CN216692415U - Pipeline trolley for pipeline penetration - Google Patents

Pipeline trolley for pipeline penetration Download PDF

Info

Publication number
CN216692415U
CN216692415U CN202123412846.0U CN202123412846U CN216692415U CN 216692415 U CN216692415 U CN 216692415U CN 202123412846 U CN202123412846 U CN 202123412846U CN 216692415 U CN216692415 U CN 216692415U
Authority
CN
China
Prior art keywords
pipeline
shaped pipe
trolley
pulley
baffle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202123412846.0U
Other languages
Chinese (zh)
Inventor
邹勇
豆连旺
张淼馨
徐晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Energy Construction Engineering Design And Research Co ltd
Original Assignee
Shanghai Gas Engineering Design & Research Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Gas Engineering Design & Research Co ltd filed Critical Shanghai Gas Engineering Design & Research Co ltd
Priority to CN202123412846.0U priority Critical patent/CN216692415U/en
Application granted granted Critical
Publication of CN216692415U publication Critical patent/CN216692415U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Abstract

The utility model discloses a pipeline trolley for pipeline penetration, which is used for pipeline penetration in a sleeve, and comprises a U-shaped pipe clamp and a U-shaped pipe bracket, wherein the U-shaped pipe bracket consists of an arc-shaped steel plate, a rib plate, a vertical baffle, a horizontal supporting steel plate, a vertical pulley baffle and a horizontal pulley baffle; the pipeline is supported on the U-shaped pipe bracket, the U-shaped pipe clamp and the opening of the U-shaped pipe bracket are arranged oppositely, and the U-shaped pipe clamp is connected with the U-shaped pipe bracket through a bolt. The pipeline trolley provided by the utility model can push the pipeline into the sleeve only by overcoming the rolling friction between the trolley and the sleeve, and is convenient to construct.

Description

Pipeline trolley for pipeline penetration
Technical Field
The utility model relates to the technical field of pipeline engineering construction, in particular to a pipeline trolley for pipeline penetration.
Background
At present, in the construction of urban underground pipelines, various pipelines are compactly arranged for saving land resources, such as water supply, rainwater, sewage, gas, oil pipelines and the like which are generally laid in parallel. When the pipelines pass through roads or railways, in order to reduce the influence on the operation of the roads or railways, the pipelines are generally passed through in a pipe jacking mode. For example, in the engineering construction of pipeline crossing railway, a pipe jacking working well and a pipe jacking receiving well are arranged on two sides of a railway crossing position, 1 casing pipe is jacked to a certain depth below a railway subgrade by using a jacking machine and crosses the railway, and then a pipeline to be passed is installed in the casing pipe in the pipe jacking working well.
In many cases, pipelines to be passed for different purposes are built by different units, communication connection is lacked among the building units, and it is rarely considered that a plurality of pipelines share one pipe jacking project for passing through, so that when the pipelines pass through a railway, generally 1 pipeline is passed through by the pipe jacking independently, and only 1 pipeline is arranged in a sleeve of the pipe jacking project. Because the pipe jacking deep foundation pit and the sleeve pipe related to the pipe jacking project are jacked and constructed under the road, the construction cost for penetrating through the project by each pipe jacking is high, and the investment of 1 pipe jacking is usually as high as millions of yuan. If a plurality of through pipelines share one pipe-jacking project to cross a road on site, most of the pipelines are jacked into a roadbed downwards in a shared pipe-jacking working well, and the pipelines respectively penetrate through the pipelines in the casings.
In traditional construction methods, 1 pipeline is worn in 1 sleeve pipe that passes through, and pipeline platform truck is all installed to the intraductal pipeline of common sleeve, but most of the time these traditional platform trucks all take the ring carrier form, and a plurality of gyro wheels of a week installation on the ring carrier roll through the gyro wheel, push the pipeline into the sleeve pipe. The crossing mode of the pipeline in the sleeve can cause the pipeline to be twisted in the sleeve frequently, so that the anticorrosive coating of the pipeline is damaged. Sometimes, the pipeline is excessively distorted and deformed, so that stress concentration occurs in a pipe body mountain, and the safety of the pipeline is influenced.
According to the traditional pipeline crossing mode, each pipeline crosses independently, sleeves are arranged at crossing positions respectively, and site conditions which can meet the crossing of a plurality of pipelines are difficult to find on site. If several pipes are considered to share one casing for crossing, according to the conventional casing-in-pipe crossing manner, if the length of the crossed casing is large, for example, more than 100m, it is almost impossible to cross several pipes in 1 casing. The penetration mode also easily causes the damage of the anti-corrosion layer of the pipeline, and the safety of the pipeline is influenced. Even if the push pipe working well is shared, a plurality of sleeves need to be jacked respectively, jacking cost is large, jacking distance between the sleeves needs to be increased for avoiding mutual safety influence, and the size of a push pipe foundation pit is increased, so that engineering investment is further increased.
In addition, when the pipeline passes through the road surfaces such as the railway, certain influence is generated on the railway operation, and railway administrative departments generally require that the pipeline does not pass through the same area for many times.
Therefore, those skilled in the art have endeavored to provide a pipeline trolley for pipeline penetration, which can realize rapid pipeline penetration, reduce cost and shorten construction period.
SUMMERY OF THE UTILITY MODEL
In view of the defects in the prior art, the technical problem to be solved by the utility model is how to provide a pipeline trolley for pipeline penetration.
In order to achieve the purpose, the utility model provides a pipeline trolley for a pipeline to penetrate through a sleeve, which is used for the pipeline to penetrate through the sleeve, and comprises a U-shaped pipe clamp and a U-shaped pipe bracket, wherein the bottom of the U-shaped pipe bracket is connected with a vertical baffle, and the lower part of the vertical baffle is provided with a first pulley; the pipeline is supported on the U-shaped pipe bracket, the U-shaped pipe clamp and the opening of the U-shaped pipe bracket are arranged oppositely, and the U-shaped pipe clamp is connected with the U-shaped pipe bracket.
Preferably, the U-shaped pipe clamp and the U-shaped pipe bracket are connected through a bolt.
Further, the upper portion of U type conduit saddle is equipped with the support the arc steel sheet of pipeline, the arc steel sheet with vertical baffle is connected.
Further, still include the floor, the floor with the arc steel sheet, vertical baffle is connected.
Furthermore, the lower parts of the rib plates and the vertical baffle plates are connected with horizontal supporting steel plates.
Further, a vertical pulley baffle is installed below the horizontal supporting steel plate, and the first pulley is connected with the vertical pulley baffle.
Preferably, the first pulley is connected with the vertical pulley baffle through a first pin shaft.
Furthermore, a horizontal pulley baffle is installed on the vertical baffle on the outer side.
Furthermore, a second pulley is installed on the horizontal pulley baffle.
Preferably, the second pulley is connected with the horizontal pulley baffle through a second pin shaft.
The utility model has at least the following beneficial technical effects:
1. according to the pipeline trolley for pipeline penetration, when a pipeline penetrates through the sleeve, the trolley rolls on the platform, the pipeline can be pushed into the sleeve only by overcoming friction between the trolley and the sleeve, and construction is convenient.
2. The pipeline trolley for pipeline penetration provided by the utility model moves horizontally, so that the phenomenon of distortion cannot occur, and the pipeline safety is good.
3. According to the pipeline trolley for pipeline penetration, the guide pulleys are arranged on the side wall of the trolley, so that the pipe body does not collide with the inner wall of the sleeve in the process that the pipeline penetrates through the sleeve, and the pipeline can be conveniently and smoothly penetrated into the sleeve.
The conception, the specific structure and the technical effects of the present invention will be further described with reference to the accompanying drawings to fully understand the objects, the features and the effects of the present invention.
Drawings
FIG. 1 is a schematic view of a sleeve structure according to a preferred embodiment of the present invention;
FIG. 2 is a schematic front view of a U-shaped pipe bracket structure in a trolley according to a preferred embodiment of the utility model;
FIG. 3 is a side view of the trolley structure of a preferred embodiment of the present invention;
fig. 4 is a schematic view of the distribution of the trolleys according to the preferred embodiment of the utility model.
The pipe fitting comprises, by weight, 1-a sleeve pipe, 2-an installation platform, 3-a pipeline, 4-a U-shaped pipe clamp, 5-a hard shoulder, 6-a U-shaped pipe bracket, 7-a bolt, 8-an arc-shaped steel plate, 9-a rib plate, 10-a vertical baffle, 11-a horizontal supporting steel plate, 12-a vertical pulley baffle, 13-a horizontal pulley baffle, 14-a first pulley, 15-a first pin shaft, 16-a second pulley and 17-a second pin shaft.
Detailed Description
The technical contents of the preferred embodiments of the present invention will be more clearly and easily understood by referring to the drawings attached to the specification. The present invention may be embodied in many different forms of embodiments and the scope of the utility model is not limited to the embodiments set forth herein.
In the drawings, structurally identical elements are represented by like reference numerals, and structurally or functionally similar elements are represented by like reference numerals throughout the several views. The size and thickness of each component shown in the drawings are arbitrarily illustrated, and the present invention is not limited to the size and thickness of each component. The thickness of the components has been exaggerated in some places in the drawings where appropriate for clarity of illustration.
The utility model provides a pipeline trolley for pipeline penetration, which realizes the penetration of a pipeline in a sleeve, and the arrangement of the sleeve and the pipeline after the pipeline penetration is shown in figure 1. In the figure 1, a sleeve 1 is horizontally arranged, a mounting platform 2 is arranged at the bottom of the sleeve 1, the mounting platform 2 is formed by pouring concrete, a barrier pier 5 is arranged on the mounting platform 2, the barrier pier 5 separates the sleeve 1 along the axial direction of the sleeve 1, and different pipelines can pass through two sides of the barrier pier 5.
The trolleys are installed at intervals along the axial direction of the pipeline 3, the trolleys support the pipeline 3, and meanwhile, the trolleys can slide or roll relative to the installation platform 2 and the isolation piers 5.
As shown in fig. 1, 2, and 3, the trolley of the present embodiment includes a U-shaped pipe clamp 4 and a U-shaped pipe bracket 6, the pipeline 3 is supported on the U-shaped pipe bracket 6, the U-shaped pipe clamp 4 is disposed opposite to an opening of the U-shaped pipe bracket 6, and the U-shaped pipe clamp 4 and the U-shaped pipe bracket 6 are connected by a bolt 7 to form a radial limit for the pipeline 3. U type conduit saddle 6's upper portion is equipped with arc steel sheet 8, and arc steel sheet 8 supports through floor 9 and vertical baffle 10, and floor 9 and vertical baffle 10 are supported by horizontal supporting steel plate 11, and 11 lower parts of horizontal supporting steel plate are equipped with two sets of vertical pulley baffles 12, and vertical pulley baffle 12 bottom is provided with first pulley 14, realizes the rolling motion of platform truck for mounting platform 2 through first pulley 14. Vertical baffle 10 in U type conduit saddle 6 outside is connected with horizontal pulley baffle 13, and the other end of horizontal pulley baffle 13 is connected with second pulley 16, and second pulley 16 can roll along hard shoulder 5 or sleeve pipe 1 inner wall, has realized the direction to the platform truck.
The first pulley 14 is connected with the vertical pulley baffle 12 through a first pin shaft 15, and the horizontal pulley baffle 13 is connected with the second pulley 16 through a second pin shaft 17. The parts of the U-shaped pipe bracket 6 can be welded and connected, and can also be integrally formed.
As shown in fig. 2 and 3, in the present embodiment, the number of the vertical pulley baffles 12 is 2, each group includes 2 steel plates, and the vertical pulley baffles 12 are symmetrically distributed along the horizontal supporting steel plate 11 at the lower portion of the U-shaped pipe bracket 6. The bottom of each group of vertical pulley baffle plates 12 is provided with a first pulley 14, and the vertical baffle plates 10 on the side surfaces of the trolley are connected with a horizontal pulley baffle plate 13.
As shown in fig. 4, the trolleys are distributed at intervals along the axial direction of the pipeline 3, so that the longer pipeline is supported, and the strength and flexibility requirements of the pipeline are met.
When the pipeline trolley is used for pipe penetration, in the process of pushing a pipeline from the end part, the roller or the sliding block at the bottom of the trolley can reduce the friction force between the trolley and the bottom surface, and the force applied during pushing is small; the rollers or the sliders on the two sides of the trolley play a role in guiding the pipeline, so that the pipeline is prevented from deviating.
The foregoing detailed description of the preferred embodiments of the utility model has been presented. It should be understood that numerous modifications and variations could be devised by those skilled in the art in light of the present teachings without departing from the inventive concepts. Therefore, the technical solutions available to those skilled in the art through logic analysis, reasoning and limited experiments based on the prior art according to the concept of the present invention should be within the scope of protection defined by the claims.

Claims (10)

1. A pipeline trolley for pipeline penetration is used for pipeline penetration in a sleeve and is characterized by comprising a U-shaped pipe clamp and a U-shaped pipe bracket, wherein the bottom of the U-shaped pipe bracket is connected with a vertical baffle, and the lower part of the vertical baffle is provided with a first pulley; the pipeline is supported on the U-shaped pipe bracket, the U-shaped pipe clamp and the opening of the U-shaped pipe bracket are arranged oppositely, and the U-shaped pipe clamp is connected with the U-shaped pipe bracket.
2. The pipeline trolley for pipeline threading as claimed in claim 1, wherein the U-shaped pipe clamp and the U-shaped pipe bracket are connected by a bolt.
3. The pipeline trolley for pipeline threading as claimed in claim 1, wherein an arc steel plate for supporting the pipeline is arranged at the upper part of the U-shaped pipe bracket, and the arc steel plate is connected with the vertical baffle.
4. The pipe trolley according to claim 3, further comprising a rib plate, wherein the rib plate is connected with the arc-shaped steel plate and the vertical baffle plate.
5. The pipe trolley according to claim 4, wherein horizontal support steel plates are connected to the lower portions of the ribs and the vertical baffle.
6. The pipeline trolley for pipeline threading as claimed in claim 5, wherein a vertical pulley baffle is installed below the horizontal support steel plate, and the first pulley is connected with the vertical pulley baffle.
7. The conduit trolley of claim 6 wherein the first pulley is connected to the vertical pulley stop by a first pin.
8. The pipe trolley of claim 4 wherein the outer vertical baffles are fitted with horizontal sheave baffles.
9. The conduit trolley of claim 8 wherein a second pulley is mounted on the horizontal pulley block.
10. The pipe trolley of claim 9 wherein the second pulley is connected to the horizontal pulley stop by a second pin.
CN202123412846.0U 2021-12-31 2021-12-31 Pipeline trolley for pipeline penetration Active CN216692415U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202123412846.0U CN216692415U (en) 2021-12-31 2021-12-31 Pipeline trolley for pipeline penetration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202123412846.0U CN216692415U (en) 2021-12-31 2021-12-31 Pipeline trolley for pipeline penetration

Publications (1)

Publication Number Publication Date
CN216692415U true CN216692415U (en) 2022-06-07

Family

ID=81815510

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202123412846.0U Active CN216692415U (en) 2021-12-31 2021-12-31 Pipeline trolley for pipeline penetration

Country Status (1)

Country Link
CN (1) CN216692415U (en)

Similar Documents

Publication Publication Date Title
CN103410093A (en) Reverse dragging device for construction of dragging large-span steel braced girder
CN216692415U (en) Pipeline trolley for pipeline penetration
CN201145098Y (en) Movable device in buried sleeve
CN203451070U (en) Movable type gantry
CN109441457B (en) Construction method for synchronously transferring shield split starting pipeline
CN206429270U (en) A kind of shield machine station-crossing device
CN209100765U (en) Installation of heating pipeline facility in a kind of push pipe crossing project
CN216692416U (en) Sleeve structure for pipeline penetration
JP7306619B2 (en) Main pipe conveying device into sheath pipe
CN2905595Y (en) Pedrail type shuffling stillage truck device
CN210310336U (en) Power station rock anchor beam track pouring travelling bogie
CN214662455U (en) Two-way jacking pipe jacking construction system
CN206555568U (en) A kind of device of the fixation oil pipeline with cushioning effect
CN114857353B (en) Construction method for penetrating steel sleeve steel steam pipeline in jacking pipe
CN114132400A (en) Thrust wheel convenient to maintain and use
CN210948674U (en) Auxiliary system for shield air-assisted pushing forming underground excavation tunnel in pipe gallery construction
CN114294471A (en) Method for penetrating pipe in sleeve
CN210566707U (en) Fixing bracket capable of dragging pipeline
CN217756552U (en) Portal frame walking track applied to aeolian sand geological section
CN214491583U (en) Folding equipment for installing lining pipe
CN101997293A (en) Pipe jacking construction process
CN211223420U (en) Spiral water-cooling wall installation moves fortune device
CN202521054U (en) Sliding bracket special for pipeline assembly
CN206267871U (en) A kind of porous pre-buried channel flow
CN206159646U (en) Small cross section shield tunnel interior conduit dispensing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 200135 no.887 Gushan Road, Pudong New Area, Shanghai

Patentee after: Shanghai Energy Construction Engineering Design and Research Co.,Ltd.

Address before: 200135 no.887 Gushan Road, Pudong New Area, Shanghai

Patentee before: SHANGHAI GAS ENGINEERING DESIGN & RESEARCH Co.,Ltd.

CP01 Change in the name or title of a patent holder