall of the first annular plate 701 is fixedly connected to the surface of one end of the support rod 1, the top of the first annular plate 701 is movably connected to a second annular plate 702, the bottom of the second annular plate 702 is fixedly connected to a limit rod 703, the top of the movable rod 2 is provided with a plurality of limit grooves 704 used in cooperation with the limit rod 703, both sides of the inner cavity of the first annular plate 701 are provided with clamp grooves 8, the inner cavity of the clamp grooves 8 is movably connected to a support plate 9, the top of the support plate 9 is fixedly connected to a movable rod 10, the top of the movable rod 10 is fixedly connected to the bottom of the second annular plate 702, the surface of the movable rod 10 is sleeved with a spring 11, the top of the spring 11 is fixedly connected to the inner wall of the clamp grooves 8, the bottom of the spring 11 is fixedly connected to the top of the support plate 9, and the positioning mechanism 7, the support rod 1 and the movable rod 2 are used in cooperation, can make the user set up the strong point according to the wall height, pulling second annular plate 702, second annular plate 702 drives carriage release lever 10 and backup pad 9 and removes, backup pad 9 drives spring 11 atress deformation, adjust 2 length backs of movable rod, loosen second annular plate 702, spring 11 atress deformation drives gag lever post 703 card and goes into the spacing groove 704, the location effect to movable rod 2 has been reached, after adjusting the angle of equipment board 3 and arc 4, support fixedly with wall and ground, the effect of regulation has been increased, conveniently accomodate when not using, thereby the transportation convenience.
Referring to fig. 3, the sliding grooves 12 are formed in both sides of the inner wall of the clamping groove 8, the sliding blocks 13 are movably connected to the inner cavities of the sliding grooves 12, one sides of the sliding blocks 13 are fixedly connected to the surface of the supporting plate 9, and the sliding blocks 13 and the sliding grooves 12 are matched for use, so that the supporting plate 9 can only move up and down, the supporting plate 9 is prevented from being inclined, the clamping condition is avoided, friction between the supporting plate 9 and the inner wall of the clamping groove 8 is reduced, and the clamping is convenient to pull.
Referring to fig. 1-4, an adjusting rod 14 is disposed at the bottom of a supporting rod 1, an inner cavity of the adjusting rod 14 is movably connected with a telescopic rod 15, the bottom of the telescopic rod 15 is movably connected with a friction plate 16, the adjusting rod 14 and the telescopic rod 15 are fixed by bolts, a plurality of threaded holes matched with the bolts are formed in the surface of the adjusting rod 14, so that the expansion degree of the telescopic rod 15 in the adjusting rod 14 can be adjusted according to the use requirement, a threaded rod 17 is fixedly connected to the bottom of the telescopic rod 15, a threaded groove 18 matched with the threaded rod 17 is formed in the top of the friction plate 16, two fixing blocks 19 are fixedly connected to the surface of the supporting rod 1, a rotating shaft 20 is movably connected between the two fixing blocks 19, the surface of the rotating shaft 20 is fixedly connected with one end of the adjusting rod 14, and after the supporting rod 1 and the movable rod 2 are positioned by the arrangement of the telescopic rod 15, the adjusting rod 14 and the friction plate 16, the user rotates through pivot 20 and drives regulation pole 14 rotatory to drive the 15 angle modulation of telescopic link, played the effect of conveniently accomodating when not using, be connected with friction plate 16 through threaded rod 17 and thread groove 18, friction plate 16 increases the friction dynamics with ground, thereby increased the supplementary support effect of bracing piece 1 bottom, further increased stable effect.
Specifically, this strutting arrangement for steel house construction's working process or theory of operation do: when the utility model is used, the user stimulates second annular plate 702, second annular plate 702 drives movable rod 10 and removes, movable rod 10 drives backup pad 9 and removes, backup pad 9 drives spring 11 atress deformation, backup pad 9 drives slider 13 and removes in spout 12, after adjusting movable rod 2 length, loosen second annular plate 702, spring 11 atress deformation drives gag lever post 703 card and goes into in the spacing groove 704, reached the location effect to movable rod 2, prevent to remove, after adjusting the angle of equipment board 3 and arc 4, support fixedly with wall and ground, rotation adjusting rod 14, telescopic link 15 carries out length adjustment according to angle with the ground, friction plate 16 carries out the chucking through threaded rod 17 and thread groove 18 with telescopic link 15, thereby the auxiliary stay dynamics bottom bracing piece 1 has been increased, prevent the slope.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. The utility model provides a strutting arrangement is used in steel house building construction, includes bracing piece (1), its characterized in that, the inner chamber swing joint of bracing piece (1) has movable rod (2), the equal swing joint in surface of bracing piece (1) and movable rod (2) has equipment board (3), two equal fixedly connected with two arcs of one side (4) of equipment board (3), every the equal swing joint in one side of arc (4) has bearing (5), the inner wall fixedly connected with bull stick (6) of bearing (5) inner circle, every the one end of bull stick (6) is connected with the fixed surface of movable rod (2) and bracing piece (1) respectively, the one end of bracing piece (1) is provided with positioning mechanism (7) of using with the cooperation of movable rod (2).
2. The supporting device for the steel structure house construction according to claim 1, wherein the positioning mechanism (7) comprises a first annular plate (701), the inner wall of the first annular plate (701) is fixedly connected with one end surface of the supporting rod (1), the top of the first annular plate (701) is movably connected with a second annular plate (702), the bottom of the second annular plate (702) is fixedly connected with a limiting rod (703), and the top of the movable rod (2) is provided with a plurality of limiting grooves (704) matched with the limiting rod (703).
3. The supporting device for the steel structure house construction according to claim 2, wherein clamping grooves (8) are formed in two sides of an inner cavity of the first annular plate (701), a supporting plate (9) is movably connected to the inner cavity of each clamping groove (8), a moving rod (10) is fixedly connected to the top of each supporting plate (9), and the top of each moving rod (10) is fixedly connected to the bottom of the second annular plate (702).
4. The supporting device for the steel structure house building according to claim 3, wherein the surface of the moving rod (10) is sleeved with a spring (11), the top of the spring (11) is fixedly connected with the inner wall of the clamping groove (8), and the bottom of the spring (11) is fixedly connected with the top of the supporting plate (9).
5. The supporting device for the steel structure house construction according to claim 4, wherein sliding grooves (12) are formed in two sides of the inner wall of the clamping groove (8), a sliding block (13) is movably connected to an inner cavity of each sliding groove (12), and one side of each sliding block (13) is fixedly connected with the surface of the supporting plate (9).
6. The supporting device for the steel structure house construction according to claim 1, wherein an adjusting rod (14) is arranged at the bottom of the supporting rod (1), an inner cavity of the adjusting rod (14) is movably connected with a telescopic rod (15), a friction plate (16) is movably connected at the bottom of the telescopic rod (15), and the adjusting rod (14) and the telescopic rod (15) are fixed through bolts.
7. The supporting device for the steel structure house construction according to claim 6, wherein a threaded rod (17) is fixedly connected to the bottom of the telescopic rod (15), and a threaded groove (18) matched with the threaded rod (17) is formed in the top of the friction plate (16).
8. The supporting device for the steel structure house construction according to claim 6, wherein two fixing blocks (19) are fixedly connected to the surface of the supporting rod (1), a rotating shaft (20) is movably connected between the two fixing blocks (19), and the surface of the rotating shaft (20) is fixedly connected with one end of the adjusting rod (14).
CN202122709027.6U 2021-11-05 2021-11-05 Strutting arrangement is used in steel house room construction Active CN216713952U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202122709027.6U CN216713952U (en) 2021-11-05 2021-11-05 Strutting arrangement is used in steel house room construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202122709027.6U CN216713952U (en) 2021-11-05 2021-11-05 Strutting arrangement is used in steel house room construction

Publications (1)

Publication Number Publication Date
CN216713952U true CN216713952U (en) 2022-06-10

Family

ID=81878425

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202122709027.6U Active CN216713952U (en) 2021-11-05 2021-11-05 Strutting arrangement is used in steel house room construction

Country Status (1)

Country Link
CN (1) CN216713952U (en)

Similar Documents

Publication Publication Date Title
CN216713952U (en) Strutting arrangement is used in steel house room construction
CN216277099U (en) Strutting arrangement with adjustable civil construction is used
CN214170030U (en) Strutting arrangement is used in building engineering construction
CN214246597U (en) Supporting equipment convenient for bottom fixing for building
CN211572726U (en) Support frame for construction convenient to adjust shrink
CN213062948U (en) A consolidate bearing structure for building engineering
CN216406362U (en) Supporting and reinforcing device for telegraph pole
CN216476366U (en) Template supporting construction for construction engineering construction
CN216616992U (en) Energy-saving supporting device for construction of green building engineering
CN214532017U (en) Building wall bearing structure
CN210370008U (en) Crossbeam strutting arrangement for construction
CN218970819U (en) Auxiliary supporting mechanism
CN214365163U (en) Integrated supporting platform for building construction
CN217781762U (en) Movable support leg of bridge erecting machine
CN220415379U (en) Construction frame for maintaining subway tunnel
CN219952824U (en) Steel structure supporting structure
CN211817517U (en) Assembled steel construction stair
CN212201915U (en) Anti-toppling device for derrick production
CN218265244U (en) Electrical equipment platform suitable for electric power angle steel iron tower
CN212984557U (en) Constructional engineering steel construction support frame
CN217555678U (en) Material lifting mechanism for super high-rise construction
CN216380324U (en) Steel construction vertical-running stair
CN212945135U (en) Steel bar bending device for building construction
CN214696996U (en) Building engineering stair are with interim rail guard
CN217734448U (en) Energy-saving prefabricated shear wall for building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant