Structure air conditioner hole embedded sleeve reinforcing apparatus
Technical Field
The utility model relates to the technical field of building construction, in particular to a device for reinforcing an embedded sleeve of a structural air-conditioning hole.
Background
Along with the rapid development of economic construction in China, the construction of constructional engineering is more and more standard, and the scale of the constructional engineering is larger and larger; the building quality requirements are higher and higher; the quality requirement for the residential installation reserved hole is more and more strict; the innovative, green and environment-friendly concept is in depth.
In carrying out the work progress, need fix the pre-buried sleeve of PVC, directly install off-the-shelf air conditioner pre-buried sleeve fixer on shear force wall horizontal distribution reinforcing bar when shear force wall construction ligature reinforcing bar, generally all fix through the cooperation of ferrule and bolt, it is not enough to its steadiness, and then make the fixed work of PVC pre-buried sleeve stable inadequately, cause the landing easily and become flexible, influence the normal clear of construction.
Therefore, the utility model provides a device for reinforcing an embedded sleeve of a structural air-conditioning hole, which is used for solving the problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a reinforcing device for an embedded sleeve of a structural air-conditioning hole, which aims to solve the problems in the background technology.
In order to achieve the purpose, the utility model provides the following technical scheme: a pre-buried sleeve reinforcing device for a structural air-conditioning hole comprises a shear wall, reinforcing steel bars, a PVC sleeve, a first pipe hoop main body, a second pipe hoop main body and a locking assembly, wherein the reinforcing steel bars are equidistantly arranged on the shear wall, an S-shaped hook is hung on the reinforcing steel bars, a groove is arranged on the S-shaped hook and clamped on the reinforcing steel bars, a threaded suspender is connected to the other end of the S-shaped hook in a threaded manner and locked through a fixing nut, the first pipe hoop main body is fixedly arranged at one end of the threaded suspender, the first pipe hoop main body and the second pipe hoop main body are matched to form a hoop, the PVC sleeve is fixed through the hoop, arc-shaped rubber pads are directly arranged on the inner side walls of the first pipe hoop main body and the second pipe hoop main body, first connecting plates are symmetrically arranged at two ends of the first pipe hoop main body in an integrally formed manner, and second connecting plates are symmetrically arranged at two ends of the second pipe hoop main body in an integrally formed manner, and the second connecting plate and the first connecting plate are both provided with threaded holes and are connected and locked through the arranged locking assemblies.
Preferably, locking Assembly includes connecting screw, ring groove, solid fixed ring, locking card strip, arc chute, connecting screw threaded connection is in second connecting plate and first connecting plate to connecting screw's lateral wall is provided with ring groove, gu fixed ring integrated into one piece sets up the one side at the second connecting plate to the equidistance activity is provided with the locking card strip in the fixed ring, the one end of locking card strip extends to in the arc chute, and the both sides integrated into one piece symmetry of locking card strip is provided with the lug, and the integrated into one piece symmetry is provided with reset spring on the lug, and reset spring other end is fixed to be set up in the fixed ring, arc chute equidistance sets up in the locking ring, and locking ring threaded connection sets up on solid fixed ring to the lateral wall equidistance of locking ring is fixed and is provided with the lug.
Preferably, the arc-shaped chute corresponds to the locking clamping strip in arrangement position and is provided with the same number of groups.
Preferably, the end part of the locking clamping strip movably arranged in the arc chute is arranged to be an arc surface.
Preferably, the width of the notch of the arc chute is larger than the thickness of the locking clamping strip.
Preferably, the locking clamping strip corresponds to the annular clamping groove in arrangement position, and the width of the notch of the annular clamping groove is equal to the thickness of the locking clamping strip.
Compared with the prior art, the utility model has the beneficial effects that:
according to the pre-buried sleeve reinforcing device for the structural air conditioner hole, when the PVC sleeve is reinforced, the used pipeline hoop can be locked, the stability of the processing work of the PVC sleeve is guaranteed, the device is simple to operate and convenient to use, convenience is brought to construction, labor force is saved, the labor intensity of workers is reduced, the labor environment of the workers is improved, the labor efficiency is improved, dust pollution and noise pollution caused when the air conditioner sleeve is shaved are avoided, the usage amount of templates is saved, and further the improvement of the construction economic benefit is facilitated.
Drawings
FIG. 1 is a schematic view of the structural connection of the present invention;
FIG. 2 is an enlarged view of a portion of the structure shown in FIG. 1 according to the present invention;
FIG. 3 is an enlarged view of a portion of the first pipe clamp body, the second pipe clamp body and the PVC pipe casing according to the present invention;
FIG. 4 is a bottom view of the reinforcement structure of the present invention shown in connection therewith;
FIG. 5 is an enlarged view of a portion of the S-shaped hook structure of FIG. 4 according to the present invention;
FIG. 6 is an enlarged view of the first and second pipe clamp bodies and the locking assembly of FIG. 4 according to the present invention;
FIG. 7 is a top view of the first and second connector plates in structural engagement with the locking assembly in accordance with the present invention;
FIG. 8 is a bottom view of the first and second connector plates in structural engagement with the locking assembly in accordance with the present invention;
FIG. 9 is a sectional view showing the connection of the inner structure of the fixing ring of the locking assembly of FIG. 8 according to the present invention.
In the figure: shear force wall 1, reinforcing bar 2, PVC sleeve pipe 3, S type couple 4, recess 5, screw thread jib 6, fixation nut 7, first ferrule main part 8, second ferrule main part 9, first connecting plate 10, second connecting plate 11, arc rubber pad 12, locking subassembly 13, connecting screw 1301, ring channel 1302, solid fixed ring 1303, locking ring 1304, locking card strip 1305, arc chute 1306.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below. The embodiments of the present invention, and all other embodiments obtained by a person of ordinary skill in the art without any inventive work, belong to the scope of protection of the present invention.
Referring to fig. 1 to 9, the present invention provides a technical solution: the utility model relates to a structure air-conditioning hole pre-buried sleeve reinforcing device, which comprises a shear wall 1, reinforcing steel bars 2, a PVC sleeve 3, a first pipe hoop main body 8, a second pipe hoop main body 9 and a locking assembly 13, wherein the reinforcing steel bars 2 are equidistantly arranged on the shear wall 1, an S-shaped hook 4 is hung on the reinforcing steel bars 2, a groove 5 is arranged on the S-shaped hook 4, the groove 5 is clamped on the reinforcing steel bars 2, the other end of the S-shaped hook 4 is provided with a threaded suspender 6 in a threaded connection manner, the threaded suspender 6 is locked through a fixing nut 7, one end of the threaded suspender 6 is fixedly provided with the first pipe hoop main body 8, the first pipe hoop main body 8 and the second pipe hoop main body 9 are matched to form a hoop, the PVC sleeve 3 is fixed through the hoop, the inner side walls of the first pipe hoop main body 8 and the second pipe hoop main body 9 are both directly provided with arc-shaped rubber pads 12, and the two ends of the first pipe hoop main body 8 are symmetrically provided with first connecting plates 10 through integral forming, the two ends of the second pipe hoop main body 9 are symmetrically provided with second connecting plates 11 in an integrally formed manner, the second connecting plates 11 and the first connecting plates 10 are provided with threaded holes, and the second connecting plates and the first connecting plates are connected and locked through the arranged locking assemblies 13.
Here, the locking assembly 13 includes a connection screw 1301, a ring-shaped slot 1302, a fixing ring 1303, a locking ring 1304, a locking strip 1305, an arc-shaped inclined groove 1306, the connection screw 1301 is screwed into the second connection plate 11 and the first connection plate 10, and the outer side wall of the connecting screw 1301 is provided with a ring-shaped clamping groove 1302, the fixing ring 1303 is integrally formed at one side of the second connecting plate 11, and the fixed ring 1303 is provided with a locking strip 1305 in an equidistant and movable manner, one end of the locking strip 1305 extends into the arc chute 1306, the locking clamping strip 1305 is symmetrically provided with lugs at two sides in an integrated forming way, the lugs are symmetrically provided with return springs in an integrated forming way, the other ends of the return springs are fixedly arranged in the fixed rings 1303, the arc-shaped inclined grooves 1306 are equidistantly arranged in the locking ring 1304, the locking ring 1304 is threadedly arranged on the fixing ring 1303, and the convex blocks are fixedly arranged on the outer side wall of the locking ring 1304 at equal intervals.
The arc chute 1306 corresponds to the locking clamping strip 1305 in arrangement position and is provided with the same number of groups; the end part of the locking clamping strip 1305 movably arranged in the arc chute 1306 is set to be an arc surface; the width of the notch of the arc chute 1306 is larger than the thickness of the locking clamping strip 1305; locking strip 1305 is located corresponding to ring slot 1302 and the width of the notch of ring slot 1302 is equal to the thickness of locking strip 1305.
The working principle is as follows: in the construction process, according to the construction and reinforcement requirements of pipelines, firstly, a proper S-shaped hook 4 is selected to hook the inner side of a steel bar 2 to ensure that a fixed part is installed in a protective layer, wherein the arc-shaped rubber pads 12 bonded on the inner side walls of the first pipe hoop main body 8 and the second pipe hoop main body 9 have a good auxiliary effect on fixing the PVC sleeve 3, and the PVC sleeve is prevented from sliding and falling off in the installation process; the first pipe hoop body 8 and the S-shaped hook 4 are connected by a threaded suspender 6 and locked by a fixed nut 7, the height difference between the inside and the outside of a wall of 1 percent of a shear wall with the thickness of 200mm meets the design requirement of 20mm, rainwater is prevented from flowing backwards, finally the first pipe hoop body 8 and the second pipe hoop body 9 are locked and fixed by a locking assembly 13, a connecting screw 1301 is threaded from a first connecting plate 10 and passes through the second connecting plate 11, finally reaches a fixing ring 1303, after the connecting screw 1301 is screwed, an annular clamping groove arranged on the connecting screw 1301 reaches the position of a locking clamping strip 1305 in a fixing ring 1303, then the locking ring 1304 is rotated and screwed, a locking clamping strip 1305 of an arc chute 1306 in the locking ring 1304 is squeezed, one end of the locking clamping strip 1305 is clamped into the annular clamping groove 1302, and the connection screw 1301 is completed, the locking of the first pipe clamp main body 8 and the second pipe clamp main body 9 can be completed, and then the reinforcing of the PVC sleeve 3 can be completed, so that the operation is simple and the use is convenient.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents.