CN216689249U - Hydraulic engineering construction bank protection - Google Patents

Hydraulic engineering construction bank protection Download PDF

Info

Publication number
CN216689249U
CN216689249U CN202220219374.2U CN202220219374U CN216689249U CN 216689249 U CN216689249 U CN 216689249U CN 202220219374 U CN202220219374 U CN 202220219374U CN 216689249 U CN216689249 U CN 216689249U
Authority
CN
China
Prior art keywords
stone
layer
revetment
hydraulic engineering
engineering construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220219374.2U
Other languages
Chinese (zh)
Inventor
陈光辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202220219374.2U priority Critical patent/CN216689249U/en
Application granted granted Critical
Publication of CN216689249U publication Critical patent/CN216689249U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Abstract

The utility model discloses a hydraulic engineering construction revetment, which comprises a revetment base layer, wherein the upper surface of the revetment base layer is fixedly connected with a first masonry plate, the upper surface of the first masonry plate is fixedly connected with a foundation stone filling layer, the right side surface of the revetment base layer is fixedly connected with a wave-proof guard plate, the right side surface of the foundation stone filling layer and the right side surface of the first masonry plate are fixedly connected with the left side surface of the wave-proof guard plate, and the upper surface of the foundation stone filling layer is fixedly connected with a sandstone layer. According to the utility model, through the matching of the limiting stone slabs and the planting through holes, workers can conveniently plant ecological vegetation, the protection of the revetment is improved, the vegetation is more resistant to rainwater erosion after being planted, the multilayer laying of the revetment can be reinforced through the matching of the stone building stop blocks and the first drainage holes, the strength of the revetment is enhanced, through the matching of the second stone building slabs and the reinforcing grooves, the workers can conveniently install corresponding equipment on the revetment, and the working efficiency of the workers is improved.

Description

Hydraulic engineering construction bank protection
Technical Field
The application relates to a bank protection technical field especially relates to a hydraulic engineering construction bank protection.
Background
The slope protection can prevent water and soil loss, reduce the pore water pressure of the slope body, intercept rainfall, weaken splash corrosion and control soil particle loss; can improve environmental function, can resume destroyed ecological environment, the noise reduction reduces light pollution, the guarantee driving safety, and present water conservancy river course is protected the river course both sides with regard to extensively adopting ecological bank protection.
Current hydraulic engineering bank protection, the anti-rain wash effect is relatively poor, makes the slope protection board receive to erode the landing downwards easily to lead to the fact destruction to the hydraulic engineering bank protection, receive the rain wash or permeate the back, cause great destruction to the vegetation easily, consequently for solving above problem, we provide a hydraulic engineering construction bank protection.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a hydraulic engineering construction revetment, which aims to solve the problems in the background technology.
The embodiment of the application adopts the following technical scheme:
the utility model provides a hydraulic engineering construction bank protection, includes the bank protection basic unit, the first stone slab of last fixed surface of bank protection basic unit, the last fixed surface of first stone slab is connected with the basement stone filling layer, the unrestrained backplate is prevented to the right flank fixedly connected with of bank protection basic unit, the right flank of basement stone filling layer and the right flank of first stone slab all with the left surface fixed connection who prevents unrestrained backplate, the last fixed surface of basement stone filling layer is connected with gravel layer, gravel layer's last fixed surface is connected with the coarse sand layer, the last fixed surface of coarse sand layer is connected with fine sand layer, the planting soil layer has been laid to the upper surface of fine sand layer.
Preferably, spacing slabstones arranged at equal intervals are fixedly embedded on the upper surface of the planting soil layer, and planting through holes arranged at equal intervals are formed in the upper surface of each spacing slabstone.
Preferably, the last fixed surface of bank protection basic unit is connected with the stone dog, the upper surface of stone dog and the bottom surface fixed connection who plants the soil layer, the first drainage hole that the equidistance was arranged is seted up to the left surface of stone dog.
Preferably, the upper surface of the slope protection base layer is fixedly connected with a second stone slab, and the upper surface of the second stone slab is fixedly connected with reinforcing grooves which are arranged equidistantly.
Preferably, the upper surface of the second masonry slab is provided with symmetrical first drainage grooves, and the left side surface of the second masonry slab is provided with second drainage holes which are arranged equidistantly.
Preferably, the upper surface fixedly connected with buffer board of planting the soil layer, the fixed slabstone of left side fixedly connected with of bank protection basic unit, the second water drainage tank has been seted up to the upper surface of fixed slabstone.
The embodiment of the application adopts at least one technical scheme which can achieve the following beneficial effects:
one of which, cooperation through spacing slabstone and planting through-hole, can make things convenient for the staff to plant ecological vegetation, improve the protection to this bank protection, make vegetation plant the back more resistant rainwash, cooperation through building stone dog and first drainage hole, can lay the multilayer of this bank protection and consolidate, strengthen the intensity of bank protection, build the slabstone through the second and consolidate the cooperation in groove, can make things convenient for the staff to the equipment that this bank protection installation corresponds, improve staff's work efficiency, current hydraulic engineering bank protection has been solved, anti-rainwash effect is relatively poor, make the fender board receive to erode downwards landing easily, thereby cause the problem of destruction to the hydraulic engineering bank protection.
Its two, through the cooperation of first water drainage tank and second wash port, can be quick arrange the rainwater to second water drainage tank, reduce the rainwater to the washing away of bank protection, through the cooperation of fixed slabstone and second water drainage tank, reach the effect of quick drainage, improve the protection to this bank protection, through the cooperation of wave guard plate and buffer board, can slow down the river course and play the impact of unrestrained time to the bank protection, improve the protection to bank protection and ecological vegetation.
Drawings
The accompanying drawings, which are included to provide a further understanding of the application and are incorporated in and constitute a part of this application, illustrate embodiment(s) of the application and together with the description serve to explain the application and not to limit the application. In the drawings:
FIG. 1 is a diagram: the utility model relates to a three-dimensional structure schematic diagram of a hydraulic engineering construction slope protection;
FIG. 2 is a diagram of: the utility model relates to a side view of a stone block;
FIG. 3 is a diagram of: the utility model plants the sectional view of the soil horizon elevation;
FIG. 4 is a diagram of: the utility model is shown in the enlarged schematic view of the structure at A in FIG. 3.
In the figure: 1. slope protection base course; 2. a first stone building plate; 3. a keystone fill layer; 4. a sandstone layer; 5. a coarse sand layer; 6. a fine sand layer; 7. planting a soil layer; 8. a limit stone plate; 9. planting through holes; 10. a wave guard plate; 11. a buffer plate; 12. a second stone building plate; 13. a first drainage tank; 14. a reinforcing groove; 15. fixing the stone slab; 16. a second water discharge tank; 17. building a stone block; 18. a first drain hole; 19. a second drain hole.
Detailed Description
In order to make the objects, technical solutions and advantages of the present application more apparent, the technical solutions of the present application will be described in detail and completely with reference to the following specific embodiments of the present application and the accompanying drawings. It should be apparent that the described embodiments are only a few embodiments of the present application, and not all embodiments. All other embodiments obtained by a person of ordinary skill in the art based on the embodiments in the present application without making any creative effort belong to the protection scope of the present application.
The technical solutions provided by the embodiments of the present application are described in detail below with reference to the accompanying drawings.
Referring to fig. 1-4, the present invention provides a technical solution for slope protection in hydraulic engineering construction:
a hydraulic engineering construction slope comprises a slope base layer 1, wherein the upper surface of the slope base layer 1 is fixedly connected with a first stone-laying plate 2, the upper surface of the first stone-laying plate 2 is fixedly connected with a foundation stone filling layer 3, the right side surface of the slope base layer 1 is fixedly connected with a wave-proof guard plate 10, the right side surface of the foundation stone filling layer 3 and the right side surface of the first stone-laying plate 2 are fixedly connected with the left side surface of the wave-proof guard plate 10, the upper surface of the foundation stone filling layer 3 is fixedly connected with a gravel layer 4, the upper surface of the gravel layer 4 is fixedly connected with a coarse sand layer 5, the upper surface of the coarse sand layer 5 is fixedly connected with a fine sand layer 6, and a planting soil layer 7 is laid on the upper surface of the fine sand layer 6; specifically, the impact on the revetment when the river is rippled can be relieved through the wave guard plate 10, and the protection on the revetment and ecological vegetation is improved;
in the present embodiment, as shown in fig. 1, fig. 2, fig. 3, and fig. 4, the limiting stone slabs 8 arranged at equal intervals are fixedly embedded on the upper surfaces of the planting soil layers 7, and planting through holes 9 arranged at equal intervals are formed on the upper surfaces of the limiting stone slabs 8;
the upper surface of the revetment base layer 1 is fixedly connected with a masonry stop block 17, the upper surface of the masonry stop block 17 is fixedly connected with the bottom surface of the planting soil layer 7, and the left side surface of the masonry stop block 17 is provided with first drainage holes 18 which are arranged at equal intervals;
the upper surface of the slope protection base layer 1 is fixedly connected with a second stone slab 12, and the upper surface of the second stone slab 12 is fixedly connected with reinforcing grooves 14 which are arranged at equal intervals; specifically, through the matching of the limiting stone slabs 8 and the planting through holes 9, the ecological vegetation can be conveniently planted by workers, the protection of the revetment is improved, the vegetation is more resistant to rainwater erosion after being planted, the multilayer laying of the revetment can be reinforced through the matching of the stone building blocks 17 and the first drainage holes 18, the strength of the revetment is enhanced, the corresponding equipment can be conveniently installed on the revetment by the workers through the matching of the second stone building blocks 12 and the reinforcing grooves 14, and the working efficiency of the workers is improved;
in this embodiment, as shown in fig. 1, 2 and 3, symmetrical first drainage grooves 13 are formed on the upper surface of the second stone slab 12, and second drainage holes 19 are formed on the left side surface of the second stone slab 12 and are arranged at equal intervals;
the upper surface of the planting soil layer 7 is fixedly connected with a buffer plate 11, the left side surface of the slope protection base layer 1 is fixedly connected with a fixed stone plate 15, and the upper surface of the fixed stone plate 15 is provided with a second drainage groove 16; specifically, through the cooperation of first wash port 13 and second wash port 19, can be quick arrange the rainwater to second water drainage tank 16, reduce the rainwater and to the erodeing of bank protection, through the cooperation of fixed slabstone 15 and second water drainage tank 16, reach the effect of quick drainage, improve the protection to this bank protection.
The working principle is as follows: when this hydraulic engineering construction bank protection uses, the user at first lays first stone masonry board 2 and second stone masonry board 12 in the top of slope protection basic unit 1, and lay stone masonry dog 17 between first stone masonry board 2 and second stone masonry board 12, then can fix stone masonry dog 17 through first stone masonry board 2 and second stone masonry board 12, lay stone masonry filling layer 3 in the top of first stone masonry board 2, then with grit layer 4, coarse sand layer 5 and fine sand layer 6 lay in proper order, lay when fine sand layer 6 and accomplish the back, again lay planting soil layer 7 in the top of fine sand layer 6, then plant the inside of soil layer 7 to spacing stone slab 8 equidistance embedding, then place unrestrained backplate 10 in the right flank of slope protection basic unit 1, then utilize and plant corresponding vegetation of 9 kinds of planting through-holes, accomplish the construction of laying of this slope protection structure.
It should also be noted that the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other like elements in a process, method, article, or apparatus that comprises the element.
The above description is only an example of the present application and is not intended to limit the present application. Various modifications and changes may occur to those skilled in the art to which the present application pertains. Any modification, equivalent replacement, improvement or the like made within the spirit and principle of the present application shall be included in the scope of the claims of the present application.

Claims (6)

1. The utility model provides a hydraulic engineering construction bank protection, includes slope protection basic unit (1), its characterized in that: last fixed surface of bank protection basic unit (1) is connected with first stone layer (2), the last fixed surface of first stone layer (2) is connected with stone filling layer (3), the right flank fixedly connected with of bank protection basic unit (1) prevents unrestrained backplate (10), the right flank of stone filling layer (3) and the right flank of first stone layer (2) all with the left surface fixed connection who prevents unrestrained backplate (10), the last fixed surface of stone filling layer (3) is connected with gravel layer (4), the last fixed surface of gravel layer (4) is connected with coarse sand layer (5), the last fixed surface of coarse sand layer (5) is connected with fine sand layer (6), the upper surface of fine sand layer (6) is laid and is equipped with planting soil layer (7).
2. The hydraulic engineering construction revetment of claim 1, wherein: the upper surface of planting soil layer (7) is fixed and is inlayed spacing slabstone (8) that have the equidistance and arrange, every planting through-hole (9) that the equidistance was arranged are all seted up to the upper surface of spacing slabstone (8).
3. The hydraulic engineering construction revetment of claim 1, wherein: last fixed surface of bank protection basic unit (1) is connected with stone dog (17), the upper surface of stone dog (17) and the bottom surface fixed connection who plants soil layer (7), first drainage hole (18) that the equidistance was arranged are seted up to the left surface of stone dog (17).
4. The hydraulic engineering construction revetment of claim 1, wherein: the upper surface fixed connection of bank protection basic unit (1) has second stone slab (12), the upper surface fixed connection of second stone slab (12) has reinforcing groove (14) that the equidistance was arranged.
5. The hydraulic engineering construction revetment of claim 4, wherein: symmetrical first water drainage grooves (13) are formed in the upper surface of the second stone-laying plate (12), and second water drainage holes (19) which are arranged equidistantly are formed in the left side surface of the second stone-laying plate (12).
6. The hydraulic engineering construction revetment of claim 1, wherein: plant last fixed surface of soil layer (7) and be connected with buffer board (11), the fixed slabstone (15) of left surface fixedly connected with of slope protection basic unit (1), second water drainage tank (16) have been seted up to the upper surface of fixed slabstone (15).
CN202220219374.2U 2022-01-27 2022-01-27 Hydraulic engineering construction bank protection Active CN216689249U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220219374.2U CN216689249U (en) 2022-01-27 2022-01-27 Hydraulic engineering construction bank protection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220219374.2U CN216689249U (en) 2022-01-27 2022-01-27 Hydraulic engineering construction bank protection

Publications (1)

Publication Number Publication Date
CN216689249U true CN216689249U (en) 2022-06-07

Family

ID=81827275

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220219374.2U Active CN216689249U (en) 2022-01-27 2022-01-27 Hydraulic engineering construction bank protection

Country Status (1)

Country Link
CN (1) CN216689249U (en)

Similar Documents

Publication Publication Date Title
CN106498953A (en) Cut slope composite supporting construction and its construction method
CN106759104A (en) Ecological slope protection structure and construction method
CN215329701U (en) Dykes and dams protector is used in hydraulic engineering construction
CN103334450B (en) Construction method of pile precast slab retaining wall with drainage ditch
CN216689249U (en) Hydraulic engineering construction bank protection
CN107761668B (en) Coastal shore reservoir land-building type revetment structure and construction method thereof
CN105040707A (en) Combined densely-arrayed pile deep foundation pit supporting and enclosure structure used as basement external wall
CN208733565U (en) A kind of wetland revetment slope protection construction
CN111851407A (en) Construction method of gabion retaining wall
CN102330398A (en) High-speed railway roadbed structure of unsaturated soil foundation in plain region
CN206545150U (en) A kind of semi-transparent road brick of anti-ponding
CN213709370U (en) Ocean fishing port wave-proof impact structure
CN211228371U (en) Prevention of seepage water structure on hydraulic engineering
CN212316830U (en) Hydraulic engineering is with ecological slope protection brick of concatenation formula
CN211547830U (en) Structure for preventing ground from being wetted
CN209620125U (en) A kind of underground structure blind drainage system
CN210134438U (en) Seasonal river soaks embankment side slope protective structure
CN111962632A (en) Rainwater sewer and construction method thereof
KR20150021098A (en) Waterside structures reinforced method
CN218322140U (en) Subgrade is consolidated to weak soil
CN206245321U (en) Cut slope composite supporting construction
CN2412925Y (en) Dike-closing and dam-building member for irrigation works
CN215977583U (en) High water level basement bottom plate lower floor drainage area rainwater reuse integration circulation system's structure
CN112176950B (en) Can improve slope formula revetment structure for hydraulic engineering of angle bead installation steadiness
CN219508293U (en) Roadbed structure in saline soil area

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant